{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-e0351ba98650d0c9cba2","physical_site_stable_key":"curated:cidc-zhongwei-green-intelligent-computing-base-xuanhe","name":"CIDC Zhongwei Green Intelligent Computing Industrial Base (Xuanhe)","country":"China","country_iso_a2":"CN","latitude":37.378340278,"longitude":105.498314722,"geometry":{"coordinates":[105.498314722,37.378340278],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_eia_geographic_dms_point_transcription"],"geometry_scope_classes":["official_eia_on_campus_substation_locator"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["EIA centre point of the base's own Phases 1-2 330 kV substation, which the report places inside the CIDC Xuanhe base site with base land to its north and west. Locates the base through on-campus support infrastructure, in the south-east part of the Phase 1 site; not a compute-centre footprint, parcel centroid, entrance or construction extent. The Phase 1 site extends up to about 500 m from the point and Phase 2 land lies beyond it."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84 reading is supported by agreement within about 25 m with the official Phase 1 board placed on the registered detailed plan (itself about 5 m RMS image-to-image against imagery of unstated accuracy), by the report's own station-centre and station-boundary monitoring coordinates and by the official gate labels; the 2025 imagery predates construction, so no direct imagery check was possible. Estimated within roughly 60 m of the substation centre, but because the special assessment also prints a conflicting centre about 190 m north-west (inside the same block), an error of up to about 200 m cannot be excluded. Decimal places are transcription precision, not accuracy.","geometry_evidence_ids":["080520c4-50e9-55e9-a4ed-273538b4005a"],"project_count":1,"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"project_stable_keys":["curated:cidc-zhongwei-green-intelligent-computing-base-xuanhe:phases-1-2"],"statuses":["under_construction"],"oldest_status_as_of":"2026-10-20","newest_status_as_of":"2026-10-20","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e0351ba98650d0c9cba2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e0351ba98650d0c9cba2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Ecology and Environment Bureau"]},"projects":[{"project_id":"a67dbc84-b8fc-537c-a3b0-b6515a2fede5","project_stable_key":"curated:cidc-zhongwei-green-intelligent-computing-base-xuanhe:phases-1-2","site_id":"vcc-site-e0351ba98650d0c9cba2","physical_site_stable_key":"curated:cidc-zhongwei-green-intelligent-computing-base-xuanhe","name":"CIDC Zhongwei Green Intelligent Computing Industrial Base (Xuanhe) — Phases 1–2 Development","country":"China","country_iso_a2":"CN","latitude":37.378340278,"longitude":105.498314722,"geometry":{"coordinates":[105.498314722,37.378340278],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"direct_geometry","geometry_method":"official_eia_geographic_dms_point_transcription","geometry_scope_class":"official_eia_on_campus_substation_locator","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"EIA centre point of the base's own Phases 1-2 330 kV substation, which the report places inside the CIDC Xuanhe base site with base land to its north and west. Locates the base through on-campus support infrastructure, in the south-east part of the Phase 1 site; not a compute-centre footprint, parcel centroid, entrance or construction extent. The Phase 1 site extends up to about 500 m from the point and Phase 2 land lies beyond it.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84 reading is supported by agreement within about 25 m with the official Phase 1 board placed on the registered detailed plan (itself about 5 m RMS image-to-image against imagery of unstated accuracy), by the report's own station-centre and station-boundary monitoring coordinates and by the official gate labels; the 2025 imagery predates construction, so no direct imagery check was possible. Estimated within roughly 60 m of the substation centre, but because the special assessment also prints a conflicting centre about 190 m north-west (inside the same block), an error of up to about 200 m cannot be excluded. Decimal places are transcription precision, not accuracy.","geometry_evidence_id":"080520c4-50e9-55e9-a4ed-273538b4005a","last_observed_physical_status":"under_construction","status_as_of":"2026-10-20","status_age_days_at_review":7,"status_method":"authoritative_physical_status_update","status_evidence_id":"a0210558-9c44-54f7-ac43-7c34d5c43188","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"080520c4-50e9-55e9-a4ed-273538b4005a","party":"CIDC (Zhongwei) Technology Co., Ltd. (中金数据（中卫）科技有限公司)","relationship_scope":"current","role":"owner"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"CIDC (Zhongwei) Technology Co., Ltd. (中金数据（中卫）科技有限公司)","operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.spt.gov.cn/xwzx/bmgz/202610/t20261020_5376411.html","geometry_source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/ssthjj/fdzdgknr_49584/jsxmhjyxpj_49608/202603/P020260312539399643273.pdf","project_details":[],"evidence_ids":["080520c4-50e9-55e9-a4ed-273538b4005a","146d0c06-6b80-5ebc-aa88-f6175ef009c1","2b6d3e5b-61e2-5569-aacc-5379234889aa","38c21ae0-7f59-51e2-a52a-2ccb4b31f218","3b4a78aa-24a7-51ab-90b1-b1c80fa5815d","4b056738-2043-5316-b87b-f205c6f085c8","718f7253-b428-54c0-aab9-2cf155509c71","a0210558-9c44-54f7-ac43-7c34d5c43188","a9da85d7-c0ef-5997-9cb3-820c1f645752","bea13a4f-5c25-58dd-902b-32dbbfc103a3","e9594487-8871-578c-8f6a-ea4ab7477be5","fcfb5115-244c-50db-8c10-98168c4e3e94"],"status_source":{"evidence_id":"a0210558-9c44-54f7-ac43-7c34d5c43188","title":"Shapotou District department news: Xuanhe market-supervision office special food-safety campaign at canteens of projects under construction (20 October 2026)","publisher":"Shapotou District Branch, Zhongwei Market Supervision Administration","kind":"government_record","published_at":"2026-10-20","source_url":"https://www.spt.gov.cn/xwzx/bmgz/202610/t20261020_5376411.html","license":"all-rights-reserved","attribution":"中卫市市场监督管理局沙坡头区分局 (Shapotou District Branch, Zhongwei Market Supervision Administration), via the Shapotou District People's Government website"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e0351ba98650d0c9cba2/#project-a67dbc84-b8fc-537c-a3b0-b6515a2fede5","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/a67dbc84-b8fc-537c-a3b0-b6515a2fede5.json","geometry_source":{"evidence_id":"080520c4-50e9-55e9-a4ed-273538b4005a","title":"Environmental impact report form: CIDC Zhongwei Green Intelligent Computing Industrial Base Phases 1-2 330 kV substation (Zhongwei EEB acceptance notice, 11 March 2026)","publisher":"Zhongwei Ecology and Environment Bureau","kind":"government_record","published_at":"2026-03-12","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/ssthjj/fdzdgknr_49584/jsxmhjyxpj_49608/202603/P020260312539399643273.pdf","license":"all-rights-reserved","attribution":"Zhongwei Ecology and Environment Bureau"}}],"evidence":[{"evidence_id":"080520c4-50e9-55e9-a4ed-273538b4005a","roles":["geometry","role:owner"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Environmental impact report form: CIDC Zhongwei Green Intelligent Computing Industrial Base Phases 1-2 330 kV substation (Zhongwei EEB acceptance notice, 11 March 2026)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/ssthjj/fdzdgknr_49584/jsxmhjyxpj_49608/202603/P020260312539399643273.pdf","publisher":"Zhongwei Ecology and Environment Bureau","source_family":"Zhongwei Ecology and Environment Bureau","license":"all-rights-reserved","attribution":"Zhongwei Ecology and Environment Bureau","published_at":"2026-03-12","retrieved_at":"2026-10-23T00:17:23.163Z","content_hash":"6531413d6494a012d45072445941b613b238516b8f4ba795b909ea2c42384afd","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/080520c4-50e9-55e9-a4ed-273538b4005a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/080520c4-50e9-55e9-a4ed-273538b4005a.json","archive_url":"https://web.archive.org/web/20261023001723/https://www.nxzw.gov.cn/zwgk/bmxxgkml/ssthjj/fdzdgknr_49584/jsxmhjyxpj_49608/202603/P020260312539399643273.pdf"},{"evidence_id":"fcfb5115-244c-50db-8c10-98168c4e3e94","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Plan board: CIDC Zhongwei Green Intelligent Computing Industrial Base Phase 1 planning and design scheme, pre-approval publicity (29 October-6 November 2025)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/ghgs/202511/W020251106382439527101.jpg","publisher":"Zhongwei Natural Resources Bureau","source_family":"Zhongwei Natural Resources Bureau","license":"all-rights-reserved","attribution":"Zhongwei Natural Resources Bureau","published_at":"2025-11-06","retrieved_at":"2026-10-22T23:53:05.802Z","content_hash":"bafb8d4ff29e98e704540487715990433ac307b8b8811f4863a1a6258bff2845","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fcfb5115-244c-50db-8c10-98168c4e3e94.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fcfb5115-244c-50db-8c10-98168c4e3e94.json","archive_url":"https://web.archive.org/web/20261022235305/https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/ghgs/202511/W020251106382439527101.jpg"},{"evidence_id":"a9da85d7-c0ef-5997-9cb3-820c1f645752","roles":["context:identity"],"project_ids":["1fc276fd-e412-5266-9c77-d4ca01259fbd","a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Plan board: Zhongwei Data Center Cluster Xuanhe Area infrastructure construction project planning and design scheme, pre-approval publicity (19 October 2026)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/ghgs/202610/W020261019558886621435.jpg","publisher":"Zhongwei Natural Resources Bureau","source_family":"Zhongwei Natural Resources Bureau","license":"all-rights-reserved","attribution":"Zhongwei Natural Resources Bureau","published_at":"2026-10-19","retrieved_at":"2026-10-22T16:15:08.000Z","content_hash":"423f207bf1478fbb49b6bd29badc0e3c1096b0dd417fbf5f1161fd90068784ce","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-89983863af9dd704fc99","vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a9da85d7-c0ef-5997-9cb3-820c1f645752.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a9da85d7-c0ef-5997-9cb3-820c1f645752.json","archive_url":"https://web.archive.org/web/20261022161508/https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/ghgs/202610/W020261019558886621435.jpg"},{"evidence_id":"a0210558-9c44-54f7-ac43-7c34d5c43188","roles":["physical_status"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5","e5f1b401-d5fd-5bd9-a30e-20e2ddd88b3b"],"kind":"government_record","title":"Shapotou District department news: Xuanhe market-supervision office special food-safety campaign at canteens of projects under construction (20 October 2026)","source_url":"https://www.spt.gov.cn/xwzx/bmgz/202610/t20261020_5376411.html","publisher":"Shapotou District Branch, Zhongwei Market Supervision Administration","source_family":"Shapotou District People's Government","license":"all-rights-reserved","attribution":"中卫市市场监督管理局沙坡头区分局 (Shapotou District Branch, Zhongwei Market Supervision Administration), via the Shapotou District People's Government website","published_at":"2026-10-20","retrieved_at":"2026-10-22T23:46:16.081Z","content_hash":"c533bdc34da6e598592d01d135689f0c4264a23bdbef0edd83d1e1162b7de785","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-59f5181a670956fe610c","vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a0210558-9c44-54f7-ac43-7c34d5c43188.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a0210558-9c44-54f7-ac43-7c34d5c43188.json","archive_url":"https://web.archive.org/web/20261022234616/https://www.spt.gov.cn/xwzx/bmgz/202610/t20261020_5376411.html"},{"evidence_id":"4b056738-2043-5316-b87b-f205c6f085c8","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5","e5f1b401-d5fd-5bd9-a30e-20e2ddd88b3b"],"kind":"news","title":"Shapotou District government news: Xuanhe Town supports the high-quality development of the digital information industry (24 July 2026)","source_url":"https://www.spt.gov.cn/xwzx/sptyw/202607/t20260724_5297212.html","publisher":"Zhongwei News Media Centre (Shapotou District People's Government website)","source_family":"Shapotou District People's Government","license":"all-rights-reserved","attribution":"中卫市新闻传媒中心 (Zhongwei News Media Centre), via the Shapotou District People's Government website","published_at":"2026-07-24","retrieved_at":"2026-10-22T23:49:15.658Z","content_hash":"27464206a4ffeab738f36da60ba038c708bfea3e36a60a86beb42bc54bfbde0f","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-59f5181a670956fe610c","vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4b056738-2043-5316-b87b-f205c6f085c8.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4b056738-2043-5316-b87b-f205c6f085c8.json","archive_url":"https://web.archive.org/web/20261022234915/https://www.spt.gov.cn/xwzx/sptyw/202607/t20260724_5297212.html"},{"evidence_id":"718f7253-b428-54c0-aab9-2cf155509c71","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Zhongwei Ecology and Environment Bureau: notice of EIA documents accepted on 11 March 2026 (CIDC Zhongwei Green Intelligent Computing Industrial Base Phases 1-2 330 kV substation)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/ssthjj/fdzdgknr_49584/jsxmhjyxpj_49608/202603/t20260312_5191026.html","publisher":"Zhongwei Ecology and Environment Bureau","source_family":"Zhongwei Ecology and Environment Bureau","license":"all-rights-reserved","attribution":"Zhongwei Ecology and Environment Bureau","published_at":"2026-03-11","retrieved_at":"2026-10-23T00:21:19.499Z","content_hash":"b9dbfc14a9f1442b96dc6f2804bd1c6ff1d54ec97eb58fe002cb3b42000f8385","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/718f7253-b428-54c0-aab9-2cf155509c71.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/718f7253-b428-54c0-aab9-2cf155509c71.json","archive_url":"https://web.archive.org/web/20261023002119/https://www.nxzw.gov.cn/zwgk/bmxxgkml/ssthjj/fdzdgknr_49584/jsxmhjyxpj_49608/202603/t20260312_5191026.html"},{"evidence_id":"3b4a78aa-24a7-51ab-90b1-b1c80fa5815d","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, CIDC Zhongwei Green Intelligent Computing Industrial Base Phase 1 (330 kV outdoor substation buildings)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086334.html","publisher":"Zhongwei Natural Resources Bureau","source_family":"Zhongwei Natural Resources Bureau","license":"all-rights-reserved","attribution":"Zhongwei Natural Resources Bureau","published_at":"2025-11-11","retrieved_at":"2026-10-22T23:51:29.959Z","content_hash":"fb267e668967f05af4960de0d665675603ddc88ef35b2fe4702856da14ff8845","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b4a78aa-24a7-51ab-90b1-b1c80fa5815d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b4a78aa-24a7-51ab-90b1-b1c80fa5815d.json","archive_url":"https://web.archive.org/web/20261022235129/https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086334.html"},{"evidence_id":"38c21ae0-7f59-51e2-a52a-2ccb4b31f218","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, CIDC Zhongwei Green Intelligent Computing Industrial Base Phase 1 (D1 compute centre, D1-1 power centre and DF waste store)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086315.html","publisher":"Zhongwei Natural Resources Bureau","source_family":"Zhongwei Natural Resources Bureau","license":"all-rights-reserved","attribution":"Zhongwei Natural Resources Bureau","published_at":"2025-11-11","retrieved_at":"2026-10-22T23:51:27.558Z","content_hash":"9b10a9fb0227e24baba4e019ba9c1f8bf5a515ff8716de44c862f14214a7d2f3","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/38c21ae0-7f59-51e2-a52a-2ccb4b31f218.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/38c21ae0-7f59-51e2-a52a-2ccb4b31f218.json","archive_url":"https://web.archive.org/web/20261022235127/https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086315.html"},{"evidence_id":"bea13a4f-5c25-58dd-902b-32dbbfc103a3","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, CIDC Zhongwei Green Intelligent Computing Industrial Base Phase 1 (D2 compute centre, D2-1 power centre and DM1 gatehouse)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086320.html","publisher":"Zhongwei Natural Resources Bureau","source_family":"Zhongwei Natural Resources Bureau","license":"all-rights-reserved","attribution":"Zhongwei Natural Resources Bureau","published_at":"2025-11-11","retrieved_at":"2026-10-22T23:51:28.375Z","content_hash":"2de6cf146118e51af9ec24fb4580b237bc701ba6c15d646fcc028ad1e57d7fbd","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bea13a4f-5c25-58dd-902b-32dbbfc103a3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bea13a4f-5c25-58dd-902b-32dbbfc103a3.json","archive_url":"https://web.archive.org/web/20261022235128/https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086320.html"},{"evidence_id":"2b6d3e5b-61e2-5569-aacc-5379234889aa","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, CIDC Zhongwei Green Intelligent Computing Industrial Base Phase 1 (D3 compute centre, D3-1 power centre, DM2 gatehouse and DX fire pump room)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086323.html","publisher":"Zhongwei Natural Resources Bureau","source_family":"Zhongwei Natural Resources Bureau","license":"all-rights-reserved","attribution":"Zhongwei Natural Resources Bureau","published_at":"2025-11-11","retrieved_at":"2026-10-22T23:51:29.124Z","content_hash":"d697d325e5bf52c2f4f26b182ac31820aca5a9f65cc6752f38505fa92cbfa213","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2b6d3e5b-61e2-5569-aacc-5379234889aa.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2b6d3e5b-61e2-5569-aacc-5379234889aa.json","archive_url":"https://web.archive.org/web/20261022235129/https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/zsydys_zrzyj/202511/t20251118_5086323.html"},{"evidence_id":"146d0c06-6b80-5ebc-aa88-f6175ef009c1","roles":["context:identity"],"project_ids":["a67dbc84-b8fc-537c-a3b0-b6515a2fede5"],"kind":"government_record","title":"Zhongwei Natural Resources Bureau pre-approval notice: CIDC Zhongwei Green Intelligent Computing Industrial Base Phase 1 planning and design scheme","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/ghgs/202511/t20251106_5076362.html","publisher":"Zhongwei Natural Resources Bureau","source_family":"Zhongwei Natural Resources Bureau","license":"all-rights-reserved","attribution":"Zhongwei Natural Resources Bureau","published_at":"2025-10-29","retrieved_at":"2026-10-22T23:51:30.730Z","content_hash":"7e3ca81a6a02ee6d1bea26eaf8a9147a81194809e5d9d64649317e17bef5a763","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e0351ba98650d0c9cba2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/146d0c06-6b80-5ebc-aa88-f6175ef009c1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/146d0c06-6b80-5ebc-aa88-f6175ef009c1.json","archive_url":"https://web.archive.org/web/20261022235130/https://www.nxzw.gov.cn/zwgk/bmxxgkml/szrzyj/fdzdgknr_49539/ghgs/202511/t20251106_5076362.html"},{"evidence_id":"e9594487-8871-578c-8f6a-ea4ab7477be5","roles":["context:identity","geometry"],"project_ids":["1fc276fd-e412-5266-9c77-d4ca01259fbd","5162c73e-0ea8-58dc-a0b6-738512de7b1e","a67dbc84-b8fc-537c-a3b0-b6515a2fede5","e5f1b401-d5fd-5bd9-a30e-20e2ddd88b3b","ee5309f9-3359-5fa4-a3b8-add3262fe778"],"kind":"government_record","title":"中卫数据中心集群宣和片区详细规划（公布稿）— Zhongwei Data Center Cluster Xuanhe Area Detailed Plan (published version)","source_url":"https://www.nxzw.gov.cn/zwgk/bmxxgkml/syjshdsjfzj/fdzdgknr_50309/bmwj_50338/202608/P020260820589860877344.pdf","publisher":"Zhongwei Data Bureau","source_family":"Zhongwei Data Bureau","license":"all-rights-reserved","attribution":"Zhongwei Data Bureau (中卫市数据局)","published_at":"2026-08-20","retrieved_at":"2026-10-22T16:19:23.000Z","content_hash":"7d0c7a664373bf609305b1862393ea7a7e11c3640949cb87cdddd00e04134991","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-59f5181a670956fe610c","vcc-site-89983863af9dd704fc99","vcc-site-e0351ba98650d0c9cba2","vcc-site-f6ace3da50c7c2c3c50e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e9594487-8871-578c-8f6a-ea4ab7477be5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e9594487-8871-578c-8f6a-ea4ab7477be5.json","archive_url":"https://web.archive.org/web/20261022161923/https://www.nxzw.gov.cn/zwgk/bmxxgkml/syjshdsjfzj/fdzdgknr_50309/bmwj_50338/202608/P020260820589860877344.pdf"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e0351ba98650d0c9cba2/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e0351ba98650d0c9cba2.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-e0351ba98650d0c9cba2","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
