{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-e5eab403e494a3dd5ba0","physical_site_stable_key":"curated:cidc-ulanqab-zero-carbon-computing-base","name":"CIDC Ulanqab Zero-Carbon Computing Base","country":"China","country_iso_a2":"CN","latitude":40.99166694,"longitude":113.31362861,"geometry":{"coordinates":[113.31362861,40.99166694],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["coordinate_transform"],"geometry_methods":["Government_EIA_substation_centre_DMS_to_decimal_with_primary_campus_map_and_Esri_WGS84_property_pattern_crosscheck"],"geometry_scope_classes":["official_campus_substation_reference"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Campus marker at the centre of the existing 220kV user substation inside the northwest part of CIDC’s Ulanqab zero-carbon computing base. This marks the named parent campus, not an individual data hall, entrance or campus centroid."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The EIA publishes milliarcsecond coordinate digits but no survey accuracy or explicit datum for this centre. Coordinates are converted from DMS without a datum shift; WGS84 is a mapping interpretation corroborated by the same property pattern in georeferenced imagery, not a datum declaration in the EIA. Campus-level scope and unknown accuracy are retained.","geometry_evidence_ids":["dae46995-880f-54b7-aff6-b9f3045a4292"],"project_count":1,"project_ids":["83a215f6-40e0-55c1-bf26-176e550c71da"],"project_stable_keys":["curated:cidc-ulanqab-zero-carbon-computing-base:existing-operations"],"statuses":["operational"],"oldest_status_as_of":"2026-10-17","newest_status_as_of":"2026-10-17","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5eab403e494a3dd5ba0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e5eab403e494a3dd5ba0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; assessment prepared for 中金数据（乌兰察布）有限公司"]},"projects":[{"project_id":"83a215f6-40e0-55c1-bf26-176e550c71da","project_stable_key":"curated:cidc-ulanqab-zero-carbon-computing-base:existing-operations","site_id":"vcc-site-e5eab403e494a3dd5ba0","physical_site_stable_key":"curated:cidc-ulanqab-zero-carbon-computing-base","name":"CIDC Ulanqab Zero-Carbon Computing Base — existing commercial data-centre operations","country":"China","country_iso_a2":"CN","latitude":40.99166694,"longitude":113.31362861,"geometry":{"coordinates":[113.31362861,40.99166694],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"coordinate_transform","geometry_method":"Government_EIA_substation_centre_DMS_to_decimal_with_primary_campus_map_and_Esri_WGS84_property_pattern_crosscheck","geometry_scope_class":"official_campus_substation_reference","geometry_authority_class":"compiled_reference","geometry_use_scope":"campus_locator","geometry_precision_scope":"Campus marker at the centre of the existing 220kV user substation inside the northwest part of CIDC’s Ulanqab zero-carbon computing base. This marks the named parent campus, not an individual data hall, entrance or campus centroid.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The EIA publishes milliarcsecond coordinate digits but no survey accuracy or explicit datum for this centre. Coordinates are converted from DMS without a datum shift; WGS84 is a mapping interpretation corroborated by the same property pattern in georeferenced imagery, not a datum declaration in the EIA. Campus-level scope and unknown accuracy are retained.","geometry_evidence_id":"dae46995-880f-54b7-aff6-b9f3045a4292","last_observed_physical_status":"operational","status_as_of":"2026-10-17","status_age_days_at_review":10,"status_method":"attributed_firsthand_physical_status_report","status_evidence_id":"aa51e5e7-6959-596c-b154-a108e8f90fc6","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"aa51e5e7-6959-596c-b154-a108e8f90fc6","party":"CIDC (中金数据)","relationship_scope":"current","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":"CIDC (中金数据)","users":null,"tenants":null,"customers":null,"status_source_url":"https://www.peopleapp.com/column/30053361372-500007744784","geometry_source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202608/P020260828552070386582.docx","project_details":[],"evidence_ids":["aa51e5e7-6959-596c-b154-a108e8f90fc6","dae46995-880f-54b7-aff6-b9f3045a4292"],"status_source":{"evidence_id":"aa51e5e7-6959-596c-b154-a108e8f90fc6","title":"行见内蒙古 | 乌兰察布：殷殷嘱托化为行动 绿电草原算力奔涌","publisher":"People’s Daily client, Inner Mongolia channel","kind":"news","published_at":"2026-10-17","source_url":"https://www.peopleapp.com/column/30053361372-500007744784","license":"all-rights-reserved","attribution":"People’s Daily; text by Feng Huaduo (冯华朵)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5eab403e494a3dd5ba0/#project-83a215f6-40e0-55c1-bf26-176e550c71da","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/83a215f6-40e0-55c1-bf26-176e550c71da.json","geometry_source":{"evidence_id":"dae46995-880f-54b7-aff6-b9f3045a4292","title":"Inner Mongolia EED: CIDC Ulanqab zero-carbon computing campus 220kV substation expansion EIA","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","kind":"government_environmental_document","published_at":"2026-08-28","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202608/P020260828552070386582.docx","license":"public-record-source-terms","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; assessment prepared for 中金数据（乌兰察布）有限公司"}}],"evidence":[{"evidence_id":"dae46995-880f-54b7-aff6-b9f3045a4292","roles":["geometry"],"project_ids":["83a215f6-40e0-55c1-bf26-176e550c71da"],"kind":"government_environmental_document","title":"Inner Mongolia EED: CIDC Ulanqab zero-carbon computing campus 220kV substation expansion EIA","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202608/P020260828552070386582.docx","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia EED environmental assessment records","license":"public-record-source-terms","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; assessment prepared for 中金数据（乌兰察布）有限公司","published_at":"2026-08-28","retrieved_at":"2026-10-25T13:19:48.637166+00:00","content_hash":"5d3cd79fa61fc4beb7545d101ed90977ccb4220d3de391fdd6afbc247f331365","publication_date_precision":"day","content_hash_scope":"sha256_original_document_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e5eab403e494a3dd5ba0"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/dae46995-880f-54b7-aff6-b9f3045a4292.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/dae46995-880f-54b7-aff6-b9f3045a4292.json","archive_url":"https://web.archive.org/web/20261025131948/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202608/P020260828552070386582.docx"},{"evidence_id":"aa51e5e7-6959-596c-b154-a108e8f90fc6","roles":["physical_status","role:operator"],"project_ids":["83a215f6-40e0-55c1-bf26-176e550c71da"],"kind":"news","title":"行见内蒙古 | 乌兰察布：殷殷嘱托化为行动 绿电草原算力奔涌","source_url":"https://www.peopleapp.com/column/30053361372-500007744784","publisher":"People’s Daily client, Inner Mongolia channel","source_family":"People’s Daily original reporting","license":"all-rights-reserved","attribution":"People’s Daily; text by Feng Huaduo (冯华朵)","published_at":"2026-10-17","retrieved_at":"2026-10-25T13:04:24.832384+00:00","content_hash":"960886c1ce71045dffd2859f84de8043fb303afcaa44e370badc5fe979a9e6b3","publication_date_precision":"day","content_hash_scope":"sha256_exact_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-e5eab403e494a3dd5ba0"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aa51e5e7-6959-596c-b154-a108e8f90fc6.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aa51e5e7-6959-596c-b154-a108e8f90fc6.json","archive_url":"https://web.archive.org/web/20261025130424/https://www.peopleapp.com/column/30053361372-500007744784"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5eab403e494a3dd5ba0/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e5eab403e494a3dd5ba0.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-e5eab403e494a3dd5ba0","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
