{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-ee33430200d597833ebe","physical_site_stable_key":"curated:qts-cambois-data-centre-campus","name":"QTS Cambois Data Centre Campus","country":"United Kingdom","country_iso_a2":"GB","latitude":55.15092301981584,"longitude":-1.533627047468273,"geometry":{"coordinates":[-1.533627047468273,55.15092301981584],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["official_coordinate_transform"],"geometry_methods":["applicant_report_osgb36_national_grid_reference_to_wgs84"],"geometry_scope_classes":["government_hosted_applicant_report_wider_campus_reference_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Government-hosted applicant report's approximate centre for the wider Cambois Campus, transformed once from NGR NZ 29820 84164. It is not the Phase A point, east- or south-side earthworks location, parcel, campus, building, project, or current-work boundary."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The report explicitly calls the NGR an approximate centre and supplies no numeric horizontal-accuracy statement; transformed digits do not add accuracy.","geometry_evidence_ids":["a4ff7674-bfdc-5a88-92cd-673e02250b1a"],"project_count":3,"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e","564a45b7-445e-5fab-bb6a-37fffe529883","5b11c034-5a3b-5e5d-bc6a-b7122e21fbec"],"project_stable_keys":["curated:qts-cambois-data-centre-campus:2026-earthworks","curated:qts-cambois-data-centre-campus:phase-2-data-centre-buildings","imported:semiconductor-atlas:qts-cambois-blyth"],"statuses":["announced","civil_works","under_construction"],"oldest_status_as_of":"2026-07-01","newest_status_as_of":"2026-09-25","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"gb","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee33430200d597833ebe/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ee33430200d597833ebe.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["QTS Data Centres; Cundall; Environment Agency consultation portal"]},"projects":[{"project_id":"5b11c034-5a3b-5e5d-bc6a-b7122e21fbec","project_stable_key":"curated:qts-cambois-data-centre-campus:2026-earthworks","site_id":"vcc-site-ee33430200d597833ebe","physical_site_stable_key":"curated:qts-cambois-data-centre-campus","name":"QTS Cambois 2026 Earthworks","country":"United Kingdom","country_iso_a2":"GB","latitude":55.15092301981584,"longitude":-1.533627047468273,"geometry":{"coordinates":[-1.533627047468273,55.15092301981584],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"official_coordinate_transform","geometry_method":"applicant_report_osgb36_national_grid_reference_to_wgs84","geometry_scope_class":"government_hosted_applicant_report_wider_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Government-hosted applicant report's approximate centre for the wider Cambois Campus, transformed once from NGR NZ 29820 84164. It is not the Phase A point, east- or south-side earthworks location, parcel, campus, building, project, or current-work boundary.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The report explicitly calls the NGR an approximate centre and supplies no numeric horizontal-accuracy statement; transformed digits do not add accuracy.","geometry_evidence_id":"a4ff7674-bfdc-5a88-92cd-673e02250b1a","last_observed_physical_status":"civil_works","status_as_of":"2026-07-01","status_age_days_at_review":118,"status_method":"authoritative_physical_status_update","status_evidence_id":"b3d96fed-4eb9-53a1-a67b-848bbe9c4c4d","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by the v0.13 geometry batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed project power observation selected by this batch; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://q.com/data-centers/cambois/","geometry_source_url":"https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf","project_details":[],"evidence_ids":["a4ff7674-bfdc-5a88-92cd-673e02250b1a","b3d96fed-4eb9-53a1-a67b-848bbe9c4c4d"],"status_source":{"evidence_id":"b3d96fed-4eb9-53a1-a67b-848bbe9c4c4d","title":"Cambois","publisher":"QTS Data Centers","kind":"company_disclosure","published_at":"2024-11-04T16:41:55+00:00","source_url":"https://q.com/data-centers/cambois/","license":"all-rights-reserved","attribution":"QTS Data Centers"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee33430200d597833ebe/#project-5b11c034-5a3b-5e5d-bc6a-b7122e21fbec","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/5b11c034-5a3b-5e5d-bc6a-b7122e21fbec.json","geometry_source":{"evidence_id":"a4ff7674-bfdc-5a88-92cd-673e02250b1a","title":"QTS Project Wind Environmental Setting and Site Design Report","publisher":"Environment Agency consultation portal","kind":"government_record","published_at":"2025-11-05","source_url":"https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf","license":"all-rights-reserved-fact-extraction-only","attribution":"QTS Data Centres; Cundall; Environment Agency consultation portal"}},{"project_id":"2bd78b04-9314-5aa8-ac32-ef30e111bc2e","project_stable_key":"imported:semiconductor-atlas:qts-cambois-blyth","site_id":"vcc-site-ee33430200d597833ebe","physical_site_stable_key":"curated:qts-cambois-data-centre-campus","name":"QTS Cambois Data Centre Campus","country":"United Kingdom","country_iso_a2":"GB","latitude":55.1453,"longitude":-1.5309,"geometry":{"coordinates":[-1.5309,55.1453],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Sources place the campus on the former Blyth Power Station site at Cambois. Nominatim did not return the power station site, so the Cambois village centroid is used.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","last_observed_physical_status":"under_construction","status_as_of":"2026-08-06","status_age_days_at_review":82,"status_method":"imported_documented_status","status_evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"bf9d3cb2-85aa-5ed1-b796-452102f90a21","notes":null,"party":"QTS","relationship_scope":"unknown","role":"developer","source_record_id":"qts-cambois-blyth"},{"evidence_id":"be702df2-d081-5b90-b9cd-f7293c1d6427","notes":null,"party":"QTS","relationship_scope":"unknown","role":"developer","source_record_id":"qts-cambois-blyth"},{"evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","notes":null,"party":"QTS","relationship_scope":"unknown","role":"developer","source_record_id":"qts-cambois-blyth"},{"evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","notes":null,"party":"QTS","relationship_scope":"unknown","role":"operator","source_record_id":"qts-cambois-blyth"},{"evidence_id":"bf9d3cb2-85aa-5ed1-b796-452102f90a21","notes":"Owner of QTS; the UK government credited Blackstone funds with a projected GBP 10bn investment in the campus.","party":"Blackstone","relationship_scope":"unknown","role":"investor","source_record_id":"qts-cambois-blyth"},{"evidence_id":"16c9db8a-3405-5535-8a99-032f92fc323e","notes":"Owner of QTS; the UK government credited Blackstone funds with a projected GBP 10bn investment in the campus.","party":"Blackstone","relationship_scope":"unknown","role":"investor","source_record_id":"qts-cambois-blyth"},{"evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","notes":"Blackstone-owned entity described as financing the project.","party":"Renaissance Land","relationship_scope":"unknown","role":"investor","source_record_id":"qts-cambois-blyth"},{"evidence_id":"aacb5e2e-7b84-5bb4-82a5-6899ad1f0080","notes":"Ground improvement and piling subcontractor for data centres one and two.","party":"Keller","relationship_scope":"unknown","role":"builder","source_record_id":"qts-cambois-blyth"},{"evidence_id":"bf9d3cb2-85aa-5ed1-b796-452102f90a21","notes":"Planning authority.","party":"Northumberland County Council","relationship_scope":"unknown","role":"government","source_record_id":"qts-cambois-blyth"},{"evidence_id":"4ab43094-1e98-5c84-b6f1-65d54de480d3","notes":"Planning authority.","party":"Northumberland County Council","relationship_scope":"unknown","role":"government","source_record_id":"qts-cambois-blyth"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":"QTS","users":null,"tenants":null,"customers":null,"status_source_url":"https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/","geometry_source_url":"https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["administrative_locator_not_project_geometry","campus_and_phase_scopes_must_remain_separate"],"rationale":"Same QTS former Blyth Power Station campus. Source covers ten-building campus with initial two-building works; existing record selects 2026 earthworks. TBC Partners Factory Road proposal is explicitly nearby and separate.","source_record_id":"qts-cambois-blyth","source_relations":[{"reason":"TBC proposal on Factory Road is explicitly described as near the QTS former power-station campus; identical Cambois centroid is administrative only.","relationship":"separate_nearby_campuses","source_id":"tbc-partners-cambois"}],"target_physical_site_stable_key":"curated:qts-cambois-data-centre-campus"},"record":{"aliases":["Project Wind","Blackstone Northumberland data centre","QTS Cambois"],"id":"qts-cambois-blyth","last_reviewed":"2026-10-09","location":{"admin1":"England","admin2":"Northumberland","country":"GB","lat":55.1453,"locality":"Cambois","lon":-1.5309,"note":"Sources place the campus on the former Blyth Power Station site at Cambois. Nominatim did not return the power station site, so the Cambois village centroid is used.","precision":"locality","source_ids":["s6","s8"]},"metrics":[{"applies_to":"campus","as_of":"2026","basis":"planned","metric":"power_capacity","note":"Architect Corgan lists 720 MW, with each of ten buildings providing 72 MW of IT capacity. Data Centre Review also reports about 720 MW across ten facilities if fully built, without stating scope; W.Media's description of phase one as two 720 MW facilities conflicts with both and is not recorded.","power_scope":"it_load","qualifier":"exact","source_ids":["s5"],"unit":"MW","value":720},{"applies_to":"campus","as_of":"2025-03-05","basis":"announced","metric":"investment","note":"Some sources give GBP 10bn without 'up to'; the UK government describes it as projected investment by Blackstone funds.","qualifier":"up_to","source_ids":["s1","s2","s3","s7"],"unit":"GBP","value":10000000000},{"applies_to":"campus","as_of":"2025-03-05","basis":"planned","metric":"floor_area","qualifier":"up_to","source_ids":["s1","s2","s5"],"unit":"sq_m","value":540000},{"applies_to":"campus","as_of":"2026","basis":"reported","metric":"land_area","qualifier":"exact","source_ids":["s5"],"unit":"hectares","value":100},{"applies_to":"campus","as_of":"2026-08-06","basis":"reported","metric":"land_area","note":"Keller's description of the site; differs slightly from Corgan's 100 hectares.","qualifier":"more_than","source_ids":["s8"],"unit":"acres","value":133},{"applies_to":"campus","as_of":"2026-08-06","basis":"planned","metric":"buildings","qualifier":"exact","source_ids":["s5","s8"],"unit":"count","value":10},{"applies_to":"phase","as_of":"2026-08-06","basis":"under_construction","metric":"buildings","note":"Reserved matters approved in December 2025 for the first two buildings; ground improvement for data centres one and two under way in August 2026.","phase_label":"Phase one","qualifier":"exact","source_ids":["s6","s8"],"unit":"count","value":2},{"applies_to":"campus","as_of":"2025-08-27","basis":"planned","metric":"jobs_construction","note":"Described as construction jobs over several years; the March 2025 report gave more than 1,000.","qualifier":"exact","source_ids":["s2"],"unit":"count","value":1200}],"milestones":[{"date":"2025-03","event":"zoning_approved","kind":"actual","note":"Northumberland County Council approved the planning application for the campus.","source_ids":["s1"]},{"date":"2025-08","event":"permit_approved","kind":"actual","note":"Approval reported for preparatory works such as a site compound, vegetation clearance and earthworks.","source_ids":["s2"]},{"date":"2025-09-16","event":"other","kind":"actual","note":"UK government release quoted Blackstone saying its Northumberland campus had been designated an AI Growth Zone.","source_ids":["s3"]},{"date":"2025-10","event":"construction_started","kind":"actual","note":"Trade press reports that construction began in October 2025, after the August approval.","source_ids":["s4"]},{"date":"2025-12-02","event":"zoning_approved","kind":"actual","note":"Council approval of reserved matters for phase one, covering the first two buildings.","source_ids":["s4","s6"]},{"date":"2026-08","event":"other","kind":"actual","note":"Ground improvement with vibro stone columns and CFA piles for data centres one and two was under way, due to finish later in August 2026.","source_ids":["s8"]},{"date":"2028","event":"first_operational","kind":"planned","note":"Corgan says phase one is projected to open in early 2028.","source_ids":["s5"]},{"date":"2035","event":"fully_operational","kind":"planned","note":"Campus completion and tenant onboarding expected by 2035.","source_ids":["s5"]}],"name":"QTS Cambois Data Centre Campus","parties":[{"name":"QTS","role":"developer","source_ids":["s1","s2","s6"]},{"name":"QTS","role":"operator","source_ids":["s6"]},{"name":"Blackstone","note":"Owner of QTS; the UK government credited Blackstone funds with a projected GBP 10bn investment in the campus.","role":"investor","source_ids":["s1","s3"]},{"name":"Renaissance Land","note":"Blackstone-owned entity described as financing the project.","role":"investor","source_ids":["s6"]},{"name":"Keller","note":"Ground improvement and piling subcontractor for data centres one and two.","role":"builder","source_ids":["s8"]},{"name":"Northumberland County Council","note":"Planning authority.","role":"government","source_ids":["s1","s4"]}],"power_sources":[],"related_ids":["tbc-partners-cambois"],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20250724125702/https://www.uktech.news/big-data/northumberland-council-approves-plans-for-10bn-data-centre-20250305","id":"s1","published":"2025-03-05","publisher":"UKTN","title":"Northumberland Council approves plans for £10bn data centre","type":"news","url":"https://www.uktech.news/big-data/northumberland-council-approves-plans-for-10bn-data-centre-20250305"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260309001235/https://www.acenet.co.uk/news/infrastructure-intelligence/new-milestone-reached-on-10bn-data-centre-project/","id":"s2","published":"2025-08-27","publisher":"ACE Infrastructure Intelligence","title":"New milestone reached on £10bn data centre project","type":"trade_press","url":"https://www.acenet.co.uk/news/infrastructure-intelligence/new-milestone-reached-on-10bn-data-centre-project/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261003180409/https://www.gov.uk/government/news/us-uk-pact-will-boost-advances-in-drug-discovery-create-tens-of-thousands-of-jobs-and-transform-lives","id":"s3","published":"2025-09-16","publisher":"UK Government","title":"US-UK pact will boost advances in drug discovery, create tens of thousands of jobs and transform lives","type":"government","url":"https://www.gov.uk/government/news/us-uk-pact-will-boost-advances-in-drug-discovery-create-tens-of-thousands-of-jobs-and-transform-lives"},{"accessed":"2026-10-09","id":"s4","published":"2025-12-09","publisher":"W.Media","title":"QTS gained approval for data center project in Northumbria","type":"trade_press","url":"https://w.media/qts-gained-approval-for-data-center-project-in-northumbria/"},{"accessed":"2026-10-09","id":"s5","published":null,"publisher":"Corgan","title":"QTS Data Center Campus Cambois","type":"company","url":"https://www.corgan.com/projects/qts-data-center-campus-cambois"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260521014552/https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/","id":"s6","published":"2026-04-13","publisher":"Place North East","title":"QTS doubles down as OpenAI pauses North East data centre ambitions","type":"news","url":"https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/"},{"accessed":"2026-10-09","id":"s7","published":"2026-04-14","publisher":"Data Centre Review","title":"QTS reaffirms commitment to North East AI Growth Zone","type":"trade_press","url":"https://datacentrereview.com/2026/04/qts-reaffirms-commitment-to-north-east-ai-growth-zone/"},{"accessed":"2026-10-09","id":"s8","published":"2026-08-06","publisher":"Keller","title":"Keller lays foundations for huge data centre","type":"company","url":"https://www.keller.co.uk/news/keller-lays-foundations-huge-data-centre"}],"status":"under_construction","status_as_of":"2026-08-06","status_source_ids":["s6","s8"],"summary":"QTS, the Blackstone-owned data centre company, is building its first UK campus on the former Blyth Power Station site at Cambois, Northumberland, with up to GBP 10bn of investment. Plans cover ten three-storey buildings and up to 540,000 square metres, with the architect citing 720 MW of IT capacity. Northumberland County Council approved the scheme in March 2025 and phase-one reserved matters for the first two buildings in December 2025. Work on site began in October 2025, and ground improvement for the first two data centres was under way in August 2026. The site sits in the UK's North East AI Growth Zone.","workloads":[]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"bf9d3cb2-85aa-5ed1-b796-452102f90a21","s2":"be702df2-d081-5b90-b9cd-f7293c1d6427","s3":"16c9db8a-3405-5535-8a99-032f92fc323e","s4":"4ab43094-1e98-5c84-b6f1-65d54de480d3","s5":"32ac4772-10ce-539c-88d9-4d419bff74ef","s6":"bd226832-56cd-5e1a-9507-a7e23cdf6777","s7":"7ae4db6e-53eb-5962-afbc-9bc4bf691a04","s8":"aacb5e2e-7b84-5bb4-82a5-6899ad1f0080"},"source_file":"datacenters/projects/qts-cambois-blyth.json","source_record_id":"qts-cambois-blyth","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"102e9f9c4b02ce10721d3e1dbe44c28f322f748aa97e3b9459eece88dc34d64c"}],"evidence_ids":["16c9db8a-3405-5535-8a99-032f92fc323e","2323d010-3034-5129-985d-13c20b896937","32ac4772-10ce-539c-88d9-4d419bff74ef","4ab43094-1e98-5c84-b6f1-65d54de480d3","566dd165-0f85-5b66-af21-c4ee1b59e962","7ae4db6e-53eb-5962-afbc-9bc4bf691a04","aacb5e2e-7b84-5bb4-82a5-6899ad1f0080","bd226832-56cd-5e1a-9507-a7e23cdf6777","be702df2-d081-5b90-b9cd-f7293c1d6427","bf9d3cb2-85aa-5ed1-b796-452102f90a21"],"status_source":{"evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","title":"QTS doubles down as OpenAI pauses North East data centre ambitions","publisher":"Place North East","kind":"news","published_at":"2026-04-13","source_url":"https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/","license":"source-terms-not-recorded","attribution":"Place North East"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee33430200d597833ebe/#project-2bd78b04-9314-5aa8-ac32-ef30e111bc2e","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/2bd78b04-9314-5aa8-ac32-ef30e111bc2e.json","geometry_source":{"evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","title":"QTS doubles down as OpenAI pauses North East data centre ambitions","publisher":"Place North East","kind":"news","published_at":"2026-04-13","source_url":"https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/","license":"source-terms-not-recorded","attribution":"Place North East"}},{"project_id":"564a45b7-445e-5fab-bb6a-37fffe529883","project_stable_key":"curated:qts-cambois-data-centre-campus:phase-2-data-centre-buildings","site_id":"vcc-site-ee33430200d597833ebe","physical_site_stable_key":"curated:qts-cambois-data-centre-campus","name":"QTS Cambois Phase 2 - two data centre buildings (Northumberland reserved matters 26/03028/REM)","country":"United Kingdom","country_iso_a2":"GB","latitude":55.15092301981584,"longitude":-1.533627047468273,"geometry":{"coordinates":[-1.533627047468273,55.15092301981584],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"official_coordinate_transform","geometry_method":"applicant_report_osgb36_national_grid_reference_to_wgs84","geometry_scope_class":"government_hosted_applicant_report_wider_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Government-hosted applicant report's approximate centre for the wider Cambois Campus, transformed once from NGR NZ 29820 84164. It is not the Phase A point, east- or south-side earthworks location, parcel, campus, building, project, or current-work boundary.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The report explicitly calls the NGR an approximate centre and supplies no numeric horizontal-accuracy statement; transformed digits do not add accuracy.","geometry_evidence_id":"a4ff7674-bfdc-5a88-92cd-673e02250b1a","last_observed_physical_status":"announced","status_as_of":"2026-09-25","status_age_days_at_review":32,"status_method":"authoritative_project_announcement","status_evidence_id":"3149c6ad-d50d-5efb-a38f-da76ac502504","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"9c753d9b-6043-5542-8374-9fdb720910a5","party":"QTS","relationship_scope":"intended","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":"QTS","users":null,"tenants":null,"customers":null,"status_source_url":"https://publicnoticeportal.uk/notice/planning/6ab5ba6edeea59784913179e","geometry_source_url":"https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf","project_details":[],"evidence_ids":["2323d010-3034-5129-985d-13c20b896937","3149c6ad-d50d-5efb-a38f-da76ac502504","9c753d9b-6043-5542-8374-9fdb720910a5","a4ff7674-bfdc-5a88-92cd-673e02250b1a"],"status_source":{"evidence_id":"3149c6ad-d50d-5efb-a38f-da76ac502504","title":"Northumberland County Council planning applications notice of 25 September 2026 (Northumberland Gazette), including 26/03028/REM: reserved matters for two data centre buildings on Phase 2 of the data centre campus, former power station site, Cambois","publisher":"Northumberland County Council (statutory planning notice published in the Northumberland Gazette and on the News Media Association's Public Notice Portal)","kind":"government_record","published_at":"2026-09-25","source_url":"https://publicnoticeportal.uk/notice/planning/6ab5ba6edeea59784913179e","license":"all-rights-reserved (statutory notice reproduced on the Public Notice Portal)","attribution":"Northumberland County Council; Public Notice Portal (News Media Association)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee33430200d597833ebe/#project-564a45b7-445e-5fab-bb6a-37fffe529883","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/564a45b7-445e-5fab-bb6a-37fffe529883.json","geometry_source":{"evidence_id":"a4ff7674-bfdc-5a88-92cd-673e02250b1a","title":"QTS Project Wind Environmental Setting and Site Design Report","publisher":"Environment Agency consultation portal","kind":"government_record","published_at":"2025-11-05","source_url":"https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf","license":"all-rights-reserved-fact-extraction-only","attribution":"QTS Data Centres; Cundall; Environment Agency consultation portal"}}],"evidence":[{"evidence_id":"b3d96fed-4eb9-53a1-a67b-848bbe9c4c4d","roles":["context:source_location_identity","physical_status"],"project_ids":["5b11c034-5a3b-5e5d-bc6a-b7122e21fbec"],"kind":"company_disclosure","title":"Cambois","source_url":"https://q.com/data-centers/cambois/","publisher":"QTS Data Centers","source_family":"qts_data_center_location_pages","license":"all-rights-reserved","attribution":"QTS Data Centers","published_at":"2024-11-04T16:41:55+00:00","retrieved_at":"2026-07-19T16:29:03Z","content_hash":"6eab7c0ac2af11363f89c7d3257d1e17e072a60b1bb1a15055d638acd770a06c","publication_date_precision":"datetime","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b3d96fed-4eb9-53a1-a67b-848bbe9c4c4d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b3d96fed-4eb9-53a1-a67b-848bbe9c4c4d.json","archive_url":"https://web.archive.org/web/20260719162903/https://q.com/data-centers/cambois/"},{"evidence_id":"9c753d9b-6043-5542-8374-9fdb720910a5","roles":["context:identity","role:operator"],"project_ids":["564a45b7-445e-5fab-bb6a-37fffe529883"],"kind":"company_disclosure","title":"Cambois, United Kingdom - Data Centre Campus (QTS campus page)","source_url":"https://q.com/data-centers/cambois/","publisher":"QTS Realty Trust, LLC","source_family":"uk-regions-p2-qts","license":"all-rights-reserved","attribution":"QTS Realty Trust, LLC","published_at":"2024-11-04","retrieved_at":"2026-10-23T02:37:41.528Z","content_hash":"dbac04020c82d2d874b2f8c5af17c589948da65ff8bce47290c9e26b3deab6e5","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9c753d9b-6043-5542-8374-9fdb720910a5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9c753d9b-6043-5542-8374-9fdb720910a5.json","archive_url":"https://web.archive.org/web/20261023023741/https://q.com/data-centers/cambois/"},{"evidence_id":"aacb5e2e-7b84-5bb4-82a5-6899ad1f0080","roles":["imported:geometry","imported:record","imported:status","metric:buildings","metric:land_area","milestone:other","role:builder"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"company_disclosure","title":"Keller lays foundations for huge data centre","source_url":"https://www.keller.co.uk/news/keller-lays-foundations-huge-data-centre","publisher":"Keller","source_family":"www.keller.co.uk","license":"source-terms-not-recorded","attribution":"Keller","published_at":"2026-08-06","retrieved_at":"2026-10-09","content_hash":"f944cb834441b293b367133dc35aa736c8f39f47023abd073d062b2161f6939d","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s8","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aacb5e2e-7b84-5bb4-82a5-6899ad1f0080.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aacb5e2e-7b84-5bb4-82a5-6899ad1f0080.json","archive_url":"https://web.archive.org/web/20261009/https://www.keller.co.uk/news/keller-lays-foundations-huge-data-centre"},{"evidence_id":"be702df2-d081-5b90-b9cd-f7293c1d6427","roles":["imported:record","metric:floor_area","metric:investment","metric:jobs_construction","milestone:permit_approved","role:developer"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"trade_press","title":"New milestone reached on £10bn data centre project","source_url":"https://www.acenet.co.uk/news/infrastructure-intelligence/new-milestone-reached-on-10bn-data-centre-project/","publisher":"ACE Infrastructure Intelligence","source_family":"www.acenet.co.uk","license":"source-terms-not-recorded","attribution":"ACE Infrastructure Intelligence","published_at":"2025-08-27","retrieved_at":"2026-10-09","content_hash":"a3a2f84b5629c57f4e0fdd408312ef71832afa83724de559629c4277d6ec09c8","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s2","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/be702df2-d081-5b90-b9cd-f7293c1d6427.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/be702df2-d081-5b90-b9cd-f7293c1d6427.json","archive_url":"https://web.archive.org/web/20261009/https://www.acenet.co.uk/news/infrastructure-intelligence/new-milestone-reached-on-10bn-data-centre-project/"},{"evidence_id":"bf9d3cb2-85aa-5ed1-b796-452102f90a21","roles":["imported:record","metric:floor_area","metric:investment","milestone:zoning_approved","role:developer","role:government","role:investor"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"news","title":"Northumberland Council approves plans for £10bn data centre","source_url":"https://www.uktech.news/big-data/northumberland-council-approves-plans-for-10bn-data-centre-20250305","publisher":"UKTN","source_family":"www.uktech.news","license":"source-terms-not-recorded","attribution":"UKTN","published_at":"2025-03-05","retrieved_at":"2026-10-09","content_hash":"caa80b991d3112b4b733bc4937100d0957b837ba6ba95d91f64715908e47bd55","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s1","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bf9d3cb2-85aa-5ed1-b796-452102f90a21.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bf9d3cb2-85aa-5ed1-b796-452102f90a21.json","archive_url":"https://web.archive.org/web/20261009/https://www.uktech.news/big-data/northumberland-council-approves-plans-for-10bn-data-centre-20250305"},{"evidence_id":"3149c6ad-d50d-5efb-a38f-da76ac502504","roles":["announcement"],"project_ids":["564a45b7-445e-5fab-bb6a-37fffe529883"],"kind":"government_record","title":"Northumberland County Council planning applications notice of 25 September 2026 (Northumberland Gazette), including 26/03028/REM: reserved matters for two data centre buildings on Phase 2 of the data centre campus, former power station site, Cambois","source_url":"https://publicnoticeportal.uk/notice/planning/6ab5ba6edeea59784913179e","publisher":"Northumberland County Council (statutory planning notice published in the Northumberland Gazette and on the News Media Association's Public Notice Portal)","source_family":"uk-regions-p2-northumberland-planning-notices","license":"all-rights-reserved (statutory notice reproduced on the Public Notice Portal)","attribution":"Northumberland County Council; Public Notice Portal (News Media Association)","published_at":"2026-09-25","retrieved_at":"2026-10-23T02:27:00.675Z","content_hash":"427245d284975f1bf1cd5356b6ac25c82f3bbcfb923813391e3bc7faef1d5e35","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3149c6ad-d50d-5efb-a38f-da76ac502504.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3149c6ad-d50d-5efb-a38f-da76ac502504.json","archive_url":"https://web.archive.org/web/20261023022700/https://publicnoticeportal.uk/notice/planning/6ab5ba6edeea59784913179e"},{"evidence_id":"566dd165-0f85-5b66-af21-c4ee1b59e962","roles":["context:power_readiness"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"government_record","title":"Northumberland County Council planning applications notice of 4 September 2026 (Northumberland Gazette), including 26/02818/FUL: 11/33kV temporary substations for the construction and early operation of the proposed Cambois Data Centre Campus","source_url":"https://publicnoticeportal.uk/notice/planning/6a9a0af060b7ab3fdff540b1","publisher":"Northumberland County Council (statutory planning notice published in the Northumberland Gazette and on the News Media Association's Public Notice Portal)","source_family":"uk-regions-p2-northumberland-planning-notices","license":"all-rights-reserved (statutory notice reproduced on the Public Notice Portal)","attribution":"Northumberland County Council; Public Notice Portal (News Media Association)","published_at":"2026-09-04","retrieved_at":"2026-10-23T02:31:39.911Z","content_hash":"278e15888632a2986cb83f9455948060df61811fe4d9c2e3fe9c6a7e25674d67","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/566dd165-0f85-5b66-af21-c4ee1b59e962.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/566dd165-0f85-5b66-af21-c4ee1b59e962.json","archive_url":"https://web.archive.org/web/20261023023139/https://publicnoticeportal.uk/notice/planning/6a9a0af060b7ab3fdff540b1"},{"evidence_id":"2323d010-3034-5129-985d-13c20b896937","roles":["context:identity","context:power_readiness"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e","564a45b7-445e-5fab-bb6a-37fffe529883"],"kind":"government_record","title":"Northumberland County Council planning applications notice of 9 October 2026 (Northumberland Gazette), including 26/02919/FUL: 60kV temporary substation for the construction and early operation of the proposed Cambois Data Centre Campus (24/04112/OUTES)","source_url":"https://publicnoticeportal.uk/notice/planning/6ac8340bdbabc40910bc77ed","publisher":"Northumberland County Council (statutory planning notice published in the Northumberland Gazette and on the News Media Association's Public Notice Portal)","source_family":"uk-regions-p2-northumberland-planning-notices","license":"all-rights-reserved (statutory notice reproduced on the Public Notice Portal)","attribution":"Northumberland County Council; Public Notice Portal (News Media Association)","published_at":"2026-10-09","retrieved_at":"2026-10-23T02:17:08.136Z","content_hash":"d365f87539d24241b6fb647fb3e5251217551b8c0ecde5135f36ae4797d6767e","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2323d010-3034-5129-985d-13c20b896937.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2323d010-3034-5129-985d-13c20b896937.json","archive_url":"https://web.archive.org/web/20261023021708/https://publicnoticeportal.uk/notice/planning/6ac8340bdbabc40910bc77ed"},{"evidence_id":"32ac4772-10ce-539c-88d9-4d419bff74ef","roles":["imported:record","metric:buildings","metric:floor_area","metric:land_area","metric:power_capacity","milestone:first_operational","milestone:fully_operational"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"company_disclosure","title":"QTS Data Center Campus Cambois","source_url":"https://www.corgan.com/projects/qts-data-center-campus-cambois","publisher":"Corgan","source_family":"www.corgan.com","license":"source-terms-not-recorded","attribution":"Corgan","published_at":null,"retrieved_at":"2026-10-09","content_hash":"0475b3983f63af7f6156d5cd7c8e0997815b9b8602d65575a96dedf5e229f36e","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s5","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/32ac4772-10ce-539c-88d9-4d419bff74ef.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/32ac4772-10ce-539c-88d9-4d419bff74ef.json","archive_url":"https://web.archive.org/web/20261009/https://www.corgan.com/projects/qts-data-center-campus-cambois"},{"evidence_id":"bd226832-56cd-5e1a-9507-a7e23cdf6777","roles":["imported:geometry","imported:record","imported:status","metric:buildings","milestone:zoning_approved","role:developer","role:investor","role:operator"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"news","title":"QTS doubles down as OpenAI pauses North East data centre ambitions","source_url":"https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/","publisher":"Place North East","source_family":"www.placenortheast.co.uk","license":"source-terms-not-recorded","attribution":"Place North East","published_at":"2026-04-13","retrieved_at":"2026-10-09","content_hash":"07501f81b96be3e9f04c1c44a669389a14df0cca0691d92500804551e1309f1c","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s6","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bd226832-56cd-5e1a-9507-a7e23cdf6777.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bd226832-56cd-5e1a-9507-a7e23cdf6777.json","archive_url":"https://web.archive.org/web/20261009/https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/"},{"evidence_id":"4ab43094-1e98-5c84-b6f1-65d54de480d3","roles":["imported:record","milestone:construction_started","milestone:zoning_approved","role:government"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"trade_press","title":"QTS gained approval for data center project in Northumbria","source_url":"https://w.media/qts-gained-approval-for-data-center-project-in-northumbria/","publisher":"W.Media","source_family":"w.media","license":"source-terms-not-recorded","attribution":"W.Media","published_at":"2025-12-09","retrieved_at":"2026-10-09","content_hash":"eeb2042e2282e3f390d234aa808c7709ab166dfade0760f0906663ee4f48bde9","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s4","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4ab43094-1e98-5c84-b6f1-65d54de480d3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4ab43094-1e98-5c84-b6f1-65d54de480d3.json","archive_url":"https://web.archive.org/web/20261009/https://w.media/qts-gained-approval-for-data-center-project-in-northumbria/"},{"evidence_id":"a4ff7674-bfdc-5a88-92cd-673e02250b1a","roles":["context:geometry_identity","geometry"],"project_ids":["564a45b7-445e-5fab-bb6a-37fffe529883","5b11c034-5a3b-5e5d-bc6a-b7122e21fbec"],"kind":"government_record","title":"QTS Project Wind Environmental Setting and Site Design Report","source_url":"https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf","publisher":"Environment Agency consultation portal","source_family":"uk_environment_agency_applicant_documents","license":"all-rights-reserved-fact-extraction-only","attribution":"QTS Data Centres; Cundall; Environment Agency consultation portal","published_at":"2025-11-05","retrieved_at":"2026-08-23","content_hash":"25235f3c8187b67df890d8460cf520537ddad603a87c56e84bf06728cd7946f4","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a4ff7674-bfdc-5a88-92cd-673e02250b1a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a4ff7674-bfdc-5a88-92cd-673e02250b1a.json","archive_url":"https://web.archive.org/web/20260823/https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf"},{"evidence_id":"7ae4db6e-53eb-5962-afbc-9bc4bf691a04","roles":["imported:record","metric:investment"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"trade_press","title":"QTS reaffirms commitment to North East AI Growth Zone","source_url":"https://datacentrereview.com/2026/04/qts-reaffirms-commitment-to-north-east-ai-growth-zone/","publisher":"Data Centre Review","source_family":"datacentrereview.com","license":"source-terms-not-recorded","attribution":"Data Centre Review","published_at":"2026-04-14","retrieved_at":"2026-10-09","content_hash":"9599b25d8b715ca8426beee052f7ef93202ca5cafc3327749c88f33a35249378","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s7","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7ae4db6e-53eb-5962-afbc-9bc4bf691a04.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7ae4db6e-53eb-5962-afbc-9bc4bf691a04.json","archive_url":"https://web.archive.org/web/20261009/https://datacentrereview.com/2026/04/qts-reaffirms-commitment-to-north-east-ai-growth-zone/"},{"evidence_id":"16c9db8a-3405-5535-8a99-032f92fc323e","roles":["imported:record","metric:investment","milestone:other","role:investor"],"project_ids":["2bd78b04-9314-5aa8-ac32-ef30e111bc2e"],"kind":"government_record","title":"US-UK pact will boost advances in drug discovery, create tens of thousands of jobs and transform lives","source_url":"https://www.gov.uk/government/news/us-uk-pact-will-boost-advances-in-drug-discovery-create-tens-of-thousands-of-jobs-and-transform-lives","publisher":"UK Government","source_family":"www.gov.uk","license":"source-terms-not-recorded","attribution":"UK Government","published_at":"2025-09-16","retrieved_at":"2026-10-09","content_hash":"e9d37d5b18d2b40cfd7e6766493d0002169e44a01fd75f24f01489f345764d9c","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qts-cambois-blyth","source_local_id":"s3","source_record_sha256":"0b723f64ffa9d6efd917b3e9c656e1369d367d1a946f7568d998ed9ce8cd7927","site_ids":["vcc-site-ee33430200d597833ebe"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/16c9db8a-3405-5535-8a99-032f92fc323e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/16c9db8a-3405-5535-8a99-032f92fc323e.json","archive_url":"https://web.archive.org/web/20261009/https://www.gov.uk/government/news/us-uk-pact-will-boost-advances-in-drug-discovery-create-tens-of-thousands-of-jobs-and-transform-lives"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee33430200d597833ebe/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ee33430200d597833ebe.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-ee33430200d597833ebe","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}