{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-f335df1fb078ba6f6d19","physical_site_stable_key":"curated:huawei-cloud-horinger-data-center-yungu-west-zone","name":"Huawei Cloud Horinger Data Center — Yungu West Zone","country":"China","country_iso_a2":"CN","latitude":40.533498056,"longitude":111.802858889,"geometry":{"coordinates":[111.802858889,40.533498056],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_eia_geographic_dms_point_transcription"],"geometry_scope_classes":["official_eia_on_campus_substation_locator"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["EIA centre point of the West Zone Phase 1 project's own 220 kV substation building (147.1 m x 42.2 m), which the report states is one of the West Zone Phase 1 buildings and lies inside that project's land. Locates the West Zone campus through on-campus power infrastructure at its south side; not the 2# machine-room building whose completion is recorded, nor an entrance or parcel centroid. The campus's data-centre buildings lie north of the point."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84/CGCS2000 reading is supported by the report's internally consistent side points and by agreement with independent Esri imagery of unstated accuracy and date within about 10-15 m (manual visual comparison). The point marks the campus's substation building at its south side, up to a few hundred metres from the machine-room buildings. Decimal places are transcription precision, not accuracy.","geometry_evidence_ids":["ea139fe4-8201-51e1-8a72-b14cd289728f"],"project_count":1,"project_ids":["5c88b0bc-da28-541d-9a42-ef1e195ffcc7"],"project_stable_keys":["curated:huawei-cloud-horinger-data-center-yungu-west-zone:phase-1-second-batch"],"statuses":["completed"],"oldest_status_as_of":"2026-09-23","newest_status_as_of":"2026-09-23","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f335df1fb078ba6f6d19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f335df1fb078ba6f6d19.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 华为云计算技术有限公司"]},"projects":[{"project_id":"5c88b0bc-da28-541d-9a42-ef1e195ffcc7","project_stable_key":"curated:huawei-cloud-horinger-data-center-yungu-west-zone:phase-1-second-batch","site_id":"vcc-site-f335df1fb078ba6f6d19","physical_site_stable_key":"curated:huawei-cloud-horinger-data-center-yungu-west-zone","name":"Huawei Cloud Horinger Yungu West Zone Phase 1 — second-batch works (2# data-centre machine-room building and 2# generator platform)","country":"China","country_iso_a2":"CN","latitude":40.533498056,"longitude":111.802858889,"geometry":{"coordinates":[111.802858889,40.533498056],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"direct_geometry","geometry_method":"official_eia_geographic_dms_point_transcription","geometry_scope_class":"official_eia_on_campus_substation_locator","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"EIA centre point of the West Zone Phase 1 project's own 220 kV substation building (147.1 m x 42.2 m), which the report states is one of the West Zone Phase 1 buildings and lies inside that project's land. Locates the West Zone campus through on-campus power infrastructure at its south side; not the 2# machine-room building whose completion is recorded, nor an entrance or parcel centroid. The campus's data-centre buildings lie north of the point.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84/CGCS2000 reading is supported by the report's internally consistent side points and by agreement with independent Esri imagery of unstated accuracy and date within about 10-15 m (manual visual comparison). The point marks the campus's substation building at its south side, up to a few hundred metres from the machine-room buildings. Decimal places are transcription precision, not accuracy.","geometry_evidence_id":"ea139fe4-8201-51e1-8a72-b14cd289728f","last_observed_physical_status":"completed","status_as_of":"2026-09-23","status_age_days_at_review":34,"status_method":"authoritative_physical_status_update","status_evidence_id":"75f62bc3-a97d-5224-997c-3a2a9ff43aff","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"ea139fe4-8201-51e1-8a72-b14cd289728f","party":"Huawei Cloud Computing Technology Co., Ltd. (华为云计算技术有限公司)","relationship_scope":"current","role":"owner"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"Huawei Cloud Computing Technology Co., Ltd. (华为云计算技术有限公司)","operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260923_2039089.html","geometry_source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/P020250210586911302396.pdf","project_details":[],"evidence_ids":["2c82a8e7-be93-5b45-8cc8-090aab9ec5cd","75f62bc3-a97d-5224-997c-3a2a9ff43aff","9f580c94-41d2-5e7a-bad0-12b41dc71754","b99d1ea2-91ff-5a48-b415-dcb4594053a6","ea139fe4-8201-51e1-8a72-b14cd289728f"],"status_source":{"evidence_id":"75f62bc3-a97d-5224-997c-3a2a9ff43aff","title":"Horinger New Area news item: 'Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) second-batch construction works complete their completion-acceptance filing' (华为云和林格尔数据中心项目-云谷西区（一期）第二批次建设工程完成竣工验收备案), 23 September 2026","publisher":"Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局)","kind":"government_record","published_at":"2026-09-23","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260923_2039089.html","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f335df1fb078ba6f6d19/#project-5c88b0bc-da28-541d-9a42-ef1e195ffcc7","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/5c88b0bc-da28-541d-9a42-ef1e195ffcc7.json","geometry_source":{"evidence_id":"ea139fe4-8201-51e1-8a72-b14cd289728f","title":"Environmental impact report form: Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) 220 kV substation (Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity, 10 February 2025)","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","kind":"government_environmental_document","published_at":"2025-02-10","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/P020250210586911302396.pdf","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 华为云计算技术有限公司"}}],"evidence":[{"evidence_id":"ea139fe4-8201-51e1-8a72-b14cd289728f","roles":["geometry","role:owner"],"project_ids":["5c88b0bc-da28-541d-9a42-ef1e195ffcc7"],"kind":"government_environmental_document","title":"Environmental impact report form: Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) 220 kV substation (Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity, 10 February 2025)","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/P020250210586911302396.pdf","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 华为云计算技术有限公司","published_at":"2025-02-10","retrieved_at":"2026-10-26T22:44:37.742Z","content_hash":"9b06c22e80a414e9849561c4f5edb18bd9e8c3b09ad2939bb25185e608ee5940","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f335df1fb078ba6f6d19"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ea139fe4-8201-51e1-8a72-b14cd289728f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ea139fe4-8201-51e1-8a72-b14cd289728f.json","archive_url":"https://web.archive.org/web/20261026224437/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/P020250210586911302396.pdf"},{"evidence_id":"9f580c94-41d2-5e7a-bad0-12b41dc71754","roles":["context:identity"],"project_ids":["5c88b0bc-da28-541d-9a42-ef1e195ffcc7"],"kind":"map","title":"Esri World Imagery EPSG:4326 export around the Huawei Cloud Horinger West Zone, the Bank of China data centre and the Northern Data Lake park, Horinger (request bbox 111.794-111.814E, 40.528-40.548N)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.794,40.528,111.814,40.548&bboxSR=4326&imageSR=4326&size=1522,2000&format=jpg&f=image","publisher":"Esri","source_family":"Esri World Imagery","license":"all-rights-reserved","attribution":"Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)","published_at":null,"retrieved_at":"2026-10-26T22:46:08.891Z","content_hash":"0e31c5f0c9a3d0d30bff5966095a70891bf4d3bcbc9feebb1f8cde5a80970a99","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f335df1fb078ba6f6d19"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9f580c94-41d2-5e7a-bad0-12b41dc71754.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9f580c94-41d2-5e7a-bad0-12b41dc71754.json","archive_url":"https://web.archive.org/web/20261026224608/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.794,40.528,111.814,40.548&bboxSR=4326&imageSR=4326&size=1522,2000&format=jpg&f=image"},{"evidence_id":"75f62bc3-a97d-5224-997c-3a2a9ff43aff","roles":["physical_status"],"project_ids":["5c88b0bc-da28-541d-9a42-ef1e195ffcc7"],"kind":"government_record","title":"Horinger New Area news item: 'Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) second-batch construction works complete their completion-acceptance filing' (华为云和林格尔数据中心项目-云谷西区（一期）第二批次建设工程完成竣工验收备案), 23 September 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260923_2039089.html","publisher":"Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-09-23","retrieved_at":"2026-10-26T22:43:43.155Z","content_hash":"45741cf839343622262fabea0906aac229e73b5874d51cf094e8a151d8af3e6d","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f335df1fb078ba6f6d19"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/75f62bc3-a97d-5224-997c-3a2a9ff43aff.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/75f62bc3-a97d-5224-997c-3a2a9ff43aff.json","archive_url":"https://web.archive.org/web/20261026224343/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260923_2039089.html"},{"evidence_id":"2c82a8e7-be93-5b45-8cc8-090aab9ec5cd","roles":["context:identity","physical_status"],"project_ids":["5c88b0bc-da28-541d-9a42-ef1e195ffcc7","7da9b59e-38b7-5335-9393-f739f93d03cd"],"kind":"government_record","title":"Horinger New Area news item: 'Huawei's first 3D data centre in north China tops out' (华为北方首个3D数据中心封顶), 13 October 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261013_2042365.html","publisher":"Investment Promotion Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区招商服务局)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区招商服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-10-13","retrieved_at":"2026-10-26T22:43:49.214Z","content_hash":"306978d461918c0f215358a37c57e7d0ef159e766c0fb7d6ce3bd17ffd2a5c26","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-aef6f651cb9065d646b0","vcc-site-f335df1fb078ba6f6d19"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2c82a8e7-be93-5b45-8cc8-090aab9ec5cd.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2c82a8e7-be93-5b45-8cc8-090aab9ec5cd.json","archive_url":"https://web.archive.org/web/20261026224349/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261013_2042365.html"},{"evidence_id":"b99d1ea2-91ff-5a48-b415-dcb4594053a6","roles":["context:identity"],"project_ids":["5c88b0bc-da28-541d-9a42-ef1e195ffcc7"],"kind":"government_record","title":"Inner Mongolia Department of Ecology and Environment approval-result publicity for the radiation-category EIA of the Huawei Cloud Horinger Data Center project - Yungu West Zone (Phase 1) 220 kV substation, 10 February 2025","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/t20250210_2664374.html","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment","published_at":"2025-02-10","retrieved_at":"2026-10-26T22:42:30.833Z","content_hash":"d6339c070fa54807f3a9f1076127f02f55aa8ca9e7a2f7d3496cef56d86594be","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f335df1fb078ba6f6d19"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b99d1ea2-91ff-5a48-b415-dcb4594053a6.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b99d1ea2-91ff-5a48-b415-dcb4594053a6.json","archive_url":"https://web.archive.org/web/20261026224230/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/t20250210_2664374.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f335df1fb078ba6f6d19/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f335df1fb078ba6f6d19.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-f335df1fb078ba6f6d19","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
