{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-f49882717c93278a3c62","physical_site_stable_key":"imported:semiconductor-atlas:homer-city-redevelopment","name":"Homer City Energy Campus","country":"United States","country_iso_a2":"US","latitude":40.5108,"longitude":-79.1936,"geometry":{"coordinates":[-79.1936,40.5108],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["approximate_site"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["approximate_site_locator"],"geometry_precision_scopes":["Coordinates of the former Homer City Generating Station from Wikipedia (s6), which places it in Center Township near the borough of Homer City; the campus is built on the former station site, which covers a large area, so the point is approximate."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["78e4189f-fca3-5ade-9969-696d30129b77"],"project_count":1,"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"project_stable_keys":["imported:semiconductor-atlas:homer-city-redevelopment"],"statuses":["under_construction"],"oldest_status_as_of":"2026-10-20","newest_status_as_of":"2026-10-20","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f49882717c93278a3c62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f49882717c93278a3c62.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Pennsylvania Senate Republicans"]},"projects":[{"project_id":"7d6333d2-26e6-548c-979a-324c7113281b","project_stable_key":"imported:semiconductor-atlas:homer-city-redevelopment","site_id":"vcc-site-f49882717c93278a3c62","physical_site_stable_key":"imported:semiconductor-atlas:homer-city-redevelopment","name":"Homer City Energy Campus","country":"United States","country_iso_a2":"US","latitude":40.5108,"longitude":-79.1936,"geometry":{"coordinates":[-79.1936,40.5108],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"approximate_site","geometry_authority_class":"compiled_reference","geometry_use_scope":"approximate_site_locator","geometry_precision_scope":"Coordinates of the former Homer City Generating Station from Wikipedia (s6), which places it in Center Township near the borough of Homer City; the campus is built on the former station site, which covers a large area, so the point is approximate.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"78e4189f-fca3-5ade-9969-696d30129b77","last_observed_physical_status":"under_construction","status_as_of":"2026-10-20","status_age_days_at_review":7,"status_method":"authoritative_physical_status_update","status_evidence_id":"7688ebdd-d687-5482-9aad-c399f603138d","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"66dee0cf-aaa0-5561-889d-7609ee252494","notes":null,"party":"Homer City Redevelopment","relationship_scope":"unknown","role":"developer","source_record_id":"homer-city-redevelopment"},{"evidence_id":"08c1fde3-35eb-5cf1-a141-822cfefed1f4","notes":null,"party":"Homer City Redevelopment","relationship_scope":"unknown","role":"developer","source_record_id":"homer-city-redevelopment"},{"evidence_id":"66dee0cf-aaa0-5561-889d-7609ee252494","notes":"Engineering, procurement and construction contractor.","party":"Kiewit Power Constructors Co.","relationship_scope":"unknown","role":"builder","source_record_id":"homer-city-redevelopment"},{"evidence_id":"41d3b525-b2df-5a76-99bf-155814c1264d","notes":"Engineering, procurement and construction contractor.","party":"Kiewit Power Constructors Co.","relationship_scope":"unknown","role":"builder","source_record_id":"homer-city-redevelopment"},{"evidence_id":"97df27dd-a5e1-5fe6-894a-95ac5c5609eb","notes":"Engineering, procurement and construction contractor.","party":"Kiewit Power Constructors Co.","relationship_scope":"unknown","role":"builder","source_record_id":"homer-city-redevelopment"},{"evidence_id":"66dee0cf-aaa0-5561-889d-7609ee252494","notes":"Supplier of the seven gas turbines.","party":"GE Vernova","relationship_scope":"unknown","role":"hardware_supplier","source_record_id":"homer-city-redevelopment"},{"evidence_id":"41d3b525-b2df-5a76-99bf-155814c1264d","notes":"Supplier of the seven gas turbines.","party":"GE Vernova","relationship_scope":"unknown","role":"hardware_supplier","source_record_id":"homer-city-redevelopment"},{"evidence_id":"41d3b525-b2df-5a76-99bf-155814c1264d","notes":"Named on the project FAQ as providing financing.","party":"Knighthead Capital Management","relationship_scope":"unknown","role":"investor","source_record_id":"homer-city-redevelopment"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.homercityredevelopment.com/post/homer-city-generation-highlights-kiewit-s-one-year-anniversary-of-being-active-on-site-as-engineerin","geometry_source_url":"https://www.pasenategop.com/news/pittman-hails-new-wave-of-energy-advancement-in-pennsylvania/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["approximate_locator_not_boundary"],"rationale":"No matching named development in the 201-project release. Preserve Homer City Energy Campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.","source_record_id":"homer-city-redevelopment"},"record":{"aliases":["Homer City Redevelopment","Homer City Generation"],"id":"homer-city-redevelopment","last_reviewed":"2026-10-09","location":{"admin1":"Pennsylvania","admin2":"Indiana County","country":"US","lat":40.5108,"locality":"Center Township","lon":-79.1936,"note":"Coordinates of the former Homer City Generating Station from Wikipedia (s6), which places it in Center Township near the borough of Homer City; the campus is built on the former station site, which covers a large area, so the point is approximate.","precision":"approximate_site","source_ids":["s3","s4","s6"]},"metrics":[{"applies_to":"campus","as_of":"2025-12-11","basis":"planned","metric":"power_capacity","note":"Gas-fired generation capacity intended to power the data centers on the campus, with surplus to the grid.","power_scope":"onsite_generation","qualifier":"up_to","source_ids":["s1","s4"],"unit":"MW","value":4400},{"applies_to":"campus","as_of":"2025-04-02","basis":"announced","metric":"investment","note":"Figure cited by the Pennsylvania Senate majority leader on the announcement date.","qualifier":"exact","source_ids":["s3"],"unit":"USD","value":10000000000},{"applies_to":"campus","as_of":"2026-10-09","basis":"announced","metric":"investment","note":"Developer FAQ projects initial capital for power infrastructure and site readiness to exceed this amount, with data center development adding billions more. The page is undated and was accessed on this date.","qualifier":"more_than","source_ids":["s2"],"unit":"USD","value":10000000000},{"applies_to":"campus","as_of":"2025-12-11","basis":"reported","metric":"land_area","qualifier":"more_than","source_ids":["s1","s4"],"unit":"acres","value":3200},{"applies_to":"campus","as_of":"2026-09-04","basis":"planned","metric":"jobs_construction","note":"Direct on-site construction jobs expected over about five years.","qualifier":"more_than","source_ids":["s1","s5"],"unit":"count","value":10000},{"applies_to":"campus","as_of":"2026-09-04","basis":"planned","metric":"jobs_permanent","note":"Total direct and indirect permanent positions once operating.","qualifier":"approximately","source_ids":["s1","s5"],"unit":"count","value":1000}],"milestones":[{"date":"2025-04-02","event":"announced","kind":"actual","source_ids":["s1","s3"]},{"date":"2025-11-18","event":"permit_approved","kind":"actual","note":"Air-quality permit issued by the Pennsylvania Department of Environmental Protection.","source_ids":["s4"]},{"date":"2026-09-04","event":"other","kind":"actual","note":"Developer reported more than 1,800 workers on site and site-readiness milestones completed.","source_ids":["s5"]},{"date":"2027","event":"first_operational","kind":"planned","note":"Target for power production; turbine deliveries were expected to begin in 2026.","source_ids":["s2","s4"]}],"name":"Homer City Energy Campus","parties":[{"name":"Homer City Redevelopment","role":"developer","source_ids":["s1","s4"]},{"name":"Kiewit Power Constructors Co.","note":"Engineering, procurement and construction contractor.","role":"builder","source_ids":["s1","s2","s5"]},{"name":"GE Vernova","note":"Supplier of the seven gas turbines.","role":"hardware_supplier","source_ids":["s1","s2"]},{"name":"Knighthead Capital Management","note":"Named on the project FAQ as providing financing.","role":"investor","source_ids":["s2"]}],"power_sources":[{"description":"Seven GE Vernova 7HA.02 hydrogen-enabled gas turbines on site, burning Marcellus Shale gas; EQT is reported as the gas supplier.","source_ids":["s1","s2","s4"],"type":"natural_gas_onsite"},{"description":"The site keeps the former plant's connections to PJM and NYISO, and the campus is expected to supply some power to the local grid.","source_ids":["s2","s4"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":null,"publisher":"Homer City Redevelopment","title":"Project Overview","type":"company","url":"https://www.homercityredevelopment.com/project-overview"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261002183713/https://www.homercityredevelopment.com/faq","id":"s2","published":null,"publisher":"Homer City Redevelopment","title":"FAQ","type":"company","url":"https://www.homercityredevelopment.com/faq"},{"accessed":"2026-10-09","id":"s3","published":"2025-04-02","publisher":"Pennsylvania Senate Republicans","title":"Pittman Hails New Wave of Energy Advancement in Pennsylvania","type":"government","url":"https://www.pasenategop.com/news/pittman-hails-new-wave-of-energy-advancement-in-pennsylvania/"},{"accessed":"2026-10-09","id":"s4","published":"2025-12-11","publisher":"Yale Environment 360","title":"To Feed Data Centers, Pennsylvania Faces a New Fracking Surge","type":"news","url":"https://e360.yale.edu/features/pennsylvania-data-centers-natural-gas"},{"accessed":"2026-10-09","id":"s5","published":"2026-09-04","publisher":"Homer City Redevelopment","title":"Homer City Energy Campus Workforce Grows to More Than 1,800 Workers, Including Members of 9 Building and Construction Trade Unions","type":"company","url":"https://www.homercityredevelopment.com/post/homer-city-energy-campus-workforce-grows-to-more-than-1-800-workers-including-members-of-9-building"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260421060149/https://en.wikipedia.org/wiki/Homer_City_Generating_Station","id":"s6","published":null,"publisher":"Wikipedia","title":"Homer City Generating Station","type":"other","url":"https://en.wikipedia.org/wiki/Homer_City_Generating_Station"}],"status":"under_construction","status_as_of":"2026-09-04","status_source_ids":["s5"],"summary":"Redevelopment of the retired Homer City coal-fired generating station in Indiana County, Pennsylvania, into a gas-fired power and data center campus of more than 3,200 acres. Seven GE Vernova 7HA.02 turbines are planned to deliver up to 4.4 GW for multiple large data center customers, with some power also supplied to the local grid. The developer projects more than 10 billion US dollars for power infrastructure and site readiness, with data centers adding more. Pennsylvania regulators issued an air permit in November 2025; by September 2026 more than 1,800 workers were on site, with power production targeted for 2027. No data center tenant has been named.","workloads":["ai_unspecified","hpc"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"66dee0cf-aaa0-5561-889d-7609ee252494","s2":"41d3b525-b2df-5a76-99bf-155814c1264d","s3":"78e4189f-fca3-5ade-9969-696d30129b77","s4":"08c1fde3-35eb-5cf1-a141-822cfefed1f4","s5":"97df27dd-a5e1-5fe6-894a-95ac5c5609eb","s6":"edfc18b9-9ea2-5d47-87f6-6610c5f66dfc"},"source_file":"datacenters/projects/homer-city-redevelopment.json","source_record_id":"homer-city-redevelopment","source_record_sha256":"df51c430e2602ca76bfc730c4a832dc4378f8c2783e5e0d87db5fa2704e614db","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"d0717abb8b9441401da026b4470274bec5ee412c94ed706de4ad41dd1c89dda7"}],"evidence_ids":["08c1fde3-35eb-5cf1-a141-822cfefed1f4","41d3b525-b2df-5a76-99bf-155814c1264d","66dee0cf-aaa0-5561-889d-7609ee252494","7688ebdd-d687-5482-9aad-c399f603138d","78e4189f-fca3-5ade-9969-696d30129b77","97df27dd-a5e1-5fe6-894a-95ac5c5609eb","edfc18b9-9ea2-5d47-87f6-6610c5f66dfc"],"status_source":{"evidence_id":"7688ebdd-d687-5482-9aad-c399f603138d","title":"Homer City Generation: Homer City Generation Highlights Kiewit's One-Year Anniversary of Being Active On Site as Engineering, Procurement, and Construction Partner (release, 20 October 2026)","publisher":"Homer City Generation, L.P.","kind":"company_disclosure","published_at":"2026-10-20","source_url":"https://www.homercityredevelopment.com/post/homer-city-generation-highlights-kiewit-s-one-year-anniversary-of-being-active-on-site-as-engineerin","license":"all-rights-reserved","attribution":"Homer City Generation, L.P."},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f49882717c93278a3c62/#project-7d6333d2-26e6-548c-979a-324c7113281b","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/7d6333d2-26e6-548c-979a-324c7113281b.json","geometry_source":{"evidence_id":"78e4189f-fca3-5ade-9969-696d30129b77","title":"Pittman Hails New Wave of Energy Advancement in Pennsylvania","publisher":"Pennsylvania Senate Republicans","kind":"government_record","published_at":"2025-04-02","source_url":"https://www.pasenategop.com/news/pittman-hails-new-wave-of-energy-advancement-in-pennsylvania/","license":"source-terms-not-recorded","attribution":"Pennsylvania Senate Republicans"}}],"evidence":[{"evidence_id":"41d3b525-b2df-5a76-99bf-155814c1264d","roles":["imported:record","metric:investment","milestone:first_operational","power_source:grid","power_source:natural_gas_onsite","role:builder","role:hardware_supplier","role:investor"],"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"kind":"company_disclosure","title":"FAQ","source_url":"https://www.homercityredevelopment.com/faq","publisher":"Homer City Redevelopment","source_family":"www.homercityredevelopment.com","license":"source-terms-not-recorded","attribution":"Homer City Redevelopment","published_at":null,"retrieved_at":"2026-10-09","content_hash":"3d71997467545fa61cee6cc0b43be168682002a53d73bae058e6ba1739a53cfc","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"homer-city-redevelopment","source_local_id":"s2","source_record_sha256":"df51c430e2602ca76bfc730c4a832dc4378f8c2783e5e0d87db5fa2704e614db","site_ids":["vcc-site-f49882717c93278a3c62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/41d3b525-b2df-5a76-99bf-155814c1264d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/41d3b525-b2df-5a76-99bf-155814c1264d.json","archive_url":"https://web.archive.org/web/20261009/https://www.homercityredevelopment.com/faq"},{"evidence_id":"97df27dd-a5e1-5fe6-894a-95ac5c5609eb","roles":["imported:record","imported:status","metric:jobs_construction","metric:jobs_permanent","milestone:other","role:builder"],"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"kind":"company_disclosure","title":"Homer City Energy Campus Workforce Grows to More Than 1,800 Workers, Including Members of 9 Building and Construction Trade Unions","source_url":"https://www.homercityredevelopment.com/post/homer-city-energy-campus-workforce-grows-to-more-than-1-800-workers-including-members-of-9-building","publisher":"Homer City Redevelopment","source_family":"www.homercityredevelopment.com","license":"source-terms-not-recorded","attribution":"Homer City Redevelopment","published_at":"2026-09-04","retrieved_at":"2026-10-09","content_hash":"932cd4aa6af65a49aa5e3362ccee844677bc50388780aea3b4b884206b24437d","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"homer-city-redevelopment","source_local_id":"s5","source_record_sha256":"df51c430e2602ca76bfc730c4a832dc4378f8c2783e5e0d87db5fa2704e614db","site_ids":["vcc-site-f49882717c93278a3c62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/97df27dd-a5e1-5fe6-894a-95ac5c5609eb.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/97df27dd-a5e1-5fe6-894a-95ac5c5609eb.json","archive_url":"https://web.archive.org/web/20261009/https://www.homercityredevelopment.com/post/homer-city-energy-campus-workforce-grows-to-more-than-1-800-workers-including-members-of-9-building"},{"evidence_id":"edfc18b9-9ea2-5d47-87f6-6610c5f66dfc","roles":["imported:geometry","imported:record"],"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"kind":"other","title":"Homer City Generating Station","source_url":"https://en.wikipedia.org/wiki/Homer_City_Generating_Station","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"188c11d42739b584d68a10de26aa69716b497968aa567109bcc5defe6ab6fd3c","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"homer-city-redevelopment","source_local_id":"s6","source_record_sha256":"df51c430e2602ca76bfc730c4a832dc4378f8c2783e5e0d87db5fa2704e614db","site_ids":["vcc-site-f49882717c93278a3c62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/edfc18b9-9ea2-5d47-87f6-6610c5f66dfc.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/edfc18b9-9ea2-5d47-87f6-6610c5f66dfc.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Homer_City_Generating_Station"},{"evidence_id":"7688ebdd-d687-5482-9aad-c399f603138d","roles":["physical_status"],"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"kind":"company_disclosure","title":"Homer City Generation: Homer City Generation Highlights Kiewit's One-Year Anniversary of Being Active On Site as Engineering, Procurement, and Construction Partner (release, 20 October 2026)","source_url":"https://www.homercityredevelopment.com/post/homer-city-generation-highlights-kiewit-s-one-year-anniversary-of-being-active-on-site-as-engineerin","publisher":"Homer City Generation, L.P.","source_family":"homer_city_redevelopment_news","license":"all-rights-reserved","attribution":"Homer City Generation, L.P.","published_at":"2026-10-20","retrieved_at":"2026-10-27T02:33:28.360Z","content_hash":"aeba11bc885dc4c86a743bfdf24b2aa5ac63f09d31413855cdff5123be07f521","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f49882717c93278a3c62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7688ebdd-d687-5482-9aad-c399f603138d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7688ebdd-d687-5482-9aad-c399f603138d.json","archive_url":"https://web.archive.org/web/20261027023328/https://www.homercityredevelopment.com/post/homer-city-generation-highlights-kiewit-s-one-year-anniversary-of-being-active-on-site-as-engineerin"},{"evidence_id":"78e4189f-fca3-5ade-9969-696d30129b77","roles":["imported:geometry","imported:record","metric:investment","milestone:announced"],"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"kind":"government_record","title":"Pittman Hails New Wave of Energy Advancement in Pennsylvania","source_url":"https://www.pasenategop.com/news/pittman-hails-new-wave-of-energy-advancement-in-pennsylvania/","publisher":"Pennsylvania Senate Republicans","source_family":"www.pasenategop.com","license":"source-terms-not-recorded","attribution":"Pennsylvania Senate Republicans","published_at":"2025-04-02","retrieved_at":"2026-10-09","content_hash":"bd0e8666453e4e76cfd4740b3ca9642fafe389bba2ab8b3f0802ea404d8cf491","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"homer-city-redevelopment","source_local_id":"s3","source_record_sha256":"df51c430e2602ca76bfc730c4a832dc4378f8c2783e5e0d87db5fa2704e614db","site_ids":["vcc-site-f49882717c93278a3c62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/78e4189f-fca3-5ade-9969-696d30129b77.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/78e4189f-fca3-5ade-9969-696d30129b77.json","archive_url":"https://web.archive.org/web/20261009/https://www.pasenategop.com/news/pittman-hails-new-wave-of-energy-advancement-in-pennsylvania/"},{"evidence_id":"66dee0cf-aaa0-5561-889d-7609ee252494","roles":["imported:record","metric:jobs_construction","metric:jobs_permanent","metric:land_area","metric:power_capacity","milestone:announced","power_source:natural_gas_onsite","role:builder","role:developer","role:hardware_supplier"],"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"kind":"company_disclosure","title":"Project Overview","source_url":"https://www.homercityredevelopment.com/project-overview","publisher":"Homer City Redevelopment","source_family":"www.homercityredevelopment.com","license":"source-terms-not-recorded","attribution":"Homer City Redevelopment","published_at":null,"retrieved_at":"2026-10-09","content_hash":"173a4c8c505169a12338cfb9b660ce472dcb12fccae2396898c9e5b48a562779","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"homer-city-redevelopment","source_local_id":"s1","source_record_sha256":"df51c430e2602ca76bfc730c4a832dc4378f8c2783e5e0d87db5fa2704e614db","site_ids":["vcc-site-f49882717c93278a3c62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/66dee0cf-aaa0-5561-889d-7609ee252494.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/66dee0cf-aaa0-5561-889d-7609ee252494.json","archive_url":"https://web.archive.org/web/20261009/https://www.homercityredevelopment.com/project-overview"},{"evidence_id":"08c1fde3-35eb-5cf1-a141-822cfefed1f4","roles":["imported:geometry","imported:record","metric:land_area","metric:power_capacity","milestone:first_operational","milestone:permit_approved","power_source:grid","power_source:natural_gas_onsite","role:developer"],"project_ids":["7d6333d2-26e6-548c-979a-324c7113281b"],"kind":"news","title":"To Feed Data Centers, Pennsylvania Faces a New Fracking Surge","source_url":"https://e360.yale.edu/features/pennsylvania-data-centers-natural-gas","publisher":"Yale Environment 360","source_family":"e360.yale.edu","license":"source-terms-not-recorded","attribution":"Yale Environment 360","published_at":"2025-12-11","retrieved_at":"2026-10-09","content_hash":"6d68bbe6a00b5bf1e19713eec1a11d909c0c98de301162e05f6ee85516020f90","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"homer-city-redevelopment","source_local_id":"s4","source_record_sha256":"df51c430e2602ca76bfc730c4a832dc4378f8c2783e5e0d87db5fa2704e614db","site_ids":["vcc-site-f49882717c93278a3c62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/08c1fde3-35eb-5cf1-a141-822cfefed1f4.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/08c1fde3-35eb-5cf1-a141-822cfefed1f4.json","archive_url":"https://web.archive.org/web/20261009/https://e360.yale.edu/features/pennsylvania-data-centers-natural-gas"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f49882717c93278a3c62/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f49882717c93278a3c62.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-f49882717c93278a3c62","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
