{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-f59d2f5037e6cf9243dd","physical_site_stable_key":"curated:volcano-engine-inner-mongolia-horinger-compute-centre-phase-1","name":"Volcano Engine Inner Mongolia Horinger Compute Centre — Phase 1 Campus","country":"China","country_iso_a2":"CN","latitude":40.58596,"longitude":111.8467,"geometry":{"coordinates":[111.8467,40.58596],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_eia_geographic_dms_point_transcription_with_cgcs2000_parcel_and_imagery_check"],"geometry_scope_classes":["official_eia_on_campus_boiler_house_point_parcel_checked"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["EIA point of the Phase 1 A gas boiler house inside the integrated building, which lies at the north of the Phase 1 A parcel, immediately east of building 10-1. The point is inside the Phase 1 A parcel computed from its CGCS2000 parcel plan, 54 m from the parcel boundary and 155 m from the parcel centroid, and about 165 m east-north-east of the visual centre of building 10-1. It locates the Phase 1 A campus of the compute centre; it is not the footprint or centre of building 10-1, nor an entrance, and it does not locate Phase 1 B (east of Phase 1 A) or the separate Phase 2 park."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The report states no datum or positional accuracy. The WGS84/CGCS2000 reading is supported by the point lying inside the Phase 1 A parcel computed from the parcel plan's CGCS2000 boundary coordinates and by the parcel's agreement with independent Esri imagery of unstated accuracy and date (manual visual comparison, roughly 10 m). The point marks the integrated-building block about 165 m from the centre of building 10-1. Decimal places are transcription precision, not accuracy.","geometry_evidence_ids":["2130cbd0-e145-5f34-aa5f-6910db5fdbf2"],"project_count":1,"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"project_stable_keys":["curated:volcano-engine-inner-mongolia-horinger-compute-centre-phase-1:phase-1a-10-1-machine-room-building"],"statuses":["completed"],"oldest_status_as_of":"2026-10-27","newest_status_as_of":"2026-10-27","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f59d2f5037e6cf9243dd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f59d2f5037e6cf9243dd.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["呼和浩特市生态环境局; report form prepared for 呼和浩特市塞北红城科技有限公司"]},"projects":[{"project_id":"83d24ae4-38df-5b1f-9d3c-ea679f7c21d0","project_stable_key":"curated:volcano-engine-inner-mongolia-horinger-compute-centre-phase-1:phase-1a-10-1-machine-room-building","site_id":"vcc-site-f59d2f5037e6cf9243dd","physical_site_stable_key":"curated:volcano-engine-inner-mongolia-horinger-compute-centre-phase-1","name":"Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A — 10-1 data-centre machine-room building","country":"China","country_iso_a2":"CN","latitude":40.58596,"longitude":111.8467,"geometry":{"coordinates":[111.8467,40.58596],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"direct_geometry","geometry_method":"official_eia_geographic_dms_point_transcription_with_cgcs2000_parcel_and_imagery_check","geometry_scope_class":"official_eia_on_campus_boiler_house_point_parcel_checked","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"EIA point of the Phase 1 A gas boiler house inside the integrated building, which lies at the north of the Phase 1 A parcel, immediately east of building 10-1. The point is inside the Phase 1 A parcel computed from its CGCS2000 parcel plan, 54 m from the parcel boundary and 155 m from the parcel centroid, and about 165 m east-north-east of the visual centre of building 10-1. It locates the Phase 1 A campus of the compute centre; it is not the footprint or centre of building 10-1, nor an entrance, and it does not locate Phase 1 B (east of Phase 1 A) or the separate Phase 2 park.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The report states no datum or positional accuracy. The WGS84/CGCS2000 reading is supported by the point lying inside the Phase 1 A parcel computed from the parcel plan's CGCS2000 boundary coordinates and by the parcel's agreement with independent Esri imagery of unstated accuracy and date (manual visual comparison, roughly 10 m). The point marks the integrated-building block about 165 m from the centre of building 10-1. Decimal places are transcription precision, not accuracy.","geometry_evidence_id":"2130cbd0-e145-5f34-aa5f-6910db5fdbf2","last_observed_physical_status":"completed","status_as_of":"2026-10-27","status_age_days_at_review":0,"status_method":"authoritative_physical_status_update","status_evidence_id":"57454158-b171-5a06-8659-785457c564b1","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"2130cbd0-e145-5f34-aa5f-6910db5fdbf2","party":"Hohhot Saibei Hongcheng Technology Co., Ltd. (呼和浩特市塞北红城科技有限公司)","relationship_scope":"current","role":"owner"},{"evidence_id":"57454158-b171-5a06-8659-785457c564b1","party":"Volcano Engine (火山引擎)","relationship_scope":"intended","role":"user"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"Hohhot Saibei Hongcheng Technology Co., Ltd. (呼和浩特市塞北红城科技有限公司)","operator":null,"users":"Volcano Engine (火山引擎)","tenants":null,"customers":null,"status_source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261027_2045505.html","geometry_source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/P020250619383769020711.pdf","project_details":[],"evidence_ids":["04ad7b39-a044-52f3-87c5-85fe7a37eb3a","04c9dabf-83fa-5489-9680-004a38e83243","2130cbd0-e145-5f34-aa5f-6910db5fdbf2","57454158-b171-5a06-8659-785457c564b1","80ed36c1-65cb-5c48-a37b-65336c41c709","994a0690-ba5d-5ca0-b675-fac8c6e97590","b5152228-7680-5036-a60d-fe39da80b1c1","b7138e90-01c5-57b8-946b-6c0a772e7582"],"status_source":{"evidence_id":"57454158-b171-5a06-8659-785457c564b1","title":"Horinger New Area news item: 'Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project 10-1 data-centre machine-room building works complete their completion-acceptance filing' (火山引擎内蒙古和林格尔算力中心一期A项目10-1数据中心机房楼工程完成竣工验收备案), 27 October 2026","publisher":"Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局)","kind":"government_record","published_at":"2026-10-27","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261027_2045505.html","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f59d2f5037e6cf9243dd/#project-83d24ae4-38df-5b1f-9d3c-ea679f7c21d0","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/83d24ae4-38df-5b1f-9d3c-ea679f7c21d0.json","geometry_source":{"evidence_id":"2130cbd0-e145-5f34-aa5f-6910db5fdbf2","title":"Environmental impact report form (accepted version): Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project, gas boiler house (火山引擎内蒙古和林格尔算力中心一期项目环境影响报告表), attached to the Hohhot Ecology and Environment Bureau acceptance notice of 18 June 2025","publisher":"Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局)","kind":"government_environmental_document","published_at":null,"source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/P020250619383769020711.pdf","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局; report form prepared for 呼和浩特市塞北红城科技有限公司"}}],"evidence":[{"evidence_id":"2130cbd0-e145-5f34-aa5f-6910db5fdbf2","roles":["geometry","role:owner"],"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"kind":"government_environmental_document","title":"Environmental impact report form (accepted version): Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project, gas boiler house (火山引擎内蒙古和林格尔算力中心一期项目环境影响报告表), attached to the Hohhot Ecology and Environment Bureau acceptance notice of 18 June 2025","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/P020250619383769020711.pdf","publisher":"Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局)","source_family":"Hohhot Ecology and Environment Bureau environmental assessment records","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局; report form prepared for 呼和浩特市塞北红城科技有限公司","published_at":null,"retrieved_at":"2026-10-27T03:32:55.968Z","content_hash":"68137319695787cf288b09c756bd599374b09a89e0c6766b781905b3eb62dd22","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2130cbd0-e145-5f34-aa5f-6910db5fdbf2.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2130cbd0-e145-5f34-aa5f-6910db5fdbf2.json","archive_url":"https://web.archive.org/web/20261027033255/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/P020250619383769020711.pdf"},{"evidence_id":"80ed36c1-65cb-5c48-a37b-65336c41c709","roles":["context:identity"],"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"kind":"government_environmental_document","title":"Environmental impact report form (earlier publicised version with attachments and figures): Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project gas boiler house, attached to the Hohhot Ecology and Environment Bureau acceptance notice of March 2025","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202503/P020250507388440918408.pdf","publisher":"Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局)","source_family":"Hohhot Ecology and Environment Bureau environmental assessment records","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局; report form prepared for 呼和浩特市塞北红城科技有限公司","published_at":null,"retrieved_at":"2026-10-27T03:33:08.978Z","content_hash":"34883c10c49b952dae04cf32b9aba01509000f05e15a09ccb12c0d3e83615337","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/80ed36c1-65cb-5c48-a37b-65336c41c709.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/80ed36c1-65cb-5c48-a37b-65336c41c709.json","archive_url":"https://web.archive.org/web/20261027033308/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202503/P020250507388440918408.pdf"},{"evidence_id":"b7138e90-01c5-57b8-946b-6c0a772e7582","roles":["context:identity"],"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"kind":"government_environmental_document","title":"Environmental impact report form: Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project 110 kV substation (火山引擎内蒙古和林格尔算力中心一期A项目110kV变电站工程环境影响报告表), Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity of 26 February 2025","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/P020250226337204474596.pdf","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment","published_at":"2025-02-26","retrieved_at":"2026-10-27T03:55:58.880Z","content_hash":"f9797dc28eff21b9ace520ccd242427ef03c94599f49e7d7173fcca043f3290c","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b7138e90-01c5-57b8-946b-6c0a772e7582.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b7138e90-01c5-57b8-946b-6c0a772e7582.json","archive_url":"https://web.archive.org/web/20261027035558/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202502/P020250226337204474596.pdf"},{"evidence_id":"994a0690-ba5d-5ca0-b675-fac8c6e97590","roles":["context:identity"],"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"kind":"map","title":"Esri World Imagery EPSG:4326 export around the Volcano Engine Horinger Phase 1 A parcel (request bbox 111.8395-111.8545E, 40.5800-40.5900N)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.8395,40.5800,111.8545,40.5900&bboxSR=4326&imageSR=4326&size=1600,1067&format=jpg&f=image","publisher":"Esri","source_family":"Esri World Imagery","license":"all-rights-reserved","attribution":"Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)","published_at":null,"retrieved_at":"2026-10-27T03:35:11.331Z","content_hash":"c6a3574a0119df9b9af931682225eaf2661c21ae64e41533ae231ab782eca47c","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/994a0690-ba5d-5ca0-b675-fac8c6e97590.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/994a0690-ba5d-5ca0-b675-fac8c6e97590.json","archive_url":"https://web.archive.org/web/20261027033511/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.8395,40.5800,111.8545,40.5900&bboxSR=4326&imageSR=4326&size=1600,1067&format=jpg&f=image"},{"evidence_id":"04ad7b39-a044-52f3-87c5-85fe7a37eb3a","roles":["context:identity"],"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"kind":"government_record","title":"Hohhot Ecology and Environment Bureau: acceptance notice for the EIA document of the Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 project (关于火山引擎内蒙古和林格尔算力中心一期项目环境影响评价文件受理情况公示)","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/t20250619_1902630.html","publisher":"Hohhot Ecology and Environment Bureau (呼和浩特市生态环境局)","source_family":"Hohhot Ecology and Environment Bureau environmental assessment records","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局","published_at":"2025-06-18","retrieved_at":"2026-10-27T03:32:48.513Z","content_hash":"3188e504ea20deea7e90b2630c06e1b307b7dc66ed3a49e1174d5212ff66333d","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/04ad7b39-a044-52f3-87c5-85fe7a37eb3a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/04ad7b39-a044-52f3-87c5-85fe7a37eb3a.json","archive_url":"https://web.archive.org/web/20261027033248/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/t20250619_1902630.html"},{"evidence_id":"04c9dabf-83fa-5489-9680-004a38e83243","roles":["context:identity"],"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"kind":"government_record","title":"Horinger New Area major-project information: integrated building of the Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project passes completion acceptance (火山引擎内蒙古和林格尔算力中心一期A项目综合楼顺利通过竣工验收), 12 December 2025","source_url":"http://hlgena.huhhot.gov.cn/zwgk/zfxxgkzl/fdzdgknr/zdxmjs/xmjbqk/202512/t20251212_1958124.html","publisher":"Inner Mongolia Horinger New Area Planning and Construction Bureau (内蒙古和林格尔新区规划建设局)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"内蒙古和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2025-12-12","retrieved_at":"2026-10-27T03:33:12.820Z","content_hash":"44b652fb2f48f01a578803df526ecc55c3aba91cca9c25ccadf8f39969f2c777","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/04c9dabf-83fa-5489-9680-004a38e83243.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/04c9dabf-83fa-5489-9680-004a38e83243.json","archive_url":"https://web.archive.org/web/20261027033312/http://hlgena.huhhot.gov.cn/zwgk/zfxxgkzl/fdzdgknr/zdxmjs/xmjbqk/202512/t20251212_1958124.html"},{"evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","roles":["context:identity","physical_status","role:operator"],"project_ids":["1dd04d18-ca1c-5a59-846b-235ebabebffa","8140cff8-04b3-5d90-a8bc-f5fb48f7af08","83d24ae4-38df-5b1f-9d3c-ea679f7c21d0","cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"kind":"government_record","title":"Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区：“三看”自贸试验区里的算力“加速度”), 10 August 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html","publisher":"Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-08-10","retrieved_at":"2026-10-23T01:34:11.305Z","content_hash":"6cccbcc8c8de9c82f37e7af13ba3a6ae74ba5c35b18905bc478a8d386d81ff15","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-23ffbb893f12f178d8d3","vcc-site-8b806f7ae4b0034de59b","vcc-site-c1888e4188c5e991f794","vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5152228-7680-5036-a60d-fe39da80b1c1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5152228-7680-5036-a60d-fe39da80b1c1.json","archive_url":"https://web.archive.org/web/20261023013411/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html"},{"evidence_id":"57454158-b171-5a06-8659-785457c564b1","roles":["physical_status","role:user"],"project_ids":["83d24ae4-38df-5b1f-9d3c-ea679f7c21d0"],"kind":"government_record","title":"Horinger New Area news item: 'Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A project 10-1 data-centre machine-room building works complete their completion-acceptance filing' (火山引擎内蒙古和林格尔算力中心一期A项目10-1数据中心机房楼工程完成竣工验收备案), 27 October 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261027_2045505.html","publisher":"Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区规划建设局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-10-27","retrieved_at":"2026-10-27T03:31:19.160Z","content_hash":"d75a551cd23680cff10d153497858f225b247d0678bc55b6b77f4781e29d4183","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/57454158-b171-5a06-8659-785457c564b1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/57454158-b171-5a06-8659-785457c564b1.json","archive_url":"https://web.archive.org/web/20261027033119/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261027_2045505.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f59d2f5037e6cf9243dd/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f59d2f5037e6cf9243dd.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-f59d2f5037e6cf9243dd","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}