{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-faa101d551da0c45f1c5","physical_site_stable_key":"curated:iron-mountain-amsterdam-data-center-campus","name":"Iron Mountain Amsterdam Data Center Campus","country":"Netherlands","country_iso_a2":"NL","latitude":52.39172475368806,"longitude":4.664735411619385,"geometry":{"coordinates":[4.664735411619385,52.39172475368806],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["official_notice_source_point"],"geometry_methods":["EPSG_28992_to_EPSG_4326_always_xy_with_documented_Amersfoort_transform"],"geometry_scope_classes":["official_permit_notice_campus_reference_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["The provincial notice point locates the campus at J.W. Lucasweg 35, Haarlem, not the selected expansion building's footprint. Linking the owner's AMS-2 10 MW description to the SEC AMS-1 Phase 4 row is an analyst identity inference from the same campus, 10 MW scope and Q2 2027 schedule, not an explicit issuer renaming statement. The separate 20 MW held-development row is excluded. Existing and future campus buildings count once."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No source-specific numeric horizontal accuracy is published; transform operation accuracy is not site-locator uncertainty.","geometry_evidence_ids":["4791ed5e-b266-5f0f-b86f-d183cc829ba2","583562f6-1d06-596e-81cc-289524fe0c00"],"project_count":1,"project_ids":["e3f1fc38-bc59-5373-803f-d5c86d817096"],"project_stable_keys":["curated:iron-mountain-amsterdam-data-center-campus:ams-2-10mw-expansion"],"statuses":["under_construction"],"oldest_status_as_of":"2026-06-30","newest_status_as_of":"2026-06-30","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"nl","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-faa101d551da0c45f1c5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-faa101d551da0c45f1c5.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Officiele Bekendmakingen","Province of Noord-Holland / Officiele Bekendmakingen"]},"projects":[{"project_id":"e3f1fc38-bc59-5373-803f-d5c86d817096","project_stable_key":"curated:iron-mountain-amsterdam-data-center-campus:ams-2-10mw-expansion","site_id":"vcc-site-faa101d551da0c45f1c5","physical_site_stable_key":"curated:iron-mountain-amsterdam-data-center-campus","name":"Iron Mountain AMS-2 10 MW Expansion","country":"Netherlands","country_iso_a2":"NL","latitude":52.39172475368806,"longitude":4.664735411619385,"geometry":{"coordinates":[4.664735411619385,52.39172475368806],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"official_notice_source_point","geometry_method":"EPSG_28992_to_EPSG_4326_always_xy_with_documented_Amersfoort_transform","geometry_scope_class":"official_permit_notice_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"The provincial notice point locates the campus at J.W. Lucasweg 35, Haarlem, not the selected expansion building's footprint. Linking the owner's AMS-2 10 MW description to the SEC AMS-1 Phase 4 row is an analyst identity inference from the same campus, 10 MW scope and Q2 2027 schedule, not an explicit issuer renaming statement. The separate 20 MW held-development row is excluded. Existing and future campus buildings count once.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No source-specific numeric horizontal accuracy is published; transform operation accuracy is not site-locator uncertainty.","geometry_evidence_id":"583562f6-1d06-596e-81cc-289524fe0c00","last_observed_physical_status":"under_construction","status_as_of":"2026-06-30","status_age_days_at_review":119,"status_method":"authoritative_physical_status_update","status_evidence_id":"681761fe-09c6-5f22-b508-1e20945f632d","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by this reviewed draft batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm","geometry_source_url":"https://zoek.officielebekendmakingen.nl/prb-2025-5574/metadata.xml","project_details":[],"evidence_ids":["0a91dfb2-a658-54cd-8294-e917690855b7","4791ed5e-b266-5f0f-b86f-d183cc829ba2","583562f6-1d06-596e-81cc-289524fe0c00","681761fe-09c6-5f22-b508-1e20945f632d","af754737-fdde-580f-9b3e-c1e1bc787bcf","d2a2c2ab-27ad-53e6-873a-e6f37c4a8e66"],"status_source":{"evidence_id":"681761fe-09c6-5f22-b508-1e20945f632d","title":"Q2 2026 Supplemental Financial Information - construction rows","publisher":"Iron Mountain Incorporated","kind":"company_disclosure","published_at":"2026-08-05","source_url":"https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm","license":"all-rights-reserved","attribution":"Iron Mountain Incorporated"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-faa101d551da0c45f1c5/#project-e3f1fc38-bc59-5373-803f-d5c86d817096","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/e3f1fc38-bc59-5373-803f-d5c86d817096.json","geometry_source":{"evidence_id":"583562f6-1d06-596e-81cc-289524fe0c00","title":"Iron Mountain Haarlem official notice marker","publisher":"Province of Noord-Holland / Officiele Bekendmakingen","kind":"government_record","published_at":"2025-04-07","source_url":"https://zoek.officielebekendmakingen.nl/prb-2025-5574/metadata.xml","license":"no-open-redistribution-license-asserted","attribution":"Province of Noord-Holland / Officiele Bekendmakingen"}}],"evidence":[{"evidence_id":"d2a2c2ab-27ad-53e6-873a-e6f37c4a8e66","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["e3f1fc38-bc59-5373-803f-d5c86d817096"],"kind":"company_disclosure","title":"Amsterdam Data Center","source_url":"https://www.ironmountain.com/data-centers/locations/amsterdam-data-center","publisher":"Iron Mountain Data Centers","source_family":"iron_mountain_data_center_location_pages","license":"all-rights-reserved","attribution":"Iron Mountain Data Centers","published_at":null,"retrieved_at":"2026-07-20T04:22:16Z","content_hash":"62be35adea69fb7cddf87a9a1a07734afac9898e3e9a76416d8a64b598f7b392","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-faa101d551da0c45f1c5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d2a2c2ab-27ad-53e6-873a-e6f37c4a8e66.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d2a2c2ab-27ad-53e6-873a-e6f37c4a8e66.json","archive_url":"https://web.archive.org/web/20260720042216/https://www.ironmountain.com/data-centers/locations/amsterdam-data-center"},{"evidence_id":"0a91dfb2-a658-54cd-8294-e917690855b7","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["e3f1fc38-bc59-5373-803f-d5c86d817096"],"kind":"company_disclosure","title":"Amsterdam Data Center campus 3D rendering: Powering the future with AMS-2","source_url":"https://resources.ironmountain.com/videos-and-webinars/d/data-centers-inside-the-amsterdam-data-center-campus-3d-rendering","publisher":"Iron Mountain Data Centers","source_family":"iron_mountain_resources","license":"all-rights-reserved","attribution":"Iron Mountain Data Centers","published_at":"2026-06-12T18:03:57Z","retrieved_at":"2026-07-20T04:22:16Z","content_hash":"cf3624ab97b5d5e8b372655cecd2f9c98df3406fa2a2678eea8d5ecba25391de","publication_date_precision":"datetime","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-faa101d551da0c45f1c5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0a91dfb2-a658-54cd-8294-e917690855b7.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0a91dfb2-a658-54cd-8294-e917690855b7.json","archive_url":"https://web.archive.org/web/20260720042216/https://resources.ironmountain.com/videos-and-webinars/d/data-centers-inside-the-amsterdam-data-center-campus-3d-rendering"},{"evidence_id":"583562f6-1d06-596e-81cc-289524fe0c00","roles":["context:site_distinctness","geometry"],"project_ids":["e3f1fc38-bc59-5373-803f-d5c86d817096"],"kind":"government_record","title":"Iron Mountain Haarlem official notice marker","source_url":"https://zoek.officielebekendmakingen.nl/prb-2025-5574/metadata.xml","publisher":"Province of Noord-Holland / Officiele Bekendmakingen","source_family":"iron_amsterdam_notice","license":"no-open-redistribution-license-asserted","attribution":"Province of Noord-Holland / Officiele Bekendmakingen","published_at":"2025-04-07","retrieved_at":"2026-09-08T19:54:10Z","content_hash":"bddeb5396dfe5d50b1d0049319fd2153e91b26d40d61c9ba65bd35bc593592c3","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-faa101d551da0c45f1c5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/583562f6-1d06-596e-81cc-289524fe0c00.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/583562f6-1d06-596e-81cc-289524fe0c00.json","archive_url":"https://web.archive.org/web/20260908195410/https://zoek.officielebekendmakingen.nl/prb-2025-5574/metadata.xml"},{"evidence_id":"af754737-fdde-580f-9b3e-c1e1bc787bcf","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["e3f1fc38-bc59-5373-803f-d5c86d817096"],"kind":"government_record","title":"Iron Mountain Haarlem permit - exact address","source_url":"https://zoek.officielebekendmakingen.nl/prb-2025-5574.html","publisher":"Province of Noord-Holland","source_family":"iron_amsterdam_permit","license":"no-open-redistribution-license-asserted","attribution":"Province of Noord-Holland","published_at":"2025-04-07","retrieved_at":"2026-09-08T19:54:10Z","content_hash":"e6409d9298cdf249b9cc37c6609173d28a25300092d0df95cb588a6f76d5facf","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-faa101d551da0c45f1c5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/af754737-fdde-580f-9b3e-c1e1bc787bcf.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/af754737-fdde-580f-9b3e-c1e1bc787bcf.json","archive_url":"https://web.archive.org/web/20260908195410/https://zoek.officielebekendmakingen.nl/prb-2025-5574.html"},{"evidence_id":"4791ed5e-b266-5f0f-b86f-d183cc829ba2","roles":["context:site_distinctness","geometry"],"project_ids":["e3f1fc38-bc59-5373-803f-d5c86d817096","f8900f55-087d-5d51-aef2-820402bcbdc2"],"kind":"government_record","title":"Official notice map implementation - RD coordinate reference system","source_url":"https://zoek.officielebekendmakingen.nl/static/kaartmodule/js/index.js","publisher":"Officiele Bekendmakingen","source_family":"netherlands_official_notice_map_implementation","license":"no-open-redistribution-license-asserted","attribution":"Officiele Bekendmakingen","published_at":null,"retrieved_at":"2026-09-08T19:28:37Z","content_hash":"c9a4b32921b71171eecd74c90d4341965147717da3f60c6c66399760c5b7fe54","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-044046b0ede92919a936","vcc-site-faa101d551da0c45f1c5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4791ed5e-b266-5f0f-b86f-d183cc829ba2.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4791ed5e-b266-5f0f-b86f-d183cc829ba2.json","archive_url":"https://web.archive.org/web/20260908192837/https://zoek.officielebekendmakingen.nl/static/kaartmodule/js/index.js"},{"evidence_id":"681761fe-09c6-5f22-b508-1e20945f632d","roles":["physical_status"],"project_ids":["825dd9ee-ffe9-525e-8d9f-ec8e370d9944","e3f1fc38-bc59-5373-803f-d5c86d817096"],"kind":"company_disclosure","title":"Q2 2026 Supplemental Financial Information - construction rows","source_url":"https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm","publisher":"Iron Mountain Incorporated","source_family":"iron_mountain_q2","license":"all-rights-reserved","attribution":"Iron Mountain Incorporated","published_at":"2026-08-05","retrieved_at":"2026-09-08T19:54:32Z","content_hash":"40c74e89fad0c524afd19bcaaa0254b329c4f871c8f7636383fd20948afff946","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-b2ce7bc4242acd906a7b","vcc-site-faa101d551da0c45f1c5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/681761fe-09c6-5f22-b508-1e20945f632d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/681761fe-09c6-5f22-b508-1e20945f632d.json","archive_url":"https://web.archive.org/web/20260908195432/https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-faa101d551da0c45f1c5/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-faa101d551da0c45f1c5.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-faa101d551da0c45f1c5","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
