{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-ff3fe91dbbe9f9beaf9e","physical_site_stable_key":"imported:semiconductor-atlas:natelli-new-hill-digital-campus","name":"New Hill Digital Campus","country":"United States","country_iso_a2":"US","latitude":35.6811,"longitude":-78.9356,"geometry":{"coordinates":[-78.9356,35.6811],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Wikipedia coordinates for the New Hill community. WRAL places the site on Shearon Harris Road beside the Shearon Harris nuclear plant, a few kilometres south of this point; no cited source gives site coordinates."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["b65b4f7b-10e1-58b6-ae22-7f723d348388"],"project_count":1,"project_ids":["03207f8c-1d9d-577f-9d8c-af881144fb86"],"project_stable_keys":["imported:semiconductor-atlas:natelli-new-hill-digital-campus"],"statuses":["cancelled"],"oldest_status_as_of":"2026-03-10","newest_status_as_of":"2026-03-10","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff3fe91dbbe9f9beaf9e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff3fe91dbbe9f9beaf9e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WRAL"]},"projects":[{"project_id":"03207f8c-1d9d-577f-9d8c-af881144fb86","project_stable_key":"imported:semiconductor-atlas:natelli-new-hill-digital-campus","site_id":"vcc-site-ff3fe91dbbe9f9beaf9e","physical_site_stable_key":"imported:semiconductor-atlas:natelli-new-hill-digital-campus","name":"New Hill Digital Campus","country":"United States","country_iso_a2":"US","latitude":35.6811,"longitude":-78.9356,"geometry":{"coordinates":[-78.9356,35.6811],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Wikipedia coordinates for the New Hill community. WRAL places the site on Shearon Harris Road beside the Shearon Harris nuclear plant, a few kilometres south of this point; no cited source gives site coordinates.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"b65b4f7b-10e1-58b6-ae22-7f723d348388","last_observed_physical_status":"cancelled","status_as_of":"2026-03-10","status_age_days_at_review":231,"status_method":"imported_documented_status","status_evidence_id":"3b847726-3c79-5d0b-8e80-70c0498fd745","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"3b847726-3c79-5d0b-8e80-70c0498fd745","notes":null,"party":"Natelli Investments","relationship_scope":"unknown","role":"developer","source_record_id":"natelli-new-hill-digital-campus"},{"evidence_id":"b65b4f7b-10e1-58b6-ae22-7f723d348388","notes":null,"party":"Natelli Investments","relationship_scope":"unknown","role":"developer","source_record_id":"natelli-new-hill-digital-campus"},{"evidence_id":"b15455cd-25b4-5e61-b70c-33d0359a295f","notes":null,"party":"Natelli Investments","relationship_scope":"unknown","role":"developer","source_record_id":"natelli-new-hill-digital-campus"},{"evidence_id":"b65b4f7b-10e1-58b6-ae22-7f723d348388","notes":"Annexation and rezoning authority for the site.","party":"Town of Apex","relationship_scope":"unknown","role":"government","source_record_id":"natelli-new-hill-digital-campus"},{"evidence_id":"3b847726-3c79-5d0b-8e80-70c0498fd745","notes":"Annexation and rezoning authority for the site.","party":"Town of Apex","relationship_scope":"unknown","role":"government","source_record_id":"natelli-new-hill-digital-campus"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.bisnow.com/news/raleigh-durham/data-center/massive-raleigh-area-data-center-scrapped-133584","geometry_source_url":"https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve New Hill Digital Campus as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"natelli-new-hill-digital-campus"},"record":{"aliases":["Apex data center (Natelli Investments)"],"id":"natelli-new-hill-digital-campus","last_reviewed":"2026-10-09","location":{"admin1":"North Carolina","admin2":"Wake County","country":"US","lat":35.6811,"locality":"New Hill","lon":-78.9356,"note":"Wikipedia coordinates for the New Hill community. WRAL places the site on Shearon Harris Road beside the Shearon Harris nuclear plant, a few kilometres south of this point; no cited source gives site coordinates.","precision":"locality","source_ids":["s2","s1"]},"metrics":[{"applies_to":"campus","as_of":"2026-03-10","basis":"planned","metric":"power_capacity","power_scope":"unspecified","qualifier":"exact","source_ids":["s1","s2"],"unit":"MW","value":250},{"applies_to":"campus","as_of":"2026-03-10","basis":"planned","metric":"land_area","note":"A WRAL photo caption gives 190 acres.","qualifier":"approximately","source_ids":["s1","s2"],"unit":"acres","value":189}],"milestones":[{"date":"2025-09","event":"announced","kind":"actual","note":"Bisnow, writing in March 2026, says the developer first proposed the project in September and requested rezoning last fall, which places it in 2025. WRAL reports residents were already pushing back in August, so the proposal may have been known earlier.","source_ids":["s1"]},{"date":"2026-03-05","event":"cancelled","kind":"actual","note":"Natelli withdrew its annexation and rezoning applications on 5 March, per WRAL; ABC11 reports the company's announcement on 7 March.","source_ids":["s2","s1","s3"]}],"name":"New Hill Digital Campus","notes":"Recorded as cancelled because the developer withdrew its applications and the coverage describes the project as scrapped; Natelli said it could decide on a further course of action if Apex later adopts a zoning amendment allowing data centers.","parties":[{"name":"Natelli Investments","role":"developer","source_ids":["s1","s2","s3"]},{"name":"Town of Apex","note":"Annexation and rezoning authority for the site.","role":"government","source_ids":["s2","s1"]}],"power_sources":[],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2026-03-10","publisher":"Bisnow","title":"Apex Data Center Scrapped","type":"trade_press","url":"https://www.bisnow.com/news/raleigh-durham/data-center/massive-raleigh-area-data-center-scrapped-133584"},{"accessed":"2026-10-09","id":"s2","published":"2026-03-05","publisher":"WRAL","title":"Residents near proposed Apex data center relieved project is scrapped, says more work needed","type":"news","url":"https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261001014120/https://abc11.com/post/data-center-developer-pulls-back-apex-now/18685708/","id":"s3","published":"2026-03-07","publisher":"ABC11 (WTVD)","title":"Data center developer pulls back from Apex for now","type":"news","url":"https://abc11.com/post/data-center-developer-pulls-back-apex-now/18685708/"}],"status":"cancelled","status_as_of":"2026-03-10","status_source_ids":["s1","s2","s3"],"summary":"Maryland developer Natelli Investments proposed a 250 MW data center campus on about 189 acres of former farmland on Shearon Harris Road in the New Hill community of Wake County, North Carolina, next to Duke Energy's Shearon Harris nuclear plant. The project needed annexation into and rezoning by the Town of Apex and drew organized local opposition in 2025. In March 2026 Natelli withdrew its annexation and rezoning applications, saying it would consider next steps only if Apex amended its zoning rules to allow data centers, while town leaders weighed a one-year moratorium."},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"3b847726-3c79-5d0b-8e80-70c0498fd745","s2":"b65b4f7b-10e1-58b6-ae22-7f723d348388","s3":"b15455cd-25b4-5e61-b70c-33d0359a295f"},"source_file":"datacenters/projects/natelli-new-hill-digital-campus.json","source_record_id":"natelli-new-hill-digital-campus","source_record_sha256":"ce0a61a3c0650b4f20901871383b33a499a2f44ec25ff5f8d350a43483c5f70c","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"334fcb46e99a2440902633f2788d2445a18859a2d38dd97a94c3b9b36d81d1ad"}],"evidence_ids":["3b847726-3c79-5d0b-8e80-70c0498fd745","b15455cd-25b4-5e61-b70c-33d0359a295f","b65b4f7b-10e1-58b6-ae22-7f723d348388"],"status_source":{"evidence_id":"3b847726-3c79-5d0b-8e80-70c0498fd745","title":"Apex Data Center Scrapped","publisher":"Bisnow","kind":"trade_press","published_at":"2026-03-10","source_url":"https://www.bisnow.com/news/raleigh-durham/data-center/massive-raleigh-area-data-center-scrapped-133584","license":"source-terms-not-recorded","attribution":"Bisnow"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff3fe91dbbe9f9beaf9e/#project-03207f8c-1d9d-577f-9d8c-af881144fb86","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/03207f8c-1d9d-577f-9d8c-af881144fb86.json","geometry_source":{"evidence_id":"b65b4f7b-10e1-58b6-ae22-7f723d348388","title":"Residents near proposed Apex data center relieved project is scrapped, says more work needed","publisher":"WRAL","kind":"news","published_at":"2026-03-05","source_url":"https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/","license":"source-terms-not-recorded","attribution":"WRAL"}}],"evidence":[{"evidence_id":"3b847726-3c79-5d0b-8e80-70c0498fd745","roles":["imported:geometry","imported:record","imported:status","metric:land_area","metric:power_capacity","milestone:announced","milestone:cancelled","role:developer","role:government"],"project_ids":["03207f8c-1d9d-577f-9d8c-af881144fb86"],"kind":"trade_press","title":"Apex Data Center Scrapped","source_url":"https://www.bisnow.com/news/raleigh-durham/data-center/massive-raleigh-area-data-center-scrapped-133584","publisher":"Bisnow","source_family":"www.bisnow.com","license":"source-terms-not-recorded","attribution":"Bisnow","published_at":"2026-03-10","retrieved_at":"2026-10-09","content_hash":"5980ec4eadb91aeb00110e51afc03db24a349325da1e6ab89c9697459339b16d","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"natelli-new-hill-digital-campus","source_local_id":"s1","source_record_sha256":"ce0a61a3c0650b4f20901871383b33a499a2f44ec25ff5f8d350a43483c5f70c","site_ids":["vcc-site-ff3fe91dbbe9f9beaf9e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b847726-3c79-5d0b-8e80-70c0498fd745.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b847726-3c79-5d0b-8e80-70c0498fd745.json","archive_url":"https://web.archive.org/web/20261009/https://www.bisnow.com/news/raleigh-durham/data-center/massive-raleigh-area-data-center-scrapped-133584"},{"evidence_id":"b15455cd-25b4-5e61-b70c-33d0359a295f","roles":["imported:record","imported:status","milestone:cancelled","role:developer"],"project_ids":["03207f8c-1d9d-577f-9d8c-af881144fb86"],"kind":"news","title":"Data center developer pulls back from Apex for now","source_url":"https://abc11.com/post/data-center-developer-pulls-back-apex-now/18685708/","publisher":"ABC11 (WTVD)","source_family":"abc11.com","license":"source-terms-not-recorded","attribution":"ABC11 (WTVD)","published_at":"2026-03-07","retrieved_at":"2026-10-09","content_hash":"bf4646ca797e3cf4afb3927433e791fd1c91ce581dcf4f4ef34fd69dedb55424","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"natelli-new-hill-digital-campus","source_local_id":"s3","source_record_sha256":"ce0a61a3c0650b4f20901871383b33a499a2f44ec25ff5f8d350a43483c5f70c","site_ids":["vcc-site-ff3fe91dbbe9f9beaf9e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b15455cd-25b4-5e61-b70c-33d0359a295f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b15455cd-25b4-5e61-b70c-33d0359a295f.json","archive_url":"https://web.archive.org/web/20261009/https://abc11.com/post/data-center-developer-pulls-back-apex-now/18685708/"},{"evidence_id":"b65b4f7b-10e1-58b6-ae22-7f723d348388","roles":["imported:geometry","imported:record","imported:status","metric:land_area","metric:power_capacity","milestone:cancelled","role:developer","role:government"],"project_ids":["03207f8c-1d9d-577f-9d8c-af881144fb86"],"kind":"news","title":"Residents near proposed Apex data center relieved project is scrapped, says more work needed","source_url":"https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/","publisher":"WRAL","source_family":"www.wral.com","license":"source-terms-not-recorded","attribution":"WRAL","published_at":"2026-03-05","retrieved_at":"2026-10-09","content_hash":"aa81f148d56e0fc6df509c4caa05ac1663e5e82e68deeb556ddd088dd0a16564","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"natelli-new-hill-digital-campus","source_local_id":"s2","source_record_sha256":"ce0a61a3c0650b4f20901871383b33a499a2f44ec25ff5f8d350a43483c5f70c","site_ids":["vcc-site-ff3fe91dbbe9f9beaf9e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b65b4f7b-10e1-58b6-ae22-7f723d348388.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b65b4f7b-10e1-58b6-ae22-7f723d348388.json","archive_url":"https://web.archive.org/web/20261009/https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff3fe91dbbe9f9beaf9e/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff3fe91dbbe9f9beaf9e.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-ff3fe91dbbe9f9beaf9e","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
