# Data Center Atlas v0.18 expansion draft

200 physical sites, 203 projects, 46 countries. The frozen v0.17 baseline has 100 sites; this reviewed draft adds 100. The requested expansion target remains 200 total sites (100 additional).

This is an opt-in local draft, not a public release or a claim of goal completion. The public builder still defaults to v0.17. All inherited rows and features are preserved, except the changes made by pinned baseline corrections: the enumerated fields of 1 re-scoped project row, 1 site row and 1 feature; 1 superseded evidence row dropped; and 1 shared evidence row gaining only the corrected project association. Locators are not building footprints or surveyed boundaries unless their explicit semantics say otherwise. No additional roles, workloads, capacities, energy, or efficiency observations are inferred.

Baseline corrections: 1 pinned versioned correction (cgk-host-estate-locator-rescope-v1) re-scopes inherited locator semantics and evidence only; no site, project, geometry, display anchor or lifecycle observation is added, removed or moved. 1 counted project has host-estate locality context only, not a reviewed site locator; such a display anchor is not a site position. See selection-report.json baseline_corrections and locator_exceptions.

Lifecycle cutoff: 2026-08-20. Imagery outcomes: 10/203; additional blind reviews: 0. See selection-report.json for every gate and ATTRIBUTION.txt for source terms.