Data Center Atlas Verified Construction Core v0.17 preview

Compact derived facts only; third-party terms remain controlling.

- ACT Government Development Applications | rights-status-uncertain-fact-extraction-only | https://dafinder.blob.core.windows.net/dadocuments/DOCs/LSCAPE-202341644-06.pdf
- AS "Augstsprieguma tīkls" | all-rights-reserved | https://www.ast.lv/en/events/commissioning-new-building-latvias-power-system-main-dispatcher-control-and-data-centre
- AVAIO Digital Partners | all-rights-reserved | https://www.avaiodigital.com/developments/brandon-mississippi
- AVAIO Digital Partners | all-rights-reserved | https://www.avaiodigital.com/updates/avaio-digital-breaks-ground-on-6-billion-brandon-data-center-campus-leading-mississippi-contractor-begins-site-work
- AdaniConneX | all-rights-reserved | https://resources.adaniconnex.com/blog/scaling-indias-data-centres-responsibly-for-the-ai-era-bridging-people-planet-and-growth
- Agência Portuguesa do Ambiente (APA) | rights-status-uncertain-fact-extraction-only | https://siaia.apambiente.pt/AIADOC/AIA3633/22045-ep-amb-des-001-01-a202382212930.pdf
- Akashi Data Center | all-rights-reserved | https://akashi.cloud/about/
- Akashi Data Center | all-rights-reserved | https://akashi.cloud/construction-progress/
- Alto Infrastructure | all-rights-reserved | https://altoinfrastructure.com/assets/index-qcBJRWrY.js
- Amazon Innovation Campuses in Pennsylvania | all-rights-reserved | https://www.amazoninnovationinpa.com/salem-township-innovation-campus/
- Ascenty | all-rights-reserved | https://ascenty.com/en/blog/news-ascenty-en/ascenty-ai-contracts/
- Ascenty | all-rights-reserved-fact-extraction-only | https://ascenty.com/wp-content/uploads/2025/02/EN-Campus-Vinhedo_compressed.pdf
- Australian Capital Territory | CC-BY-4.0 | https://services1.arcgis.com/E5n4f1VY84i0xSjy/ArcGIS/rest/services/ACTGOV_BLOCKS/FeatureServer/0/query?where=DIVISION_NAME%3D%27BEARD%27%20AND%20SECTION_NUMBER%3D11%20AND%20BLOCK_NUMBER%3D24&outFields=%2A&returnGeometry=true&outSR=4326&f=geojson
- Australian Communications and Media Authority | ACMA-radiocomms-licence-data-terms | https://api.acma.gov.au/SpectrumLicensingAPIOuterService/OuterService.svc/SiteSearchJSON/10038207?searchField=SITE_ID
- Bitdeer Technologies Group | all-rights-reserved | https://www.sec.gov/Archives/edgar/data/1899123/000121390026079816/ea029852701ex99-1.htm
- Bitzero Holdings Inc. | all-rights-reserved | https://www.newsfilecorp.com/release/301582
- Bitzero Holdings Inc. via SEC EDGAR | all-rights-reserved-fact-extraction-only | https://www.sec.gov/Archives/edgar/data/2100457/000175392626000899/g085467_ex99-57.htm
- Bitzero Holdings Inc. via SEC EDGAR | all-rights-reserved-fact-extraction-only | https://www.sec.gov/Archives/edgar/data/2100457/000175392626000899/g085467_ex99-80.htm
- Bravida | all-rights-reserved | https://www.bravida.se/en/press/press-releases/2026/bravida-finland-awarded-additional-installation-contract-for-xtx-markets-data-center-complex-in-kajaani/
- Bureau National d'Evaluation Environnementale, Republic of Niger | all-rights-reserved | https://www.bnee.ne/wp-content/uploads/2022/08/Rapport-de%CC%81finitif-EIES-DATACENTER-PK5-Niamey_VP.pdf
- CDC Data Centres | all-rights-reserved | https://cdc.com.au/locations/perth/
- CDC Data Centres | all-rights-reserved | https://cdc.com.au/locations/sydney/
- CDC Data Centres | all-rights-reserved | https://www.cdc.com.au/locations/canberra/
- CDC Data Centres | all-rights-reserved | https://www.cdc.com.au/locations/melbourne/
- CRA | all-rights-reserved | https://www.linkedin.com/embed/feed/update/urn:li:activity:7496145983718969344
- Catawba County GIS | county-public-gis-fact-extraction-only | https://arcgis2.catawbacountync.gov/arcgis/rest/services/Catawba_Basic_MIL1/MapServer/2/query
- Chiba Prefecture | rights-status-not-established | https://www.pref.chiba.lg.jp/taiki/tetsuzuki/taibouhou/documents/20250331baien.pdf
- Chirisa Technology Parks | all-rights-reserved | https://chirisatechnologyparks.com/
- City and County of Denver | CC-BY-3.0 | https://services1.arcgis.com/zdB7qR0BtYrg0Xpl/arcgis/rest/services/ODC_PROP_PARCELS_A/FeatureServer/245/query?where=SITUS_ADDRESS_ID%3D23973%20AND%20SCHEDNUM%3D%270214400131000%27&outFields=OBJECTID%2CSCHEDNUM%2CSITUS_ADDRESS_ID%2CSITUS_ADDRESS_LINE1%2CSITUS_CITY%2CSITUS_STATE%2CSITUS_ZIP%2COWNER_NAME%2CPARCELNUM&returnGeometry=true&returnCentroid=true&outSR=4326&f=json
- City of Abilene Planning and Development Services | public-government-record | https://abilenetx.gov/DocumentCenter/View/36625/2025-Quarter-2---Quarterly-Report-PDF
- City of Aurora | public-domain | https://services1.arcgis.com/79UxTxnBeBW8JHY4/arcgis/rest/services/Address_Points/FeatureServer/0/query?where=LOCATIONID%3D85050%20AND%20PIN%3D%2707-05-105-006%27&outFields=OBJECTID%2CLOCATIONID%2CPIN%2CADDRESS%2CCITY%2CZIPCODE%2CCOUNTY%2CZONING%2CLANDUSE%2COWNERNAME&returnGeometry=true&outSR=4326&f=geojson
- City of Chicago | SEE_TERMS_OF_USE | https://data.cityofchicago.org/resource/syp8-uezg.json?bldg_id=871169
- City of Gosnells | rights-status-uncertain-fact-extraction-only | https://maps.gosnells.wa.gov.au/intramaps22A/?project=Gosnells
- City of Kajaani | rights-status-uncertain-fact-extraction-only | https://kajaani.cloudnc.fi/download/noname/%7B9718289e-abdf-42c7-bedf-f52f8187fb6e%7D/67308
- City of Kouvola | rights-status-uncertain-fact-extraction-only | https://ep10.kouvola.fi/kokous/20261369-9-158346.PDF
- City of Loviisa | all-rights-reserved | https://www.loviisa.fi/ajankohtaista/meluavat-tyot-datakeskuksen-tyomaalla-jatkuvat/
- City of Loviisa | rights-status-uncertain-fact-extraction-only | https://loviisa.oncloudos.com/fi/kokous/20251258-4-67458.PDF
- City of San Jose | city-open-data-disclaimer | https://geo.sanjoseca.gov/server/rest/services/OPN/OPN_OpenDataService/MapServer/36
- City of San Jose | rights-status-disclaimer-fact-extraction-only | https://geo.sanjoseca.gov/server/rest/services/OPN/OPN_OpenDataService/MapServer/455
- Colt Data Centre Services | all-rights-reserved | https://www.coltdatacentres.net/-/media/Files/guides/colt-dcs-sustainability-report-cy2025.pdf
- Colt Data Centre Services | all-rights-reserved | https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/frankfurt-three
- Colt Data Centre Services | all-rights-reserved | https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/london-4
- Colt Data Centre Services | all-rights-reserved | https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/london-4/timeline
- Colt Data Centre Services | all-rights-reserved | https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-2
- Copenhagen Infrastructure Partners | all-rights-reserved | https://www.cip.com/copenhagen-infrastructure-partners-p-s/r/cip-and-thylander-start-construction-of-energy-integrated-data-centre-in-denmark-backed-by-pensionda,c4383657?nfiid=3202
- CoreSite | all-rights-reserved | https://www.coresite.com/data-center/de3-denver-co
- CoreSite | all-rights-reserved | https://www.coresite.com/en-us/data-centers/denver/de3-construction
- CoreSite | all-rights-reserved | https://www.coresite.com/hubfs/-website-documents/facility-specifications/sp-CoreSite-Denver-DE3-Spec-Sheet.pdf
- CoreSite | all-rights-reserved | https://www.coresite.com/news/coresite-achieves-key-construction-milestone-for-new-de3-data-center-in-denver
- Crane Industry Council of Australia | all-rights-reserved | https://www.linkedin.com/embed/feed/update/urn:li:activity:7475736271517286400
- CyrusOne | all-rights-reserved | https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus
- CyrusOne | all-rights-reserved | https://www.linkedin.com/posts/cyrusone_datacenters-digitalinfrastructure-operationalexcellence-activity-7471180193492078592-WzIz
- Czech Office for Surveying, Mapping and Cadastre (CUZK) | all-rights-reserved | https://ags.cuzk.gov.cz/arcgis/rest/services/RUIAN/MapServer/5/query?where=katastralniuzemi%3d660175+AND+%28%28cisloparcely%3d%27505%2f2%27+AND+druhcislovanikod%3d2%29+OR+%28cisloparcely%3d%27379%27+AND+druhcislovanikod%3d1%29%29&outFields=id%2ccisloparcely%2ckatastralniuzemi%2ckmenovecislo%2cpoddelenicisla%2cdruhcislovanikod%2cvymeraparcely%2cplatiod%2cplatido%2czdroj&returnGeometry=true&outSR=4326&f=geojson
- Danish Environmental Protection Agency | all-rights-reserved | https://dma.mst.dk/vis-virksomhed/6caab521-290e-45ba-aabd-17d4f2a86c17
- Data World | all-rights-reserved | https://dataworld.com.np/
- Datagrid New Zealand | all-rights-reserved | https://www.datagrid.nz/pr1-rc/horizontal-works-begin-on-datagrids-ai-data-centre-campus-in-makarewa
- Digi Power X Inc. | all-rights-reserved | https://thankful-miracle-1ed8bdfdaf.media.strapiapp.com/Digi_Power_X_Provides_Operations_and_Financial_Update_4a179c433b.pdf
- Digital Edge | all-rights-reserved | https://www.digitaledgedc.com/wp-content/uploads/2023/06/SEL2_Specsheet_EN.pdf
- Digital Edge Indonesia | all-rights-reserved | https://id.digitaledgedc.com/news/digital-edge-tops-out-cgk1-secures-largest-indonesia-power-deal
- Digital Realty | all-rights-reserved | https://go2.digitalrealty.com/rs/087-YZJ-646/images/BR_Digital_Realty_2606_Park_Wien_VIE13_EN.pdf
- Digital Realty | all-rights-reserved | https://www.digitalrealty.com/about/projects/digital-cermak
- Digital Realty | all-rights-reserved | https://www.digitalrealty.com/data-centers/emea/vienna/vie13
- Digital Realty | all-rights-reserved | https://www.linkedin.com/posts/digitalrealty_carrier-hub-day-wrapupmp4-activity-7473287475726213120-4j-2
- Direction générale des Finances publiques (DGFiP) / data.gouv.fr | etalab-2.0 | https://cadastre.data.gouv.fr/data/etalab-cadastre/latest/geojson/communes/91/91661/cadastre-91661-parcelles.json.gz
- ENKA Data Solutions | all-rights-reserved | https://enkadatasolutions.com/locations/eds-ist-01-tuzla/
- ENKA Data Solutions | all-rights-reserved | https://www.linkedin.com/embed/feed/update/urn:li:activity:7471178062345297920
- ENKA İnşaat ve Sanayi A.Ş. | all-rights-reserved | https://www.enka.com/portfolio-item/enka-tuzla-data-center/
- ENKA İnşaat ve Sanayi A.Ş. | all-rights-reserved | https://www.enka.com/what-we-do/
- EdgeCore Digital Infrastructure | all-rights-reserved | https://edgecore.com/locations/ashburn-data-center
- EdgeCore Digital Infrastructure | all-rights-reserved | https://www.linkedin.com/posts/edgecore-digital-infrastructure_yesterday-edgecore-celebrated-the-topping-activity-7478135212778938368-t979
- Edged | all-rights-reserved | https://www.linkedin.com/posts/edgedenergy_edgedus-councilbluffs-omaha-activity-7483966398021390336-wI13
- Edged US | all-rights-reserved | https://edged.us/chicago
- Edged US | all-rights-reserved | https://edged.us/news/edged-breaks-ground-on-200-mw-council-bluffs-data-center-to-power-ai
- Edged US | all-rights-reserved | https://edged.us/news/edged-us-tops-out-second-sustainable-data-center-on-edged-chicago-campus
- Energieagentur Rheinland-Pfalz | all-rights-reserved-fact-extraction-only | https://www.energieatlas.rlp.de/geoserver/earp/ows?service=WFS&version=1.0.0&request=GetFeature&typeName=earp%3Apraxisbeispiele&srsName=EPSG%3A4326&outputFormat=application%2Fjson&cql_filter=id%3D149%20AND%20typ%3D%27unternehmen%27
- Engineering Consultants Group S.A. | all-rights-reserved | https://www.ecgsa.com/telecom-egypt-regional-data-hub-2-rdh2-data-center/
- Environment Agency consultation portal | all-rights-reserved-fact-extraction-only | https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf
- Ezditek | all-rights-reserved | https://ezditek.com/2024/11/ezditek-breaks-ground-on-data-center-facility-in-riyadh-to-provide-a-foundation-for-ai-and-cloud-innovation-in-the-kingdom-of-saudi-arabia/
- Ezditek | all-rights-reserved | https://www.linkedin.com/embed/feed/update/urn:li:activity:7473316883811930112
- Finnish Environment Institute Ryhti | CC-BY-4.0 | https://paikkatiedot.ymparisto.fi/geoserver/ryhti_permit/ogc/features/v1/collections/open_permit_building/items?f=application%2Fgeo%2Bjson&filter=permanent_permit_identifier%3D%27302396994R%27%20AND%20gross_floor_area%3D24145&limit=10
- Geodetic Survey Section, Lands Department, Government of the Hong Kong SAR | Hong-Kong-DATA.GOV.HK-Terms-of-Use | https://www.geodetic.gov.hk/transform/v2/?inSys=hkgrid&outSys=wgsgeog&e=832091&n=825415
- Gilbane Building Company | all-rights-reserved | https://www.gilbaneco.com/about/whats-new/news/gilbane-marks-steel-topping-out-milestone-for-data-center-campus-in-upstate-south-carolina/
- Goodman Group | all-rights-reserved | https://au.goodman.com/en/our-properties/properties-for-lease/goodman-syd01
- Goodman Group | all-rights-reserved | https://hk.goodman.com/en/about-goodman/media-centre/news/2026/20260716-goodman-advances-hkg09-groundbreaking
- Goodman Group | all-rights-reserved | https://hk.goodman.com/our-properties/data-centres/global-data-centre-pipeline
- Gouvernement de la République du Niger | all-rights-reserved | https://www.gouv.ne/index.php/actualite-des-ministeres/1200-communication-et-numerique-le-niger-ambitionne-de-devenir-un-hub-regional-des-telecommunications
- Government of Alberta | Open-Government-Licence-Alberta | https://geospatial.alberta.ca/titan/rest/services/ags_apps/ags_apps_alberta_township_system/MapServer/2/query
- Government of Aragón | all-rights-reserved | https://www.aragonhoy.es/economia-competitividad-y-empleo/walqa-refuerza-crecimiento-nueva-conexion-directa-huesca-105562
- Government of Aragón | rights-status-not-established | https://www.aragon.es/documents/d/guest/tomo-i-memoria-justificativa-pdf
- Green | all-rights-reserved | https://www.green.ch/en/enterprise/data-center-locations/green-switzerland/campus-zrh1-lupfig/datacenter-4-lupfig
- Green Mountain | all-rights-reserved | https://greenmountain.no/data-center/fra-mainz/
- Green Mountain | all-rights-reserved | https://info.greenmountain.no/datasenter-pa-undheim/
- HITT Contracting | all-rights-reserved | https://www.hitt.com/news-hub/hitt-breaks-ground-microsoft-alviso-datacenter/
- Haidong Municipal People's Government | all-rights-reserved | https://www.haidong.gov.cn/haidongos/ewebeditor/uploadfile/2025051314534893333.pdf
- Huzhu County People's Government | all-rights-reserved | https://www.huzhu.gov.cn/info/1007/85926.htm
- Impact Geotechnical Limited | all-rights-reserved | https://consult.environment-agency.gov.uk/psc/cmr-we4588ab-v017-9na-harlow-operations-limited/supporting_documents/Application%20%20Variation%20V002%20%20APPENDIX%20H%20%20Interim%20Baseline%20Report%20%20Kao%20Data%20Centre%202025%2031032025.pdf
- Inflect, Inc. | all-rights-reserved-fact-extraction-only | https://inflect.com/building/38-ring-road-tunari/nxdata/datacenter/nxdata-3
- Infratil Limited | all-rights-reserved | https://api.nzx.com/public/announcement/473284/attachment/469320/473284-469320.pdf
- International Finance Corporation | all-rights-reserved | https://ifc.shorthandstories.com/watts-and-zeros-powering-nepals-digital-future/embed.js
- Internet Initiative Japan Inc. | all-rights-reserved | https://www.iij.ad.jp/en/ir/policy/risk/
- Internet Initiative Japan Inc. | all-rights-reserved | https://www.iij.ad.jp/en/news/pressrelease/2025/0508.html
- Invest in Spain, ICEX España Exportación e Inversiones | all-rights-reserved | https://www.investinspain.org/es/noticias-main/2026/alto
- Junta de Andalucía | rights-status-not-established | https://www.juntadeandalucia.es/organismos/sobre-junta/altos-cargos/agenda/detalle/217027.html
- Kartverket | CC-BY-4.0 | https://api.kartverket.no/eiendom/v1
- Kartverket | CC-BY-4.0 | https://api.kartverket.no/eiendom/v1/geokoding?matrikkelnummer=5044-50%2F44&omrade=true&utkoordsys=4258
- Kartverket / Statens kartverk | CC-BY-4.0 | https://wfs.geonorge.no/skwms1/wfs.matrikkelen-eiendomskart-teig?service=WFS&version=2.0.0&request=GetFeature&typeNames=app%3ATeig&count=20&srsName=EPSG%3A4326&NAMESPACES=xmlns%28app%2Chttp%3A%2F%2Fskjema.geonorge.no%2FSOSI%2Fproduktspesifikasjon%2FMatrikkelen-Eiendomskart-Teig%2F20211101%29&FILTER=%3Cfes%3AFilter+xmlns%3Afes%3D%22http%3A%2F%2Fwww.opengis.net%2Ffes%2F2.0%22+xmlns%3Aapp%3D%22http%3A%2F%2Fskjema.geonorge.no%2FSOSI%2Fproduktspesifikasjon%2FMatrikkelen-Eiendomskart-Teig%2F20211101%22%3E%3Cfes%3AAnd%3E%3Cfes%3APropertyIsEqualTo%3E%3Cfes%3AValueReference%3Eapp%3Akommunenummer%3C%2Ffes%3AValueReference%3E%3Cfes%3ALiteral%3E1806%3C%2Ffes%3ALiteral%3E%3C%2Ffes%3APropertyIsEqualTo%3E%3Cfes%3APropertyIsEqualTo%3E%3Cfes%3AValueReference%3Eapp%3AmatrikkelnummerTekst%3C%2Ffes%3AValueReference%3E%3Cfes%3ALiteral%3E10%2F760%3C%2Ffes%3ALiteral%3E%3C%2Ffes%3APropertyIsEqualTo%3E%3C%2Ffes%3AAnd%3E%3C%2Ffes%3AFilter%3E
- Kartverket / Statens kartverk | CC-BY-4.0 | https://ws.geonorge.no/adresser/v1/sok?sok=%C3%98stre%20Aker%20vei%2024C%2C%200581%20Oslo&utkoordsys=4326&treffPerSide=10
- Kendall County GIS | county-public-gis-fact-extraction-only | https://maps.co.kendall.il.us/server/rest/services/Hosted/Current_Cadastral_Features/FeatureServer/1/query
- Klimadatastyrelsen | CC-BY-4.0 | https://api.dataforsyningen.dk/adgangsadresser/b0351879-20c7-47f9-8cde-54dad6a417a8?format=geojson&srid=4326
- Land Information New Zealand | CC-BY-4.0 | https://services.arcgis.com/xdsHIIxuCWByZiCB/ArcGIS/rest/services/LINZ_NZ_Primary_Parcels/FeatureServer/0/query?where=appellation+IN+%28%27Lot+1+DP+595572%27%2c%27Lot+2+DP+595572%27%2c%27Lot+3+DP+595572%27%2c%27Lot+2+DP+526953%27%29&outFields=OBJECTID%2cid%2cappellation%2cparcel_intent%2ctopology_type%2cland_district%2ctitles%2csurvey_area%2ccalc_area%2cShape__Area%2cShape__Length&returnGeometry=true&outSR=4326&orderByFields=appellation+ASC&f=geojson
- Landsvirkjun | all-rights-reserved | https://www.landsvirkjun.com/news/borealis-and-landsvirkjun-sign-a-12-mw-power-purchasing-agreement
- Licking County, Ohio | rights-status-uncertain-fact-extraction-only | https://services1.arcgis.com/iUtb2L01aPkOaIXu/arcgis/rest/services/Parcels_LickingOH/FeatureServer
- Loudoun County, Virginia | Loudoun-County-GIS-disclaimer | https://logis.loudoun.gov/gis/rest/services/COL_WebMercator/Parcels4DIT/MapServer/0/query
- Macquarie Data Centres | all-rights-reserved | https://www.macquariedatacentres.com/blog/treasurer-tops-out-macquarie-data-centres-newest-47mw-ai-and-cloud-data-centre/
- Macquarie Data Centres | all-rights-reserved | https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/ic3-super-west/
- Macquarie Data Centres | all-rights-reserved | https://www.macquariedatacentres.com/wp-content/uploads/sites/5/2023/09/Data-Centres-Data-Sheet-IC3-Super-West-Specs-230923.pdf
- Mannverk | all-rights-reserved | https://www.mannverk.is/allprojects/atnorth2
- Mercury Engineering | all-rights-reserved | https://www.mercuryeng.com/2026/07/16/mercury-marks-significant-milestone-at-equinixs-mu4-3-data-centre-delivery-in-munich-germany/
- Meta | all-rights-reserved | https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/
- Microsoft | all-rights-reserved | https://local.microsoft.com/blog/heath-datacenter-construction-updates/
- Microsoft | all-rights-reserved | https://local.microsoft.com/blog/hebron-datacenter-construction-update/
- Microsoft | all-rights-reserved | https://local.microsoft.com/blog/lyle-creek-datacenter-construction-update/
- Microsoft | all-rights-reserved | https://local.microsoft.com/blog/newalbany-datacenter-construction-update/
- Microsoft | all-rights-reserved | https://local.microsoft.com/blog/san-bovio-datacenter-construction-update/
- Microsoft | all-rights-reserved | https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/
- Ministerio del Medio Ambiente de Chile - SIMBIO | no-use-restriction-stated-for-reference-cartography | https://simbio.mma.gob.cl/DPA/GetSEIA?Codigo=13
- Municipality of Mäntsälä | all-rights-reserved | https://mantsala.karttatiimi.fi/maps/search.ashx
- NSW Department of Planning, Housing and Infrastructure | no-license-stated-for-compact-factual-extraction | https://www.planningportal.nsw.gov.au/major-projects/projects/roberts-road-data-centre
- NSW Planning Portal | all-rights-reserved-fact-extraction-only | https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-66777221%2120240606T082629.257+GMT
- NTT DATA, Inc. | all-rights-reserved | https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-4-data-center
- NTT DATA, Inc. | all-rights-reserved | https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/emea/frankfurt-1-data-center
- NTT Global Data Centers | all-rights-reserved | https://www.linkedin.com/posts/ntt-global-data-centers_time-lapse-video-tx4-garland-tx-activity-7473147125938147328-uZsM
- NXDATA | all-rights-reserved | https://www.linkedin.com/posts/nxdata_nxdata-nxdata3-datacenter-activity-7467582788171616256-fwVo
- NXDATA SRL | all-rights-reserved | https://nxdata3.com/
- National Land Survey of Finland (NLS) | CC-BY-4.0 | https://inspire-wfs.maanmittauslaitos.fi/inspire-wfs/cp/ows?service=WFS&version=2.0.0&request=GetFeature&typeNames=cp%3ACadastralParcel&outputFormat=application%2Fjson&CQL_FILTER=nationalCadastralReference%3D%2720500700040001%27
- National Land Survey of Finland (NLS) | CC-BY-4.0 | https://inspire-wfs.maanmittauslaitos.fi/inspire-wfs/cp/ows?service=WFS&version=2.0.0&request=GetFeature&typeNames=cp%3ACadastralParcel&outputFormat=application%2Fjson&CQL_FILTER=nationalCadastralReference%3D%2728642300200001%27
- New Mexico State Ethics Commission | rights-status-not-established | https://www.sec.nm.gov/wp-content/uploads/2026/04/2026-04-23-SEC-v.-Elevate-NM-Press-Release.pdf
- Nscale | all-rights-reserved | https://www.nscale.com/press-releases/nordscale
- ODATA | all-rights-reserved | https://odatacolocation.com/blog/data-center/dc-sp04/
- ODATA | all-rights-reserved-fact-extraction-only | https://odatacolocation.com/blog/data-center/dc-sp04/
- ODATA - An Aligned Data Centers Company | all-rights-reserved | https://www.linkedin.com/embed/feed/update/urn:li:activity:7473377620018077696
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/1336972876/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/1485385261/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/1544103564/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/545580264/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/554352050/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/568349989/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/639973556/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://api.openstreetmap.org/api/0.6/way/639973557/full.json
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1171439340
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1223207434
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1227173411
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1298979790
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1334234458
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1417621831
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1476734418
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1495920404
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1528327802
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1528490094
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/1533569836
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/210537873
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/242248627
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/263915226
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/38246899
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/697501723
- OpenStreetMap contributors | ODbL-1.0 | https://www.openstreetmap.org/way/899514480
- Oracle | all-rights-reserved | https://www.oracle.com/data-centers/
- PDOK / Netherlands Cadastre, Land Registry and Mapping Agency | Public-Domain-Mark-1.0 | https://api.pdok.nl/bzk/locatieserver/search/v3_1/lookup?id=adr-26c03da8f403dfbe0de863d7b9cff485&fl=%2A
- Portal Site of Official Statistics of Japan (e-Stat) | e-stat-terms-compatible-with-CC-BY-4.0 | https://www.e-stat.go.jp/gis/statmap-search/data?dlserveyId=A002005212020&code=12232&coordSys=1&format=shape&downloadType=5&datum=2011
- Pottawattamie County GIS | county-open-data-no-explicit-license | https://gis.pottcounty-ia.gov/arcgis/rest/services/OpenData/MapServer/9/query
- Prefeitura de Fortaleza - SEUMA | all-rights-reserved | https://urbanismoemeioambiente.fortaleza.ce.gov.br/images/urbanismo-e-meio-ambiente/infocidade/cppd/PROJETO_ARQUITETONICO_FL01-02.pdf
- Pune Data Center Limited | all-rights-reserved | https://www.adaniconnex.com/-/media/Project/AdaniConneX/AdaniConneX-AboutUs-Assets/Certifications/Post-EC-compliance-report-PNQ26--with-Anneure.pdf
- Pure DC | all-rights-reserved | https://puredc.com/2026/05/27/pure-dc-secures-2-7-billion-to-accelerate-ai-infrastructure-growth-across-europe-and-the-middle-east
- Pure DC | all-rights-reserved | https://puredc.com/2026/05/28/pure-dc-appoints-glencar-for-next-phase-of-its-90mw-brent-cross-campus-build-out
- Pure DC | all-rights-reserved | https://puredc.com/amsterdam
- QScale | all-rights-reserved | https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure
- QTS Data Centers | all-rights-reserved | https://q.com/data-centers/cambois/
- QTS Data Centers | all-rights-reserved | https://q.com/data-centers/cedar-rapids/
- QTS Data Centers | all-rights-reserved | https://q.com/data-centers/eagle-mountain/
- QTS Data Centers | all-rights-reserved | https://q.com/data-centers/york/
- QTS Data Centers | all-rights-reserved-fact-extraction-only | https://q.com/data-centers/cedar-rapids/
- Racks Central | all-rights-reserved | https://www.rackscentral.com/news/racks-central-celebrates-milestone-for-southeast-asia-s-first-ai-factory-campus-in-johor
- Regierungspräsidium Darmstadt | rights-status-not-established | https://rp-darmstadt.hessen.de/sites/rp-darmstadt.hessen.de/files/2026-07/bescheid-4_ndma-ff7-cyrusone_end.pdf
- Related Digital | all-rights-reserved | https://www.related-digital.com/wyoming
- Related Digital | all-rights-reserved | https://www.related.com/press-releases/2026-06-01/related-digital-blackstone-oracle-openai-walbridge-and-governor-whitmer
- Related Digital | all-rights-reserved-fact-extraction-only | https://www.related-digital.com/wyoming
- SK ecoplant | all-rights-reserved | https://news.skecoplant.com/board/19247
- ST Telemedia Global Data Centres | all-rights-reserved | https://assets.sttelemediagdc.com/sttgdc/global_en/public/2026-07/STT_Jakarta_3_Factsheet-vJul2026.pdf
- ST Telemedia Global Data Centres | all-rights-reserved | https://www.sttelemediagdc.com/newsroom/stt-gdc-accelerates-jakarta-campus-expansion-power-indonesia-ai-and-digital-ambitions
- Sabey Data Centers | all-rights-reserved | https://sabeydatacenters.com/news/sdc-austin-progress-q2-2026
- Scala Data Centers | all-rights-reserved | https://scaladatacenters.com/en/data-centers-en/
- Sentia | all-rights-reserved | https://www.sentiagruppen.no/press/hent-inngar-kontrakt-pa-byggetrinn-2-osl1-datasenter-pa-okern
- Skygard | all-rights-reserved | https://www.skygard.no/osl1-eng
- Southland District Council | all-rights-reserved | https://www.southlanddc.govt.nz/assets/Planning-Resource-Consent/datagrid/01-Application/0-Application-Datagrid-New-Zealand-Partnership-Limited.pdf
- Start Campus | all-rights-reserved | https://www.linkedin.com/feed/update/urn:li:activity:7475104761256718337
- Stockholms stad | rights-status-not-established | https://vaxer.stockholm/projekt/akalla/serverhallar-med-atervinning-av-overskottsvarme/
- Sturgeon County | government-copyright-fact-extraction-only | https://www.sturgeoncounty.ca/development-permit-approval-notice-for-56111-rge-rd-223/
- TAB Egypt | all-rights-reserved | https://www.linkedin.com/embed/feed/update/urn:li:activity:7470418236245942286
- TRG Datacenters | all-rights-reserved | https://www.trgdatacenters.com/wp-content/uploads/2026/01/TRG-Campus-HOU2-Brochure.pdf
- Telia Lietuva, AB | all-rights-reserved | https://www.nasdaqbaltic.com/market/upload/reports/tel1/2026_q2_en.pdf
- Ten Brinke Group | all-rights-reserved | https://www.tenbrinke.com/en/projects/current-projects/current-projects-details/data-center-spata-26-1052-gr.html
- Teraco | all-rights-reserved | https://www.teraco.co.za/data-centre-locations/cape-town/?tab=rondebosch-ct1
- Teraco | all-rights-reserved | https://www.teraco.co.za/news/teraco-announces-ct1-data-centre-expansion-in-rondebosch-cape-town/
- Thomas Jefferson National Accelerator Facility | all-rights-reserved | https://www.jlab.org/news/releases/jefferson-lab-breaks-ground-new-building-power-next-generation-scientific-discovery
- U.S. Army Corps of Engineers, Wilmington District | US-federal-public-domain | https://saw-reg.usace.army.mil/PN/2023/SAW-2023-00898-PN.pdf
- Unidad Administrativa Especial de Catastro Distrital (UAECD) | CC-BY-4.0 | https://serviciosgis.catastrobogota.gov.co/arcgis/rest/services/catastro/placadomiciliaria/MapServer/0/query?where=PDOCODIGO%3D%27AAA0137OYMRPD01%27&outFields=OBJECTID%2CPDOCODIGO%2CPDOTEXTO%2CPDOCINTERI%2CPDONVIAL%2CPDOCLOTE%2CPDOTIPO&returnGeometry=true&outSR=4326&f=geojson
- Unified Environmental Portal of Kazakhstan | no-license-stated-for-compact-factual-extraction | https://ecoportal.kz/Rubric/RubService/LoadFile/59205
- United States Census Bureau | US-federal-public-domain | https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=130%20Industrial%20Pkwy%2C%20Columbiana%2C%20AL&benchmark=Public_AR_Current&vintage=Current_Current&format=json
- United States Census Bureau | public-domain-us-government | https://geocoding.geo.census.gov/geocoder/
- United States Securities and Exchange Commission | all-rights-reserved-fact-extraction-only | https://www.sec.gov/Archives/edgar/data/1899123/000110465923029896/tm2135137d43_ex10-19.htm
- United States Securities and Exchange Commission | all-rights-reserved-fact-extraction-only | https://www.sec.gov/Archives/edgar/data/1899123/000114036123040877/brhc20057629_ex10-2.htm
- Utah County GIS Division | county-public-gis-fact-extraction-only | https://maps.utahcounty.gov/arcgis/rest/services/Parcels/Parcel_AddressPoints/MapServer/0/query
- Valsts akciju sabiedrība “Latvijas Valsts radio un televīzijas centrs” | all-rights-reserved | https://www.lvrtc.lv/projekti/datu-centrs-pozitrons/
- Valsts akciju sabiedrība “Latvijas Valsts radio un televīzijas centrs” | all-rights-reserved | https://www.lvrtc.lv/projekti/datu-centrs-pozitrons/projekta-aktualitate/
- Valsts zemes dienests | CC-BY-4.0 | https://geo-dpps.viss.gov.lv/api/DPPSPackage/client/Adresu_tel_418_k6gL2A/3d692785-0c95-44a8-816c-f2f91493c4ce?service=WFS&version=2.0.0&request=GetFeature&typeNames=ad%3AAddress&featureID=AD101873308
- Valsts zemes dienests | CC-BY-4.0 | https://grafws.kadastrs.lv/geoserver/cp/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=cp%3ACadastralParcel&outputFormat=application%2Fjson&CQL_FILTER=label%3D%2762740010343%27
- Vantage Data Centers | all-rights-reserved | https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin
- Verne | all-rights-reserved | https://www.verne.co/news/news-verne-begins-construction-of-the-first-70-mw-on-its-data-center-campus-in-m%C3%A4nts%C3%A4l%C3%A4
- Village of Hebron, Ohio | rights-status-uncertain-fact-extraction-only | https://villageofhebron.squarespace.com/s/P-Z-030724-Minutes.pdf
- Washington State Geoportal | use-restrictions-fact-extraction-only | https://services.arcgis.com/jsIt88o09Q0r1j8h/arcgis/rest/services/Current_Parcels/FeatureServer
- Wisconsin Department of Natural Resources | public-government-record | https://dnr.wisconsin.gov/topic/EIA/Portwashington.html
- Wisconsin Department of Natural Resources | public-government-record-fact-extraction-only | https://dnr.wisconsin.gov/topic/EIA/Portwashington.html
- YIT | all-rights-reserved | https://www.yitgroup.com/en/news-repository/investor-news/yit-and-atnorth-agree-on-construction-of-a-data-center-in-kouvola--value-for-yit-approximately-eur-300-million
- atNorth | all-rights-reserved | https://www.atnorth.com/news/atnorth-joins-norwegian-data-center-association/
- eStruxture | all-rights-reserved | https://www.estruxture.com/data-centers/calgary/cal-3
- eStruxture | all-rights-reserved-fact-extraction-only | https://www.estruxture.com/hubfs/eStruxture_Datasheet_CAL3%20EN%20V1%202024.pdf?hsLang=en
- firstcolo | all-rights-reserved | https://firstcolo.net/en/250-million-euros-for-ai-infrastructure-firstcolo-breaks-ground-on-fra7-data-center-in-hesse/
- firstcolo Datacenters GmbH | all-rights-reserved-fact-extraction-only | https://firstcolo.net/wp-content/uploads/factsheet-rosbach_dez_25_DE.pdf
- maincubes | all-rights-reserved | https://www.maincubes.com/en/data-centers/berlin-cloud-ai-provider-campus-ber02/
- maincubes | all-rights-reserved | https://www.maincubes.com/wp-content/uploads/2026/02/maincubes_factsheet_ber02_en.pdf

Processed statistical boundary notice: Portal Site of Official Statistics of Japan (e-Stat); Statistics Bureau of Japan; selected Shapefile feature converted to GeoJSON by Data Center Atlas.
Terms: https://www.e-stat.go.jp/terms-of-use
GIS terms: https://www.e-stat.go.jp/gis-terms

Census locator notice: United States Census Bureau, Census Geocoder Public_AR_Current exact-address matches; compact factual locator results only. Street-range interpolation is not parcel, building, campus, project, or construction geometry. No map tiles or imagery are redistributed.

v0.13 geometry notice: Contains data from the National Land Survey of Finland INSPIRE Cadastral Parcels (CP) WFS, licensed under the National Land Survey open data Attribution CC 4.0 licence; retrieved 2026-08-23. Kartverket property geometry is CC BY 4.0, © Kartverket. RUH01 geometry is © OpenStreetMap contributors and ODbL 1.0. Raw all-rights PDFs and issuer HTML are not redistributed or relicensed; only compact facts and hashes are retained. No Esri imagery or pixels are redistributed or interpreted.

v0.14 geometry notice: Seven selected points are factual address-match results from the United States Census Bureau Public_AR_Current benchmark and are treated as U.S. government public-domain data. One selected point is a compact fact from the QTS Cedar Rapids page; one is a City of San Jose address point subject to the City's open-data disclaimer. Washington and Licking County parcel data, SEC exhibits, the Village of Hebron PDF, the City development polygon, and all source HTML/PDF remain fact-extraction-only and are not redistributed. No parcel polygon, source imagery, map tile, or third-party pixel is redistributed or interpreted.

v0.15 geometry notice: The exact FIN04 NLS MultiPolygon and Hyperco Ryhti building point contain Finnish public-sector data licensed under CC BY 4.0. The exact CDC Beard Block 24 Section 11 polygon contains Australian Capital Territory cadastral data licensed under CC BY 4.0; the source marks it RETIRED and this preview uses it only as a historical BE1 locator, never a present legal boundary. CAL-3 and the Energieatlas FRA-Mainz points are compact factual extractions from their named official sources. All raw PDFs, HTML, all-rights-reserved responses, source imagery, map tiles, and third-party pixels are excluded.

v0.16 geometry notice: The Smart Village, Iskandar Halal Park Phase 1 and 2, Telia Vilnius, and Greenland International Industrial Center ways contain OpenStreetMap data made available under ODbL 1.0. Their derived Polygon or MultiPolygon geometries are broad campus locators only, never official boundaries or project footprints. The exact IDECA address-point fact is attributed under CC BY 4.0, and the exact PDOK BAG address-point fact carries Public Domain Mark 1.0. The APA SIN02-06 point is a compact approximate 25-metre GeoPDF-derived shared-area centroid only. Raw API responses, HTML, PDFs, GeoPDFs, drawing bundles, source imagery, map tiles, and third-party pixels are excluded.

v0.17 geometry notice: The 20 new records are locator facts only. Their exact source, attribution, licence or fact-extraction posture, raw-capture digest, and precision limitation are preserved in evidence.csv and selection-report.json. No raw source document, map, API response, imagery, or publisher media is redistributed.

Contains information licensed under the Open Government Licence – Alberta. The Alberta quarter-section polygons and LINZ primary parcels are selected and dissolved into locator unions; the DAR address point is selected without changing its coordinates. These derived locators do not imply provider endorsement.

v0.17 captured source credits and rights links:
- ascenty-vinhedo-campus-factsheet: Ascenty | all-rights-reserved-fact-extraction-only | https://ascenty.com/wp-content/uploads/2025/02/EN-Campus-Vinhedo_compressed.pdf | Rights: https://ascenty.com/wp-content/uploads/2025/02/EN-Campus-Vinhedo_compressed.pdf
- cdc-brooklyn-acma-site-10038207: Australian Communications and Media Authority | ACMA-radiocomms-licence-data-terms | https://api.acma.gov.au/SpectrumLicensingAPIOuterService/OuterService.svc/SiteSearchJSON/10038207?searchField=SITE_ID | Rights: https://www.acma.gov.au/radiocomms-licence-data
- cdc-maddington-gosnells-intramaps-lot-500: City of Gosnells | rights-status-uncertain-fact-extraction-only | https://maps.gosnells.wa.gov.au/intramaps22A/?project=Gosnells | Rights: https://www.gosnells.wa.gov.au/Your_property/Online_services/Intramaps
- china-mobile-haidong-phase2-stage1-eia: Haidong Municipal People's Government | all-rights-reserved | https://www.haidong.gov.cn/haidongos/ewebeditor/uploadfile/2025051314534893333.pdf | Rights: No separate rights URL captured
- cra-prague-gateway-cuzk-permit-parcels: Czech Office for Surveying, Mapping and Cadastre (CUZK) | all-rights-reserved | https://ags.cuzk.gov.cz/arcgis/rest/services/RUIAN/MapServer/5/query?where=katastralniuzemi%3d660175+AND+%28%28cisloparcely%3d%27505%2f2%27+AND+druhcislovanikod%3d2%29+OR+%28cisloparcely%3d%27379%27+AND+druhcislovanikod%3d1%29%29&outFields=id%2ccisloparcely%2ckatastralniuzemi%2ckmenovecislo%2cpoddelenicisla%2cdruhcislovanikod%2cvymeraparcely%2cplatiod%2cplatido%2czdroj&returnGeometry=true&outSR=4326&f=geojson | Rights: No separate rights URL captured
- cyrusone-yorkville-kendall-pin-02-18-300-004-centroid: Kendall County GIS | county-public-gis-fact-extraction-only | https://maps.co.kendall.il.us/server/rest/services/Hosted/Current_Cadastral_Features/FeatureServer/1/query | Rights: https://maps.co.kendall.il.us/server/rest/services/Hosted/Current_Cadastral_Features/FeatureServer/1
- data-world-matatirtha-first-party-kathmandu-marker: Data World | all-rights-reserved | https://dataworld.com.np/ | Rights: No separate rights URL captured
- datagrid-makarewa-linz-four-primary-parcels: Crown copyright - Land Information New Zealand; CC BY 4.0 | CC-BY-4.0 | https://services.arcgis.com/xdsHIIxuCWByZiCB/ArcGIS/rest/services/LINZ_NZ_Primary_Parcels/FeatureServer/0/query?where=appellation+IN+%28%27Lot+1+DP+595572%27%2c%27Lot+2+DP+595572%27%2c%27Lot+3+DP+595572%27%2c%27Lot+2+DP+526953%27%29&outFields=OBJECTID%2cid%2cappellation%2cparcel_intent%2ctopology_type%2cland_district%2ctitles%2csurvey_area%2ccalc_area%2cShape__Area%2cShape__Length&returnGeometry=true&outSR=4326&orderByFields=appellation+ASC&f=geojson | Rights: https://data.linz.govt.nz/layer/50772-nz-primary-parcels/; https://data.linz.govt.nz/license/attribution-4-0-international/
- datagrid-makarewa-sdc-resource-consent-application: Southland District Council | all-rights-reserved | https://www.southlanddc.govt.nz/assets/Planning-Resource-Consent/datagrid/01-Application/0-Application-Datagrid-New-Zealand-Partnership-Limited.pdf | Rights: No separate rights URL captured
- ddc1-esbjerg-dar-sahara-9-address-point: Klimadatastyrelsen / Danmarks Adresseregister (DAR); CC BY 4.0 | CC-BY-4.0 | https://api.dataforsyningen.dk/adgangsadresser/b0351879-20c7-47f9-8cde-54dad6a417a8?format=geojson&srid=4326 | Rights: https://dataforsyningen.dk/asset/PDF/rettigheder_vilkaar/Vilk%C3%A5r%20for%20frie%20geografiske%20data%20og%20CC%20BY%204_0%20licens.pdf
- ddc1-esbjerg-dma-facility-record: Danish Environmental Protection Agency | all-rights-reserved | https://dma.mst.dk/vis-virksomhed/6caab521-290e-45ba-aabd-17d4f2a86c17 | Rights: No separate rights URL captured
- digipowerx-columbiana-census-geocode: United States Census Bureau | US-federal-public-domain | https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=130%20Industrial%20Pkwy%2C%20Columbiana%2C%20AL&benchmark=Public_AR_Current&vintage=Current_Current&format=json | Rights: https://www.census.gov/about/policies/copyright.html
- edgecore-as02-loudoun-parcel-045465016000: Loudoun County, Virginia | Loudoun-County-GIS-disclaimer | https://logis.loudoun.gov/gis/rest/services/COL_WebMercator/Parcels4DIT/MapServer/0/query | Rights: https://logis.loudoun.gov/gis/rest/services/COL_WebMercator/Parcels4DIT/MapServer/info/iteminfo
- edged-council-bluffs-pott-address-35068: Pottawattamie County GIS | county-open-data-no-explicit-license | https://gis.pottcounty-ia.gov/arcgis/rest/services/OpenData/MapServer/9/query | Rights: https://www.pottcounty-ia.gov/gis/download_data/
- meta-sturgeon-alberta-ats-quarter-sections: Government of Alberta | Open-Government-Licence-Alberta | https://geospatial.alberta.ca/titan/rest/services/ags_apps/ags_apps_alberta_township_system/MapServer/2/query | Rights: https://open.alberta.ca/licence
- meta-sturgeon-dp26-0028-permit-notice: Sturgeon County | government-copyright-fact-extraction-only | https://www.sturgeoncounty.ca/development-permit-approval-notice-for-56111-rge-rd-223/ | Rights: https://www.sturgeoncounty.ca/development-permit-approval-notice-for-56111-rge-rd-223/
- microsoft-lyle-creek-catawba-containing-parcel: Catawba County GIS | county-public-gis-fact-extraction-only | https://arcgis2.catawbacountync.gov/arcgis/rest/services/Catawba_Basic_MIL1/MapServer/2/query | Rights: https://gis.catawbacountync.gov/
- microsoft-lyle-creek-usace-saw-2023-00898-index-extract: U.S. Army Corps of Engineers, Wilmington District | US-federal-public-domain | https://saw-reg.usace.army.mil/PN/2023/SAW-2023-00898-PN.pdf | Rights: https://www.usa.gov/government-copyright
- niger-national-dc-pk5-bnee-eies: Republic of Niger, Ministry of Posts and New Information Technologies / BNEE | all-rights-reserved | https://www.bnee.ne/wp-content/uploads/2022/08/Rapport-de%CC%81finitif-EIES-DATACENTER-PK5-Niamey_VP.pdf | Rights: No separate rights URL captured
- nxdata3-inflect-datacenter-marker: Inflect, Inc.; compact factual extraction only | all-rights-reserved-fact-extraction-only | https://inflect.com/building/38-ring-road-tunari/nxdata/datacenter/nxdata-3 | Rights: https://inflect.com/terms
- odata-sp04-current-facility-page-map-pin: ODATA | all-rights-reserved-fact-extraction-only | https://odatacolocation.com/blog/data-center/dc-sp04/ | Rights: https://odatacolocation.com/blog/data-center/dc-sp04/
- qts-eagle-mountain-utah-county-address-258853: GIS Division, Utah County Information Systems Department | county-public-gis-fact-extraction-only | https://maps.utahcounty.gov/arcgis/rest/services/Parcels/Parcel_AddressPoints/MapServer/0/query | Rights: https://maps.utahcounty.gov/arcgis/rest/services/Parcels/Parcel_AddressPoints/MapServer/0
- related-digital-cheyenne-wyoming-page-map-point: Related Digital | all-rights-reserved-fact-extraction-only | https://www.related-digital.com/wyoming | Rights: https://www.related-digital.com/wyoming
- vantage-lighthouse-wisconsin-dnr-current-page: Wisconsin Department of Natural Resources | public-government-record-fact-extraction-only | https://dnr.wisconsin.gov/topic/EIA/Portwashington.html | Rights: https://dnr.wisconsin.gov/about/publicRecords

Map-provider terms:
- © OpenStreetMap contributors | ODbL 1.0 | https://www.openstreetmap.org/copyright
- © Kartverket | CC BY 4.0 | https://www.kartverket.no/en/api-and-data/terms-of-use
- Direction générale des Finances publiques (DGFiP) — Cadastre Etalab — millésime 1 June 2026 | Licence Ouverte 2.0 | https://www.data.gouv.fr/pages/legal/licences/etalab-2.0
- Government of the Hong Kong SAR — Lands Department | DATA.GOV.HK Terms of Use | https://data.gov.hk/en/terms-and-conditions
- Valsts zemes dienests (State Land Service of Latvia) | CC BY 4.0 | https://www.vzd.gov.lv/en
- City and County of Denver | CC BY 3.0 | https://www.denvergov.org/opendata

City of Chicago data notice

Attribution: City of Chicago
Terms: https://www.chicago.gov/city/en/narr/foia/data_disclaimer.html

Required disclaimer:
“This site provides applications using data that has been modified for use from its original source, www.cityofchicago.org, the official website of the City of Chicago. The City of Chicago makes no claims as to the content, accuracy, timeliness, or completeness of any of the data provided at this site. The data provided at this site is subject to change at any time. It is understood that the data provided at this site is being used at one’s own risk.”

Additional terms reminder:
Comply with any additional Terms of Use set forth by the City agency or department providing data used by the software application, or other secondary or derivative application, including, without limitation, requirements to include additional citations or disclaimers at the site where the application can be accessed or downloaded.


V0.18 DRAFT ADDITIONAL SOURCE ATTRIBUTION

am10-etobicoke-aug5-current-build
Microsoft
all-rights-reserved
https://local.microsoft.com/blog/etobicoke-construction-update/
Source input: sources/curated-official-2026-09-08-americas-round10-etobicoke-current-build.json

am10-etobicoke-city-datacenter-address
City of Toronto
no-open-redistribution-license-asserted
https://www.toronto.ca/legdocs/mmis/2026/mm/bgrd/backgroundfile-289859.pdf
Source input: sources/verified-construction-core-v0.18-americas-round10-etobicoke-geometry-proposal.json

am10-etobicoke-city-owner-address
City of Toronto
no-open-redistribution-license-asserted
https://www.toronto.ca/legdocs/mmis/2024/gg/bgrd/backgroundfile-250035.pdf
Source input: sources/verified-construction-core-v0.18-americas-round10-etobicoke-geometry-proposal.json

am10-etobicoke-oar-crs-corroboration
City of Toronto
Open Government Licence - Toronto
https://gis.toronto.ca/arcgis/rest/services/cot_geospatial27/FeatureServer/101/query?where=ADDRESS_POINT_ID%3D30029368&outFields=ADDRESS_POINT_ID,ADDRESS_ID,ADDRESS_NUMBER,LINEAR_NAME_FULL,MAINT_STAGE,ADDRESS_CLASS,ADDRESS_CLASS_DESC,ADDRESS_FULL,LONGITUDE,LATITUDE&returnGeometry=true&outSR=4326&f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round10-etobicoke-geometry-proposal.json

am10-etobicoke-oar-land-point
City of Toronto, Geospatial Competency Centre
Open Government Licence - Toronto
https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/datastore_search?resource_id=0b3756af-9caf-4f0f-ac28-9c6617adede4&filters=%7B%22LINEAR_NAME_FULL%22:%22Lowe%27s%20Pl%22%7D&limit=100
Source input: sources/verified-construction-core-v0.18-americas-round10-etobicoke-geometry-proposal.json

am10-toronto-oar-catalog
City of Toronto
Open Government Licence - Toronto
https://ckan0.cf.opendata.inter.prod-toronto.ca/api/3/action/package_show?id=address-points-municipal-toronto-one-address-repository
Source input: sources/verified-construction-core-v0.18-americas-round10-etobicoke-geometry-proposal.json

am10-toronto-oar-license-binding
City of Toronto
Open Government Licence - Toronto
https://open.toronto.ca/dataset/address-points-municipal-toronto-one-address-repository/
Source input: sources/verified-construction-core-v0.18-americas-round10-etobicoke-geometry-proposal.json

am10-toronto-ogl
City of Toronto
Open Government Licence - Toronto
https://open.toronto.ca/open-data-licence/
Source input: sources/verified-construction-core-v0.18-americas-round10-etobicoke-geometry-proposal.json

am11-census-nad83-faq
U.S. Census Bureau
no-open-redistribution-license-asserted
https://www2.census.gov/geo/pdfs/maps-data/data/FAQ_for_Census_Bureau_Public_Geocoder.pdf
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-parker-geometry-proposal.json

am11-census-public-use-citation
U.S. Census Bureau
no-open-redistribution-license-asserted
https://www.census.gov/about/policies/citation.html
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-parker-geometry-proposal.json

am11-flexential-hillsboro5-aug18-current-build
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news-releases/flexential-secures-800-million-to-fund-data-center-development-across-four-high-growth-markets-302853453.html
Source input: sources/curated-official-2026-09-08-americas-round11-flexential-hillsboro5-current-build.json

am11-flexential-index-successor-check
Flexential, distributed by PR Newswire
no-open-redistribution-license-asserted
https://www.prnewswire.com/news/flexential/
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-parker-geometry-proposal.json

am11-flexential-parker-aug18-current-build
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news-releases/flexential-secures-800-million-to-fund-data-center-development-across-four-high-growth-markets-302853453.html
Source input: sources/curated-official-2026-09-08-americas-round11-flexential-parker-current-build.json

am11-hillsboro5-2025-identity
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news-releases/flexential-acquires-prime-property-in-hillsboro-plans-new-data-center-as-next-phase-of-expansion-302546009.html
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-hillsboro5-esg-completion-context
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news-releases/flexentials-2025-esg-report-details-progress-on-sustainable-data-center-infrastructure-302820256.html
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-hillsboro5-index-successor-check
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news/flexential/
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-hillsboro5-osm-exact-way-identity
© OpenStreetMap contributors
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%5Btimeout%3A25%5D%3Bway%281080170580%29%3Bout%20meta%20geom%3B
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-hillsboro5-osm-named-building-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/lookup?osm_ids=W1080170580&format=jsonv2&addressdetails=1&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-hillsboro5-owner-address
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news-releases/flexential-secures-strategic-real-estate-ownership-in-hillsboro-oregon-with-acquisition-of-two-data-center-properties-302783801.html
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-hillsboro5-owner-brochure-caveat
Flexential
all-rights-reserved
https://www.flexential.com/system/files/file/2024-06/Hillsboro-5-Data-Center-hvc.pdf
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-osm-rights-attribution
OpenStreetMap Foundation / OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-osm-wgs84-coordinate-convention
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Converting_to_WGS84
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-hillsboro5-geometry-proposal.json

am11-parker-census-address-range
U.S. Census Bureau
no-open-redistribution-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=15255%20Compark%20Blvd%2C%20Englewood%2C%20CO%2080112&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-parker-geometry-proposal.json

am11-parker-county-postal-alias
Douglas County GIS Services Team
no-open-redistribution-license-asserted
https://apps.douglas.co.us/gisod/rest/services/POSSE_Address/MapServer/0/query?where=ADDRESS_NUMBER%3D15255&outFields=FID,ADDRESS_NUMBER,STREET_NAME_FULL,ZIP_CODE,POSTAL_NAME,PARCEL_SPN,BUSINESS_NAME,ADDRESS_USE&returnGeometry=true&outSR=4326&f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-parker-geometry-proposal.json

am11-parker-pcl-structural-completion-caveat
PCL Construction
no-open-redistribution-license-asserted
https://www.pcl.com/us/en/newsroom/press-releases/pcl-tops-out-192-million-ai-ready-data-center-as-denvers-digital-infrastructure-demand-accelerates
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-parker-geometry-proposal.json

am11-parker-town-den12-address
Town of Parker
no-open-redistribution-license-asserted
https://www.parkerco.gov/Archive/ViewFile/Item/7258
Source input: sources/verified-construction-core-v0.18-americas-round11-flexential-parker-geometry-proposal.json

am12-douglasville2-census-unselected
U.S. Census Bureau
no-open-redistribution-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=1750%20N%20River%20Rd%2C%20Douglasville%2C%20GA%2030122&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-flexential-douglasville2-reviewed-geometry.json

am12-douglasville2-esg-scope
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news-releases/flexentials-2025-esg-report-details-progress-on-sustainable-data-center-infrastructure-302820256.html
Source input: sources/verified-construction-core-v0.18-flexential-douglasville2-reviewed-geometry.json

am12-douglasville2-osm-point
OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/lookup?osm_ids=W1258702591&format=jsonv2&addressdetails=1&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-flexential-douglasville2-reviewed-geometry.json

am12-douglasville2-osm-way
OpenStreetMap contributors
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%5Btimeout%3A25%5D%3Bway%281258702591%29%3Bout%20meta%20geom%3B
Source input: sources/verified-construction-core-v0.18-flexential-douglasville2-reviewed-geometry.json

am12-douglasville2-owner-address
Flexential, distributed by PR Newswire
no-open-redistribution-license-asserted
https://www.prnewswire.com/news-releases/flexential-secures-strategic-real-estate-control-in-atlanta-with-acquisition-of-two-facilities-302452014.html
Source input: sources/verified-construction-core-v0.18-flexential-douglasville2-reviewed-geometry.json

am12-douglasville2-successor-index
Flexential, distributed by PR Newswire
no-open-redistribution-license-asserted
https://www.prnewswire.com/news/flexential/
Source input: sources/verified-construction-core-v0.18-flexential-douglasville2-reviewed-geometry.json

am12-flexential-douglasville2-current-build
Flexential, distributed by PR Newswire
all-rights-reserved
https://www.prnewswire.com/news-releases/flexential-secures-800-million-to-fund-data-center-development-across-four-high-growth-markets-302853453.html
Source input: sources/curated-official-2026-09-09-flexential-douglasville2-current-build.json

am15-census-nad83-faq
U.S. Census Bureau
no-open-redistribution-license-asserted
https://www2.census.gov/geo/pdfs/maps-data/data/FAQ_for_Census_Bureau_Public_Geocoder.pdf
Source input: sources/verified-construction-core-v0.18-americas-round15-lake-mariner-geometry-proposal.json

am15-census-public-use-citation
U.S. Census Bureau
no-open-redistribution-license-asserted
https://www.census.gov/about/policies/citation.html
Source input: sources/verified-construction-core-v0.18-americas-round15-lake-mariner-geometry-proposal.json

am15-core-ceo-exact-profile-authority
Core Scientific, Inc.; Adam Sullivan
no-open-redistribution-license-asserted
https://corescientific.com/about/leadership/
Source input: sources/curated-official-2026-09-09-core-scientific-pecos-round15-ceo-current-build.json

am15-core-index-successor-check
Core Scientific, Inc.
all-rights-reserved
https://investors.corescientific.com/news-events/press-releases
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-lake-mariner-cb5-aug5-current-build
TeraWulf Inc.
all-rights-reserved
https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
Source input: sources/curated-official-2026-09-09-americas-round15-lake-mariner-cb5-current-build.json

am15-lake-mariner-cb5-exact-address
TeraWulf Inc.
all-rights-reserved
https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000092/terawulf-revolvingcreditag.htm
Source input: sources/verified-construction-core-v0.18-americas-round15-lake-mariner-geometry-proposal.json

am15-lake-mariner-census-address-range
U.S. Census Bureau
no-open-redistribution-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=7725%20Lake%20Road%2C%20Barker%2C%20NY%2014012&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-americas-round15-lake-mariner-geometry-proposal.json

am15-lake-mariner-historical-property-corroboration
TeraWulf Inc.
all-rights-reserved
https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001104659-22-041168/0001104659-22-041168.pdf
Source input: sources/verified-construction-core-v0.18-americas-round15-lake-mariner-geometry-proposal.json

am15-nominatim-representative-point-semantics
Nominatim project
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-osm-rights
OpenStreetMap Foundation / OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-osm-wgs84
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Converting_to_WGS84
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-pecos-1851-issuer-deed-identity
Core Scientific, Inc.
all-rights-reserved
https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001193125-24-008966/d527548dex99t3c1.htm
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-pecos-ceo-june2-current-build
Core Scientific, Inc.; Adam Sullivan
no-open-redistribution-license-asserted
https://www.linkedin.com/posts/adamtsullivan_corescientific-aiinfrastructure-datacenters-activity-7467608574056300546-4pYw
Source input: sources/curated-official-2026-09-09-core-scientific-pecos-round15-ceo-current-build.json

am15-pecos-existing-campus-conversion-identity
Core Scientific, Inc.
all-rights-reserved
https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-027645/exhibit991-pecosexpansio.htm
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-pecos-july-transcript-completion-caveat
EarningsCall; attributed remarks by Adam Sullivan, CEO, and Matt Brown, COO, Core Scientific
all-rights-reserved
https://earningscall.biz/e/nasdaq/s/corz/y/2026/q/q2
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-pecos-osm-exact-relation-tags
© OpenStreetMap contributors
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%3Brel(20669718)%3Bout%20meta%20geom%3B
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-pecos-osm-named-campus-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/lookup?osm_ids=R20669718&format=jsonv2&addressdetails=1&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-pecos-owner-campus-alias
Core Scientific, Inc.
all-rights-reserved
https://corescientific.com/high-density-data-centers/pecos-tx/
Source input: sources/verified-construction-core-v0.18-pecos-round15-reviewed-geometry.json

am15-terawulf-index-successor-check
TeraWulf Inc.
all-rights-reserved
https://investors.terawulf.com/news-events/press-releases
Source input: sources/verified-construction-core-v0.18-americas-round15-lake-mariner-geometry-proposal.json

am16-monarch-agency-successor-check
West Virginia Department of Environmental Protection
no-open-license-asserted
https://dep.wv.gov/news/Pages/default.aspx
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-monarch-integrated-campus-application
Monarch Cloud Campus LLC / Environmental Resources Management; hosted by WVDEP
no-open-license-asserted
https://apps.dep.wv.gov/Documents/DAQ/NSRPermits/053-00136/Draft/053-00136_APPLICATION_R14-0042.pdf
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-monarch-july14-physical-work
West Virginia Department of Environmental Protection
no-open-license-asserted
https://dep.wv.gov/news/Pages/WVDEP-Issues-Enforcement-Order-Following-Stormwater-Violations-at-Monarch-Cloud-Campus-Construction-Site.aspx
Source input: sources/curated-official-2026-09-09-americas-round16-monarch-current-build.json

am16-monarch-official-application-index
West Virginia Department of Environmental Protection
no-open-license-asserted
https://dep.wv.gov/daq/permitting/Pages/NSR-Permit-Applications.aspx
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-monarch-operator-campus-identity
Nscale Limited
all-rights-reserved
https://www.nscale.com/ai-infrastructure/monarch
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-monarch-project-participant-identity
West Virginia Building and Construction Trades Council
no-open-license-asserted
https://www.wvtrades.org/general/monarch-compute-campus-west-virginia/
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-monarch-registration-public-notice
West Virginia Department of Environmental Protection
no-open-license-asserted
https://apps.dep.wv.gov/ListServ/api.cfc?method=viewMessage
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-monarch-wvr113311-native-point
West Virginia Department of Environmental Protection
no-open-license-asserted
https://tagis.dep.wv.gov/arcgis/rest/services/WVDEP_enterprise/water_resources/MapServer/2/query?f=json&where=permit_id+%3D+%27WVR113311%27&outFields=*&returnGeometry=true&outSR=3857
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-monarch-wvr113311-official-point
West Virginia Department of Environmental Protection
no-open-license-asserted
https://tagis.dep.wv.gov/arcgis/rest/services/WVDEP_enterprise/water_resources/MapServer/2/query?f=json&where=permit_id+%3D+%27WVR113311%27&outFields=*&returnGeometry=true&outSR=4326
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-wvdep-public-gis-use-context
West Virginia Department of Environmental Protection
no-open-license-asserted
https://dep.wv.gov/Data/Pages/default.aspx
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-wvdep-water-item-rights
West Virginia Department of Environmental Protection
no-open-license-asserted
https://tagis.dep.wv.gov/portal/sharing/rest/content/items/af46df9d6bbb4b81a5f7037665713cc1?f=json
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am16-wvdep-water-layer-semantics
West Virginia Department of Environmental Protection
no-open-license-asserted
https://tagis.dep.wv.gov/arcgis/rest/services/WVDEP_enterprise/water_resources/MapServer/2?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round16-monarch-geometry-proposal.json

am20-conesville-county-centroid
Coshocton County GIS
no-open-license-asserted
https://services5.arcgis.com/zhyAQE7C1EXFJ6bG/ArcGIS/rest/services/Parcels_View/FeatureServer/0/query?objectIds=27692&outFields=OBJECTID,PIN,ONAME,ONAME2&returnGeometry=false&returnCentroid=true&outSR=4326&datumTransformation=1188&f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-county-layer
Coshocton County GIS
no-open-license-asserted
https://services5.arcgis.com/zhyAQE7C1EXFJ6bG/arcgis/rest/services/Parcels_View/FeatureServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-county-native-centroid
Coshocton County GIS
no-open-license-asserted
https://services5.arcgis.com/zhyAQE7C1EXFJ6bG/ArcGIS/rest/services/Parcels/FeatureServer/0/query?objectIds=27692&outFields=OBJECTID,PIN,ONAME,ONAME2&returnGeometry=true&returnCentroid=true&outSR=3734&f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-county-parcel-identity
Coshocton County Board of Commissioners
no-open-license-asserted
https://www.coshoctoncounty.net/uploads/boc/minutes/2026-07-15.pdf
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-county-public-gis
Coshocton County GIS and Tax Map Office
no-open-license-asserted
https://www.coshoctoncounty.net/taxmap/gis/
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-county-rights
Coshocton County GIS
no-open-license-asserted
https://www.arcgis.com/sharing/rest/content/items/7a62283c7d75401e87fd7c08f8de6420?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-county-viewer-config
Coshocton County GIS
no-open-license-asserted
https://www.arcgis.com/sharing/rest/content/items/dcc7010b7b4f47a983273a642fa8164d/data?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-county-webmap
Coshocton County GIS
no-open-license-asserted
https://www.arcgis.com/sharing/rest/content/items/b6f6de3d2902468093e60cd0d28c2908/data?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-july-pad-work
CCU Coal & Construction
no-open-license-asserted
https://ccucoal.com/ccu_projects/aligned-data-pad-project/
Source input: sources/curated-official-2026-09-09-americas-round20-conesville-july-pad-work.json

am20-conesville-operator-identity
Aligned Data Centers
no-open-license-asserted
https://aligneddc.com/northeast-ohio-data-centers/
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am20-conesville-operator-rights
Aligned Data Centers
no-open-license-asserted
https://aligneddc.com/legal/
Source input: sources/verified-construction-core-v0.18-americas-round20-conesville-geometry-proposal.json

am21-nominatim-point-semantics
Nominatim project
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-osm-rights
OpenStreetMap Foundation
no-open-license-asserted
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-osm-wgs84
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-procergs-aug17-successor-context
Convergência Digital — Ana Paula Lobo
no-open-license-asserted
https://convergenciadigital.com.br/governo/data-center-da-procergs-afetado-pela-enchente-ganha-estrutura-renovada-a-partir-de-setembro/
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-procergs-contract6033-location
PROCERGS procurement portal
no-open-license-asserted
https://www.compras.procergs.rs.gov.br/anexos/805071-71a433905d64308ba2c14e1a07c5a3acd866d06cc6f39c98997fa18dacaec4b4
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-procergs-historic-name
PROCERGS procurement portal
no-open-license-asserted
https://www.compras.procergs.rs.gov.br/editais/0058_2018/239085
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-procergs-july-substation-construction
PROCERGS — Rio Grande do Sul
no-open-license-asserted
https://www.procergs.rs.gov.br/upload/arquivos/202608/20132929-aporte2025-prestacaocontas-jul2026.pdf
Source input: sources/curated-official-2026-09-09-americas-round21-procergs-july-current-build.json

am21-procergs-nominatim-point
OpenStreetMap contributors / Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?format=jsonv2&q=PROCERGS%20Porto%20Alegre&addressdetails=1&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-procergs-official-dc-address
PROCERGS procurement portal
no-open-license-asserted
https://www.compras.procergs.rs.gov.br/anexos/858795-aeddda652fdb499ace96f1b33e45f6282ad26bafdb45e159b2868ef5694f75c2
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am21-procergs-osm-way-identity
OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/api/0.6/way/112410783/full.json
Source input: sources/verified-construction-core-v0.18-americas-round21-procergs-geometry-proposal.json

am24-aurora-city-address-layer-crs
City of Aurora, Colorado
no-open-license-asserted
https://ags.auroragov.org/aurora/rest/services/OpenData/MapServer/9?f=json
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-city-document-identity
City of Aurora, Colorado
no-open-license-asserted
https://coaapps.auroragov.org/publicdocuments/publicrecordsearch.aspx?locationkey=227490
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-city-map-rights
City of Aurora, Colorado
no-open-license-asserted
https://AuroraCo.maps.arcgis.com/sharing/rest/content/items/3bb0ce685ce442129077c9b1d37081fc?f=json
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-city-map-service-binding
City of Aurora, Colorado
no-open-license-asserted
https://AuroraCo.maps.arcgis.com/sharing/rest/content/items/3bb0ce685ce442129077c9b1d37081fc/data?f=json
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-city-native-address-context
City of Aurora, Colorado
no-open-license-asserted
https://ags.auroragov.org/aurora/rest/services/OpenData/MapServer/9/query?f=json&where=ADDRESS+IN+%28%271160+N+GUN+CLUB+RD%27%2C%271140+N+GUN+CLUB+RD%27%2C%271100+N+GUN+CLUB+RD%27%29&outFields=OBJECTID%2CADDRESS%2CADDRESS_TYPE%2CADDRESS_STATUS%2CADDRESS_ID%2CPROPERTYRSN%2CCO_DATE%2CCO_ISSUED%2CSUBDIVISION_NAME%2CSUBDIVISION_CASE_NUMBER%2CLOT%2CBLOCK%2CHYPERLINK%2CPOINT_X%2CPOINT_Y%2CLATITUDE%2CLONGITUDE&returnGeometry=true
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-city-permit-identity
City of Aurora, Colorado
no-open-license-asserted
https://ags.auroragov.org/aurora/rest/services/OpenData/MapServer/156/query?f=json&where=PropHouse+IN+%28%271160%27%2C%271140%27%2C%271100%27%29+AND+UPPER%28PropStreet%29+%3D+%27GUN+CLUB%27&outFields=OBJECTID%2CFolderRSN%2CPermit_%2CInDate%2CStatus_1%2CFolderType%2CFolderDesc%2CSubDesc%2CFolderDescription%2CFolderCondition%2CIssueDate%2CPropertyRSN%2CAddress%2CFULL_ADDRESS%2CPropGisId1&returnGeometry=false
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-city-wgs84-address-point
City of Aurora, Colorado
no-open-license-asserted
https://ags.auroragov.org/aurora/rest/services/OpenData/MapServer/9/query?f=json&where=ADDRESS+IN+%28%271160+N+GUN+CLUB+RD%27%2C%271140+N+GUN+CLUB+RD%27%2C%271100+N+GUN+CLUB+RD%27%29&outFields=OBJECTID%2CADDRESS%2CADDRESS_ID%2CPROPERTYRSN&returnGeometry=true&outSR=4326&datumTransformation=1188
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-dc2-aug19-drywall-inspection
City of Aurora, Colorado
no-open-license-asserted
https://amandacommerce.auroragov.org/BuildingPlanReviewPub/MyProjects/Inspections.aspx
Source input: sources/curated-official-2026-09-09-americas-round24-qts-aurora-dc2-current-build.json

am24-aurora-postcutoff-inspection-context
City of Aurora, Colorado
no-open-license-asserted
https://amandacommerce.auroragov.org/BuildingPlanReviewPub/MyProjects/Inspections.aspx
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-public-app-map-binding
City of Aurora, Colorado
no-open-license-asserted
https://www.arcgis.com/sharing/rest/content/items/25e68ba47119437cb4bf6bdeea6fbea4/data?f=json
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am24-aurora-public-inspection-authority
City of Aurora, Colorado
no-open-license-asserted
https://www.auroragov.org/business_services/building_division/inspections
Source input: sources/verified-construction-core-v0.18-americas-round24-qts-aurora-geometry-proposal.json

am26-omnia-pecem-june16-official-site-visit
Complexo do Pecém / ASCOM–Casa Civil
all-rights-reserved
https://www.complexodopecem.com.br/no-ceara-iniciadas-obras-do-terminal-logistico-que-ligara-o-porto-do-pecem-a-transnordestina/
Source input: sources/curated-official-2026-09-09-americas-round26-omnia-pecem-june16-current-build.json

am26-pecem-map-wgs84-semantics
Google for Developers
CC-BY-4.0
https://developers.google.com/maps/documentation/javascript/coordinates
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-mpf-conditions-context
Ministério Público Federal
no-open-license-asserted
https://www.mpf.mp.br/o-mpf/unidades/pr-ce/noticias/mpf-e-dpu-pedem-adequacoes-em-licenciamento-ambiental-de-data-center-no-ceara-antes-do-inicio-da-operacao
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-semace-exact-campus-point
Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)
no-open-license-asserted
https://servicos.semace.ce.gov.br/SemaceMobileWS/webService/consultaProcesso/processos
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-semace-public-map-binding
Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)
no-open-license-asserted
https://servicos.semace.ce.gov.br/SemaceMobileWeb/resources/bundle.js?v=18
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-semace-public-service
Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)
no-open-license-asserted
https://servicos.semace.ce.gov.br/
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-semace-records-page1
Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)
no-open-license-asserted
https://servicos.semace.ce.gov.br/SemaceMobileWS/webService/consultaProcesso/processos
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-semace-records-page2
Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)
no-open-license-asserted
https://servicos.semace.ce.gov.br/SemaceMobileWS/webService/consultaProcesso/processos
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-semace-records-page3
Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)
no-open-license-asserted
https://servicos.semace.ce.gov.br/SemaceMobileWS/webService/consultaProcesso/processos
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am26-pecem-signed-installation-license
Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)
no-open-license-asserted
https://servicos.semace.ce.gov.br/SemaceMobileWS/webService/consultaProcesso/downloadArquivo?arquivo=6365822&nome=Licen%C3%A7a%20de%20Instala%C3%A7%C3%A3o-48%2F2025&link=undefined&spu=57022010023202558
Source input: sources/verified-construction-core-v0.18-americas-round26-omnia-pecem-geometry-proposal.json

am28-palmcoast-city-address-2236-audit
City of Palm Coast
no-open-license-asserted
https://gis.palmcoast.gov/hosting/rest/services/External/FlaglerCountyParcels/MapServer/0/query?f=json&where=ADDRESS%20%3D%20%271109%20TOWN%20CENTER%20BLVD%27&outFields=OBJECTID%2CPT_ID%2CADDRESS%2CADDR_NUM%2CST_NAME%2CST_TYPE%2CPO_CITY%2CSTATE%2CZIPCODE%2CPARCEL_ID%2CCONF%2CStatus&returnGeometry=true&outSR=2236
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-address-layer
City of Palm Coast
no-open-license-asserted
https://gis.palmcoast.gov/hosting/rest/services/External/FlaglerCountyParcels/MapServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-address-point
City of Palm Coast
no-open-license-asserted
https://gis.palmcoast.gov/hosting/rest/services/External/FlaglerCountyParcels/MapServer/0/query?f=json&objectIds=93663&outFields=OBJECTID%2CPT_ID%2CADDRESS%2CPARCEL_ID%2CCONF%2CStatus&returnGeometry=true&outSR=2881
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-approved-plan
City of Palm Coast / Jacobs approved project plan
no-open-license-asserted
https://copc-strapi-production.s3.amazonaws.com/1109_Town_Center_Blvd_Permit_2025100821_Approved_Site_Plan_a7a5b3f29c.pdf
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-gis-rights
City of Palm Coast; Flagler Property Appraiser
no-open-license-asserted
https://gis.palmcoast.gov/portal/sharing/rest/content/items/14e7221cb8224211b02185fdb1a76863?f=json
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-gis-service
City of Palm Coast; Flagler Property Appraiser
no-open-license-asserted
https://gis.palmcoast.gov/hosting/rest/services/External/FlaglerCountyParcels/MapServer?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-identity
City of Palm Coast
no-open-license-asserted
https://www.palmcoast.gov/cls
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-july2-successor
City of Palm Coast
no-open-license-asserted
https://www.palmcoast.gov/newsroom/home/details/additional-resources-on-dc-blox-project
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-june19-build
City of Palm Coast
no-open-license-asserted
https://www.palmcoast.gov/newsroom/home/details/approved-scope-of-dc-blox
Source input: sources/curated-official-2026-09-09-americas-round28-palm-coast-current-build.json

am28-palmcoast-city-lot7b
City of Palm Coast
no-open-license-asserted
https://gis.palmcoast.gov/hosting/rest/services/External/FlaglerCountyParcels/MapServer/1/query?f=json&objectIds=54350&outFields=OBJECTID%2CPARCELNO%2Cfile_as_name%2Csitus_num%2Csitus_street%2Csitus_city%2Csitus_zip%2CLegal%2Cconfidential&returnGeometry=true&returnCentroid=true&outSR=2236
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-parcel-layer
City of Palm Coast
no-open-license-asserted
https://gis.palmcoast.gov/hosting/rest/services/External/FlaglerCountyParcels/MapServer/1?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am28-palmcoast-city-public-gis
City of Palm Coast
no-open-license-asserted
https://www.palmcoast.gov/newsroom/home/details/new-gis-hub
Source input: sources/verified-construction-core-v0.18-americas-round28-palm-coast-geometry-proposal.json

am29-redoak-databank-terms
DataBank
no-open-license-asserted
https://www.databank.com/terms-of-use/
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-ellis-address-layer
Ellis County, Texas GIS
no-open-license-asserted
https://maps.co.ellis.tx.us/arcgis/rest/services/Elections/External_Elections_Web_Map/MapServer/888?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-ellis-address-point
Ellis County, Texas GIS
no-open-license-asserted
https://maps.co.ellis.tx.us/arcgis/rest/services/Elections/External_Elections_Web_Map/MapServer/888/query?objectIds=70622&outFields=OBJECTID,Address,AddressLong,LandmkName,Placement,Parcel_ID,Source,DateUpdate,Post_Comm,Post_Code&returnGeometry=true&outSR=2276&f=json
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-ellis-copyright
Ellis County, Texas GIS
no-open-license-asserted
https://elliscountytx.gov/503/Copyright
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-ellis-gis-authority
Ellis County, Texas GIS
no-open-license-asserted
https://www.elliscountytx.gov/65/GIS-Maps-and-9-1-1-Addressing
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-ellis-gis-service
Ellis County, Texas GIS
no-open-license-asserted
https://maps.co.ellis.tx.us/arcgis/rest/services/Elections/External_Elections_Web_Map/MapServer?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-ellis-webmap-binding
Ellis County, Texas GIS
no-open-license-asserted
https://maps.co.ellis.tx.us/portal/sharing/rest/content/items/699ad5fa2c004d0d972f22f416747072/data?f=json
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-ellis-webmap-rights
Ellis County, Texas GIS
no-open-license-asserted
https://maps.co.ellis.tx.us/portal/sharing/rest/content/items/699ad5fa2c004d0d972f22f416747072?f=json
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-july26-current-build
DataBank
no-open-license-asserted
https://www.databank.com/resources/news/inside-databanks-multibillion-dollar-red-oak-data-center-campus/
Source input: sources/curated-official-2026-09-09-americas-round29-databank-red-oak-current-build.json

am29-redoak-official-successor-index
DataBank
no-open-license-asserted
https://www.databank.com/about-databank/press-releases/?year-num=2026
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-operator-campus-identity
DataBank
no-open-license-asserted
https://www.databank.com/data-centers/dallas/red-oak-campus/
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-operator-dfw10-address
DataBank
no-open-license-asserted
https://www.databank.com/data-centers/dallas/red-oak-campus/dfw10/
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am29-redoak-yates-dfw10-identity
Yates Construction
no-open-license-asserted
https://www.wgyates.com/case-studies/databankdfw10-datacenter/
Source input: sources/verified-construction-core-v0.18-americas-round29-databank-red-oak-geometry-proposal.json

am30-ccq-lancienne-lorette-june8-active
Commission de la construction du Québec
no-open-license-asserted
https://www.ccq.org/-/media/Project/Ccq/Ccq-Website/PDF/Recherche/ChantiersImportants/Juin2026/Quebec.pdf?rev=f6c6681d730744f7bf856c79a7b114a0&sc_lang=fr-CA
Source input: sources/curated-official-2026-09-09-americas-round30-microsoft-lancienne-lorette-current-build.json

am30-ccq-levis-charny-june8-active
Commission de la construction du Québec
no-open-license-asserted
https://www.ccq.org/-/media/Project/Ccq/Ccq-Website/PDF/Recherche/ChantiersImportants/Juin2026/Quebec.pdf?rev=f6c6681d730744f7bf856c79a7b114a0&sc_lang=fr-CA
Source input: sources/curated-official-2026-09-09-americas-round30-microsoft-levis-charny-current-build.json

am30-lancienne-microsoft-scope
Microsoft
no-open-license-asserted
https://local.microsoft.com/blog/lancienne-lorette-datacentre-construction-update/
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-lancienne-rqa-address
Québec Ministère des Ressources naturelles et des Forêts
CC-BY-4.0
https://servicescarto.mern.gouv.qc.ca/pes/rest/services/Territoire/RQA_WMS/MapServer/0/query?where=NUMERO_MUNICIPAL%3D6505%20AND%20SPECIFIQUE_ODONYME%3D%27Yvon-Dolbec%27&outFields=*&returnGeometry=true&outSR=4617&f=json
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-levis-microsoft-scope
Microsoft
no-open-license-asserted
https://local.microsoft.com/blog/levis-datacenter-project-updates/
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-levis-osm-named-campus
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/1383040174/full.json
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-osm-copyright
OpenStreetMap Foundation
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-osm-node-crs
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-riot-aug10-amd-expansion
Riot Platforms, Inc.
no-open-license-asserted
https://www.riotplatforms.com/riot-platforms-reports-second-quarter-2026-financial-results-and-strategic-highlights/
Source input: sources/curated-official-2026-09-09-americas-round30-riot-rockdale-current-build.json

am30-riot-campus-operations-scope
Riot Platforms, Inc.
no-open-license-asserted
https://www.riotplatforms.com/locations/rockdale/
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-court-site-address
Rhodium debtors and Special Committee; public court docket via Verita
no-open-license-asserted
https://www.veritaglobal.net/rhodium/document/2490448251028000000000004
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-official-successor-index
Riot Platforms, Inc.
no-open-license-asserted
https://www.riotplatforms.com/category/uncategorized/
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-txgio-address-point
Texas Geographic Information Office; CSEC originating data
no-open-license-asserted
https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?objectIds=8633415&outFields=objectid,full_addr,add_number,st_name,post_comm,post_code,county,source,date_acq&returnGeometry=true&outSR=3857&f=json
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-txgio-copy-policy
Texas Geographic Information Office / Texas Water Development Board
no-open-license-asserted
https://geographic.texas.gov/site-policies.html
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-txgio-layer-crs
Texas Geographic Information Office
no-open-license-asserted
https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-txgio-program-public-use
Texas Geographic Information Office
no-open-license-asserted
https://geographic.texas.gov/stratmap/address-points.html
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-txgio-service
Texas Geographic Information Office; Various 911 Districts
no-open-license-asserted
https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-riot-whinstone-acquisition
Riot Platforms, Inc.
no-open-license-asserted
https://www.riotplatforms.com/riot-platforms-announces-closing-of-the-acquisition-of-rhodium-assets-at-the-rockdale-facility-following-the-previously-announced-settlement-agreement/
Source input: sources/verified-construction-core-v0.18-americas-round30-riot-rockdale-geometry-proposal.json

am30-rqa-dataset-rights
Québec Ministère des Ressources naturelles et des Forêts
CC-BY-4.0
https://www.donneesquebec.ca/recherche/dataset/referentiel-quebecois-des-adresses
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-rqa-guide-quality
Québec Ministère des Ressources naturelles et des Forêts
no-open-license-asserted
https://diffusion.mern.gouv.qc.ca/diffusion/RGQ/Vectoriel/Theme/Local/RQA/Document/Guide_d_utilisation_RQA.pdf
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am30-rqa-layer-crs
Québec Ministère des Ressources naturelles et des Forêts
CC-BY-4.0
https://servicescarto.mern.gouv.qc.ca/pes/rest/services/Territoire/RQA_WMS/MapServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round30-microsoft-quebec-geometry-proposal.json

am31-census-faq-datum-interpolation
U.S. Census Bureau
no-open-license-asserted
https://www2.census.gov/geo/pdfs/maps-data/data/FAQ_for_Census_Bureau_Public_Geocoder.pdf
Source input: sources/verified-construction-core-v0.18-americas-round31-cyrusone-aurora-geometry-proposal.json

am31-census-public-use-attribution
U.S. Census Bureau
no-open-license-asserted
https://www.census.gov/about/policies/citation.html
Source input: sources/verified-construction-core-v0.18-americas-round31-cyrusone-aurora-geometry-proposal.json

am31-cyrusone-aurora-aug20-retrofit
CyrusOne
no-open-license-asserted
https://www.cyrusone.com/data-centers/north-america/aurora-il-back-up-generator-schedule
Source input: sources/curated-official-2026-09-09-americas-round31-cyrusone-aurora-retrofit.json

am31-cyrusone-aurora-campus-scope
CyrusOne
no-open-license-asserted
https://www.cyrusone.com/data-centers/north-america/aurora-il
Source input: sources/verified-construction-core-v0.18-americas-round31-cyrusone-aurora-geometry-proposal.json

am31-cyrusone-aurora-census-locator
U.S. Census Bureau
no-open-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=2905%20Diehl%20Road%2C%20Aurora%2C%20IL%2060502&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-americas-round31-cyrusone-aurora-geometry-proposal.json

am31-cyrusone-aurora-state-campus-address
Illinois Office of the State Fire Marshal
no-open-license-asserted
https://webapps.sfm.illinois.gov/ustsearch/Facility.aspx?ID=2043987
Source input: sources/verified-construction-core-v0.18-americas-round31-cyrusone-aurora-geometry-proposal.json

am31-cyrusone-policy-scope
CyrusOne
no-open-license-asserted
https://www.cyrusone.com/privacy-policy
Source input: sources/verified-construction-core-v0.18-americas-round31-cyrusone-aurora-geometry-proposal.json

am38-adobe-level3-geospatial-semantics
Adobe Systems Incorporated, Adobe Supplement to ISO 32000, BaseVersion 1.7, ExtensionLevel 3, June 2008
all-rights-reserved
https://web.archive.org/web/20200621050243/https://www.adobe.com/content/dam/acom/en/devnet/acrobat/pdfs/adobe_supplement_iso32000.pdf
Source input: sources/verified-construction-core-v0.18-americas-round38-stack-bossier-geometry-proposal.json

am38-amazon-aug18-bossier-successor-context
Amazon
all-rights-reserved
https://www.aboutamazon.com/news/company-news/amazon-data-center-louisiana-new-jobs
Source input: sources/curated-official-2026-09-10-americas-round38-stack-bossier-current-build.json

am38-bossier-march18-proceedings-identity
Bossier Parish Police Jury proceedings, published in Bossier Press-Tribune on April 15, 2026
all-rights-reserved
https://bossierpress.com/wp-content/uploads/2026/04/04-15-2026-Bossier-Press-Tribune-combined-files-2-compressed.pdf
Source input: sources/curated-official-2026-09-10-americas-round38-stack-bossier-current-build.json

am38-bossier-march20-parish-identity
Bossier Parish Police Jury
public-domain-parish-generated-information-only
https://www.bossierparishla.gov/news/2026/03/20/police-jury-awards-major-infrastructure-contracts--approves-final-plat-for-amazon-data-center-technology-park
Source input: sources/curated-official-2026-09-10-americas-round38-stack-bossier-current-build.json

am38-bossier-usace-project-site-map
U.S. Army Corps of Engineers, Vicksburg District; Headwaters / Bohler Engineering applicant map
no-open-redistribution-license-asserted-for-applicant-map
https://www.mvk.usace.army.mil/Portals/58/docs/regulatory/publicnotices/Public%20Notice%20MVK-2025-00855%20WP%20Signed.pdf?ver=D2NPrQzn2XfolicLUj62YA%3D%3D
Source input: sources/verified-construction-core-v0.18-americas-round38-stack-bossier-geometry-proposal.json

am38-stack-bossier-june10-current-build
STACK Infrastructure
all-rights-reserved
https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/
Source input: sources/curated-official-2026-09-10-americas-round38-stack-bossier-current-build.json

am4-indiana-parcel-service
Indiana Geographic Information Office and Indiana local governments
no-open-redistribution-license-asserted
https://gisdata.in.gov/server/rest/services/Hosted/Parcel_Boundaries_of_Indiana_Current/FeatureServer?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round4-la-porte-geometry-facts.json

am4-la-porte-boards
Microsoft
no-open-redistribution-license-asserted
https://local.microsoft.com/wp-content/uploads/2026/04/LPO-BoardsFinal0426.pdf
Source input: sources/verified-construction-core-v0.18-americas-round4-la-porte-geometry-facts.json

am4-la-porte-idem
Indiana Department of Environmental Management; application prepared by Stantec for Microsoft; embedded LaPorte County record
no-open-redistribution-license-asserted
https://ecm.idem.in.gov/cs/idcplg?IdcService=GET_FILE&Rendition=web&allowInterrupt=1&dDocName=83988709&dID=83980589&noSaveAs=1
Source input: sources/verified-construction-core-v0.18-americas-round4-la-porte-geometry-facts.json

am4-la-porte-july-grading
Microsoft
no-open-redistribution-license-asserted
https://local.microsoft.com/blog/la-porte-public-meeting-recap/
Source input: sources/curated-official-2026-09-08-americas-round4-microsoft-la-porte-current-build.json

am4-la-porte-parcel
Indiana Geographic Information Office; source originator LaPorte County
no-open-redistribution-license-asserted
https://gisdata.in.gov/server/rest/services/Hosted/Parcel_Boundaries_of_Indiana_Current/FeatureServer/0/query?where=state_parcel_id%3D%27461107326005000058%27&outFields=*&f=pjson&returnGeometry=true&outSR=4326
Source input: sources/verified-construction-core-v0.18-americas-round4-la-porte-geometry-facts.json

am4-la-porte-status
Microsoft
no-open-redistribution-license-asserted
https://local.microsoft.com/blog/microsoft-breaks-ground-on-la-porte-datacenter-project/
Source input: sources/curated-official-2026-09-08-americas-round4-microsoft-la-porte-current-build.json

am4-lebanon-city-minutes
City of Lebanon Board of Zoning Appeals
no-open-redistribution-license-asserted
https://lebanon.in.gov/wp-content/uploads/2026/01/07.06.2026-Board-of-Zoning-Appeals-Mtg-Minutes.pdf
Source input: sources/curated-official-2026-09-08-americas-round4-meta-lebanon-current-build.json

am4-lebanon-dnr-notice
Indiana Department of Natural Resources, Division of Water
no-open-redistribution-license-asserted
https://www.in.gov/dnr/calendar/files/wa-102925.pdf
Source input: sources/verified-construction-core-v0.18-americas-round4-meta-lebanon-geometry-facts.json

am4-lebanon-doworc-help
Indiana Department of Natural Resources, Division of Water
no-open-redistribution-license-asserted
https://secure.in.gov/dnr/water/online-research-center/
Source input: sources/verified-construction-core-v0.18-americas-round4-meta-lebanon-geometry-facts.json

am4-lebanon-doworc-layer
Indiana Department of Natural Resources, Division of Water
no-open-redistribution-license-asserted
https://gisdata.in.gov/server/rest/services/Hosted/DOWUnity_ATS_Records_PROD/FeatureServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round4-meta-lebanon-geometry-facts.json

am4-lebanon-permit-point
Indiana Department of Natural Resources, Division of Water
no-open-redistribution-license-asserted
https://gisdata.in.gov/server/rest/services/Hosted/DOWUnity_ATS_Records_PROD/FeatureServer/0/query?where=folder_id%3D%27FW-33468-0%27&outFields=*&f=pjson&returnGeometry=true&outSR=4326
Source input: sources/verified-construction-core-v0.18-americas-round4-meta-lebanon-geometry-facts.json

am41-blackpearl-aug4-phase2-current-build
Cipher Digital Inc., via GlobeNewswire
all-rights-reserved
https://www.globenewswire.com/news-release/2026/08/04/3338166/0/en/cipher-digital-provides-second-quarter-2026-business-update.html
Source input: sources/curated-official-2026-09-25-americas-round41-cipher-blackpearl-current-build.json

am41-blackpearl-q2-10q-identity
Cipher Digital Inc. Form 10-Q, as mirrored on its investor-relations site
public-sec-filing
https://investors.cipherdigital.com/static-files/52a06be5-8fab-4602-90cd-d1d04d608097
Source input: sources/curated-official-2026-09-25-americas-round41-cipher-blackpearl-current-build.json

am41-blackpearl-tceq-rn112175997-identity
Texas Commission on Environmental Quality
public-record-as-is
https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=313640032025078
Source input: sources/curated-official-2026-09-25-americas-round41-cipher-blackpearl-current-build.json

am41-blackpearl-txgio-address-point
Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC
public-use-as-is
https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?where=full_addr%3D%2711786%20COUNTY%20ROAD%20209%27%20AND%20county%3D%27Winkler%27&outFields=*&returnGeometry=true&outSR=4326&f=json
Source input: sources/verified-construction-core-v0.18-americas-round41-cipher-blackpearl-geometry-proposal.json

am41-blackpearl-txgio-address-point-native
Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC
public-use-as-is
https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?where=full_addr%3D%2711786%20COUNTY%20ROAD%20209%27%20AND%20county%3D%27Winkler%27&outFields=*&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-americas-round41-cipher-blackpearl-geometry-proposal.json

am41-stingray-aug4-current-build
Cipher Digital Inc., via GlobeNewswire
all-rights-reserved
https://www.globenewswire.com/news-release/2026/08/04/3338166/0/en/cipher-digital-provides-second-quarter-2026-business-update.html
Source input: sources/curated-official-2026-09-25-americas-round41-cipher-stingray-current-build.json

am41-stingray-june15-8k-site-identity
Cipher Digital Inc. Form 8-K, as mirrored on its investor-relations site
public-sec-filing
https://investors.cipherdigital.com/static-files/83b35945-a986-4510-9a32-bcdb2945fbb0
Source input: sources/curated-official-2026-09-25-americas-round41-cipher-stingray-current-build.json

am41-stingray-tceq-rn112362454-identity
Texas Commission on Environmental Quality
public-record-as-is
https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=979508662026028
Source input: sources/curated-official-2026-09-25-americas-round41-cipher-stingray-current-build.json

am41-stingray-txgio-address-point
Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC
public-use-as-is
https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?where=full_addr%3D%27110%20SOUTHWEST%209001%27%20AND%20county%3D%27Andrews%27&outFields=*&returnGeometry=true&outSR=4326&f=json
Source input: sources/verified-construction-core-v0.18-americas-round41-cipher-stingray-geometry-proposal.json

am41-stingray-txgio-address-point-native
Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC
public-use-as-is
https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?where=full_addr%3D%27110%20SOUTHWEST%209001%27%20AND%20county%3D%27Andrews%27&outFields=*&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-americas-round41-cipher-stingray-geometry-proposal.json

am5-apld-delivered
Applied Digital Corporation
no-open-redistribution-license-asserted
https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-cass-item
Cass County North Dakota
public-domain-per-Cass-County-item-policy
https://www.arcgis.com/sharing/rest/content/items/ef3abbb09d9a41c8a0650639f211aa8d?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-cass-layer
Cass County North Dakota
public-domain-per-Cass-County-item-policy
https://gisweb.casscountynd.gov/arcgis/rest/services/OpenData/OpenData/FeatureServer/7?f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-cass-pf2-exact
Cass County North Dakota
public-domain-per-Cass-County-item-policy
https://gisweb.casscountynd.gov/arcgis/rest/services/OpenData/OpenData/FeatureServer/7/query?where=GISPIN%3D%2775000000120020%27&outFields=OBJECTID,GISPIN,DASHPIN,Name,PropertyAddress,ACRES,Section,LandCity,LandSt,LandZip&returnGeometry=true&outSR=4326&f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-cass-pf2-native
Cass County North Dakota
public-domain-per-Cass-County-item-policy
https://gisweb.casscountynd.gov/arcgis/rest/services/OpenData/OpenData/FeatureServer/7/query?where=GISPIN%3D%2775000000120020%27&outFields=OBJECTID,GISPIN,Name,PropertyAddress&returnGeometry=true&f=pjson
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-pf1-address-lease
Applied Digital Corporation
no-open-redistribution-license-asserted
https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001493152-25-017609/0001493152-25-017609.pdf
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-pf1-current-status
Applied Digital Corporation
no-open-redistribution-license-asserted
https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year
Source input: sources/curated-official-2026-09-08-americas-round5-pf1-current-build.json

am5-pf1-permit
North Dakota Department of Environmental Quality
no-open-redistribution-license-asserted
https://ceris.deq.nd.gov/ext/ncore/downloadfile/6356745512656156278
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-pf2-aqea
North Dakota Department of Environmental Quality
no-open-redistribution-license-asserted
https://deq.nd.gov/aq/Notices/AppliedDigital/DRAFTACP18345v1_0AQEA.pdf
Source input: sources/verified-construction-core-v0.18-americas-round5-geometry-facts.json

am5-pf2-current-status
Applied Digital Corporation
no-open-redistribution-license-asserted
https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year
Source input: sources/curated-official-2026-09-08-americas-round5-pf2-current-build.json

am5df1-1
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/1545345944/full.json
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-10
Applied Digital Corporation
no-open-redistribution-license-asserted
https://ir.applieddigital.com/disclaimer
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-2
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/changeset/187658622?include_discussion=true
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-3
OpenStreetMap Foundation
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-4
Louisiana DEQ / Applied Digital / W. G. Yates; publicly rehosted by Kingfish
no-open-redistribution-license-asserted
https://media.kingfish.la/2026/08/ldeq-ai250709-memo.pdf?ref=kingfish.la
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-5
Louisiana Department of Conservation and Energy; publicly rehosted by Kingfish
no-open-redistribution-license-asserted
https://media.kingfish.la/2026/08/gwr-40-0252.pdf?ref=kingfish.la
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-6
Applied Digital via JSA; publicly rehosted by Kingfish
no-open-redistribution-license-asserted
https://media.kingfish.la/2026/08/gwr_APLD_response.pdf?ref=kingfish.la
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-7
Louisiana Economic Development; hosted by England Airpark
no-open-redistribution-license-asserted
https://englandairpark.org/wp-content/uploads/2026/06/LED-News-Release_Applied-Digital.pdf
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-8
Louisiana Department of Environmental Quality
no-open-redistribution-license-asserted
https://www.deq.louisiana.gov/public-notices?q=250709
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-9
Applied Digital Corporation
no-open-redistribution-license-asserted
https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm
Source input: sources/verified-construction-core-v0.18-americas-round5-df1-geometry-facts.json

am5df1-current-status
Applied Digital Corporation
no-open-redistribution-license-asserted
https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year
Source input: sources/curated-official-2026-09-08-americas-round5-df1-current-build.json

ap41-keppel-genting-lane-kdcreit-identity
Keppel DC REIT, via SGXNet
all-rights-reserved
https://links.sgx.com/FileOpen/Keppel%20DC%20REIT-Transaction%20Announcement_19%20November%202024.ashx?App=Announcement&FileID=825669
Source input: sources/curated-official-2026-09-25-apac-round41-keppel-sgp9-current-build.json

ap41-keppel-osm-named-campus
OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/api/0.6/way/1560974456/full.json
Source input: sources/verified-construction-core-v0.18-apac-round41-keppel-sgp9-geometry-proposal.json

ap41-keppel-osm-wgs84
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-apac-round41-keppel-sgp9-geometry-proposal.json

ap41-keppel-sgp9-1h2026-commenced-construction
Keppel Ltd
all-rights-reserved
https://www.keppel.com/file/media/media-releases-sgx/2026/07-july/30-july-kcl/2-keppel-ltd-1h2026-presentation-slides.pdf
Source input: sources/curated-official-2026-09-25-apac-round41-keppel-sgp9-current-build.json

ap41-range-hk-lot-dd89-953-native
Lands Department, Government of the Hong Kong SAR; CSDI Portal
csdi-terms-free-reuse-with-attribution
https://portal.csdi.gov.hk/server/rest/services/common/landsd_rcd_1637217253134_22729/FeatureServer/0/query?where=LotCSUID%3D%27145000953%27&outFields=*&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-apac-round41-range-sandy-ridge-geometry-proposal.json

ap41-range-hk-lot-dd89-953-record
Lands Department, Government of the Hong Kong SAR; CSDI Portal
csdi-terms-free-reuse-with-attribution
https://portal.csdi.gov.hk/server/rest/services/common/landsd_rcd_1637217253134_22729/FeatureServer/1000/query?where=LotCSUID%3D%27145000953%27&outFields=*&f=json
Source input: sources/verified-construction-core-v0.18-apac-round41-range-sandy-ridge-geometry-proposal.json

ap41-range-sandy-ridge-h1-infrastructure-works
Range Intelligent Computing Technology Group, via CNINFO
all-rights-reserved
http://static.cninfo.com.cn/finalpage/2026-08-28/1225521959.PDF
Source input: sources/curated-official-2026-09-25-apac-round41-range-sandy-ridge-current-build.json

ap41-range-sandy-ridge-itib-tender-identity
Government of the Hong Kong SAR (info.gov.hk)
no-open-license-asserted
https://www.info.gov.hk/gia/general/202603/02/P2026030200249.htm
Source input: sources/curated-official-2026-09-25-apac-round41-range-sandy-ridge-current-build.json

ap43-hkg10-als-goodman-texaco-centre
Government of the Hong Kong SAR, Address Lookup Service (DATA.GOV.HK)
data-gov-hk-terms-free-reuse-with-attribution
https://www.als.gov.hk/lookup?q=Goodman%20Texaco%20Centre&n=3
Source input: sources/curated-official-2026-10-09-apac-round43-goodman-hkg10-current-build.json

ap43-hkg10-ccsas-texaco-centre-lot
Development Bureau and Construction Industry Council, Hong Kong
no-open-license-asserted
https://www.safetyweek.hk/web/files.php?id=7670&scode=3c5d51c4aebb67a615e742d56d29e47d
Source input: sources/curated-official-2026-10-09-apac-round43-goodman-hkg10-current-build.json

ap43-hkg10-fy26-wip-june30-current-build
Goodman Group
all-rights-reserved
https://www.goodman.com/-/media/project/goodman/global/files/investor-centre/gmg-goodman-group/announcements/asx-announcements/2026/4-full-year-results-presentation-5.pdf?rev=ac56d4e1f3444d309bbefa27304c7da1
Source input: sources/curated-official-2026-10-09-apac-round43-goodman-hkg10-current-build.json

ap43-hkg10-goodman-2024-texaco-conversion
Goodman Group, via PR Newswire
all-rights-reserved
https://www.prnewswire.com/apac/news-releases/goodmans-digital-infrastructure-offering-powers-ahead-with-data-centre-expansion-in-asia-302044345.html
Source input: sources/curated-official-2026-10-09-apac-round43-goodman-hkg10-current-build.json

ap43-hkg10-goodman-listing-128-texaco-road
Goodman Group; archived by the Internet Archive Wayback Machine
all-rights-reserved
https://web.archive.org/web/20260826065350id_/https://hk.goodman.com/data-centres/hong-kong/hkg10
Source input: sources/curated-official-2026-10-09-apac-round43-goodman-hkg10-current-build.json

ap43-hkg10-hk-lot-dd443-472-record
Lands Department, Government of the Hong Kong SAR; CSDI Portal
csdi-terms-free-reuse-with-attribution
https://portal.csdi.gov.hk/server/rest/services/common/landsd_rcd_1637217253134_22729/FeatureServer/1000/query?where=LotCSUID%20LIKE%20%27463000472%25%27&outFields=*&f=json
Source input: sources/verified-construction-core-v0.18-apac-round43-goodman-hkg10-geometry-proposal.json

ap43-hkg10-hk-lot-dd443-472-sa-native
Lands Department, Government of the Hong Kong SAR; CSDI Portal
csdi-terms-free-reuse-with-attribution
https://portal.csdi.gov.hk/server/rest/services/common/landsd_rcd_1637217253134_22729/FeatureServer/0/query?where=LotCSUID%3D%27463000472%20%20%20%20A%27&outFields=*&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-apac-round43-goodman-hkg10-geometry-proposal.json

as30-elmina-aug15-current-build
Media Selangor; first-hand interview with Google infrastructure principal Ken Siah
no-open-license-asserted
https://mediaselangor.com/en/2026/08/390529
Source input: sources/curated-official-2026-09-09-asia-round30-google-elmina-aug15-current-build.json

as30-elmina-wikidata-point
Wikidata contributors
CC0-1.0
https://www.wikidata.org/wiki/Special:EntityData/Q136745002.json
Source input: sources/verified-construction-core-v0.18-asia-round30-google-elmina-geometry-proposal.json

as30-google-content-rights
Google
no-open-license-asserted
https://policies.google.com/terms?hl=en
Source input: sources/verified-construction-core-v0.18-asia-round30-google-elmina-geometry-proposal.json

as30-google-elmina-official-identity
Google
no-open-license-asserted
https://blog.google/intl/ms-my/company-news/inside-google/2024_10_google-breaks-ground-on-us2-billion/
Source input: sources/verified-construction-core-v0.18-asia-round30-google-elmina-geometry-proposal.json

as30-google-ken-siah-authority
Google
no-open-license-asserted
https://blog.google/intl/zh-tw/company-news/inside-google/2023_09_twdc10/
Source input: sources/verified-construction-core-v0.18-asia-round30-google-elmina-geometry-proposal.json

as30-wikidata-cc0
Wikidata contributors
CC-BY-SA-4.0
https://www.wikidata.org/wiki/Wikidata:Data_access
Source input: sources/verified-construction-core-v0.18-asia-round30-google-elmina-geometry-proposal.json

as30-wikidata-coordinate-crs
Wikidata contributors
CC-BY-SA-4.0
https://www.wikidata.org/wiki/Help:Data_type
Source input: sources/verified-construction-core-v0.18-asia-round30-google-elmina-geometry-proposal.json

as36-chennai-july29-current-build
CapitaLand India Trust
all-rights-reserved
https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf
Source input: sources/curated-official-2026-09-10-asia-round36-chennai-current-build.json

as36-chennai-ogc-kml22-crs
Open Geospatial Consortium
no-open-license-asserted
https://docs.ogc.org/is/07-147r2/07-147r2.pdf
Source input: sources/verified-construction-core-v0.18-asia-round36-chennai-geometry-proposal.json

as36-chennai-operator-minerva-identity
CapitaLand
all-rights-reserved
https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-data-centrechennai.html
Source input: sources/curated-official-2026-09-10-asia-round36-chennai-current-build.json

as36-chennai-parivesh-caf-document-binding
Ministry of Environment, Forest and Climate Change, India; Minerva Veritas Data Centre Private Limited, proponent
no-open-license-asserted
https://parivesh.nic.in/parivesh_api/proponentApplicant/getCafDataByProposalNo?proposal_no=SIA%2FTN%2FINFRA2%2F431276%2F2023
Source input: sources/verified-construction-core-v0.18-asia-round36-chennai-geometry-proposal.json

as36-chennai-parivesh-minerva-site-layout
Minerva Veritas Data Centre Private Limited, proponent; PARIVESH, Government of India, host
no-open-license-asserted
https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=58599&refId=5696201&refType=EC_TOR&uuid=ca1d526e-045f-43a7-a88e-59e18ba39bb0&version=1.1
Source input: sources/verified-construction-core-v0.18-asia-round36-chennai-geometry-proposal.json

as36-chennai-parivesh-project-site-kml
Minerva Veritas Data Centre Private Limited, proponent; PARIVESH, Government of India, host
no-open-license-asserted
https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=40829&refId=5696080&refType=caf&uuid=963db531-1544-4984-8bef-f68e8a9a0ade&version=1.1
Source input: sources/verified-construction-core-v0.18-asia-round36-chennai-geometry-proposal.json

as37-edge2-feb2024-operator-identity
PT Ekagrata Data Gemilang / Digital Edge Indonesia
all-rights-reserved
https://id.digitaledgedc.com/news/edge2-23-mw-data-center-facility-in-the-heart-of-jakarta-is-ready-for-service
Source input: sources/curated-official-2026-09-10-asia-round37-edge2-phase3-current-build.json

as37-edge2-operator-specsheet-identity
Digital Edge / EDGE DC
all-rights-reserved
https://www.digitaledgedc.com/wp-content/uploads/2023/07/EDGE2_Specsheet_DE-S.pdf
Source input: sources/verified-construction-core-v0.18-asia-round37-edge2-geometry-proposal.json

as37-edge2-osm-named-building
OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/api/0.6/way/1230327255/full.json
Source input: sources/verified-construction-core-v0.18-asia-round37-edge2-geometry-proposal.json

as37-edge2-osm-rights
OpenStreetMap Foundation and contributors
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-asia-round37-edge2-geometry-proposal.json

as37-edge2-osm-wgs84
OpenStreetMap contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-asia-round37-edge2-geometry-proposal.json

as37-edge2-peeringdb-facility-identity
PeeringDB facility 15081 contributors
no-open-redistribution-license-asserted
https://www.peeringdb.com/fac/15081
Source input: sources/verified-construction-core-v0.18-asia-round37-edge2-geometry-proposal.json

as37-edge2-phase3-june30-current-build
PT Indointernet Tbk
all-rights-reserved
https://indonet.id/wp-content/uploads/2026/08/FS-Indonet-30-June-2026.pdf
Source input: sources/curated-official-2026-09-10-asia-round37-edge2-phase3-current-build.json

as41-thane-hycr-may27-current-build
Amazon Data Services India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)
no-open-license-asserted
https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=1544616&refId=1229589086&refType=COMPLIANCE&uuid=aeac2226-55e4-4d6e-9ec5-e5526c7cd02e&version=1.0
Source input: sources/curated-official-2026-09-25-asia-round41-aws-thane-current-build.json

as41-thane-ogc-kml22-crs
Open Geospatial Consortium
no-open-license-asserted
https://docs.ogc.org/is/07-147r2/07-147r2.pdf
Source input: sources/verified-construction-core-v0.18-asia-round41-aws-thane-geometry-proposal.json

as41-thane-parivesh-caf-kml-binding
Ministry of Environment, Forest and Climate Change, India (PARIVESH portal); Amazon Data Services India Private Limited, proponent
no-open-license-asserted
https://parivesh.nic.in/parivesh_api/proponentApplicant/getCafDataByProposalNo?proposal_no=SIA%2FMH%2FINFRA2%2F477127%2F2024
Source input: sources/verified-construction-core-v0.18-asia-round41-aws-thane-geometry-proposal.json

as41-thane-parivesh-compliance-listing
Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)
no-open-license-asserted
https://parivesh.nic.in/compliance/data/previousCompliance?proposal_no=SIA%2FMH%2FINFRA2%2F477127%2F2024
Source input: sources/curated-official-2026-09-25-asia-round41-aws-thane-current-build.json

as41-thane-parivesh-project-site-kml
Amazon Data Services India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host
no-open-license-asserted
https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=40829&refId=48515968&refType=caf&uuid=918097ab-55a6-4361-be07-77242df79e0e&version=1.0
Source input: sources/verified-construction-core-v0.18-asia-round41-aws-thane-geometry-proposal.json

as41-thane-parivesh-proposal-identity
Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)
no-open-license-asserted
https://parivesh.nic.in/mis/v2/trackYourProposal/onBasesOfProposalNo?proposalNo=SIA%2FMH%2FINFRA2%2F477127%2F2024&isLogin=false
Source input: sources/curated-official-2026-09-25-asia-round41-aws-thane-current-build.json

as42-raiden-aug3-hycr-under-construction
Raiden Infotech India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)
no-open-license-asserted
https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=1544616&refId=1237477223&refType=COMPLIANCE&uuid=448f19a4-30c8-4bdd-8381-d845615e1f8d&version=1.1
Source input: sources/curated-official-2026-10-09-asia-round43-raiden-turbhe-current-build.json

as42-raiden-ogc-kml22-crs
Open Geospatial Consortium
no-open-license-asserted
https://docs.ogc.org/is/07-147r2/07-147r2.pdf
Source input: sources/verified-construction-core-v0.18-asia-round43-raiden-turbhe-geometry-proposal.json

as42-raiden-parivesh-caf-kml-binding
Ministry of Environment, Forest and Climate Change, India (PARIVESH portal); Raiden Infotech India Private Limited, proponent
no-open-license-asserted
https://parivesh.nic.in/parivesh_api/proponentApplicant/getCafDataByProposalNo?proposal_no=SIA%2FMH%2FINFRA2%2F531703%2F2025
Source input: sources/verified-construction-core-v0.18-asia-round43-raiden-turbhe-geometry-proposal.json

as42-raiden-parivesh-compliance-listing
Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)
no-open-license-asserted
https://parivesh.nic.in/compliance/data/previousCompliance?proposal_no=SIA%2FMH%2FINFRA2%2F531703%2F2025
Source input: sources/curated-official-2026-10-09-asia-round43-raiden-turbhe-current-build.json

as42-raiden-parivesh-project-identity
Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)
no-open-license-asserted
https://parivesh.nic.in/compliance/data/getPublicDataByProposal?proposal_no=SIA%2FMH%2FINFRA2%2F531703%2F2025
Source input: sources/curated-official-2026-10-09-asia-round43-raiden-turbhe-current-build.json

as42-raiden-parivesh-project-site-kml
Raiden Infotech India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host
no-open-license-asserted
https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=40829&refId=123711148&refType=caf&uuid=82bd367c-609c-46be-ab68-0d537b8e1d8e&version=1.0
Source input: sources/verified-construction-core-v0.18-asia-round43-raiden-turbhe-geometry-proposal.json

as43-raiden-seiaa-ec-2025-11-27-identity
State Environment Impact Assessment Authority, Maharashtra; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)
no-open-license-asserted
https://parivesh.nic.in/certificates/Raiden_infotech_india_private__LIMITEd/5/123712576/V_0_SIA_MH_INFRA2_531703_2025_123712577_-signed.pdf
Source input: sources/curated-official-2026-10-09-asia-round43-raiden-turbhe-current-build.json

ascenty-sumare-campus-brochure
Ascenty
all-rights-reserved
https://ascenty.com/wp-content/uploads/2023/01/Folder_Ascenty-Campus-Sumare-EN.pdf
Source input: sources/curated-official-2026-09-08-regions-round8-ascenty-sumare3-current-build.json

ascenty-sumare3-current-status
Christopher Torto, Ascenty CEO via LinkedIn
all-rights-reserved
https://pt.linkedin.com/posts/chris-torto_ascenty-datacenter-ia-activity-7465819505873702912-8_Vq
Source input: sources/curated-official-2026-09-08-regions-round8-ascenty-sumare3-current-build.json

asia24-daou-idc-service-terms
Daou Technology Inc.
all-rights-reserved
https://www.daouidc.com/membership/policy/idc.do
Source input: sources/verified-construction-core-v0.18-asia-round24-daou-jukjeon-geometry-proposal.json

asia24-daou-jukjeon-halfyear-current-build
Daou Technology Inc.
all-rights-reserved
https://www.daou.co.kr/images/sub/ir/data_down/Daoutech_quarter_half_2026.pdf
Source input: sources/curated-official-2026-09-09-asia-round24-daou-jukjeon-halfyear-current-build.json

asia24-daou-jukjeon-operator-point
Daou Technology Inc.
all-rights-reserved
https://www.daouidc.com/infra/cdc.do
Source input: sources/verified-construction-core-v0.18-asia-round24-daou-jukjeon-geometry-proposal.json

asia24-daou-official-halfyear-download
Daou Technology Inc.
all-rights-reserved
https://www.daou.co.kr/ko/ir/ir-information
Source input: sources/curated-official-2026-09-09-asia-round24-daou-jukjeon-halfyear-current-build.json

asia24-daou-parent-idc-authority
Daou Technology Inc.
all-rights-reserved
https://www.daou.co.kr/ko/service/idc
Source input: sources/curated-official-2026-09-09-asia-round24-daou-jukjeon-halfyear-current-build.json

asia24-google-latlng-wgs84-semantics
Google
CC-BY-4.0
https://developers.google.com/maps/documentation/javascript/coordinates
Source input: sources/verified-construction-core-v0.18-asia-round24-daou-jukjeon-geometry-proposal.json

asia25-dem-syd1-address-campus-identity
DEM (Aust) Pty Ltd
all-rights-reserved
https://www.dem.com.au/digico-syd1-data-centre
Source input: sources/verified-construction-core-v0.18-asia-round25-digico-syd1-geometry-proposal.json

asia25-digico-aug21-phase-successor-context
DigiCo Infrastructure REIT / HMC Capital
all-rights-reserved
https://www.hmccapital.com.au/investment-strategies/digital-infrastructure/digico-infrastructure-reit/asx-announcements/fy26-results-presentation/
Source input: sources/verified-construction-core-v0.18-asia-round25-digico-syd1-geometry-proposal.json

asia25-digico-syd1-nsw-project-point
NSW Department of Planning, Housing and Infrastructure
CC-BY-4.0-Department-material-scope
https://www.planningportal.nsw.gov.au/major-projects/projects/digico-syd1-data-centre-expansion?page=1
Source input: sources/verified-construction-core-v0.18-asia-round25-digico-syd1-geometry-proposal.json

asia25-earningsapi-rights
EarningsAPI / DREAVERR Digital Solutions LLP
all-rights-reserved
https://earningsapi.io/terms
Source input: sources/curated-official-2026-09-09-asia-round25-digico-syd1-early-works.json

asia25-google-geographic-crs
Google
CC-BY-4.0
https://developers.google.com/maps/documentation/javascript/coordinates
Source input: sources/verified-construction-core-v0.18-asia-round25-digico-syd1-geometry-proposal.json

asia25-nsw-planning-rights
NSW Department of Planning, Housing and Infrastructure
CC-BY-4.0-Department-material-scope
https://www.planning.nsw.gov.au/copyright-and-disclaimer
Source input: sources/verified-construction-core-v0.18-asia-round25-digico-syd1-geometry-proposal.json

asia25-shape-aug19-syd1-early-works
EarningsAPI / DREAVERR Digital Solutions LLP; statements attributed to SHAPE CEO Peter Marix-Evans
all-rights-reserved
https://earningsapi.io/transcripts/shape-australia-corporation-limited_sha_earnings_call_transcript_2026-08-19
Source input: sources/curated-official-2026-09-09-asia-round25-digico-syd1-early-works.json

asia25-shape-ceo-issuer-authority
SHAPE Australia Corporation Limited
all-rights-reserved
https://app.sharelinktechnologies.com/announcement/asx/b6662ed032c0a7e523bb950bbf61b403
Source input: sources/curated-official-2026-09-09-asia-round25-digico-syd1-early-works.json

asia25-shape-issuer-results-catalogue
SHAPE Australia Corporation Limited
all-rights-reserved
https://investor.shape.com.au/reports-presentations/
Source input: sources/curated-official-2026-09-09-asia-round25-digico-syd1-early-works.json

asia25-shape-rights
SHAPE Australia Corporation Limited
all-rights-reserved
https://shape.com.au/terms-and-conditions/
Source input: sources/curated-official-2026-09-09-asia-round25-digico-syd1-early-works.json

asia25-shape-syd1-project-identity
SHAPE Australia Corporation Limited
all-rights-reserved
https://app.sharelinktechnologies.com/announcement/asx/53068d5ce89caf3a4a593fa4f807f895
Source input: sources/curated-official-2026-09-09-asia-round25-digico-syd1-early-works.json

capitaland-hyderabad-locator
CapitaLand
all-rights-reserved
https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-data-centreitphhyderabad.html
Source input: sources/verified-construction-core-v0.18-initial-three-geometry-facts.json

capitaland-hyderabad-locator-identity
CapitaLand
all-rights-reserved
https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-data-centreitphhyderabad.html
Source input: sources/curated-official-2026-09-08-capitaland-itph-hyderabad-current-build.json

capitaland-hyderabad-status
CapitaLand India Trust
all-rights-reserved
https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf
Source input: sources/curated-official-2026-09-08-capitaland-itph-hyderabad-current-build.json

capitaland-mumbai-locator
CapitaLand
all-rights-reserved
https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html
Source input: sources/verified-construction-core-v0.18-initial-three-geometry-facts.json

capitaland-mumbai-locator-identity
CapitaLand
all-rights-reserved
https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html
Source input: sources/curated-official-2026-09-08-capitaland-navi-mumbai-tower-2.json

capitaland-mumbai-status
CapitaLand India Trust
all-rights-reserved
https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf
Source input: sources/curated-official-2026-09-08-capitaland-navi-mumbai-tower-2.json

cartociudad-attribution
Instituto Geografico Nacional / Centro Nacional de Informacion Geografica
no-open-redistribution-license-asserted
https://www.cartociudad.es/web/portal/aviso-legal
Source input: sources/verified-construction-core-v0.18-iron-madrid-geometry-facts.json

cartociudad-service-crs
Instituto Geografico Nacional / Centro Nacional de Informacion Geografica
no-open-redistribution-license-asserted
https://www.cartociudad.es/web/portal/faq
Source input: sources/verified-construction-core-v0.18-iron-madrid-geometry-facts.json

cgk-giic-geofabrik-reverification
Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL). Extract by Geofabrik GmbH.
ODbL-1.0
https://download.geofabrik.de/asia/indonesia/java-latest.osm.pbf
Source input: sources/verified-construction-core-v0.18-cgk-host-estate-locator-correction-v1.json

cgk-giic-host-estate-context
Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/568349989/full.json
Source input: sources/verified-construction-core-v0.18-cgk-host-estate-locator-correction-v1.json

cgk-osm-wgs84-node-crs
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-cgk-host-estate-locator-correction-v1.json

csc-kajaani-data-center-address
CSC – IT Center for Science Ltd.
no-open-license-asserted
https://csc.fi/en/about-us/contact-information/
Source input: sources/curated-official-2026-09-09-europe-round15-csc-lumi-ai-current-build.json

csc-lumi-ai-aug20-current-build
CSC – IT Center for Science Ltd.
no-open-license-asserted
https://csc.fi/en/news/csc-strengthens-the-future-of-kainuu/
Source input: sources/curated-official-2026-09-09-europe-round15-csc-lumi-ai-current-build.json

csc-lumi-ai-same-hall-identity
CSC – IT Center for Science Ltd.
no-open-license-asserted
https://csc.fi/en/blog/construction-of-the-lumi-ai-data-center-in-full-swing/
Source input: sources/curated-official-2026-09-09-europe-round15-csc-lumi-ai-current-build.json

csc-lumi-community-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=CSC%20Kajaani&format=jsonv2&addressdetails=1
Source input: sources/verified-construction-core-v0.18-europe-round15-csc-lumi-ai-geometry-proposal.json

csc-lumi-community-way
© OpenStreetMap contributors
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%3Bway(705545655)%3Bout%20body%20geom%3B
Source input: sources/verified-construction-core-v0.18-europe-round15-csc-lumi-ai-geometry-proposal.json

digital-realty-sum01
Digital Realty
all-rights-reserved
https://www.digitalrealty.com/data-centers/americas/sao-paulo/sum01
Source input: sources/verified-construction-core-v0.18-regions-round8-sumare-geometry-proposal.json

dvz-campus-osm
OpenStreetMap contributors via Overpass
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%3Bnwr%5B%22name%22~%22DVZ%7CDatenverarbeitungszentrum%22%2Ci%5D%2853.6%2C11.3%2C53.7%2C11.45%29%3Bout%20meta%20center%3B
Source input: sources/verified-construction-core-v0.18-europe-round5-dvz-proposed-geometry.json

dvz-current-status
DVZ M-V GmbH
no-open-license-asserted
https://www.dvz-mv.de/sites/default/files/2026-07/community-01-2026_BF-final.pdf
Source input: sources/curated-official-2026-09-08-europe-round5-dvz-schwerin-proposed-build.json

dvz-exact-campus-address
TED / DVZ M-V GmbH
no-open-license-asserted
https://ted.europa.eu/en/notice/304486-2023/pdf
Source input: sources/curated-official-2026-09-08-europe-round5-dvz-schwerin-proposed-build.json

dvz-issue-pdf-link
DVZ M-V GmbH
no-open-license-asserted
https://www.dvz-mv.de/kundenmagazin
Source input: sources/curated-official-2026-09-08-europe-round5-dvz-schwerin-proposed-build.json

dvz-issue-publication
DVZ M-V GmbH
no-open-license-asserted
https://www.dvz-mv.de/news/jetzt-die-neue-ausgabe-unseres-magazins-lesen
Source input: sources/curated-official-2026-09-08-europe-round5-dvz-schwerin-proposed-build.json

dvz-newbuild-location
DVZ M-V GmbH
no-open-license-asserted
https://dvz-community-live.de/sites/default/files/2025-04/Tag%201_Deep%20Dive_Das%20neue%20DVZ-Rechenzentrum_Bru%CC%88llinger%20Baumgarten%20-%20barrierefrei.pdf
Source input: sources/curated-official-2026-09-08-europe-round5-dvz-schwerin-proposed-build.json

dvz-news-index-date
DVZ M-V GmbH
no-open-license-asserted
https://www.dvz-mv.de/news
Source input: sources/curated-official-2026-09-08-europe-round5-dvz-schwerin-proposed-build.json

edged-source-rights
Edged
all-rights-reserved
https://www.edged.es/legal-notice
Source input: sources/verified-construction-core-v0.18-merlin-two-reviewed-geometry.json

eu22-bulk-dk01-government-address
Miljøstyrelsen / Digital MiljøAdministration
no-open-license-asserted
https://dma.mst.dk/vis-virksomhed/4199d44b-5404-4907-ad78-799090d60e16
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-bulk-dk01-june30-construction
Bulk Infrastructure Group AS
no-open-license-asserted
https://bulkinfrastructure.com/uploads/Financial-report/Quarterly-Report/Bulk-Infrastructure-Group-Financial-statements-Q2-2026.pdf
Source input: sources/curated-official-2026-09-09-europe-round22-bulk-dk01-q2-current-build.json

eu22-bulk-dk01-operator-coordinate
Bulk Infrastructure Group AS
no-open-license-asserted
https://bulkinfrastructure.com/data-centers/locations/dk01
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-bulk-n01-brochure-context
Bulk Infrastructure Group AS
no-open-license-asserted
https://bulkinfrastructure.com/uploads/N01-Campus_Brochure_May24.pdf
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-bulk-n01-june30-construction
Bulk Infrastructure Group AS
no-open-license-asserted
https://bulkinfrastructure.com/uploads/Financial-report/Quarterly-Report/Bulk-Infrastructure-Group-Financial-statements-Q2-2026.pdf
Source input: sources/curated-official-2026-09-09-europe-round22-bulk-n01-q2-current-build.json

eu22-bulk-n01-nominatim-crosscheck
OpenStreetMap contributors / Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?format=jsonv2&q=Bulk%20N01&addressdetails=1&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-bulk-n01-operator-coordinate
Bulk Infrastructure Group AS
no-open-license-asserted
https://bulkinfrastructure.com/data-centers/locations/n01
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-bulk-n01-osm-identity
OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/api/0.6/relation/13780899/full.json
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-bulk-q2-publication
Bulk Infrastructure Group AS
no-open-license-asserted
https://bulkinfrastructure.com/about-us/investor-relations
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-osm-rights
OpenStreetMap Foundation
no-open-license-asserted
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu22-schema-geocoordinates-wgs84
Schema.org
no-open-license-asserted
https://schema.org/GeoCoordinates
Source input: sources/verified-construction-core-v0.18-europe-round22-bulk-geometry-proposal.json

eu24-fechenheim-fra20-campus-bridge
Digital Realty
no-open-license-asserted
https://www.digitalrealty.com/about/newsroom/press-releases/19811/digital-realty-begins-construction-of-its-latest-state-of-the-art-data-center-in-frankfurt
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-fra20-operator-point
Digital Realty
no-open-license-asserted
https://www.digitalrealty.com/de/data-centers/emea/frankfurt/fra20
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-google-wgs84-contract
Google
CC-BY-4.0
https://developers.google.com/maps/documentation/javascript/coordinates?hl=en
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-google-wrapper-contract
Digital Realty
no-open-license-asserted
https://www.digitalrealty.com/_next/static/chunks/1438.728722cd82ebeed9.js
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-lupp-publication-index
Adolf Lupp GmbH + Co KG
no-open-license-asserted
https://www.lupp.de/lupp-news
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-map-component-contract
Digital Realty
no-open-license-asserted
https://www.digitalrealty.com/_next/static/chunks/2881.7bc38f42a2a7e45e.js
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-map-hero-contract
Digital Realty
no-open-license-asserted
https://www.digitalrealty.com/_next/static/chunks/5170.09fe70abdb9673fb.js
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-map-page-code
Digital Realty
no-open-license-asserted
https://www.digitalrealty.com/_next/static/chunks/pages/%5B%5B...slug%5D%5D-8021e6fa0c539442.js
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu24-fechenheim-uw04-july2-construction
Adolf Lupp GmbH + Co KG
no-open-license-asserted
https://www.lupp.de/spatenstich-fuer-das-umspannwerk-im-digitalpark-fechenheim
Source input: sources/curated-official-2026-09-09-europe-round24-fechenheim-uw04-current-build.json

eu24-fechenheim-webpack-contract
Digital Realty
no-open-license-asserted
https://www.digitalrealty.com/_next/static/chunks/webpack-b78081d3905b684e.js
Source input: sources/verified-construction-core-v0.18-europe-round24-fechenheim-geometry-proposal.json

eu26-cloud4y-marfino-july13-current-build
Cloud4Y corporate blog on Habr, currently displayed as Cloud4U
no-open-license-asserted
https://habr.com/ru/companies/cloud4y/articles/1058450/
Source input: sources/curated-official-2026-09-09-europe-round26-cloud4y-marfino-current-build.json

eu26-cloud4y-marfino-map-code
Cloud4Y
no-open-license-asserted
https://www.cloud4y.ru/bitrix/cache/js/s1/2019/template_5c75325715617cdba326d6a89c8251cf/template_5c75325715617cdba326d6a89c8251cf_v1.js?1787322416381485
Source input: sources/verified-construction-core-v0.18-europe-round26-cloud4y-marfino-geometry-proposal.json

eu26-cloud4y-marfino-operator-identity
Cloud4Y
no-open-license-asserted
https://www.cloud4y.ru/cloud-hosting/data-center-marfino/
Source input: sources/curated-official-2026-09-09-europe-round26-cloud4y-marfino-current-build.json

eu26-cloud4y-marfino-operator-point
Cloud4Y
no-open-license-asserted
https://www.cloud4y.ru/contacts/
Source input: sources/verified-construction-core-v0.18-europe-round26-cloud4y-marfino-geometry-proposal.json

eu26-cloud4y-marfino-original-identity
Cloud4Y corporate blog on Habr, currently displayed as Cloud4U
no-open-license-asserted
https://habr.com/ru/companies/cloud4y/articles/862426/
Source input: sources/curated-official-2026-09-09-europe-round26-cloud4y-marfino-current-build.json

eu26-cloud4y-marfino-successor-index
Cloud4Y corporate blog on Habr, currently displayed as Cloud4U
no-open-license-asserted
https://habr.com/ru/companies/cloud4y/articles/
Source input: sources/curated-official-2026-09-09-europe-round26-cloud4y-marfino-current-build.json

eu26-yandex-jsapi-coordinate-order
Yandex
no-open-license-asserted
https://yandex.ru/dev/jsapi-v2-1/doc/ru/v2-1/dg/concepts/load
Source input: sources/verified-construction-core-v0.18-europe-round26-cloud4y-marfino-geometry-proposal.json

eu26-yandex-jsapi-wgs84
Yandex
no-open-license-asserted
https://yandex.ru/dev/jsapi-v2-1/doc/ru/v2-1/theory/
Source input: sources/verified-construction-core-v0.18-europe-round26-cloud4y-marfino-geometry-proposal.json

eu28-envia-campus-directions
envia TEL
no-open-license-asserted
https://www.enviatel.de/anfahrt-DCL
Source input: sources/verified-construction-core-v0.18-europe-round28-envia-leipzig-geometry-proposal.json

eu28-envia-content-rights-scope
envia TEL
no-open-license-asserted
https://www.enviatel.de/footer/rechtliche-hinweise
Source input: sources/curated-official-2026-09-09-europe-round28-envia-leipzig-current-build.json

eu28-envia-leipzig-may27-current-build
envia TEL
no-open-license-asserted
https://www.enviatel.de/presse-events/pm/PM/2026/05/27/envia-tel-schafft-sichere-digitale-infrastrukturen-f%C3%BCr-mitteldeutschland
Source input: sources/curated-official-2026-09-09-europe-round28-envia-leipzig-current-build.json

eu28-envia-leipzig-primary-successor-index
envia TEL
no-open-license-asserted
https://www.enviatel.de/presse-events/pressemitteilungen
Source input: sources/curated-official-2026-09-09-europe-round28-envia-leipzig-current-build.json

eu28-envia-leipzig2-exact-address
envia TEL
no-open-license-asserted
https://www.enviatel.de/presse-events/events/envia-tel-reseller-treffen
Source input: sources/verified-construction-core-v0.18-europe-round28-envia-leipzig-geometry-proposal.json

eu28-envia-osm-address-building-centroid
OpenStreetMap contributors via Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?street=116a%20Leipziger%20Stra%C3%9Fe&city=Taucha&country=Germany&postalcode=04425&format=jsonv2&polygon_geojson=1&addressdetails=1&extratags=1
Source input: sources/verified-construction-core-v0.18-europe-round28-envia-leipzig-geometry-proposal.json

eu28-envia-osm-object-tags
OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/api/0.6/way/394151488.json
Source input: sources/verified-construction-core-v0.18-europe-round28-envia-leipzig-geometry-proposal.json

eu28-nominatim-object-centroid-semantics
Nominatim documentation
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-europe-round28-envia-leipzig-geometry-proposal.json

eu28-osm-odbl-rights
OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-round28-envia-leipzig-geometry-proposal.json

eu28-osm-wgs84-semantics
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-europe-round28-envia-leipzig-geometry-proposal.json

eu30-datar-aug10-successor-context
dataR GmbH
no-open-license-asserted
https://www.datar.de/rechenzentren-sind-notwendig-die-frage-ist-wie-wir-sie-betreiben/
Source input: sources/curated-official-2026-09-09-europe-round30-datar-rellingen-current-build.json

eu30-datar-july17-current-build
dataR GmbH
no-open-license-asserted
https://www.datar.de/zwei-neue-kollegen-ein-gemeinsamer-start/
Source input: sources/curated-official-2026-09-09-europe-round30-datar-rellingen-current-build.json

eu30-datar-municipal-exact-campus-address
Gemeinde Rellingen
no-open-license-asserted
https://www.rellingen.de/communice-news/news/artikel/spatenstich-des-rechenzentrums-in-krupunder-2544
Source input: sources/verified-construction-core-v0.18-europe-round30-datar-rellingen-geometry-proposal.json

eu30-datar-operator-matching-address
dataR GmbH
no-open-license-asserted
https://www.datar.de/kontakt/
Source input: sources/verified-construction-core-v0.18-europe-round30-datar-rellingen-geometry-proposal.json

eu30-datar-operator-rights-identity
dataR GmbH
no-open-license-asserted
https://www.datar.de/impressum/
Source input: sources/curated-official-2026-09-09-europe-round30-datar-rellingen-current-build.json

eu30-datar-osm-exact-address-search
OpenStreetMap contributors via Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=Kellerstra%C3%9Fe%2068%2C%2025462%20Rellingen&format=jsonv2&polygon_geojson=1&addressdetails=1&extratags=1
Source input: sources/verified-construction-core-v0.18-europe-round30-datar-rellingen-geometry-proposal.json

eu30-datar-osm-native-node
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/node/11707884695.json
Source input: sources/verified-construction-core-v0.18-europe-round30-datar-rellingen-geometry-proposal.json

eu30-datar-primary-successor-index
dataR GmbH
no-open-license-asserted
https://www.datar.de/news/
Source input: sources/curated-official-2026-09-09-europe-round30-datar-rellingen-current-build.json

eu30-osm-node-wgs84
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-europe-round30-datar-rellingen-geometry-proposal.json

eu30-osm-odbl-rights
OpenStreetMap contributors
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-round30-datar-rellingen-geometry-proposal.json

eu31-firmus-community-campus-context
Firmus Technologies
no-open-license-asserted
https://firmus.co/tasmaniancommunity
Source input: sources/curated-official-2026-09-09-europe-round31-firmus-st-leonards-current-build.json

eu31-firmus-july2-abc-executive-current-build
Australian Broadcasting Corporation
no-open-license-asserted
https://www.abc.net.au/listen/programs/hobart-mornings/firmus-oliver-curtis-tim-rosenfield-tasmania-data-centres/106868690
Source input: sources/curated-official-2026-09-09-europe-round31-firmus-st-leonards-current-build.json

eu31-firmus-municipal-campus-constituent-bridge
City of Launceston
no-open-license-asserted
https://www.launceston.tas.gov.au/files/assets/public/v/1/document-resources/agenda-and-minutes/agendas/2025/1-september-2025-special-meeting/special-meeting-agenda-1-september-2025_1.pdf
Source input: sources/verified-construction-core-v0.18-europe-round31-firmus-st-leonards-geometry-proposal.json

eu31-firmus-osm-exact-named-building-centroid
OpenStreetMap contributors via Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=23%20Killafaddy%20Road%2C%20St%20Leonards%2C%20Tasmania&format=jsonv2&polygon_geojson=1&addressdetails=1&extratags=1
Source input: sources/verified-construction-core-v0.18-europe-round31-firmus-st-leonards-geometry-proposal.json

eu31-firmus-osm-native-way-identity
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/429540795.json
Source input: sources/verified-construction-core-v0.18-europe-round31-firmus-st-leonards-geometry-proposal.json

eu31-firmus-primary-newsroom-successors
Firmus Technologies
no-open-license-asserted
https://firmus.co/newsroom
Source input: sources/curated-official-2026-09-09-europe-round31-firmus-st-leonards-current-build.json

eu31-firmus-sept8-operating-portfolio-caveat
Firmus Technologies
no-open-license-asserted
https://firmus.co/newsroom/firmus-surpasses-900-mw-contracted-capacity-adds-openai-as-anchor-customer-and-expands-into-malaysia
Source input: sources/curated-official-2026-09-09-europe-round31-firmus-st-leonards-current-build.json

eu31-nominatim-centroid-semantics
Nominatim contributors
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-europe-round31-firmus-st-leonards-geometry-proposal.json

eu31-osm-odbl-rights
OpenStreetMap Foundation and contributors
ODbL-1.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-round31-firmus-st-leonards-geometry-proposal.json

eu31-osm-wgs84-semantics
OpenStreetMap contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-europe-round31-firmus-st-leonards-geometry-proposal.json

eu43-inspire-codelist-building
European Commission, INSPIRE registry
no-open-license-asserted
https://inspire.ec.europa.eu/codelist/GeometrySpecificationValue/building/building.en.json
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-inspire-codelist-byadministrator
European Commission, INSPIRE registry
no-open-license-asserted
https://inspire.ec.europa.eu/codelist/GeometryMethodValue/byAdministrator/byAdministrator.en.json
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-badencloud-site-page
LEITWERK AG / BADEN CLOUD
no-open-license-asserted
https://www.badencloud.de/rechenzentren/rechenzentrum-lahr/
Source input: sources/curated-official-2026-10-09-europe-round43-leitwerk-lahr-current-build.json

eu43-lahr-ewm-2025-08-04-jv-site
Elektrizitätswerk Mittelbaden AG & Co. KG
all-rights-reserved
https://www.e-werk-mittelbaden.de/presse/bau-rechenzentrum-lahr
Source input: sources/curated-official-2026-10-09-europe-round43-leitwerk-lahr-current-build.json

eu43-lahr-ewm-jun19-current-build
Elektrizitätswerk Mittelbaden AG & Co. KG
all-rights-reserved
https://www.e-werk-mittelbaden.de/sites/default/files/media_document/2026-06/20260619_Bilanz-Pressekonferenz-final.pdf
Source input: sources/curated-official-2026-10-09-europe-round43-leitwerk-lahr-current-build.json

eu43-lahr-lgl-address-point-etrs89
LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de
dl-de/by-2-0
https://owsproxy.lgl-bw.de/owsproxy/wfs/WFS_INSP_BW_Adr_Hauskoord_ALKIS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=ad:Address&SRSNAME=urn:ogc:def:crs:EPSG::4258&BBOX=48.36210,7.81680,48.36240,7.81720,urn:ogc:def:crs:EPSG::4258&COUNT=100
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-lgl-address-point-native
LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de
dl-de/by-2-0
https://owsproxy.lgl-bw.de/owsproxy/wfs/WFS_INSP_BW_Adr_Hauskoord_ALKIS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=ad:Address&BBOX=48.36210,7.81680,48.36240,7.81720,urn:ogc:def:crs:EPSG::4258&COUNT=100
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-lgl-adminunit-lahr
LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de
dl-de/by-2-0
https://owsproxy.lgl-bw.de/owsproxy/wfs/WFS_INSP_BW_Adr_Hauskoord_ALKIS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&STOREDQUERY_ID=urn:ogc:def:query:OGC-WFS::GetFeatureById&ID=AdminUnitName.08317065
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-lgl-postal-77933
LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de
dl-de/by-2-0
https://owsproxy.lgl-bw.de/owsproxy/wfs/WFS_INSP_BW_Adr_Hauskoord_ALKIS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&STOREDQUERY_ID=urn:ogc:def:query:OGC-WFS::GetFeatureById&ID=PostalDescriptor.77933
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-lgl-street-uniqueness
LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de
dl-de/by-2-0
https://owsproxy.lgl-bw.de/owsproxy/wfs/WFS_INSP_BW_Adr_Hauskoord_ALKIS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=ad:Address&SRSNAME=urn:ogc:def:crs:EPSG::4258&BBOX=48.3500,7.8000,48.3700,7.8250,urn:ogc:def:crs:EPSG::4258&COUNT=5000
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-lgl-thoroughfare-einsteinallee
LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de
dl-de/by-2-0
https://owsproxy.lgl-bw.de/owsproxy/wfs/WFS_INSP_BW_Adr_Hauskoord_ALKIS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&STOREDQUERY_ID=urn:ogc:def:query:OGC-WFS::GetFeatureById&ID=ThoroughfareName.0831706583002
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-lgl-wfs-capabilities
LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de
dl-de/by-2-0
https://owsproxy.lgl-bw.de/owsproxy/wfs/WFS_INSP_BW_Adr_Hauskoord_ALKIS?SERVICE=WFS&REQUEST=GetCapabilities
Source input: sources/verified-construction-core-v0.18-europe-round43-leitwerk-lahr-geometry-proposal.json

eu43-lahr-qfox-open-site-address
Q-FOX group / LEITWERK AG
no-open-license-asserted
https://www.qfox.de/events/event-details/tag-der-offenen-baustelle-informieren-sie-sich-direkt-vor-ort
Source input: sources/curated-official-2026-10-09-europe-round43-leitwerk-lahr-current-build.json

europe10-nominatim-semantics
Nominatim project
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-europe-mena-round10-portus-muc2-proposed-geometry.json

europe10-osm-crs
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-europe-mena-round10-portus-muc2-proposed-geometry.json

europe10-osm-rights
OpenStreetMap Foundation
no-open-license-asserted
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-mena-round10-portus-muc2-proposed-geometry.json

europe12-nominatim-semantics
Nominatim project
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-europe-mena-round12-noris-nbg6-ba3-geometry-proposal.json

europe12-osm-crs
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-europe-mena-round12-noris-nbg6-ba3-geometry-proposal.json

europe12-osm-rights
OpenStreetMap Foundation
no-open-license-asserted
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-mena-round12-noris-nbg6-ba3-geometry-proposal.json

europe15-nominatim-semantics
Nominatim project
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-europe-round15-csc-lumi-ai-geometry-proposal.json

europe15-osm-crs
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-europe-round15-csc-lumi-ai-geometry-proposal.json

europe15-osm-rights
OpenStreetMap Foundation
no-open-license-asserted
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-round15-csc-lumi-ai-geometry-proposal.json

europe16-dayone-lahti-aug11-current-build
SRV Group Plc
no-open-license-asserted
https://www.srv.fi/srv-yrityksena/tyomaat/2984-lahden-datakeskus/tiedotteet/
Source input: sources/curated-official-2026-09-09-europe-round16-dayone-lahti-current-build.json

europe16-dayone-lahti-city-campus-identity
City of Lahti
no-open-license-asserted
https://www.lahti.fi/en/news/a-e1-2-billion-data-centre-to-be-built-in-kiverio-lahti/
Source input: sources/verified-construction-core-v0.18-europe-round16-dayone-lahti-geometry-proposal.json

europe16-dayone-lahti-nls-reference-point
Contains data from the National Land Survey of Finland, INSPIRE Cadastral Parcels, delivered 9 September 2026; reference point transformed from EPSG:3067 to EPSG:4326.
CC-BY-4.0
https://inspire-wfs.maanmittauslaitos.fi/inspire-wfs/cp/ows?service=WFS&version=2.0.0&request=GetFeature&typeNames=cp%3ACadastralParcel&outputFormat=application%2Fjson&CQL_FILTER=nationalCadastralReference%3D%2739800509660007%27
Source input: sources/verified-construction-core-v0.18-europe-round16-dayone-lahti-geometry-proposal.json

europe16-dayone-lahti-permit-address-register
City of Lahti
no-open-license-asserted
https://www.lahti.fi/app/uploads/2025/11/3393d31f-myonnetyt-luvat-lokakuu-2025.pdf
Source input: sources/verified-construction-core-v0.18-europe-round16-dayone-lahti-geometry-proposal.json

europe16-dayone-lahti-permit-parcel
City of Lahti
no-open-license-asserted
https://lahti-prod.oncloudos.com/kokous/20251180-3-400009.PDF
Source input: sources/verified-construction-core-v0.18-europe-round16-dayone-lahti-geometry-proposal.json

europe16-dayone-lahti-srv-job2984-address
SRV Group Plc
no-open-license-asserted
https://www.srv.fi/srv-yrityksena/tyomaat/2984-lahden-datakeskus/
Source input: sources/curated-official-2026-09-09-europe-round16-dayone-lahti-current-build.json

europe16-nls-cadastral-service-rights
National Land Survey of Finland
no-open-license-asserted
https://www.maanmittauslaitos.fi/inspire-kyselypalvelut-wfs
Source input: sources/verified-construction-core-v0.18-europe-round16-dayone-lahti-geometry-proposal.json

europe16-nls-ccby4-attribution-policy
National Land Survey of Finland
no-open-license-asserted
https://www.maanmittauslaitos.fi/en/opendata-licence-cc40
Source input: sources/verified-construction-core-v0.18-europe-round16-dayone-lahti-geometry-proposal.json

europe18-greenergy-aug12-operator-successor
Greenergy Data Centers and Tensor Estate
no-open-license-asserted
https://tensor.estate/news/estonia-first-ai-factory-2026
Source input: sources/verified-construction-core-v0.18-europe-round18-greenergy-huuru-geometry-proposal.json

europe18-greenergy-caverion-finnish-caveat
Caverion
no-open-license-asserted
https://www.caverion.fi/media/tiedotteet/2026/caverion-toteuttaa-paaurakoitsijana-50-miljoonan-euron-datakeskushankkeen-mcf-group-estonialle-baltian-suurin-korkean-turvallisuusstandardin-datakeskus-laajenee/
Source input: sources/curated-official-2026-09-09-europe-round18-greenergy-huuru-current-build.json

europe18-greenergy-existing-building-scope
Estonian Business and Innovation Agency / Invest Estonia
no-open-license-asserted
https://investinestonia.com/greenergy-data-center-200m-ai-expansion/
Source input: sources/verified-construction-core-v0.18-europe-round18-greenergy-huuru-geometry-proposal.json

europe18-greenergy-jul30-preparatory-construction
MCF Group Estonia / Tensor Estate
no-open-license-asserted
https://tensor.estate/news/mcf-group-100m-expansion
Source input: sources/curated-official-2026-09-09-europe-round18-greenergy-huuru-current-build.json

europe18-greenergy-jul31-onsite-expansion
Caverion
no-open-license-asserted
https://www.caverion.com/newsroom/releases/2026/mcf-group-estonia-chooses-caverion-as-main-contractor-for-a-eur-50-million-project-the-largest-high-security-data-centre-in-the-baltics-is-expanding/
Source input: sources/curated-official-2026-09-09-europe-round18-greenergy-huuru-current-build.json

europe18-greenergy-operator-exact-address
Greenergy Data Centers
no-open-license-asserted
https://www.greenergydatacenters.com/contact
Source input: sources/verified-construction-core-v0.18-europe-round18-greenergy-huuru-geometry-proposal.json

europe18-greenergy-osm-way1043819046
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/1043819046/full.json
Source input: sources/verified-construction-core-v0.18-europe-round18-greenergy-huuru-geometry-proposal.json

europe18-osm-node-wgs84
OpenStreetMap contributors
no-open-license-asserted
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-europe-round18-greenergy-huuru-geometry-proposal.json

europe18-osm-odbl-rights
OpenStreetMap Foundation
no-open-license-asserted
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-europe-round18-greenergy-huuru-geometry-proposal.json

europe5-edged-rights
Edged
all-rights-reserved
https://www.edged.es/legal-notice
Source input: sources/verified-construction-core-v0.18-merlin-getafe-ii-reviewed-geometry.json

europe5-getafe1-distinctness
Edged
all-rights-reserved
https://www.edged.es/madrid-getafe
Source input: sources/curated-official-2026-09-08-merlin-getafe-ii-reviewed-build.json

europe5-getafe2-identity
Edged
all-rights-reserved
https://www.edged.es/madrid-getafe-2
Source input: sources/curated-official-2026-09-08-merlin-getafe-ii-reviewed-build.json

europe5-getafe2-literal-point
Edged
all-rights-reserved
https://cdn.prod.website-files.com/612d5118cc3229538b508294/68bf2b6a1186eb51f6c433e8_MAD02_Spec%20Sheet_250730_Digital.pdf
Source input: sources/verified-construction-core-v0.18-merlin-getafe-ii-reviewed-geometry.json

europe5-getafe2-status
MERLIN Properties
all-rights-reserved
https://ir.merlinproperties.com/wp-content/uploads/2026/07/RI-6M26-MERLIN-Properties_eng.pdf
Source input: sources/curated-official-2026-09-08-merlin-getafe-ii-reviewed-build.json

europe5-getafe2-successor
MERLIN Properties
all-rights-reserved
https://ir.merlinproperties.com/en/merlin-increases-total-revenues-and-ebitda-by-11-7-thanks-to-the-data-centers-division-which-reaches-160-mw-leased/
Source input: sources/curated-official-2026-09-08-merlin-getafe-ii-reviewed-build.json

europe5-merlin-rights
MERLIN Properties
all-rights-reserved
https://www.merlinproperties.com/en/legal-notice/
Source input: sources/verified-construction-core-v0.18-merlin-getafe-ii-reviewed-geometry.json

flexbase-current-status
ERNE Gruppe
no-open-license-asserted
https://www.erne-gruppe.ch/de/bauprojekte/neubau-flexbase-technologiezentrum-laufenburg/
Source input: sources/curated-official-2026-09-08-europe-round5-flexbase-laufenburg-proposed-build.json

flexbase-exact-osm
OpenStreetMap contributors via Overpass
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%3Bnwr%5B%22name%22~%22FlexBase%7CTechnologiezentrum%7CSwissgrid%22%2Ci%5D%2847.52%2C8.03%2C47.59%2C8.1%29%3Bout%20meta%20center%3B
Source input: sources/verified-construction-core-v0.18-europe-round5-flexbase-proposed-geometry.json

flexbase-foundation-corroboration
Amperio
no-open-license-asserted
https://www.amperio.ch/de/technologiezentrum-laufenburg-ki-rechenzentrum/
Source input: sources/curated-official-2026-09-08-europe-round5-flexbase-laufenburg-proposed-build.json

flexbase-operator-identity
FlexBase Group
no-open-license-asserted
https://flexbase.ch/de/kontakt
Source input: sources/curated-official-2026-09-08-europe-round5-flexbase-laufenburg-proposed-build.json

goodman-ams01-notice-crs
Officiele Bekendmakingen
no-open-redistribution-license-asserted
https://zoek.officielebekendmakingen.nl/static/kaartmodule/js/index.js
Source input: sources/verified-construction-core-v0.18-goodman-europe-three-geometry-facts.json

goodman-ams01-notice-locator
Province of Noord-Holland / Officiele Bekendmakingen
no-open-redistribution-license-asserted
https://zoek.officielebekendmakingen.nl/prb-2026-2233/metadata.xml
Source input: sources/verified-construction-core-v0.18-goodman-europe-three-geometry-facts.json

goodman-ams01-permit-identity
Province of Noord-Holland
no-open-redistribution-license-asserted
https://zoek.officielebekendmakingen.nl/prb-2026-2233.html
Source input: sources/curated-official-2026-09-08-goodman-ams01-amsterdam-reviewed-location.json

goodman-ams01-status
Goodman Group
all-rights-reserved
https://www.goodman.com/-/media/project/goodman/global/files/investor-centre/gmg-goodman-group/announcements/asx-announcements/2026/4-full-year-results-presentation-5.pdf?rev=ac56d4e1f3444d309bbefa27304c7da1
Source input: sources/curated-official-2026-09-08-goodman-ams01-amsterdam-fy26-current-build.json

goodman-ams01-usgbc-identity
U.S. Green Building Council
all-rights-reserved
https://www.usgbc.org/projects/ams01-goodman-mona-logistics-netherlands-bv
Source input: sources/curated-official-2026-09-08-goodman-ams01-amsterdam-reviewed-location.json

goodman-fra02-brochure
Goodman Group
all-rights-reserved
https://de.goodman.com/-/media/project/goodman/germany/files/property/properties-for-lease/fra-ii/fra-ii-data-centre-brochure.pdf
Source input: sources/curated-official-2026-09-08-goodman-fra02-frankfurt-reviewed-location.json

goodman-fra02-city-identity
City of Neu-Isenburg
no-open-redistribution-license-asserted
https://www.neu-isenburg.de/medien/downloads/wirtschaft/Bericht-Wirtschaftsfoerderung-Neu-Isenburg-Final-24.04.2026.pdf
Source input: sources/curated-official-2026-09-08-goodman-fra02-frankfurt-reviewed-location.json

goodman-fra02-map-locator
Goodman Group via its published Google Maps link
all-rights-reserved
https://goo.gl/maps/HXytDcSqfrnEAHNs5
Source input: sources/verified-construction-core-v0.18-goodman-fra02-geometry-facts.json

goodman-fra02-status
Goodman Group
all-rights-reserved
https://www.goodman.com/-/media/project/goodman/global/files/investor-centre/gmg-goodman-group/announcements/asx-announcements/2026/4-full-year-results-presentation-5.pdf?rev=ac56d4e1f3444d309bbefa27304c7da1
Source input: sources/curated-official-2026-09-08-goodman-fra02-frankfurt-fy26-current-build.json

goodman-lax01-identity
DataBank
all-rights-reserved
https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/
Source input: sources/curated-official-2026-07-22-goodman-databank-lax01-enrichment.json

goodman-lax01-locator
Los Angeles County Office of the Assessor
no-open-redistribution-license-asserted
https://public.gis.lacounty.gov/public/rest/services/LACounty_Cache/LACounty_Parcel/MapServer/0/query?where=SitusHouseNo%3D'3094'%20AND%20SitusStreet%20LIKE%20'%25VERNON%25'&outFields=AIN%2CAPN%2CSitusHouseNo%2CSitusDirection%2CSitusStreet%2CSitusAddress%2CSitusCity%2CSitusZIP%2CCENTER_LAT%2CCENTER_LON&returnGeometry=true&outSR=4326&f=json
Source input: sources/verified-construction-core-v0.18-initial-three-geometry-facts.json

goodman-lax01-status
Goodman Group
all-rights-reserved
https://www.goodman.com/-/media/project/goodman/global/files/investor-centre/gmg-goodman-group/announcements/asx-announcements/2026/4-full-year-results-presentation-5.pdf?rev=ac56d4e1f3444d309bbefa27304c7da1
Source input: sources/curated-official-2026-09-08-goodman-lax01-los-angeles-fy26-current-build.json

goodman-mad01-identity
Goodman Group
all-rights-reserved
https://es.goodman.com/-/media/project/goodman/spain/files/property/properties-for-lease/mad01/es_mad-01_data-centre_digibrochure_en.pdf
Source input: sources/curated-official-2026-09-08-goodman-mad01-madrid-reviewed-build.json

goodman-mad01-locator
Goodman Group via its published Google Maps link
all-rights-reserved
https://maps.app.goo.gl/27oe2osrJoEjN5eB8
Source input: sources/verified-construction-core-v0.18-europe-next-three-reviewed-geometry.json

goodman-mad01-status
Goodman Group
all-rights-reserved
https://www.goodman.com/-/media/project/goodman/global/files/investor-centre/gmg-goodman-group/announcements/asx-announcements/2026/4-full-year-results-presentation-5.pdf?rev=ac56d4e1f3444d309bbefa27304c7da1
Source input: sources/curated-official-2026-09-08-goodman-mad01-madrid-reviewed-build.json

goodman-par01-ign-locator
IGN Geoplateforme / Base Adresse Nationale
no-open-redistribution-license-asserted
https://data.geopf.fr/geocodage/search?q=13%20Rue%20Charles%20Cros%2093290%20Tremblay-en-France&index=address&limit=5
Source input: sources/verified-construction-core-v0.18-goodman-europe-three-geometry-facts.json

goodman-par01-inquiry-identity
Prefecture of Seine-Saint-Denis
no-open-redistribution-license-asserted
https://www.seine-saint-denis.gouv.fr/Actions-de-l-Etat/Environnement-risques-et-nuisances/1-Installations-classees-pour-la-protection-de-l-environnement/Installations-a-autorisation/Autorisations-environnementales/GOODMAN-AUTORISATION-ENVIRONNEMENTALE-a-Tremblay-en-France/Demande-d-autorisation-environnementale-Societe-GOODMAN-a-Tremblay-en-France
Source input: sources/curated-official-2026-09-08-goodman-par01-paris-reviewed-location.json

goodman-par01-project-identity
Goodman France, hosted by Prefecture of Seine-Saint-Denis
all-rights-reserved
https://www.seine-saint-denis.gouv.fr/contenu/telechargement/23809/192822/file/B-Description%20du%20projet.pdf
Source input: sources/curated-official-2026-09-08-goodman-par01-paris-reviewed-location.json

goodman-par01-registry-identity
French government Annuaire des Entreprises
no-open-redistribution-license-asserted
https://recherche-entreprises.api.gouv.fr/search?q=99381376500027
Source input: sources/curated-official-2026-09-08-goodman-par01-paris-reviewed-location.json

goodman-par01-status
Goodman Group
all-rights-reserved
https://www.goodman.com/-/media/project/goodman/global/files/investor-centre/gmg-goodman-group/announcements/asx-announcements/2026/4-full-year-results-presentation-5.pdf?rev=ac56d4e1f3444d309bbefa27304c7da1
Source input: sources/curated-official-2026-09-08-goodman-par01-paris-fy26-current-build.json

goodman-par02-ign-locator
IGN Geoplateforme / Base Adresse Nationale
no-open-redistribution-license-asserted
https://data.geopf.fr/geocodage/search?q=34%20Rue%20Louis%20Armand%2094190%20Villeneuve-Saint-Georges&index=address&limit=5
Source input: sources/verified-construction-core-v0.18-goodman-europe-three-geometry-facts.json

goodman-par02-inquiry-identity
Prefecture of Val-de-Marne
no-open-redistribution-license-asserted
https://www.val-de-marne.gouv.fr/index.php/Publications/Enquetes-publiques-et-concertations-prealables/Villeneuve-Saint-Georges-enquete-publique-sur-le-projet-de-creation-de-deux-data-centers
Source input: sources/curated-official-2026-09-08-goodman-par02-paris-reviewed-location.json

goodman-par02-report-identity
Prefecture of Val-de-Marne public inquiry commissioner
no-open-redistribution-license-asserted
https://www.val-de-marne.gouv.fr/contenu/telechargement/24683/190699/file/Rapport_Centre%20donn%C3%A9es%20VSG.pdf
Source input: sources/curated-official-2026-09-08-goodman-par02-paris-reviewed-location.json

goodman-par02-status
Goodman Group
all-rights-reserved
https://www.goodman.com/-/media/project/goodman/global/files/investor-centre/gmg-goodman-group/announcements/asx-announcements/2026/4-full-year-results-presentation-5.pdf?rev=ac56d4e1f3444d309bbefa27304c7da1
Source input: sources/curated-official-2026-09-08-goodman-par02-paris-fy26-current-build.json

hut8-beacon-point-point
Hut 8 Corp.
all-rights-reserved
https://www.hut8.com/data-centers/beacon-point
Source input: sources/verified-construction-core-v0.18-americas-round9-hut8-geometry-proposal.json

hut8-beacon-point-status
Hut 8 Corp.
all-rights-reserved
https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results
Source input: sources/curated-official-2026-09-08-hut8-beacon-point-q2-current-build.json

hut8-mapbox-crs
Mapbox
all-rights-reserved
https://docs.mapbox.com/mapbox-gl-js/api/geography/
Source input: sources/verified-construction-core-v0.18-americas-round9-hut8-geometry-proposal.json

hut8-marker-code
Hut 8 Corp.
all-rights-reserved
https://www.hut8.com/_nuxt/D5nZ9oDL.js
Source input: sources/verified-construction-core-v0.18-americas-round9-hut8-geometry-proposal.json

hut8-platform-locations
Hut 8 Corp.
all-rights-reserved
https://www.hut8.com/our-platform
Source input: sources/verified-construction-core-v0.18-americas-round9-hut8-geometry-proposal.json

hut8-rfc7946
IETF Trust
IETF-Trust-Legal-Provisions
https://datatracker.ietf.org/doc/html/rfc7946
Source input: sources/verified-construction-core-v0.18-americas-round9-hut8-geometry-proposal.json

hut8-rights
Hut 8 Corp.
all-rights-reserved
https://www.hut8.com/terms
Source input: sources/verified-construction-core-v0.18-americas-round9-hut8-geometry-proposal.json

hut8-river-bend-point
Hut 8 Corp.
all-rights-reserved
https://www.hut8.com/data-centers/river-bend
Source input: sources/verified-construction-core-v0.18-americas-round9-hut8-geometry-proposal.json

hut8-river-bend-status
Hut 8 Corp.
all-rights-reserved
https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results
Source input: sources/curated-official-2026-09-08-hut8-river-bend-q2-current-build.json

iron-ams-identity
Province of Noord-Holland
no-open-redistribution-license-asserted
https://zoek.officielebekendmakingen.nl/prb-2025-5574.html
Source input: sources/curated-official-2026-09-08-iron-mountain-amsterdam-reviewed-build.json

iron-ams-locator
Province of Noord-Holland / Officiele Bekendmakingen
no-open-redistribution-license-asserted
https://zoek.officielebekendmakingen.nl/prb-2025-5574/metadata.xml
Source input: sources/verified-construction-core-v0.18-europe-next-three-reviewed-geometry.json

iron-ams-owner-address
Iron Mountain Data Centers
all-rights-reserved
https://www.ironmountain.com/data-centers/locations/amsterdam-data-center
Source input: sources/curated-official-2026-09-08-iron-mountain-amsterdam-reviewed-build.json

iron-ams-owner-alias
Iron Mountain Data Centers
all-rights-reserved
https://resources.ironmountain.com/videos-and-webinars/d/data-centers-inside-the-amsterdam-data-center-campus-3d-rendering
Source input: sources/curated-official-2026-09-08-iron-mountain-amsterdam-reviewed-build.json

iron-ams-status
Iron Mountain Incorporated
all-rights-reserved
https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm
Source input: sources/curated-official-2026-09-08-iron-mountain-amsterdam-reviewed-build.json

iron-lon3-identity
Environment Agency
Open Government Licence v3.0, except where otherwise stated
https://www.gov.uk/government/publications/sl1-4pf-iron-mountain-uk-data-centre-limited-environmental-permit-application-advertisement-eprtp3120lea001/sl1-4pf-iron-mountain-uk-data-centre-limited-environmental-permit-application-advertisement-eprtp3120lea001
Source input: sources/curated-official-2026-09-08-iron-mountain-lon3-reviewed-build.json

iron-lon3-locator
Ramboll for I3 Solutions, publicly hosted by Environment Agency
all-rights-reserved
https://consult.environment-agency.gov.uk/psc/sl1-4pf-iron-mountain-uk-data-centre-limited-a001/supporting_documents/Application%20%20Bespoke%20%20Site%20Condition%20Report_REH2023N04112RAMRP00003%2030092024.pdf
Source input: sources/verified-construction-core-v0.18-europe-next-three-reviewed-geometry.json

iron-lon3-status
Iron Mountain Incorporated
all-rights-reserved
https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm
Source input: sources/curated-official-2026-09-08-iron-mountain-lon3-reviewed-build.json

iron-madrid-address-locator
Instituto Geografico Nacional / Centro Nacional de Informacion Geografica
no-open-redistribution-license-asserted
https://www.cartociudad.es/geocoder/api/geocoder/candidates?q=Calle%20Mar%20Egeo%204%20San%20Fernando%20de%20Henares&limit=5
Source input: sources/verified-construction-core-v0.18-iron-madrid-geometry-facts.json

iron-madrid-campus-identity
Iron Mountain Data Centers
all-rights-reserved
https://edge.sitecorecloud.io/ironmountain-c8dd68e9/media/project/iron-mountain/iron-mountain/files/resources/solution-guides/d/data-centers-madrid-campus-brochure.pdf?sc_lang=en
Source input: sources/curated-official-2026-09-08-iron-mountain-madrid-reviewed-build.json

iron-madrid-current-status
Iron Mountain Incorporated
all-rights-reserved
https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm
Source input: sources/curated-official-2026-09-08-iron-mountain-madrid-reviewed-build.json

lgb-address-metadata
© GeoBasis-DE/LGB/LS/VBB GmbH, dl-de/by-2-0, Daten geändert: minimal factual projection
dl-de/by-2-0
https://geobroker.geobasis-bb.de/gbss.php?MODE=GetProductInformation&PRODUCTID=51600a1d-c7a3-4211-aff8-e94fb7dc166d
Source input: sources/verified-construction-core-v0.18-europe-round7-luebbenau-address-geometry-proposal.json

lgb-search-rights
© GeoBasis-DE/LGB/LS/VBB GmbH, dl-de/by-2-0, Daten geändert: minimal factual projection
dl-de/by-2-0
https://geoportal.brandenburg.de/detailansichtdienst/render?url=https%3A%2F%2Fgeoportal.brandenburg.de%2Fgs-json%2Fxml%3Ffileid%3D9ccf1219-a550-421d-b702-946031fa7a3d
Source input: sources/verified-construction-core-v0.18-europe-round7-luebbenau-address-geometry-proposal.json

lguplus-paju-current-parcel
City of Paju
all-rights-reserved
https://www.paju.go.kr/component/file/ND_fileDownload.do?id=f85cdfff-69e1-4e2c-85d9-3b625cc99ed0
Source input: sources/curated-official-2026-09-08-lg-uplus-paju-current-build-and-parcel-bridge.json

lguplus-paju-current-status
LG Uplus
all-rights-reserved
https://news.lguplus.com/?p=21965
Source input: sources/curated-official-2026-09-08-lg-uplus-paju-current-build-and-parcel-bridge.json

lguplus-paju-june29-successor
LG Uplus
all-rights-reserved
https://news.lguplus.com/22175
Source input: sources/curated-official-2026-09-08-lg-uplus-paju-current-build-and-parcel-bridge.json

lguplus-paju-notice-identity
City of Paju
KOGL-Type-4-attribution-noncommercial-no-derivatives-text-scope
https://www.paju.go.kr/user/board/BD_board.view.do?bbsCd=1022&q_ctgCd=4063&seq=20241230134843671
Source input: sources/curated-official-2026-09-08-lg-uplus-paju-current-build-and-parcel-bridge.json

luebbenau-convis-identity
convis GmbH
no-open-license-asserted
https://www.convis.com/spatenstich-fuer-neues-rechenzentrum-in-brandenburg/
Source input: sources/verified-construction-core-v0.18-europe-round7-luebbenau-address-geometry-proposal.json

luebbenau-current-build
convis GmbH, project manager with CPM GmbH
no-open-license-asserted
https://www.convis.com/neues-von-der-baustelle-pressetermin-am-mega-rechenzentrum-in-luebbenau/
Source input: sources/curated-official-2026-09-08-europe-round7-luebbenau-current-build.json

luebbenau-lgb-address
© GeoBasis-DE/LGB/LS/VBB GmbH, dl-de/by-2-0, Daten geändert: minimal factual projection
dl-de/by-2-0
https://search.geobasis-bb.de/v2/search?query=Kraftwerkstra%C3%9Fe&limit=50&filter%5BassignMunicipality.keyword%5D=L%C3%BCbbenau%2FSpreewald%20%5BLubnjow%2FB%C5%82ota%5D
Source input: sources/verified-construction-core-v0.18-europe-round7-luebbenau-address-geometry-proposal.json

luebbenau-operator-address
Schwarz Digits
no-open-license-asserted
https://schwarz-digits.de/jobsearch/hr/datacenter-facility-management-standort-luebbenau-m-w-d-GT4274
Source input: sources/curated-official-2026-09-08-europe-round7-luebbenau-current-build.json

me41-mdcil1-fy2025-plot-identity
Mega Or Holdings Ltd
all-rights-reserved
https://megaor.co.il/wp-content/uploads/2026/05/%D7%93%D7%95%D7%97-%D7%AA%D7%A7%D7%95%D7%A4%D7%AA%D7%97-%D7%95%D7%A9%D7%A0%D7%AA%D7%99-%D7%9C%D7%A9%D7%A0%D7%AA-2025.pdf
Source input: sources/curated-official-2026-09-25-mea-round41-mega-dc-mdcil1-current-build.json

me41-mdcil1-iplan-plan-420-1456037
Israel Planning Administration (iplan.gov.il)
no-open-license-asserted
https://ags.iplan.gov.il/arcgisiplan/rest/services/PlanningPublic/Xplan/MapServer/1/query?where=pl_number%3D%27420-1456037%27&outFields=pl_number,pl_name,jurstiction_area_name,ja_concat,district_name,station_desc,pl_objectives,pl_url,pl_area_dunam,pl_date_8&returnGeometry=false&f=json
Source input: sources/verified-construction-core-v0.18-mea-round41-mega-dc-mdcil1-geometry-proposal.json

me41-mdcil1-iplan-plot-62
Israel Planning Administration (iplan.gov.il)
no-open-license-asserted
https://ags.iplan.gov.il/arcgisiplan/rest/services/PlanningPublic/Xplan/MapServer/4/query?where=num%3D%2762%27+AND+pl_number%3D%27420-1456037%27&outFields=*&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-mea-round41-mega-dc-mdcil1-geometry-proposal.json

me41-mdcil1-q2-june30-under-construction
Mega Or Holdings Ltd
all-rights-reserved
https://megaor.co.il/wp-content/uploads/2026/08/דוח-רבעון-2-לשנת-2026.pdf
Source input: sources/curated-official-2026-09-25-mea-round41-mega-dc-mdcil1-current-build.json

me41-mdcil2-fy2025-plot-identity
Mega Or Holdings Ltd
all-rights-reserved
https://megaor.co.il/wp-content/uploads/2026/05/%D7%93%D7%95%D7%97-%D7%AA%D7%A7%D7%95%D7%A4%D7%AA%D7%97-%D7%95%D7%A9%D7%A0%D7%AA%D7%99-%D7%9C%D7%A9%D7%A0%D7%AA-2025.pdf
Source input: sources/curated-official-2026-09-25-mea-round41-mega-dc-mdcil2-current-build.json

me41-mdcil2-iplan-plan-632-0649806
Israel Planning Administration (iplan.gov.il)
no-open-license-asserted
https://ags.iplan.gov.il/arcgisiplan/rest/services/PlanningPublic/Xplan/MapServer/1/query?where=pl_number%3D%27632-0649806%27&outFields=pl_number,pl_name,jurstiction_area_name,ja_concat,district_name,station_desc,pl_objectives,pl_url,pl_area_dunam,pl_date_8&returnGeometry=false&f=json
Source input: sources/verified-construction-core-v0.18-mea-round41-mega-dc-mdcil2-geometry-proposal.json

me41-mdcil2-iplan-plot-200a
Israel Planning Administration (iplan.gov.il)
no-open-license-asserted
https://ags.iplan.gov.il/arcgisiplan/rest/services/PlanningPublic/Xplan/MapServer/4/query?where=num%3D%27200A%27+AND+pl_number%3D%27632-0649806%27&outFields=*&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-mea-round41-mega-dc-mdcil2-geometry-proposal.json

me41-mdcil2-q2-june30-under-construction
Mega Or Holdings Ltd
all-rights-reserved
https://megaor.co.il/wp-content/uploads/2026/08/דוח-רבעון-2-לשנת-2026.pdf
Source input: sources/curated-official-2026-09-25-mea-round41-mega-dc-mdcil2-current-build.json

me41-mdcil5-fy2025-plot-identity
Mega Or Holdings Ltd
all-rights-reserved
https://megaor.co.il/wp-content/uploads/2026/05/%D7%93%D7%95%D7%97-%D7%AA%D7%A7%D7%95%D7%A4%D7%AA%D7%97-%D7%95%D7%A9%D7%A0%D7%AA%D7%99-%D7%9C%D7%A9%D7%A0%D7%AA-2025.pdf
Source input: sources/curated-official-2026-09-25-mea-round41-mega-dc-mdcil5-current-build.json

me41-mdcil5-idan-hanegev-park-works-began
Idan HaNegev Industrial Park
no-open-license-asserted
https://www.idnh.co.il/news_and_updates/%D7%97%D7%91%D7%A8%D7%AA-%D7%9E%D7%92%D7%94-%D7%93%D7%99-%D7%A1%D7%99-%D7%94%D7%97%D7%9C%D7%94-%D7%91%D7%A2%D7%91%D7%95%D7%93%D7%95%D7%AA-%D7%9C%D7%94%D7%A7%D7%9E%D7%AA-%D7%97%D7%95%D7%95%D7%AA-%D7%A9/
Source input: sources/curated-official-2026-09-25-mea-round41-mega-dc-mdcil5-current-build.json

me41-mdcil5-iplan-plan-625-0866855
Israel Planning Administration (iplan.gov.il)
no-open-license-asserted
https://ags.iplan.gov.il/arcgisiplan/rest/services/PlanningPublic/Xplan/MapServer/1/query?where=pl_number%3D%27625-0866855%27&outFields=pl_number,pl_name,jurstiction_area_name,ja_concat,district_name,station_desc,pl_objectives,pl_url,pl_area_dunam,pl_date_8&returnGeometry=false&f=json
Source input: sources/verified-construction-core-v0.18-mea-round41-mega-dc-mdcil5-geometry-proposal.json

me41-mdcil5-iplan-plot-10
Israel Planning Administration (iplan.gov.il)
no-open-license-asserted
https://ags.iplan.gov.il/arcgisiplan/rest/services/PlanningPublic/Xplan/MapServer/4/query?where=num%3D%2710%27+AND+pl_number%3D%27625-0866855%27&outFields=*&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-mea-round41-mega-dc-mdcil5-geometry-proposal.json

me41-mdcil5-q2-june30-under-construction
Mega Or Holdings Ltd
all-rights-reserved
https://megaor.co.il/wp-content/uploads/2026/08/דוח-רבעון-2-לשנת-2026.pdf
Source input: sources/curated-official-2026-09-25-mea-round41-mega-dc-mdcil5-current-build.json

merlin-bilbao-coordinate-query
Google redirect service resolving MERLIN's published link
no-open-license-asserted
https://maps.app.goo.gl/RfVFYuWfAxX9qTFp7
Source input: sources/verified-construction-core-v0.18-merlin-two-reviewed-geometry.json

merlin-bilbao-current-status
MERLIN Properties
all-rights-reserved
https://ir.merlinproperties.com/wp-content/uploads/2026/07/RI-6M26-MERLIN-Properties_eng.pdf
Source input: sources/curated-official-2026-09-08-merlin-bilbao-arasur-reviewed-build.json

merlin-bilbao-identity
MERLIN Properties
all-rights-reserved
https://www.merlinproperties.com/en/assets/data-center-bilbao-arasur/
Source input: sources/curated-official-2026-09-08-merlin-bilbao-arasur-reviewed-build.json

merlin-bilbao-successor
MERLIN Properties
all-rights-reserved
https://ir.merlinproperties.com/en/merlin-increases-total-revenues-and-ebitda-by-11-7-thanks-to-the-data-centers-division-which-reaches-160-mw-leased/
Source input: sources/curated-official-2026-09-08-merlin-bilbao-arasur-reviewed-build.json

merlin-lisbon-current-status
MERLIN Properties
all-rights-reserved
https://ir.merlinproperties.com/en/merlin-increases-total-revenues-and-ebitda-by-11-7-thanks-to-the-data-centers-division-which-reaches-160-mw-leased/
Source input: sources/curated-official-2026-09-08-merlin-lisbon-reviewed-build.json

merlin-lisbon-identity
MERLIN Properties
all-rights-reserved
https://www.merlinproperties.com/en/assets/data-center-lisboa/
Source input: sources/curated-official-2026-09-08-merlin-lisbon-reviewed-build.json

merlin-lisbon-literal-point
Edged
all-rights-reserved
https://www.edged.es/lisbon
Source input: sources/verified-construction-core-v0.18-merlin-two-reviewed-geometry.json

merlin-lisbon-work-update
MERLIN Properties
all-rights-reserved
https://ir.merlinproperties.com/wp-content/uploads/2026/07/RI-6M26-MERLIN-Properties_eng.pdf
Source input: sources/curated-official-2026-09-08-merlin-lisbon-reviewed-build.json

merlin-source-rights
MERLIN Properties
all-rights-reserved
https://www.merlinproperties.com/en/legal-notice/
Source input: sources/verified-construction-core-v0.18-merlin-two-reviewed-geometry.json

meta10-elpaso-city-identity
City of El Paso
all-rights-reserved
https://www.elpasotexas.gov/data-centers
Source input: sources/curated-official-2026-09-08-meta-el-paso-july28-current-build.json

meta10-elpaso-community-object
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/1547686701/full.json
Source input: sources/verified-construction-core-v0.18-meta-round10-reviewed-geometry.json

meta10-elpaso-community-point
OpenStreetMap contributors via Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=Meta%20El%20Paso&countrycodes=us&format=jsonv2&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-meta-round10-reviewed-geometry.json

meta10-elpaso-current-status
Meta
all-rights-reserved
https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/
Source input: sources/curated-official-2026-09-08-meta-el-paso-july28-current-build.json

meta10-elpaso-tdlr-identity
Texas Department of Licensing and Regulation
all-rights-reserved
https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026017750
Source input: sources/curated-official-2026-09-08-meta-el-paso-july28-current-build.json

meta10-nominatim-output
Nominatim project
no-open-license-asserted
https://nominatim.org/release-docs/latest/api/Output/
Source input: sources/verified-construction-core-v0.18-meta-round10-reviewed-geometry.json

meta10-nominatim-wgs84
Nominatim project
no-open-license-asserted
https://nominatim.org/release-docs/latest/develop/Database-Layout/
Source input: sources/verified-construction-core-v0.18-meta-round10-reviewed-geometry.json

meta10-osm-rights
OpenStreetMap Foundation
CC-BY-SA-2.0
https://www.openstreetmap.org/copyright
Source input: sources/verified-construction-core-v0.18-meta-round10-reviewed-geometry.json

meta10-richland-community-object
OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/relation/19710316/full.json
Source input: sources/verified-construction-core-v0.18-meta-round10-reviewed-geometry.json

meta10-richland-community-point
OpenStreetMap contributors via Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=Meta%20Richland%20Parish&countrycodes=us&format=jsonv2&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-meta-round10-reviewed-geometry.json

meta10-richland-current-status
Turner Construction Company
all-rights-reserved
https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana
Source input: sources/curated-official-2026-09-08-meta-richland-july16-current-build.json

meta10-richland-operator-identity
Meta
all-rights-reserved
https://datacenters.atmeta.com/richland-parish-data-center/
Source input: sources/curated-official-2026-09-08-meta-richland-july16-current-build.json

meta10-richland-phase-scope
Turner Construction Company
all-rights-reserved
https://www.turnerconstruction.com/pages/richland-parish-data-center-resource-page
Source input: sources/curated-official-2026-09-08-meta-richland-july16-current-build.json

microsoft-espoo-identity
City of Espoo
no-open-redistribution-license-asserted
https://espoo.oncloudos.com/cgi/DREQUEST.PHP?id=20251396-8&page=meetingitem
Source input: sources/curated-official-2026-09-08-microsoft-espoo-second-building-current-build.json

microsoft-espoo-locator
City of Espoo
CC-BY-4.0
https://kartat.espoo.fi/teklaogcweb/wfs.ashx?SERVICE=WFS&REQUEST=GetFeature&VERSION=1.1.0&TYPENAME=GIS%3AKiinteistot_karsittu&OUTPUTFORMAT=GML2&SRSNAME=EPSG%3A3879&MAXFEATURES=10&FILTER=%3Cogc%3AFilter%20xmlns%3Aogc%3D%22http%3A%2F%2Fwww.opengis.net%2Fogc%22%3E%3Cogc%3APropertyIsEqualTo%3E%3Cogc%3APropertyName%3EKiinteistotunnus%3C%2Fogc%3APropertyName%3E%3Cogc%3ALiteral%3E49-65-3-1%3C%2Fogc%3ALiteral%3E%3C%2Fogc%3APropertyIsEqualTo%3E%3C%2Fogc%3AFilter%3E
Source input: sources/verified-construction-core-v0.18-finland-two-geometry-facts.json

microsoft-espoo-status
City of Espoo
no-open-redistribution-license-asserted
https://espoo.oncloudos.com/cgi/DREQUEST.PHP?id=20261687-10&page=meetingitem
Source input: sources/curated-official-2026-09-08-microsoft-espoo-second-building-current-build.json

microsoft-kirkkonummi-identity
Microsoft
all-rights-reserved
https://local.microsoft.com/blog/microsoft-aikoo-rakentaa-uuden-datakeskusalueen-etela-suomeen/
Source input: sources/curated-official-2026-09-08-microsoft-kirkkonummi-first-building-current-build.json

microsoft-kirkkonummi-locator
Municipality of Kirkkonummi
no-open-redistribution-license-asserted
https://kirkkonummi.oncloudos.com/kokous/20241842-11-115303.PDF
Source input: sources/verified-construction-core-v0.18-finland-two-geometry-facts.json

microsoft-kirkkonummi-status
Winthrop Technologies
all-rights-reserved
https://winthrop.ie/kirkkonummi-finland-project-updates/
Source input: sources/curated-official-2026-09-08-microsoft-kirkkonummi-first-building-current-build.json

nebius-city-api
City of Lappeenranta via Trimble IMS
no-open-license-asserted
https://kartta.lappeenranta.fi/IMS/bundles/imscore?v=G3ob28axnml9DJ8RoTAoFLLmwbG9Chr0Fvf-WjyWgC01
Source input: sources/verified-construction-core-v0.18-europe-round5-two-proposed-geometry.json

nebius-city-identity
City of Lappeenranta
no-open-license-asserted
https://www.lappeenranta.fi/en/decision-making-and-administration/pajarila-data-center
Source input: sources/curated-official-2026-09-08-europe-round5-nebius-pajarila-proposed-build.json

nebius-city-wgs84
City of Lappeenranta via Trimble IMS
no-open-license-asserted
https://kartta.lappeenranta.fi/IMS/fi/Transform?north=6771752&east=28515420&targetSystem=EPSG%3A4326&decimalCount=8
Source input: sources/verified-construction-core-v0.18-europe-round5-two-proposed-geometry.json

nebius-current-status
Fira
no-open-license-asserted
https://fira.fi/en/news/construction-and-project-development-company-fira-selected-as-main-contractor-for-one-of-europes-largest-ai-data-center-projects/
Source input: sources/curated-official-2026-09-08-europe-round5-nebius-pajarila-proposed-build.json

nebius-exact-city-address
City of Lappeenranta via Trimble IMS
no-open-license-asserted
https://kartta.lappeenranta.fi/IMS/fi/Search?Op=all&Name=Pajarilanv%C3%A4yl%C3%A4%2024
Source input: sources/verified-construction-core-v0.18-europe-round5-two-proposed-geometry.json

nebius-exact-parcel
City of Lappeenranta
no-open-license-asserted
https://www.lappeenranta.fi/MFiles/MFFiles/Open?fileId=169510&objectId=123121&objectTypeId=0
Source input: sources/curated-official-2026-09-08-europe-round5-nebius-pajarila-proposed-build.json

nextdc-fy26-construction-definition
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/NEXTDC%20FY26%20Results%20Presentation.pdf
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-m2-fy26-current-build.json

nextdc-fy26-june30-status
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-m2-fy26-current-build.json

nextdc-ge1-government-identity
Victoria Department of Transport and Planning
all-rights-reserved
https://sftpbspomppprod01.blob.core.windows.net/applicationfiles/ac08c0c4-2a7f-f011-b4cc-00224811ea6c_PA2503895%20REDACTED_148-158%20OBRIENS%20ROAD%20CORIO%20-%20Officer%20Report.pdf
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-ge1-fy26-current-build.json

nextdc-ge1-kapitol-identity
Kapitol
all-rights-reserved
https://www.kapitol.com/our-projects/industrial/nextdc-ge1-geelong
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-ge1-fy26-current-build.json

nextdc-ge1-operator-identity
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/data-centres/geelong-data-centres/ge1-geelong
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-ge1-fy26-current-build.json

nextdc-ge1-round5-june30-status
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-ge1-fy26-current-build.json

nextdc-ge1-vicmap-point
© State of Victoria, Department of Transport and Planning, Vicmap
CC-BY-4.0
https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0/query?where=pfi%3D%27215512998%27&outFields=*&outSR=4326&returnGeometry=true&f=pjson
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

nextdc-kl1-community-object
© OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/1026603690/full.json
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

nextdc-kl1-community-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=NEXTDC%20KL1&format=jsonv2&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

nextdc-kl1-opening-scope
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/news/nextdc-goes-live-with-kl1-kuala-lumpur-launching-strategic-ai-ready-data-centre-in-southeast-asia
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-kl1-fy26-current-build.json

nextdc-kl1-operator-identity
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/contact
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-kl1-fy26-current-build.json

nextdc-kl1-round5-june30-status
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-kl1-fy26-current-build.json

nextdc-m2-m3-s3-official-addresses
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/contact
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-m2-fy26-current-build.json

nextdc-m2-operator-point
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/contact
Source input: sources/verified-construction-core-v0.18-asia-round4-nextdc-four-reviewed-geometry.json

nextdc-m3-community-object
© OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/1431074202/full.json
Source input: sources/verified-construction-core-v0.18-asia-round4-nextdc-four-reviewed-geometry.json

nextdc-m3-community-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=NEXTDC%20M3&format=jsonv2&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-asia-round4-nextdc-four-reviewed-geometry.json

nextdc-m3-independent-review-0
Maribyrnong City Council
no-open-redistribution-license-asserted
https://www.maribyrnong.vic.gov.au/files/assets/public/v/1/corporate-services-documents/council-and-committee-meeting-papers/council-meetings/2026/20260421_council_agenda.pdf
Source input: sources/verified-construction-core-v0.18-nextdc-m3-locator-discrepancy-review.json

nextdc-m3-independent-review-1
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/data-centres/melbourne-data-centres-colocation
Source input: sources/verified-construction-core-v0.18-nextdc-m3-locator-discrepancy-review.json

nextdc-m3-independent-review-2
OpenStreetMap contributors / Nominatim
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=25%20Indwe%20Street%20West%20Footscray&format=jsonv2&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-nextdc-m3-locator-discrepancy-review.json

nextdc-m3-june30-status
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-m3-fy26-current-build.json

nextdc-m3-official-identity
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/contact
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-m3-fy26-current-build.json

nextdc-m4-government-identity
Victoria Department of Transport and Planning
all-rights-reserved
https://sftpbspomppprod01.blob.core.windows.net/applicationfiles/76685df6-baaf-f011-bbd2-6045bdc32df2_REDACTED_PA2504019%20Officer%20Report%20-%20Signed%2016-01-26.pdf
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-m4-fy26-current-build.json

nextdc-m4-operator-identity
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-m4-fy26-current-build.json

nextdc-m4-vicmap-point
© State of Victoria, Department of Transport and Planning, Vicmap
CC-BY-4.0
https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0/query?where=pfi%20IN%20%28%27214016983%27%2C%27460240432%27%29&outFields=*&outSR=4326&returnGeometry=true&f=pjson
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

nextdc-round5-june30-status
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-m4-fy26-current-build.json

nextdc-round5-physical-definition
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/NEXTDC%20FY26%20Results%20Presentation.pdf
Source input: sources/curated-official-2026-09-08-asia-round5-nextdc-m4-fy26-current-build.json

nextdc-s3-community-object
© OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/1225879499/full.json
Source input: sources/verified-construction-core-v0.18-asia-round4-nextdc-four-reviewed-geometry.json

nextdc-s3-community-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=NEXTDC%20S3&format=jsonv2&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-asia-round4-nextdc-four-reviewed-geometry.json

nextdc-s3-june30-status
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-s3-fy26-current-build.json

nextdc-s3-official-identity
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/contact
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-s3-fy26-current-build.json

nextdc-s4-government-application-identity
NEXTDC Limited application published through the NSW Planning Portal
third-party-applicant-material-no-open-redistribution-asserted
https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-63741210%2120250903T043141.039+GMT
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-s4-fy26-current-build.json

nextdc-s4-government-project-point
© State of New South Wales and Department of Planning, Housing and Infrastructure 2026
CC-BY-4.0-Department-material-scope
https://www.planningportal.nsw.gov.au/major-projects/projects/nextdc-s4-data-centre-horsley-park
Source input: sources/verified-construction-core-v0.18-asia-round4-nextdc-four-reviewed-geometry.json

nextdc-s4-june30-status
NEXTDC Limited
all-rights-reserved
https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-s4-fy26-current-build.json

nextdc-s4-official-identity
© State of New South Wales and Department of Planning, Housing and Infrastructure 2026
CC-BY-4.0-Department-material-scope
https://www.planningportal.nsw.gov.au/major-projects/projects/nextdc-s4-data-centre-horsley-park
Source input: sources/curated-official-2026-09-08-asia-round4-nextdc-s4-fy26-current-build.json

noris-current-status
Data Center Group
no-open-license-asserted
https://datacenter-group.com/de/news-stories/artikel/grundstein-fuer-neues-rechenzentrum-gelegt/
Source input: sources/curated-official-2026-09-08-europe-round5-noris-fra1-proposed-build.json

noris-exact-osm
OpenStreetMap contributors via Overpass
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%3Bway%28313208490%29%3Bout%20meta%20center%3B
Source input: sources/verified-construction-core-v0.18-europe-round5-two-proposed-geometry.json

noris-identity
noris network AG via TechnologieBox
no-open-license-asserted
https://www.technologiebox.de/2026/06/11/noris-network-legt-grundstein-fr-frankfurter-rechenzentrum/
Source input: sources/curated-official-2026-09-08-europe-round5-noris-fra1-proposed-build.json

noris-nbg6-ba3-aug13-current-build
noris network AG, published on LinkedIn
no-open-license-asserted
https://www.linkedin.com/feed/update/urn:li:activity:7493585204314554368/
Source input: sources/curated-official-2026-09-09-europe-mena-round12-noris-nbg6-ba3-current-build.json

noris-nbg6-ba3-campus-identity
noris network AG, published on LinkedIn
no-open-license-asserted
https://de.linkedin.com/posts/noris-network-ag_parallel-zu-unserem-rz-ffm1-schwalbach-activity-7384141557542592512-C4NL
Source input: sources/curated-official-2026-09-09-europe-mena-round12-noris-nbg6-ba3-current-build.json

noris-nbg6-ba3-community-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=noris%20network%20N%C3%BCrnberg&format=jsonv2&addressdetails=1
Source input: sources/verified-construction-core-v0.18-europe-mena-round12-noris-nbg6-ba3-geometry-proposal.json

noris-nbg6-ba3-community-way
© OpenStreetMap contributors
ODbL-1.0
https://overpass-api.de/api/interpreter?data=%5Bout%3Ajson%5D%3B%28nwr%5B%22name%22~%22noris%7CNBG6%22%2Ci%5D%2849.40%2C11.12%2C49.42%2C11.15%29%3B%29%3Bout%20body%20geom%3B
Source input: sources/verified-construction-core-v0.18-europe-mena-round12-noris-nbg6-ba3-geometry-proposal.json

noris-nbg6-ba3-modular-identity
eco - Association of the Internet Industry
no-open-license-asserted
https://www.eco.de/?p=274354&post_type=page
Source input: sources/verified-construction-core-v0.18-europe-mena-round12-noris-nbg6-ba3-geometry-proposal.json

noris-nuremberg-government-identity
Bavarian State Government
no-open-license-asserted
https://www.bayern.de/fueracker-bau-fuer-neues-hochsicherheits-rechenzentrum-fuer-landesamt-fuer-steuern-beginnt-noris-network-stellt-flaechen-fuer-it-infrastruktur-der-steuerverwaltung-zur-verfuegung-innovative-baua/
Source input: sources/curated-official-2026-09-09-europe-mena-round12-noris-nbg6-ba3-current-build.json

nsw-planning-scoped-rights
© State of New South Wales and Department of Planning, Housing and Infrastructure 2026
CC-BY-4.0-Department-material-scope
https://www.planningportal.nsw.gov.au/copyright-and-disclaimer
Source input: sources/verified-construction-core-v0.18-asia-round4-nextdc-four-reviewed-geometry.json

nxtra-los1-campus-identity
Nxtra Africa
all-rights-reserved
https://www.nxtraafrica.com/lagos-eko-atlantic
Source input: sources/curated-official-2026-09-08-africa-round7-nxtra-los1-current-build.json

nxtra-los1-historical-identity
Airtel Africa
all-rights-reserved
https://cdn-webportal.airtelstream.net/website/investor/main/pdf/H1-2023/Airtel_Africa_commences_construction_of_Nxtra_by_Airtel_first_data_centre_in_Nigeria_1.pdf
Source input: sources/curated-official-2026-09-08-africa-round7-nxtra-los1-current-build.json

nxtra-los1-nigeria-identity
Airtel Africa
all-rights-reserved
https://www.airtel.africa/data-centers
Source input: sources/curated-official-2026-09-08-africa-round7-nxtra-los1-current-build.json

nxtra-los1-operator-point
Nxtra Africa
all-rights-reserved
https://www.nxtraafrica.com/sites/default/files/images/image-gallery/data-center-africa1.html?locations=nigeria
Source input: sources/verified-construction-core-v0.18-africa-round7-nxtra-los1-geometry-proposal.json

nxtra-los1-status
Airtel Africa
all-rights-reserved
https://cdn-webportal.airtelstream.net/website/investor/main/pdf/Q1-2027/Airtel_Africa_Q12027_results_transcript.pdf
Source input: sources/curated-official-2026-09-08-africa-round7-nxtra-los1-current-build.json

nxtra-map-wgs84
Google
CC-BY-4.0
https://developers.google.com/maps/documentation/javascript/coordinates?hl=en
Source input: sources/verified-construction-core-v0.18-africa-round7-nxtra-los1-geometry-proposal.json

nxtra-rights
Nxtra Africa
all-rights-reserved
https://www.nxtraafrica.com/privacy
Source input: sources/verified-construction-core-v0.18-africa-round7-nxtra-los1-geometry-proposal.json

paju-city-factory-register-publication
City of Paju
all-rights-reserved
https://www.paju.go.kr/user/board/BD_board.view.do?bbsCd=2003&seq=20180406090751845
Source input: sources/curated-official-2026-09-08-lg-uplus-paju-current-build-and-parcel-bridge.json

paju-city-former-factory-parcel
City of Paju
all-rights-reserved
https://www.paju.go.kr/component/file/ND_fileDownload.do?id=05fb1a35-d8df-4f3c-8bcb-025f8bf95b0d
Source input: sources/curated-official-2026-09-08-lg-uplus-paju-current-build-and-parcel-bridge.json

paju-community-former-factory-object
© OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/469691383/full.json
Source input: sources/verified-construction-core-v0.18-lg-uplus-paju-reviewed-geometry.json

paju-community-former-factory-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=%ED%9D%AC%EC%84%B1%EC%A0%84%EC%9E%90&format=jsonv2&polygon_geojson=1
Source input: sources/verified-construction-core-v0.18-lg-uplus-paju-reviewed-geometry.json

portus-download-authority
Portus Data Centers
no-open-license-asserted
https://www.portusdatacenters.com/downloads/
Source input: sources/curated-official-2026-09-08-europe-mena-round10-portus-muc2-current-build.json

portus-muc1-certified-site-address
TÜV SÜD Industrie Service GmbH, distributed by Portus Data Centers
no-open-license-asserted
https://144396000.fs1.hubspotusercontent-eu1.net/hubfs/144396000/Certificates/MUC/ISO-50600-Munich-EN.pdf
Source input: sources/curated-official-2026-09-08-europe-mena-round10-portus-muc2-current-build.json

portus-muc1-community-point
© OpenStreetMap contributors
ODbL-1.0
https://nominatim.openstreetmap.org/search?q=Marsstrasse%205%20Kirchheim%20bei%20Munchen&format=jsonv2&addressdetails=1
Source input: sources/verified-construction-core-v0.18-europe-mena-round10-portus-muc2-proposed-geometry.json

portus-muc1-community-way
© OpenStreetMap contributors
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/571006394/full.json
Source input: sources/verified-construction-core-v0.18-europe-mena-round10-portus-muc2-proposed-geometry.json

portus-muc2-current-build
Portus Data Centers
no-open-license-asserted
https://www.portusdatacenters.com/pressrelease/arcus-secures-inaugural-financing-for-portus-data-centers/
Source input: sources/curated-official-2026-09-08-europe-mena-round10-portus-muc2-current-build.json

portus-muc2-successor-screen
Portus Data Centers
no-open-license-asserted
https://www.portusdatacenters.com/our-data-centers/munich/muc2/
Source input: sources/curated-official-2026-09-08-europe-mena-round10-portus-muc2-current-build.json

portus-munich-campus-identity
Portus Data Centers
no-open-license-asserted
https://www.portusdatacenters.com/our-data-centers/munich/
Source input: sources/curated-official-2026-09-08-europe-mena-round10-portus-muc2-current-build.json

r33-hive-yguazu-aug14-current-expansion
HIVE Digital Technologies Ltd.
no-open-license-asserted
https://www.hivedigitaltechnologies.com/static/hivesite/filings/000106299326004434/form10q.htm
Source input: sources/curated-official-2026-09-10-root-round34-hive-yguazu-current-build.json

r33-hive-yguazu-aug15-successor
HIVE Digital Technologies Ltd.
no-open-license-asserted
https://www.hivedigitaltechnologies.com/static/hivesite/filings/000106299326004447/exhibit99-1.htm
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

r33-hive-yguazu-june22-scope
HIVE Digital Technologies Ltd.
no-open-license-asserted
https://www.hivedigitaltechnologies.com/static/hivesite/filings/000106299326003293/exhibit99-3.htm
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

r33-hive-zunz-acquisition-bridge
Bitfarms Ltd.; HIVE Digital Technologies Ltd.
no-open-license-asserted
https://www.sec.gov/Archives/edgar/data/1812477/000121390025053195/ea024522901ex99-1_bitfarms.htm
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

r33-hive-zunz-mades-parcel-2024
Ministerio del Ambiente y Desarrollo Sostenible, Paraguay
no-open-license-asserted
https://apps.mades.gov.py/siam/portal/dashboard-proyecto/declaracion/55562
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

r33-hive-zunz-mades-parcel-2026
Ministerio del Ambiente y Desarrollo Sostenible, Paraguay
no-open-license-asserted
https://apps.mades.gov.py/siam/portal/dashboard-proyecto/declaracion/83461
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

r33-hive-zunz-mades-point-2024
Ministerio del Ambiente y Desarrollo Sostenible, Paraguay
no-open-license-asserted
https://apps.mades.gov.py/siam/portal/det-siam-proy?expId=55562
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

r33-hive-zunz-mades-point-2026
Ministerio del Ambiente y Desarrollo Sostenible, Paraguay
no-open-license-asserted
https://apps.mades.gov.py/siam/portal/det-siam-proy?expId=83461
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

r33-hive-zunz-mades-public-index
Ministerio del Ambiente y Desarrollo Sostenible, Paraguay
no-open-license-asserted
https://apps.mades.gov.py/siam/portal/dashboard-proyecto/rest?sSearch=Zunz&iDisplayStart=0&iDisplayLength=25&sEcho=1
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

rcjm1-ihp-geofabrik-gpkg-reverification
Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL). Extract by Geofabrik GmbH.
ODbL-1.0
https://download.geofabrik.de/asia/malaysia-singapore-brunei-latest-free.gpkg.zip
Source input: sources/verified-construction-core-v0.18-rcjm1-host-estate-locator-correction-v1.json

rcjm1-ihp-phase-1-host-estate-context
Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/639973556/full.json
Source input: sources/verified-construction-core-v0.18-rcjm1-host-estate-locator-correction-v1.json

rcjm1-ihp-phase-2-host-estate-context
Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/639973557/full.json
Source input: sources/verified-construction-core-v0.18-rcjm1-host-estate-locator-correction-v1.json

rcjm1-osm-wgs84-node-crs
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-rcjm1-host-estate-locator-correction-v1.json

rcjm1-racks-central-first-plot-acquisition
Racks Central
all-rights-reserved
https://www.rackscentral.com/news/racks-central-expands-data-center-capacity-with-landmark-acquisition-in-iskandar-halal-park-johor
Source input: sources/verified-construction-core-v0.18-rcjm1-host-estate-locator-correction-v1.json

rdh2-osm-wgs84-node-crs
OpenStreetMap Wiki contributors
CC-BY-SA-2.0
https://wiki.openstreetmap.org/wiki/Node
Source input: sources/verified-construction-core-v0.18-rdh2-host-estate-locator-correction-v1.json

rdh2-smart-village-geofabrik-reverification
Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL). Extract by Geofabrik GmbH.
ODbL-1.0
https://download.geofabrik.de/africa/egypt-261008-free.gpkg.zip
Source input: sources/verified-construction-core-v0.18-rdh2-host-estate-locator-correction-v1.json

rdh2-smart-village-host-estate-context
Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).
ODbL-1.0
https://api.openstreetmap.org/api/0.6/way/545580264/full.json
Source input: sources/verified-construction-core-v0.18-rdh2-host-estate-locator-correction-v1.json

root32-trenton-auditor-former-parcels
Butler County Auditor; source attribution Butler County Engineer
no-open-license-asserted
https://maps.butlercountyauditor.org/arcgis/rest/services/basemap_wgs84/MapServer/1/query?where=UPPER%28OWNER%29%20LIKE%20%27%25TRENTON%20DATA%20CENTER%25%27&outFields=OBJECTID%2CPIN%2CPARID%2COWNER%2CACRES%2CLOCATION%2CLEGAL1%2CLEGAL2%2CLEGAL3&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-aug13-owner-bridge
Trenton Data Center Campus LLC; hosted by Supreme Court of Ohio
no-open-license-asserted
https://www.supremecourt.ohio.gov/pdf_viewer/pdf_viewer.aspx?pdf=1008007.pdf&subdirectory=2026-1035%5CDocketItems&source=DL_Clerk
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-aug20-current-build
Trenton Data Center Campus LLC; hosted by Supreme Court of Ohio
no-open-license-asserted
https://www.supremecourt.ohio.gov/pdf_viewer/pdf_viewer.aspx?pdf=1008469.pdf&subdirectory=2026-1035%5CDocketItems&source=DL_Clerk
Source input: sources/curated-official-2026-09-09-root-round32-trenton-current-build.json

root32-trenton-city-copyright
City of Trenton, Ohio
no-open-license-asserted
https://ci.trenton.oh.us/copyright
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-city-project-context
City of Trenton, Ohio
no-open-license-asserted
https://ci.trenton.oh.us/374/Private-DevelopmentRedevelopment-Project
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-county-gis-disclaimer
Butler County Auditor Office
no-open-license-asserted
https://cms3.revize.com/revize/butlercountyauditor/Documents/Real%20Estate/GIS%20Maps/2024_GISMap_Request_Form_p.pdf
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-engineer-layer-crs
Butler County Engineer Office
no-open-license-asserted
https://gismaps.bceo.org/server/rest/services/Public/ParcelQuery/FeatureServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-engineer-parcel
Butler County Engineer Office
no-open-license-asserted
https://gismaps.bceo.org/server/rest/services/Public/ParcelQuery/FeatureServer/0/query?where=UPPER%28OWNER%29%20LIKE%20%27%25TRENTON%20DATA%20CENTER%25%27&outFields=OBJECTID%2CPIN%2COWNER%2CLOCATION%2CACRES&returnGeometry=true&f=json
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-preliminary-site-plan
Bowman Consulting Group; public copy hosted by City of Trenton
no-open-license-asserted
https://ci.trenton.oh.us/DocumentCenter/View/2389
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-sept1-successor
Supreme Court of Ohio
no-open-license-asserted
https://www.supremecourt.ohio.gov/rod/docs/pdf/0/2026/2026-Ohio-3406.pdf
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root32-trenton-zoning-identity
City of Trenton, Ohio
no-open-license-asserted
https://ci.trenton.oh.us/DocumentCenter/View/2388
Source input: sources/verified-construction-core-v0.18-root-round32-trenton-geometry-proposal.json

root33-beale-source-rights
Beale Infrastructure
no-open-license-asserted
https://bealeinfra.com/terms-of-use/
Source input: sources/verified-construction-core-v0.18-root-round33-clydesdale-geometry-proposal.json

root33-clydesdale-aug19-current-build
Beale Infrastructure; joint Google and Beale announcement
no-open-license-asserted
https://bealeinfra.com/google-and-beale-infrastructure-building-new-data-center-campus-in-tulsa-county/
Source input: sources/curated-official-2026-09-09-root-round33-clydesdale-current-build.json

root33-clydesdale-draft-survey
Tulsa Planning Office / INCOG; survey prepared by GEODECA LLC
no-open-license-asserted
https://tulsaplanning.org/tmapc/agendas/exhibits/Accelerated%20Release%20of%20Permits%20-%20Staff%20Report%20v03.pdf
Source input: sources/verified-construction-core-v0.18-root-round33-clydesdale-geometry-proposal.json

root33-clydesdale-march4-agenda
Tulsa Planning Office / Tulsa Metropolitan Area Planning Commission
no-open-license-asserted
https://tulsaplanning.org/agendas/march-4-2026-tmapc-agenda/
Source input: sources/verified-construction-core-v0.18-root-round33-clydesdale-geometry-proposal.json

root33-clydesdale-march4-draft-minutes
Tulsa Metropolitan Area Planning Commission
no-open-license-asserted
https://tulsaplanning.org/tmapc/agendas/exhibits/2026-03-04-TMAPC-Minutes.pdf
Source input: sources/verified-construction-core-v0.18-root-round33-clydesdale-geometry-proposal.json

root33-clydesdale-operator-identity
Beale Infrastructure
no-open-license-asserted
https://bealeinfra.com/location/tulsa-county/
Source input: sources/verified-construction-core-v0.18-root-round33-clydesdale-geometry-proposal.json

root34-hive-mades-exp83461-geojson-point
Ministerio del Ambiente y Desarrollo Sostenible, Paraguay
no-open-license-asserted
https://apps.mades.gov.py/siam/poligono-siam?expediente=6240&gestion=2026&punto=true
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

root34-mades-public-geojson-client
Ministerio del Ambiente y Desarrollo Sostenible, Paraguay
no-open-license-asserted
https://apps.mades.gov.py/siam/portal/mapas
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

root34-rfc7946-coordinate-contract
Internet Engineering Task Force; RFC Editor
no-open-license-asserted
https://www.rfc-editor.org/rfc/rfc7946
Source input: sources/verified-construction-core-v0.18-root-round34-hive-yguazu-geometry-proposal.json

round14-arcgis-centroid-semantics
Esri
all-rights-reserved
https://developers.arcgis.com/rest/services-reference/enterprise/query-feature-service-layer/
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-chirisa-adjacent-campus-labels
Chirisa Technology Parks
no-open-redistribution-license-asserted
https://chirisatechnologyparks.com/
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-chirisa-combined-campus-2025
Chirisa Technology Parks
no-open-redistribution-license-asserted
https://chirisatechnologyparks.com/blue-owl-chirisa-technology-parks-and-powerhouse-data-centers-announce-next-phase-of-5-billion-joint-venture-development-partnership/
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-chirisa-county-address-centroid
Data retrieved from Chesterfield County GIS Data Catalog.
CC0-1.0
https://services3.arcgis.com/TsynfzBSE6sXfoLq/ArcGIS/rest/services/Cadastral_ProdA/FeatureServer/3/query
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-chirisa-digital-drive-july2026-construction
Chesterfield County, Virginia
no-open-redistribution-license-asserted
https://www.chesterfield.gov/5989/Data-Centers
Source input: sources/curated-official-2026-09-09-chesterfield-round14-chirisa-digital-drive-july-build.json

round14-chirisa-expansion-2024
Chirisa Technology Parks
no-open-redistribution-license-asserted
https://chirisatechnologyparks.com/major-150mw-expansion-initiatives-across-the-usa-3/
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-chirisa-parcel-crosscheck
Data retrieved from Chesterfield County GIS Data Catalog.
CC0-1.0
https://services3.arcgis.com/TsynfzBSE6sXfoLq/ArcGIS/rest/services/Cadastral_ProdA/FeatureServer/3/query
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-county-catalog-parcel-item
Data retrieved from Chesterfield County GIS Data Catalog.
CC0-1.0
https://www.arcgis.com/sharing/rest/content/items/caac62a09b49446b8a20744963ba1d23?f=pjson
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-county-exact-layer-catalog-binding
Data retrieved from Chesterfield County GIS Data Catalog.
CC0-1.0
https://www.arcgis.com/sharing/rest/search
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-county-july-map
Chesterfield County
no-open-redistribution-license-asserted
https://www.chesterfield.gov/DocumentCenter/View/48245/Data-Center-Map-July-2026-PDF
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-county-july-status-identity
Chesterfield County
no-open-redistribution-license-asserted
https://www.chesterfield.gov/5989/Data-Centers
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-county-open-gis-cc0-terms
Data retrieved from Chesterfield County GIS Data Catalog.
no-open-document-redistribution-license-asserted
https://chesterfieldva.maps.arcgis.com/sharing/rest/content/items/457f6e0b2d844284a649e79741460f05/data
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-county-open-gis-portal
Data retrieved from Chesterfield County GIS Data Catalog.
no-open-document-redistribution-license-asserted
https://opengisdata.chesterfield.gov/
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-county-parcel-layer-crs
Chesterfield County GIS
CC0-1.0
https://services3.arcgis.com/TsynfzBSE6sXfoLq/ArcGIS/rest/services/Cadastral_ProdA/FeatureServer/3?f=pjson
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-peanut-county-centroid
Data retrieved from Chesterfield County GIS Data Catalog.
CC0-1.0
https://services3.arcgis.com/TsynfzBSE6sXfoLq/ArcGIS/rest/services/Cadastral_ProdA/FeatureServer/3/query
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-peanut-government-parcel-identity
Chesterfield County; DEQ form completed by Peanut LLC and county officials
no-open-redistribution-license-asserted
https://www.chesterfield.gov/DocumentCenter/View/48239/Peanut---DEQ-Land-Use-Suitability-and-Value-Form-PDF
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

round14-peanut-july2026-construction
Chesterfield County, Virginia
no-open-redistribution-license-asserted
https://www.chesterfield.gov/5989/Data-Centers
Source input: sources/curated-official-2026-09-09-chesterfield-round14-peanut-july-build.json

round14-peanut-parcel-crosscheck
Chesterfield County GIS
CC0-1.0
https://services3.arcgis.com/TsynfzBSE6sXfoLq/ArcGIS/rest/services/Cadastral_ProdA/FeatureServer/3/query
Source input: sources/verified-construction-core-v0.18-chesterfield-round14-geometry-proposal.json

sumare-ceo-authority
Ascenty
all-rights-reserved
https://ascenty.com/wp-content/uploads/2026/03/MAN-CPC-0002-Code-of-Conduct-and-Ethics.pdf
Source input: sources/curated-official-2026-09-08-regions-round8-ascenty-sumare3-current-build.json

sumare-coordinate-contract-1
Digital Realty
all-rights-reserved
https://www.digitalrealty.com/_next/static/chunks/pages/%5B%5B...slug%5D%5D-8021e6fa0c539442.js
Source input: sources/verified-construction-core-v0.18-regions-round8-sumare-geometry-proposal.json

sumare-coordinate-contract-2
Digital Realty
all-rights-reserved
https://www.digitalrealty.com/_next/static/chunks/5170.09fe70abdb9673fb.js
Source input: sources/verified-construction-core-v0.18-regions-round8-sumare-geometry-proposal.json

sumare-coordinate-contract-3
Digital Realty
all-rights-reserved
https://www.digitalrealty.com/_next/static/chunks/2881.7bc38f42a2a7e45e.js
Source input: sources/verified-construction-core-v0.18-regions-round8-sumare-geometry-proposal.json

sumare-coordinate-contract-4
Digital Realty
all-rights-reserved
https://www.digitalrealty.com/_next/static/chunks/1438.728722cd82ebeed9.js
Source input: sources/verified-construction-core-v0.18-regions-round8-sumare-geometry-proposal.json

sumare-coordinate-contract-5
Google
CC-BY-4.0
https://developers.google.com/maps/documentation/javascript/coordinates?hl=en
Source input: sources/verified-construction-core-v0.18-regions-round8-sumare-geometry-proposal.json

swisstopo-address-scope
© swisstopo
no-open-license-asserted
https://www.swisstopo.admin.ch/en/official-directory-of-building-addresses
Source input: sources/verified-construction-core-v0.18-europe-mena-round9-winterthur-proposed-geometry.json

swisstopo-address-stac
© swisstopo
no-open-license-asserted
https://data.geo.admin.ch/api/stac/v0.9/collections/ch.swisstopo.amtliches-gebaeudeadressverzeichnis/items
Source input: sources/verified-construction-core-v0.18-europe-mena-round9-winterthur-proposed-geometry.json

swisstopo-bgdi-terms
© swisstopo
no-open-license-asserted
https://www.geo.admin.ch/de/allgemeine-nutzungsbedingungen-bgdi/
Source input: sources/verified-construction-core-v0.18-europe-mena-round9-winterthur-proposed-geometry.json

swisstopo-ogd-rights
© swisstopo
no-open-license-asserted
https://www.swisstopo.admin.ch/en/terms-of-use-free-geodata-and-geoservices
Source input: sources/verified-construction-core-v0.18-europe-mena-round9-winterthur-proposed-geometry.json

swisstopo-reframe-manual
© swisstopo
swisstopo-report-A-public-domain
https://www.swisstopo.admin.ch/dam/fr/sd-web/3xmcWvfxgG6X/Report16-03.pdf
Source input: sources/verified-construction-core-v0.18-europe-mena-round9-winterthur-proposed-geometry.json

tomakomai-aigid-catalogue
Ministry of Justice, Japan; AIGID conversion; Data Center Atlas selection and display-anchor derivation
CC-BY-version-unspecified; underlying MOJ-map-data-custom-terms-2023-01-23
https://www.geospatial.jp/ckan/dataset/aigid-moj-01213
Source input: sources/verified-construction-core-v0.18-asia-round6-ai-tech-tomakomai-geometry-proposal.json

tomakomai-aigid-moj-parcel
Ministry of Justice, Japan; AIGID conversion; Data Center Atlas selection and display-anchor derivation
CC-BY-version-unspecified; underlying MOJ-map-data-custom-terms-2023-01-23
https://gsic-opendata.s3.ap-northeast-1.amazonaws.com/aigid/aigid-moj/2026/01/aigid-moj-01213/01213_%E8%8B%AB%E5%B0%8F%E7%89%A7%E5%B8%82_%E5%85%AC%E5%85%B1%E5%BA%A7%E6%A8%9912%E7%B3%BB_%E7%AD%86R_2026.geojson
Source input: sources/verified-construction-core-v0.18-asia-round6-ai-tech-tomakomai-geometry-proposal.json

tomakomai-aigid-resource
Ministry of Justice, Japan; AIGID conversion; Data Center Atlas selection and display-anchor derivation
CC-BY-version-unspecified; underlying MOJ-map-data-custom-terms-2023-01-23
https://www.geospatial.jp/ckan/dataset/aigid-moj-01213/resource/2ead1043-214c-4a4f-b458-ce589d133e4a
Source input: sources/verified-construction-core-v0.18-asia-round6-ai-tech-tomakomai-geometry-proposal.json

tomakomai-aug14-interim-scope
Environmentally Friendly Holdings Co., Ltd.
all-rights-reserved
https://www.ef-hd.com/wp-content/uploads/2026/08/20260814_1ef.pdf
Source input: sources/curated-official-2026-09-08-asia-round6-ai-tech-tomakomai-phase1-current-build.json

tomakomai-july1-campus-followup
Environmentally Friendly Holdings Co., Ltd.
all-rights-reserved
https://www.ef-hd.com/news/press/2561/
Source input: sources/curated-official-2026-09-08-asia-round6-ai-tech-tomakomai-phase1-current-build.json

tomakomai-june19-physical
Environmentally Friendly Holdings Co., Ltd.
all-rights-reserved
https://www.ef-hd.com/wp-content/uploads/2026/06/2026061901_1ef.pdf
Source input: sources/curated-official-2026-09-08-asia-round6-ai-tech-tomakomai-phase1-current-build.json

tomakomai-may29-parcel-identity
Environmentally Friendly Holdings Co., Ltd.
all-rights-reserved
https://www.ef-hd.com/wp-content/uploads/2026/05/2026052901_1ef.pdf
Source input: sources/curated-official-2026-09-08-asia-round6-ai-tech-tomakomai-phase1-current-build.json

tomakomai-moj-custom-terms
Ministry of Justice, Japan; AIGID conversion; Data Center Atlas selection and display-anchor derivation
MOJ-map-data-custom-terms-2023-01-23
https://www.geospatial.jp/ckan/dataset/fc3b0593-ce9e-40d1-aa33-94382d5f0da1/resource/47871bf1-4c85-48f7-a8fe-b27c6643c1c5/download/license.pdf
Source input: sources/verified-construction-core-v0.18-asia-round6-ai-tech-tomakomai-geometry-proposal.json

tomakomai-moj-terms-endpoint
Ministry of Justice, Japan; AIGID conversion; Data Center Atlas selection and display-anchor derivation
MOJ-map-data-custom-terms-2023-01-23
https://www.geospatial.jp/ckan/dataset/houmusyouchizu-riyoukiyaku
Source input: sources/verified-construction-core-v0.18-asia-round6-ai-tech-tomakomai-geometry-proposal.json

tomakomai-sep4-postcutoff-commercial
Environmentally Friendly Holdings Co., Ltd.
all-rights-reserved
https://www.ef-hd.com/wp-content/uploads/2026/09/2026090401_1ef.pdf
Source input: sources/curated-official-2026-09-08-asia-round6-ai-tech-tomakomai-phase1-current-build.json

us-amazon-county-portal-provenance
Bucks County GIS
no-open-redistribution-license-asserted
https://maps.buckscounty.gov/
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-amazon-identity
Falls Township
no-open-redistribution-license-asserted
https://www.fallstwp.com/resources/news/article/?id=10070
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-amazon-locator
Bucks County Planning Commission / Board of Assessment
no-open-redistribution-license-asserted
https://services3.arcgis.com/SP47Tddf7RK32lBU/ArcGIS/rest/services/Bucks_County_Parcels/FeatureServer/0/query?where=PARCEL_NUM%3D%2713-051-001-034%27&outFields=OBJECTID,PARCEL_NUM,ADDRESS,MUNICIPALITY,DEED_AREA,OWNER1,OWNER2,LAND_USE_CODE,MODIFY_DATE&returnGeometry=true&outSR=4326&f=json
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-amazon-plan
Falls Township Planning Commission
no-open-redistribution-license-asserted
https://fallstwp.com/media/4609/2-25-25-pc-minutes.pdf
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-amazon-status
Amazon Innovation Campuses in Pennsylvania
all-rights-reserved
https://www.amazoninnovationinpa.com/falls-township-innovation-campus/
Source input: sources/curated-official-2026-07-19-amazon-falls-township-pa.json

us-census-geocoder-datum
U.S. Census Bureau
no-open-redistribution-license-asserted
https://www2.census.gov/geo/pdfs/maps-data/data/FAQ_for_Census_Bureau_Public_Geocoder.pdf
Source input: sources/verified-construction-core-v0.18-helios-census-datum-correction-v2.json

us-dulles-identity
Loudoun County Office of the Commissioner of the Revenue
no-open-redistribution-license-asserted
https://reparcelasmt.loudoun.gov/PT/datalets/datalet.aspx?UseSearch=no&jur=107&mode=profileall&pin=093365404003&taxyr=2026
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-dulles-locator
Digital Realty
no-open-redistribution-license-asserted
https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-dulles-status
Digital Realty
all-rights-reserved
https://www.digitalrealty.com/about/newsroom/press-releases/30426/digital-realty-announces-purchase-of-blackstone-interest-in-three-northern-virginia-data-centers
Source input: sources/curated-official-2026-07-19-digital-realty-digital-dulles-current-development.json

us-helios-identity
Texas Commission on Environmental Quality
no-open-redistribution-license-asserted
https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN111537775
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-helios-locator
United States Census Bureau
no-open-redistribution-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=984%20County%20Road%20112%20Afton%20TX%2079220&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-helios-census-datum-correction-v2.json

us-helios-phase2-identity
Texas Department of Licensing and Regulation
no-open-redistribution-license-asserted
https://www.tdlr.texas.gov/TABS/Projects/TABS2026014893
Source input: sources/verified-construction-core-v0.18-us-research-geometry-facts.json

us-helios-status
Galaxy Digital Inc.
all-rights-reserved
https://www.galaxy.com/newsroom/galaxy-completes-phase-i-of-its-helios-data-center-campus
Source input: sources/curated-official-2026-07-20-galaxy-helios-phase2.json

us2-census-datum-faq
U.S. Census Bureau
no-open-redistribution-license-asserted
https://www2.census.gov/geo/pdfs/maps-data/data/FAQ_for_Census_Bureau_Public_Geocoder.pdf
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-location-overview
Iron Mountain Data Centers
no-open-redistribution-license-asserted
https://edge.sitecorecloud.io/ironmountain-c8dd68e9/media/project/iron-mountain/iron-mountain/files/resources/data-sheets-and-brochures/i/iron-mountain-data-centers-location-overview.pdf?sc_lang=en
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-manassas-campus
Iron Mountain Data Centers
no-open-redistribution-license-asserted
https://datacenter.ironmountain.com/government-data-centers
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-mia-1-miami-status
Iron Mountain Incorporated
all-rights-reserved
https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm
Source input: sources/curated-official-2026-09-08-iron-mountain-mia-1-miami-q2-current-build.json

us2-mia1-census
U.S. Census Bureau
no-open-redistribution-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=2925%20NW%20120th%20Terrace%20Miami%20FL%2033167&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-mia1-government
Miami-Dade County Fire Rescue
no-open-redistribution-license-asserted
https://bldgadmin.miamidade.gov/mdfr/CommentRpt.asp?Permit=2024066470&flag=View
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-mia1-legacy-identity
Iron Mountain Data Centers
all-rights-reserved
https://www.ironmountain.com/data-centers/locations/miami-data-center
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-nje-1-new-jersey-status
Iron Mountain Incorporated
all-rights-reserved
https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm
Source input: sources/curated-official-2026-09-08-iron-mountain-nje-1-new-jersey-q2-current-build.json

us2-nje1-census
U.S. Census Bureau
no-open-redistribution-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=3003%20Woodbridge%20Ave%20Edison%20NJ%2008837&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-nje1-government
Township of Edison government access station
no-open-redistribution-license-asserted
https://cablecast.edisonnj.org/internetchannel/show/3903?site=1
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-va-9-phase-1-status
Iron Mountain Incorporated
all-rights-reserved
https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm
Source input: sources/curated-official-2026-09-08-iron-mountain-va-9-phase-1-q2-current-build.json

us2-va1-campus-census
U.S. Census Bureau
no-open-redistribution-license-asserted
https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=11680%20Hayden%20Road%20Manassas%20VA%2020109&benchmark=Public_AR_Current&format=json
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us2-va9-brochure
Iron Mountain Data Centers
no-open-redistribution-license-asserted
https://edge.sitecorecloud.io/ironmountain-c8dd68e9/media/project/iron-mountain/iron-mountain/files/services/imdc/locations/data-centers-va-9-brochure.pdf?sc_lang=en
Source input: sources/verified-construction-core-v0.18-iron-mountain-us-three-geometry-facts.json

us23-dataone-vineland-city-gis
City of Vineland GIS / Engineering
no-open-license-asserted
https://www.vinelandcity.org/gis-maps/
Source input: sources/verified-construction-core-v0.18-us-round23-dataone-vineland-geometry-proposal.json

us23-dataone-vineland-parcel-item
City of Vineland GIS / Engineering
no-open-license-asserted
https://gisportal.vinelandcity.org/portal/sharing/rest/content/items/dc0107ba7e8b4237a486873b600bfc5f?f=pjson
Source input: sources/verified-construction-core-v0.18-us-round23-dataone-vineland-geometry-proposal.json

us23-dataone-vineland-parcel-layer
City of Vineland GIS / Engineering
no-open-license-asserted
https://gisportal.vinelandcity.org/arcgis/rest/services/Cadastre/Parcel_Public_Viewer/MapServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-us-round23-dataone-vineland-geometry-proposal.json

us23-dataone-vineland-parcel-native
City of Vineland GIS / Engineering
no-open-license-asserted
https://gisportal.vinelandcity.org/arcgis/rest/services/Cadastre/Parcel_Public_Viewer/MapServer/0/query?f=pjson&where=BLOCK%3D%277503%27%20AND%20LOT%3D%2735.01%27&outFields=OBJECTID_1,MUN,BLOCK,LOT,UNIQUEID,ParcelAddr,Owner,X_COORD,Y_COORD,TAXMAP_LNK&returnGeometry=true
Source input: sources/verified-construction-core-v0.18-us-round23-dataone-vineland-geometry-proposal.json

us23-dataone-vineland-parcel-wgs84
City of Vineland GIS / Engineering
no-open-license-asserted
https://gisportal.vinelandcity.org/arcgis/rest/services/Cadastre/Parcel_Public_Viewer/MapServer/0/query?f=pjson&where=BLOCK%3D%277503%27%20AND%20LOT%3D%2735.01%27&outFields=OBJECTID_1,MUN,BLOCK,LOT,UNIQUEID,ParcelAddr,Owner&returnGeometry=true&outSR=4326&datumTransformation=1188
Source input: sources/verified-construction-core-v0.18-us-round23-dataone-vineland-geometry-proposal.json

us23-dataone-vineland-viewer-config
City of Vineland GIS / Engineering
no-open-license-asserted
https://gisportal.vinelandcity.org/portal/sharing/rest/content/items/89c744a0065e45a288fa2cb935bd41c3/data?f=pjson
Source input: sources/verified-construction-core-v0.18-us-round23-dataone-vineland-geometry-proposal.json

us23-dataone-vineland-viewer-item
City of Vineland GIS / Engineering
no-open-license-asserted
https://gisportal.vinelandcity.org/portal/sharing/rest/content/items/89c744a0065e45a288fa2cb935bd41c3?f=pjson
Source input: sources/verified-construction-core-v0.18-us-round23-dataone-vineland-geometry-proposal.json

us23-vineland-aug18-successor
WHYY / Zoe Read
no-open-license-asserted
https://whyy.org/articles/vineland-planning-board-approves-data-center-plan/
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-aug28-scope-context
WHYY / Zoe Read
no-open-license-asserted
https://whyy.org/articles/vineland-new-jersey-data-center-gas-generators-permit/
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-aug7-publication
City of Vineland
no-open-license-asserted
https://www.vinelandcity.org/legal-notices/
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-bloom-stop-order
City of Vineland construction official; scan hosted by The Woodbury Warbler
no-open-license-asserted
https://woodburywarbler.com/wp-content/uploads/2026/08/2026.0810-Stop-Work-Order-Bloom-Energy-Cells-826x1024.jpg
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-lng-stop-order
City of Vineland construction official; scan hosted by The Woodbury Warbler
no-open-license-asserted
https://woodburywarbler.com/wp-content/uploads/2026/08/20206.0806-Stop-Work-Order-LNG-Tank.jpg
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-nebius-successor-context
Nebius
no-open-license-asserted
https://nebius.com/vinelandnj
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-operator-successor-context
DataOne
no-open-license-asserted
https://askvineland.dataone.eu/
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-order-host-chain
The Woodbury Warbler / Jen Russell
no-open-license-asserted
https://woodburywarbler.com/vineland-issues-two-stop-work-orders-at-dataone-data-center/
Source input: sources/research-expansion-200-us-round23-dataone-vineland-2026-09-09.json

us23-vineland-phase2-aug7-construction
City of Vineland Planning Board
no-open-license-asserted
https://www.vinelandcity.org/wp-content/uploads/2026/08/Data-One-Meeting-Post-8.7.pdf
Source input: sources/curated-official-2026-09-09-us-round23-dataone-vineland-phase2-current-build.json

vicmap-address-schema
© State of Victoria, Department of Transport and Planning, Vicmap
CC-BY-4.0
https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0?f=pjson
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

vicmap-current-rights
© State of Victoria, Department of Transport and Planning, Vicmap
CC-BY-4.0
https://www.arcgis.com/sharing/rest/content/items/944561c665db48a8b0df5ca0d965d3fd?f=pjson
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

vicmap-official-endpoint
© State of Victoria, Department of Transport and Planning, Vicmap
CC-BY-4.0
https://data.gov.au/data/api/3/action/resource_show?id=eb3cd08e-762b-4b1c-ba57-6dca4e4059f4
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

vicmap-virtual-point-definition
© State of Victoria, Department of Transport and Planning, Vicmap
CC-BY-4.0
https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/7/query?where=1%3D1&outFields=*&f=pjson
Source input: sources/verified-construction-core-v0.18-asia-round5-nextdc-next-three-reviewed-geometry.json

winterthur-current-finishing
ERNE AG Bauunternehmung
no-open-license-asserted
https://www.erne.ch/fr/news/detail/ernenews/in-winterthur-lassen-wir-ein-neues-data-center-wachsen/
Source input: sources/curated-official-2026-09-08-europe-mena-round9-winterthur-zrh12-current-build.json

winterthur-dpr-erne-zrh12
DPR Construction
no-open-license-asserted
https://www.linkedin.com/posts/dpr-construction-inc_datacenter-vantagedatacenters-projectmilestone-activity-7417373744987426816-REKH
Source input: sources/curated-official-2026-09-08-europe-mena-round9-winterthur-zrh12-current-build.json

winterthur-dpr-zrh12
DPR Construction
no-open-license-asserted
https://www.dpr.com/projects/vantage-data-centers-zurich-campus-building-2-zrh12
Source input: sources/curated-official-2026-09-08-europe-mena-round9-winterthur-zrh12-current-build.json

winterthur-official-address-download
© swisstopo
swisstopo-free-geodata-terms-2021-03-01
https://data.geo.admin.ch/ch.swisstopo.amtliches-gebaeudeadressverzeichnis/amtliches-gebaeudeadressverzeichnis_ch/amtliches-gebaeudeadressverzeichnis_ch_2056.csv.zip
Source input: sources/verified-construction-core-v0.18-europe-mena-round9-winterthur-proposed-geometry.json

winterthur-operator-address
Vantage Data Centers
no-open-license-asserted
https://vantage-dc.com/data-center-locations/emea/zurich-i-switzerland/
Source input: sources/curated-official-2026-09-08-europe-mena-round9-winterthur-zrh12-current-build.json

winterthur-reframe-transform
© swisstopo
swisstopo-free-geodata-terms-2021-03-01
https://geodesy.geo.admin.ch/reframe/lv95towgs84?easting=2699653.019&northing=1261946.623&format=geojson
Source input: sources/verified-construction-core-v0.18-europe-mena-round9-winterthur-proposed-geometry.json

Sources added in 2026-10-13:
EPCC, University of Edinburgh: ACF supercomputer building steel-frame milestone — https://www.epcc.ed.ac.uk/whats-happening/articles/ai-minister-marks-milestone-supercomputer-build (all-rights-reserved)
Robertson: ACF construction milestone: principal contractor — https://www.robertson.co.uk/news/ai-minister-marks-milestone-edinburgh-supercomputer-build (all-rights-reserved)
University of Edinburgh Estates: CR4 supercomputer preparation project — https://estates.ed.ac.uk/campus-development/easter-bush/cr4-supercomputer-preparation-project (all-rights-reserved)
University of Edinburgh via Public Contracts Scotland: ACF Bush Estate address: university procurement — https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT397510 (all-rights-reserved)
OpenStreetMap contributors: ACF Building: OpenStreetMap way59574224 — https://www.openstreetmap.org/api/0.6/way/59574224/full.json (ODbL-1.0)
Oracle: Project Jupiter statement on construction permitting — https://www.oracle.com/news/announcement/project-jupiter-statement-on-construction-permitting-2026-09-14/ (all-rights-reserved)
Scala Data Centers: Scala Data Centers Portfolio — https://scaladatacenters.com/en/data-centers-en/ (all-rights-reserved)
Scala Data Centers: Scala Data Centers Portfolio — https://scaladatacenters.com/en/data-centers-en/ (all-rights-reserved)
AZ Quest Panorama Data Centers: AZ Quest Panorama Data Centers definitive prospectus, 4 August2026 — https://filemanager-cdn.mziq.com/published/eacf948d-b138-408b-a8b7-1d6db21f3e84/6352b3fe-1887-43c5-be82-dbf4c54255d3_67224342000166-OPD07082026V01-001280434.pdf (all-rights-reserved)

Consolidated source inventory: https://github.com/kiankyars/semiconductor-atlas at 3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02.
Imported references retain their recorded publishers and original publication/access dates. Source terms were not recorded in this inventory; no open license is inferred. Full source objects, including archived URLs, are in source-records.json.

Imported coordinate provenance:
Each original location.note is retained verbatim. A location citation can support the named place while the coordinate was obtained separately; the first listed geometry reference is not necessarily the coordinate provider. Original geocoder responses and lookup hashes were not included in this inventory.
Where a location note identifies OpenStreetMap or its Nominatim geocoder as the coordinate provider: © OpenStreetMap contributors; ODbL 1.0, https://www.openstreetmap.org/copyright . This attribution concerns the derived reference point, not the separately cited company or news page.
Where a location note identifies Wikipedia: coordinate provenance is credited to Wikipedia contributors; article URLs are retained when the original record supplied them. Coordinate-specific source terms and underlying coordinate provenance were not recorded, and no license is inferred for the separately cited sources.
Imported evidence content_hash values hash the canonical factual source-record projection specified in consolidation.py, not a downloaded publisher page or geocoder response.
Gobierno de Aragón: Plan de Interés General de Aragón: Instalación de un centro de datos en el término municipal de La Puebla de Alfindén — https://www.aragon.es/-/piga-acs-dc-la-puebla
Gobierno de Aragón: Modificación de la aprobación inicial del PIGA del centro de datos de La Puebla de Alfindén — https://www.aragon.es/-/piga-acs-modificacion%201
Hoy Aragón: ACS aterriza con Benbros Energy en Aragón para la construcción de otro centro de datos — https://www.hoyaragon.es/articulo/noticias-aragon/acs/20250627135338101330.html
El Español: Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras — https://www.elespanol.com/aragon/actualidad/20261005/cerca-millones-invertidos-centros-datos-aragon-esperan-rampa-salida-obras/1003744406849_0.html
El Español: Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos — https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html
Wikipedia: La Puebla de Alfindén — https://en.wikipedia.org/wiki/La_Puebla_de_Alfind%C3%A9n
AdaniConneX: Data Centers — https://www.adaniconnex.com/data-centers
AdaniConneX: AdaniConneX's Hyderabad Site Gets Five-Star Grading from British Safety Council — https://resources.adaniconnex.com/press-release/adaniconnexs-hyderabad-site-gets-five-star-grading-from-british-safety-council
Adani Group: Adani Commits USD 100 Bn to Sovereign AI Infrastructure — https://www.adani.com/newsroom/media-releases/Adani-Commits-USD-100-Bn-to-Sovereign-AI-Infrastructure
AdaniConneX: Data Centers — https://www.adaniconnex.com/data-centers
AdaniConneX: Data Centers — https://www.adaniconnex.com/data-centers
AdaniConneX: AdaniConneX Seals the Largest Data Center Financing Deal in India with a USD 213 Mn Construction Financing Facility — https://resources.adaniconnex.com/press-release/adaniconnex-raises-usd-213-mn-construction-financing-facility
AdaniConneX: Data Centers — https://www.adaniconnex.com/data-centers
Adani Group: Adani Enterprises Ltd announces Q1-FY27 results — https://www.adani.com/newsroom/media-releases/adani-enterprises-ltd-announces-q1-fy27-results
Adani Group: Adani Commits USD 100 Bn to Sovereign AI Infrastructure — https://www.adani.com/newsroom/media-releases/Adani-Commits-USD-100-Bn-to-Sovereign-AI-Infrastructure
AirTrunk: HYD1 Hyderabad — https://airtrunk.com/location/hyd1-hyderabad/
AirTrunk: AirTrunk Acquires Lumina CloudInfra — https://airtrunk.com/?p=16687
W.Media: AirTunk acquires Lumina CloudInfra, makes foray into India — https://w.media/airtunk-acquires-lumina-cloudinfra-makes-foray-into-india/
Wikipedia: Chandanvelly — https://en.wikipedia.org/wiki/Chandanvelly
AirTrunk: AirTrunk opens AI-ready data centre in Malaysia, accelerating innovation and the energy transition — https://airtrunk.com/airtrunk-opens-ai-ready-data-centre-in-malaysia-accelerating-innovation-and-the-energy-transition/
AirTrunk: 100MW expansion underway at AirTrunk JHB1 — https://airtrunk.com/airtrunk-jhb1100mw-expansion-underway/
AirTrunk: AirTrunk grows Malaysia platform with second cloud and AI-ready data centre in Johor — https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/
AirTrunk: AirTrunk doubles down in Malaysia with two new hyperscale campuses in Johor Bahru — https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/
AirTrunk: AirTrunk grows Malaysia platform with second cloud and AI-ready data centre in Johor — https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/
AirTrunk: JHB2 Johor Bahru — https://airtrunk.com/data-centres/jhb2/
AirTrunk: AirTrunk doubles down in Malaysia with two new hyperscale campuses in Johor Bahru — https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/
AirTrunk: AirTrunk secures US$2.325b green financing to support sustainable digital infrastructure growth in Malaysia — https://airtrunk.com/airtrunk-secures-us2-325b-green-financing-to-support-sustainable-digital-infrastructure-growth-in-malaysia/
AirTrunk: AirTrunk doubles down in Malaysia with two new hyperscale campuses in Johor Bahru — https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/
AirTrunk: JHB3 Johor Bahru — https://airtrunk.com/location/jhb3-johor-bahru/
W.Media: AirTrunk to invest US$ 3 billion in Johor to build two hyperscale campuses totaling 280MW capacity — https://w.media/airtrunk-to-invest-us-3-billion-in-johor-to-build-two-hyperscale-campuses-totaling-280mw-capacity/
Wikipedia: Iskandar Puteri — https://en.wikipedia.org/wiki/Iskandar_Puteri
AirTrunk: AirTrunk doubles down in Malaysia with two new hyperscale campuses in Johor Bahru — https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/
AirTrunk: JHB4 Johor Bahru — https://airtrunk.com/location/jhb4-johor-bahru/
W.Media: AirTrunk to invest US$ 3 billion in Johor to build two hyperscale campuses totaling 280MW capacity — https://w.media/airtrunk-to-invest-us-3-billion-in-johor-to-build-two-hyperscale-campuses-totaling-280mw-capacity/
Wikipedia: Iskandar Puteri — https://en.wikipedia.org/wiki/Iskandar_Puteri
AirTrunk: Kurri Kurri Data Centre — https://airtrunk.com/kurri-kurri/
NSW Planning Portal: Kurri Kurri Data Centre (SSD-128819490) — https://www.planningportal.nsw.gov.au/major-projects/projects/kurri-kurri-data-centre
W.Media: AirTrunk proposes AUD 3.7bn NSW data centre with AUD 37m community offer — https://w.media/?p=43650
Newcastle Weekly: 540MW AI data centre planned for Kurri Kurri — https://newcastleweekly.com.au/540mw-ai-data-centre-planned-for-kurri-kurri/
Newcastle Herald: Kurri data centre energy whale needs its own power supply — https://www.newcastleherald.com.au/story/9328857/kurri-data-centre-energy-whale-needs-its-own-power-supply/
Wikipedia: Kurri Kurri — https://en.wikipedia.org/wiki/Kurri_Kurri
AirTrunk: TOK1 Tokyo East — https://airtrunk.com/data-centres/tok1/
AirTrunk: AirTrunk TOK1 Phase 3 progressing at speed — https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/
AirTrunk: AirTrunk breaks ground on 40+MW phase of TOK1, Japan's largest hyperscale data centre campus. — https://airtrunk.com/airtrunk-breaks-ground-on-40mw-phase-of-tok1-japans-largest-hyperscale-data-centre-campus/
AirTrunk: AirTrunk secures largest financing for a data centre in Japan with US$1.2 billion green loan — https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/
High North News: Aker Nscale Planning Another AI Data Center in Northern Norway — https://en.highnorthnews.com/business/aker-nscale-planning-another-ai-data-center-in-northern-norway/118322
Datacenter Forum: Aker Nscale plans to build large AI data center in northern Norway — https://www.datacenter-forum.com/nscale/aker-nscale-plans-to-build-large-ai-data-center-in-northern-norway
The Tech Capital: Nscale expands AI infrastructure with new 250 MW data centre project in Norway — https://thetechcapital.com/nscale-expands-ai-infrastructure-with-new-250-mw-data-centre-project-in-norway/
Aker ASA (via Placera): Aker completes investment in Nscale's Series C funding round — https://www.placera.se/pressmeddelanden/aker-aker-completes-investment-in-nscales-series-c-funding-round-20260327
Applied Digital: Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus in a Southern U.S. State — https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai
Applied Digital: Applied Digital Announces New U.S. Based High Investment-Grade Hyperscaler Tenant at Delta Forge 1, a 430 MW AI Factory Campus — https://ir.applieddigital.com/news-events/press-releases/detail/149/applied-digital-announces-new-u-s-based-high
Applied Digital: Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results — https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year
U.S. Securities and Exchange Commission (Applied Digital filing): Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K exhibit) — https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm
Wikipedia: Boyce, Louisiana — https://en.wikipedia.org/wiki/Boyce,_Louisiana
Applied Digital: Applied Digital signs 210 MW lease at Delta Forge 2, expanding its AI factory franchise model to a fifth campus — https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2
Applied Digital via SEC EDGAR: Applied Digital reports fiscal first quarter 2027 results (Form 8-K exhibit) — https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm
ABC 33/40: $3.2 billion AI data center campus announced in Brookwood — https://abc3340.com/news/local/alabama-32-billion-ai-data-center-campus-announced-in-brookwood-brookwood-mayor-joe-barger-september-2026
FOX10 News: Applied Digital confirms $3.2 billion data center campus in Brookwood — https://www.fox10tv.com/2026/09/25/applied-digital-confirms-32-billion-data-center-campus-brookwood/
Wikipedia: Brookwood, Alabama — https://en.wikipedia.org/wiki/Brookwood,_Alabama
Applied Digital: Applied Digital Announces 250MW AI Data Center Lease With CoreWeave in North Dakota — https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with
Applied Digital: Applied Digital Achieves Ready for Service for Phase 1 at Polaris Forge 1 Building 1 for CoreWeave — https://ir.applieddigital.com/news-events/press-releases/detail/133/applied-digital-achieves-ready-for-service-for-phase-1-at
Applied Digital: Applied Digital Completes Phase II Ready for Service at Polaris Forge 1, Fully Energizing First 100 MW Building — https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at
Applied Digital: Applied Digital Announces $300 Million Senior Secured Bridge Facility — https://ir.applieddigital.com/news-events/press-releases/detail/150/applied-digital-announces-300-million-senior-secured
Applied Digital: Applied Digital Announces Pricing of $1.59 Billion of Senior Secured Notes to fund the Fourth Building at Polaris Forge 1 — https://ir.applieddigital.com/_assets/_f6377ac165e571402492e7df82cea1ee/appliedblockchaininc/news/2026-06-09_Applied_Digital_Announces_Pricing_of_1_59_Billion__156.pdf
Applied Digital: Applied Digital Brings an Additional 75 MW of AI Infrastructure Online at Polaris Forge 1 — https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai
U.S. Securities and Exchange Commission (Applied Digital filing): Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K exhibit) — https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm
Applied Digital: Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results — https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year
Wikipedia: Ellendale, North Dakota — https://en.wikipedia.org/wiki/Ellendale,_North_Dakota
Applied Digital: Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus in September 2025 — https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge
Applied Digital via GlobeNewswire (FinancialContent): Applied Digital Announces $5 Billion AI Factory Lease with U.S. Based Investment Grade Hyperscaler at Polaris Forge 2 ND Campus — https://markets.financialcontent.com/franklincredit/article/gnwcq-2025-10-22-applied-digital-announces-5-billion-ai-factory-lease-with-us-based-investment-grade-hyperscaler-at-polaris-forge-2-nd-campus
Valley News Live: Applied Digital closes $2.15B deal to build out Harwood AI campus — https://www.valleynewslive.com/2026/03/10/applied-digital-closes-215b-deal-build-out-harwood-ai-campus/
Applied Digital: Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results — https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year
U.S. Securities and Exchange Commission (Applied Digital filing): Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K exhibit) — https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm
Wikipedia: Harwood, North Dakota — https://en.wikipedia.org/wiki/Harwood,_North_Dakota
Applied Digital: Applied Digital Reaches Significant Milestone, Surpassing 1 GW of Contracted Capacity with U.S. Based High Investment-Grade Hyperscaler Lease at Fourth Campus, Polaris Forge 3 — https://ir.applieddigital.com/news-events/press-releases/detail/152/applied-digital-reaches-significant-milestone-surpassing-1
Applied Digital: Applied Digital Reports Fiscal Fourth Quarter and Full Year 2026 Results — https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year
U.S. Securities and Exchange Commission (Applied Digital filing): Applied Digital Reports Fiscal First Quarter 2027 Results (Form 8-K exhibit) — https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm
Wikipedia: Center, North Dakota — https://en.wikipedia.org/wiki/Center,_North_Dakota
Clare FM: High Court Clears Way For Construction Of €1.6bn Ennis Data Centre Project — https://www.clare.fm/news/high-court-clears-way-for-construction-of-e1-6bn-ennis-data-centre-project/
Industrial Info Resources: Court Clears Way for Major Irish Data Center — https://www.industrialinfo.com/iirenergy/industry-news/article/court-clears-way-for-major-irish-data-center--355133
BeBeez International (republishing DCD): Art Data Centres Ennis campus judicial review gets dismissed — https://bebeez.eu/en/news/art-data-centres-ennis-campus-judicial-review-gets-dismissed/
Wikipedia: Ennis — https://en.wikipedia.org/wiki/Ennis
atNorth: atNorth expands to Norway with new mega site in Haugaland — https://www.atnorth.com/news/atnorth-expands-to-norway-with-new-mega-site-in-haugaland/
atNorth: Haugaland mega site (NOR01) — https://www.atnorth.com/nordic-data-centers/norway-data-centers/haugaland-nor01/
RCRTech (RCR Wireless News): atNorth sees growing AI demand driving 350MW Norway DC campus — https://rcrtech.com/ai-infrastructure-news/atnorth-ai-demand-norway/
atNorth: atNorth to develop new data center in Salo, Finland — https://www.atnorth.com/news/atnorth-to-develop-new-data-center-in-salo-finland/
atNorth: Salo mega site (FIN05) — https://www.atnorth.com/nordic-data-centers/finland-data-centers/salo-fin05/
atNorth: New 300MW mega site in Sollefteå, Sweden — https://www.atnorth.com/news/new-300mw-mega-site-in-solleftea-sweden/
atNorth: Sollefteå mega site (SWE04) — https://www.atnorth.com/nordic-data-centers/sweden-data-centers/solleftea-swe04/
atNorth AB (prepared by COWI): Samrådsunderlag för atNorths tillståndsansökan för datacenter i Långsele, Sollefteå kommun — https://www.atnorth.com/wp-content/uploads/2026/06/SWE04-Samradsunderlag-260616.pdf
atNorth: Varde mega site (DEN02) — https://www.atnorth.com/nordic-data-centers/denmark-data-centers/varde-mega-site/
JydskeVestkysten (republished by atNorth): atNorth data center to supply district heating — https://www.atnorth.com/in-the-news/atnorths-data-center-to-supply-district-heating/
JydskeVestkysten (republished by atNorth): Local firms prepare for major project in Varde — https://www.atnorth.com/in-the-news/local-firms-prepare-for-major-project-in-varde/
atNorth: Selected Group will utilize surplus heat from atNorth's DEN02 data center — https://www.atnorth.com/news/selected-group-will-utilize-surplus-heat-from-atnorths-den02-data-center/
Office of Governor Tate Reeves: Amazon continues Mississippi expansion, announcing plans to invest a total of $25 billion across the Magnolia State — https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/
WLOX: '2,000 new jobs right here in Mississippi': Gov. Reeves $12B more in investments from AWS — https://www.wlox.com/2026/04/09/gov-reeves-local-leaders-announce-amazons-plans-invest-25-billion-across-mississippi/
Amazon: Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs — https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers
Amazon: Amazon data center communities: Here's what's happening near data centers across the US — https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news
Mississippi Free Press: Amazon Is Expanding Data Centers in Central Mississippi, Governor Announces — https://www.mississippifreepress.org/amazon-is-expanding-data-centers-in-central-mississippi-governor-announces/
Elevate Douglas Economic Partnership and Douglas County Board of Commissioners: Amazon Web Services Plans to Invest at least $5 Billion to Establish Data Center Campuses in Douglas County — https://elevatedouglas.com/wp-content/uploads/2025/01/AWS-Douglas-County-Release-01072025.pdf
The Atlanta Journal-Constitution: Amazon plans $11 billion data center expansion in Georgia — https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/
Amazon: AWS plans to invest at least $11 billion in Georgia to expand infrastructure to support AI and cloud technologies — https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure
Amazon: AWS plans $10 billion infrastructure investment in Ohio, advancing the future of AI — https://www.aboutamazon.com/news/aws/aws-continues-to-invest-in-ohio
Amazon: Amazon to invest $15 billion in Indiana for new data centers — https://aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers
21Alive News (WPTA), from Inside INdiana Business: Hobart reaches agreement with Amazon for next-gen data center — https://www.21alivenews.com/2025/11/25/hobart-reaches-agreement-with-amazon-next-gen-data-center/
FOX 32 Chicago: 'We want transparency before approvals happen': Residents oppose proposed $11 billion Amazon data center — https://fox32chicago.com/news/hobart-approves-11b-amazon-data-center-details-still-unclear
FOX 32 Chicago: Lawsuit seeks to block Amazon data center permit in Hobart, Ind. — https://www.fox32chicago.com/news/lawsuit-seeks-block-amazon-data-center-permit-hobart-ind
WBUR (Here & Now): Indiana power outage raises concerns about data centers — https://www.wbur.org/hereandnow/2026/08/25/indiana-power-data-centers
Wikipedia: Hobart, Indiana — https://en.wikipedia.org/wiki/Hobart,_Indiana
Bisnow: Amazon Data Center Campus Planned For King George County, Virginia, As Project Clears Key Hurdle — https://www.bisnow.com/news/national/data-center/amazon-data-center-campus-planned-for-king-george-county-va-as-project-clears-key-hurdle-120212
Hirschler: Hirschler Secures Historic Rezoning for Massive Data Center Campus in King George County, Virginia — https://www.hirschlerlaw.com/newsroom-news-historic-rezoning-massive-data-center-king-george-county
Bisnow: Amazon Dealt Setback In Plan For $6B Virginia Data Center Campus — https://www.bisnow.com/news/national/data-center/virginia-county-backtracks-on-agreement-with-amazon-for-6b-data-center-campus-122327
Fredericksburg Free Press: King George supervisors ready to 'go to war' with Amazon — https://www.fredericksburgfreepress.com/?p=107200
Baxtel: Amazon: King George, VA Data Center — https://baxtel.com/data-center/amazon-king-george-va
Wikipedia: Sealston, Virginia — https://en.wikipedia.org/wiki/Sealston,_Virginia
Louisa County, Virginia: Amazon Web Services announces plan to invest $11 billion in Louisa County by 2040 — https://www.louisacounty.gov/CivicAlerts.aspx?AID=363&ARC=2233
Lake Anna Life (Engage Louisa): Contractors Meet To Discuss Construction Plan At Lake Anna Technology Campus — https://lakeannalife.com/amazon-planning-to-commence-work-at-lake-anna-technology-campus/
Louisa County, Virginia: Community Update/Press FAQs: AWS — https://www.louisacounty.gov/m/faq?cat=40
Amazon: Amazon data center communities: Here's what's happening near data centers across the US — https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news
Vicksburg Daily News (press release): Amazon Web Services plans to invest $10 billion, creating 1,000 jobs to establish data center complexes in Mississippi — https://archive.vicksburgnews.com/amazon-web-services-plans-to-invest-10-billion-creating-1000-jobs-to-establish-data-center-complexes-in-mississippi/
Picayune Item: Governor Reeves Celebrates Groundbreaking of Largest Economic Development Project in Mississippi History — https://picayuneitem.com/?p=144178
Vicksburg Daily News: AWS Plans $10 Billion Data Center Investment in Mississippi — https://vicksburgnews.com/aws-plans-10-billion-data-center-investment-in-mississippi/
Amazon: Amazon data center communities: Here's what's happening near data centers across the US — https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news
Office of Governor Tate Reeves: Amazon continues Mississippi expansion, announcing plans to invest a total of $25 billion across the Magnolia State — https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/
WLOX: '2,000 new jobs right here in Mississippi': Gov. Reeves $12B more in investments from AWS — https://www.wlox.com/2026/04/09/gov-reeves-local-leaders-announce-amazons-plans-invest-25-billion-across-mississippi/
WLBT: Madison County, Amazon spar over data center tax values — https://www.wlbt.com/2026/08/18/madison-county-amazon-spar-over-data-center-tax-values/
Indiana Economic Development Corporation: Gov. Holcomb announces Amazon Web Services plans to invest $11B to create a new data center campus in Northern Indiana — https://www.iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana
GovTech (The Times, Munster, via Tribune Content Agency): Indiana data center could bring significant power use — https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use
Converge Digest: AWS activates Project Rainier data center campus — https://convergedigest.com/aws-activates-project-rainier-data-center-campus/
Amazon: AWS activates Project Rainier: One of the world's largest AI compute clusters comes online — https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster
WSBT: First look at Amazon's New Carlisle data center's administration building, campus — https://wsbt.com/news/local/first-look-at-amazons-new-carlisle-data-centers-administration-building-campus-11-billion-dollar-investment-recruit-workers-technical-careers-multiple-buildings
WNDU: Amazon Web Services investment in St. Joseph County data center campus surpasses $13.8 billion — https://www.wndu.com/2026/07/23/amazon-web-services-investment-st-joseph-county-data-center-campus-surpasses-138-billion/
ABC11 (The Associated Press): Amazon planning $10B investment in North Carolina for data center and AI campus — https://abc11.com/16658676
WITN (The Associated Press): Amazon planning $10B investment in North Carolina for data center and AI campus — https://www.witn.com/2025/06/04/amazon-planning-10b-investment-north-carolina-data-center-ai-campus/
Amazon: Amazon plans to invest $10 billion in North Carolina to expand cloud computing infrastructure and advance AI innovation — https://www.aboutamazon.com/news/aws/aws-investment-north-carolina-ai-cloud-infrastructure
Amazon: Amazon data center communities: Here's what's happening near data centers across the US — https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news
local21news (WHP): Talen Energy announces sale of data center campus to Amazon — https://local21news.com/news/local/talen-energy-announces-sale-of-data-center-campus-to-amazon
PhillyVoice: Amazon gets zoning approval for massive data center campus in Luzerne County — https://phillyvoice.com/amazon-pennsylvania-data-center-salem-luzerne-county
American Public Power Association: Talen Energy expands nuclear energy relationship with Amazon — https://www.publicpower.org/periodical/article/talen-energy-expands-nuclear-energy-relationship-with-amazon
World Nuclear News: New supply agreement expands Talen-Amazon partnership — https://wnn.world-nuclear.org/articles/new-supply-agreement-expands-talen-amazon-partnership
Amazon: Amazon plans to invest $20 billion in Pennsylvania to expand cloud computing infrastructure and advance AI innovation — https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation
Amazon Innovation in PA (project website): Salem Township Innovation Campus — https://www.amazoninnovationinpa.com/salem-township-innovation-campus/
Amazon Innovation in PA (project website): Projects Across Pennsylvania — https://www.amazoninnovationinpa.com/projects-across-pennsylvania/
Office of Governor Tate Reeves: Governor Tate Reeves announces Amazon plans to invest $3 billion in Vicksburg — https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/
Mississippi Public Broadcasting: Amazon to build $3 billion data center in Warren County, expanding tech footprint in Mississippi — https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/
Mississippi Free Press: Amazon to Build $3B AI Data Center in Vicksburg, as Gov. Reeves Proclaims Arrival of the 'Digital Delta' — https://www.mississippifreepress.org/amazon-to-build-3b-ai-data-center-in-vicksburg-as-gov-reeves-proclaims-arrival-of-the-digital-delta/
Amazon: Amazon plans to invest at least $3 billion in Warren County, Mississippi, for next-generation data center campus — https://www.aboutamazon.com/md/news/company-news/amazon-3-billion-mississippi-data-center-investment
Office of Governor Tate Reeves: Amazon continues Mississippi expansion, announcing plans to invest a total of $25 billion across the Magnolia State — https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/
Azora: Azora to invest €2 billion in Zaragoza data centre — https://azora.com/en/blog/azora-to-invest-e2-billion-in-zaragoza-data-centre/
Gobierno de Aragón: Plan de Interés General de Aragón Tillion Aragón — https://www.aragon.es/-/piga-tillion-aragon
El Español: Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras — https://www.elespanol.com/aragon/actualidad/20261005/cerca-millones-invertidos-centros-datos-aragon-esperan-rampa-salida-obras/1003744406849_0.html
El Español: Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos — https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html
Wikipedia: Villamayor de Gállego — https://en.wikipedia.org/wiki/Villamayor_de_G%C3%A1llego
Cardinal News: Data center proposal in Pittsylvania withdrawn, for now — https://cardinalnews.org/2024/11/04/data-center-proposal-in-pittsylvania-withdrawn-for-now/
Radio IQ (WVTF): Balico withdraws application to build data centers in Pittsylvania County — https://www.wvtf.org/news/2025-04-14/balico-withdraws-application-to-build-data-centers-in-pittsylvania-county
WDBJ7: Company withdraws data center proposal, residents express skepticism — https://www.wdbj7.com/2025/04/14/company-withdraws-data-center-proposal-residents-express-skepticism/
Cardinal News: Pittsylvania rejects data center project that has dominated county conversation for 6 months — https://cardinalnews.org/2025/04/16/pittsylvania-rejects-data-center-project-that-has-dominated-county-conversation-for-6-months/
Wikipedia: Chatham, Virginia — https://en.wikipedia.org/wiki/Chatham,_Virginia
Heartland Power Generation LP (filed with the Impact Assessment Agency of Canada): Beacon AI Centers - Heartland Project: Initial Project Description Summary — https://iaac-aeic.gc.ca/050/documents/p90123/164350E.pdf
Impact Assessment Agency of Canada: Beacon AI Centers Heartland Project (Canadian Impact Assessment Registry, reference 90123) — https://www.iaac-aeic.gc.ca/050/evaluations/proj/90123
Impact Assessment Agency of Canada: Notice of Early Decision with Reasons: Beacon AI Centers Heartland Project — https://iaac-aeic.gc.ca/050/evaluations/document/165326?culture=en-CA
Heartland Power Generation LP (filed with the Alberta Utilities Commission): Beacon AI Centers - Heartland Project Thermal Power Plant Application (cover letter) — https://media.auc.ab.ca/prd-wp-uploads/Shared%20Documents/Projects/30518-BeaconAICentersHeartlandProject.pdf
Indus Power Generation LP via Impact Assessment Agency of Canada registry: Beacon AI Centers - Indus Project: Initial Project Description — https://iaac-aeic.gc.ca/050/documents/p90121/164415E.pdf
Impact Assessment Agency of Canada: Beacon AI Centers Indus Project (reference 90121) — https://iaac-aeic.gc.ca/050/evaluations/proj/90121
Impact Assessment Agency of Canada: Public notice: Beacon AI Centers Indus Project, comments invited on the summary of the initial project description — https://iaac-aeic.gc.ca/050/evaluations/document/164341
Rocky View County: Rocky View County participates in Alberta Utilities Commission review of proposed Beacon AI Hub power plant — https://www.rockyview.ca/news-and-events/news/rocky-view-county-participates-alberta-utilities-commission-review-proposed
Rocky View County: Beacon AI Hub - Thermal Power Plant Application — https://www.rockyview.ca/build-plan-and-develop/planning/planning-projects-underway/beacon-ai-hub-area-structure-plan
Rocky View County: Rocky View County Affirms Commitment to Responsible AI Data Centre Development — https://www.rockyview.ca/news-and-events/news/rocky-view-county-affirms-commitment-responsible-ai-data-centre-development
The Canadian Press via BNN Bloomberg: Councillors in rural county bordering Calgary vote to pause data centres — https://www.bnnbloomberg.ca/business/politics/2026/07/28/councillors-in-rural-county-bordering-calgary-vote-to-pause-data-centres/
BCE Inc.: Bell AI Fabric to expand nation-building project in Saskatchewan with up to 900 MW of additional power — https://www.bce.ca/news-and-media/newsroom?article=bell-ai-fabric-to-expand-nation-building-project-in-saskatchewan-with-up-to-900-mw-of-additional-power
BCE Inc.: Bell AI Fabric provides construction update in Saskatchewan, announces $1 million mental health commitment — https://www.bce.ca/news-and-media/newsroom?article=bell-ai-fabric-provides-construction-update-in-saskatchewan-announces-1-million-mental-health-commitment
Government of Saskatchewan: Single Largest Private Sector Capital Investment in History of Canada Through Bell AI's Saskatchewan Expansion — https://www.saskatchewan.ca/government/news-and-media/2026/september/14/single-largest-private-sector-capital-investment-in-history-of-canada-through-bell-ais-saskatchewan
Bitdeer Technologies Group via SEC EDGAR: Bitdeer announces September 2025 production and operations update (Form 6-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/0001899123/000121390025098957/ea026118901ex99-1_bitdeer.htm
Bitdeer Technologies Group via SEC EDGAR: Bitdeer announces January 2026 production and operations update (Form 6-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1899123/000121390026013949/ea027632501ex99-1_bitdeer.htm
Bitdeer Technologies Group via SEC EDGAR: Bitdeer announces February 2026 production and operations update (Form 6-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1899123/000121390026028021/ea028179501ex99-1.htm
Bitdeer Technologies Group via SEC EDGAR: Bitdeer reports unaudited financial results for the second quarter of 2026 (Form 6-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1899123/000121390026086938/ea030131301ex99-1.htm
Wikipedia: Clarington, Ohio — https://en.wikipedia.org/wiki/Clarington,_Ohio
Calgary.Tech: Bitdeer acquires 101 MW Alberta site for bitcoin mining expansion — https://calgary.tech/2025/02/04/bitdeer-acquires-101-mw-alberta-site-for-bitcoin-mining-expansion/
Bitdeer Technologies Group (press release via BNN Bloomberg): Bitdeer breaks ground on new energy and digital infrastructure facility in Alberta, Canada — https://www.bnnbloomberg.ca/press-releases/2026/06/02/bitdeer-breaks-ground-on-new-energy-and-digital-infrastructure-facility-in-alberta-canada/
Bitdeer Technologies Group (U.S. Securities and Exchange Commission filing): Bitdeer Reports Unaudited Financial Results for the Second Quarter of 2026 (Form 6-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/0001899123/000121390026086938/ea030131301ex99-1.htm
Wikipedia: Fox Creek, Alberta — https://en.wikipedia.org/wiki/Fox_Creek,_Alberta
News 5 Cleveland (WEWS): Local developer, global tech firm plan major data center project in Portage County — https://www.news5cleveland.com/news/local-news/local-developer-global-tech-firm-plan-major-data-center-project-in-portage-county
The Portager: Asian crypto mining company and Geis partner to bring data center to Shalersville — https://theportager.com/asian-crypto-mining-company-and-geis-partner-to-bring-data-center-to-shalersville
TheEnergyMag: Bitdeer's 750MW Ohio AI Data Center Plan Draws Local Scrutiny — https://theenergymag.com/news/2026-06-17/bitdeer-ohio-ai-pushback
The Portager: Shalersville weighs zoning changes to block data center — https://theportager.com/shalersville-holds-off-on-zoning-changes-to-allow-a-data-center
The Portager: Shalersville redefines industrial zoning, adding obstacles to data center proposal — https://theportager.com/shalersville-redefines-industrial-zoning-adding-obstacles-to-data-center-proposal
Wikipedia: Shalersville Township, Portage County, Ohio — https://en.wikipedia.org/wiki/Shalersville_Township,_Portage_County,_Ohio
Bitdeer Technologies Group via SEC EDGAR: Bitdeer Announces September 2025 Production and Operations Update (Form 6-K exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/0001899123/000121390025098957/ea026118901ex99-1_bitdeer.htm
Bitdeer Technologies Group via SEC EDGAR: Bitdeer Announces October 2025 Production and Operations Update (Form 6-K exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/0001899123/000121390025107866/ea026473802ex99-1_bitdeer.htm
Bitdeer Technologies Group via SEC EDGAR: Bitdeer Reports Unaudited Financial Results for the Second Quarter of 2026 (Form 6-K exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1899123/000121390026086938/ea030131301ex99-1.htm
Wikipedia: Weathersfield Township, Trumbull County, Ohio — https://en.wikipedia.org/wiki/Weathersfield_Township,_Trumbull_County,_Ohio
Brainsre.news: Blackstone invertirá hasta 7.500 millones en un data center en Aragón — https://brainsre.news/blackstone-7500-millones-data-center-aragon/
Investment Monitor: Blackstone to make $8.2bn data centre investment in Spain — https://www.investmentmonitor.ai/news/blackstone-to-make-8-2bn-data-centre-investment-in-spain
Merca2: Aragón, la mina de oro española de los centros de datos: Microsoft, AWS, Meta y Blackstone — https://www.merca2.es/2024/10/15/aragon-centros-datos-blackstone-2029461/
elDiario.es: La explosión de los centros de datos en Aragón: entre la opacidad, el choque institucional y el riesgo de colapso — https://www.eldiario.es/aragon/politica/explosion-centros-datos-aragon-opacidad-choque-institucional-riesgo-colapso_1_12559021.amp.html
QTS Data Centers: Calatorao data centre campus — https://q.com/data-centers/calatorao-en/
QTS Data Centers: Campus de centros de datos de Calatorao — https://q.com/data-centers/calatorao/
Gobierno de Aragón (Aragón Hoy): Respaldo del Gobierno de Aragón al proyecto de Box2Bit que creará más de 1.800 puestos de trabajo en Épila — https://www.aragonhoy.es/consejos-de-gobierno/respaldo-gobierno-aragon-proyecto-box2bit-creara-1-800-puestos-epila-103723
Aragón Digital: La DGA precisa los detalles del centro de datos de Box2Bit en Épila: primera fase de 1.125 millones — https://www.aragondigital.es/articulo/economia/dga-precisa-detalles-centro-datos-box2bit-epila-primera-fase-1125-millones/20260128124944963318.html
elDiario.es: La empresa Box2Bit invertirá 3.900 millones de euros en un centro de datos en Épila tras renunciar al de Cariñena — https://www.eldiario.es/aragon/economia/empresa-box2bit-invertira-3-900-millones-euros-centro-datos-epila-renunciar-carinena_1_12942482.html
Hoy Aragón: El motivo real por el que Box2Bit abandona Cariñena y se va a Épila con 3.900 millones — https://www.hoyaragon.es/articulo/noticias-aragon/box2bit-epila-centro-datos-carinena/20260129112439121735.html
Forbes España: Morgan Stanley eleva un 55% su previsión de capacidad de centros de datos en España, impulsada por Aragón — https://forbes.es/?p=956076
Wikipedia: Épila — https://en.wikipedia.org/wiki/%C3%89pila
Bridge Data Centres: Bridge Data Centres to invest US$1.2 billion in Chonburi (Thai-language release) — https://www.bridgedatacentres.com/bridge-data-centres-%e0%b8%a5%e0%b8%87%e0%b8%97%e0%b8%b8%e0%b8%99-1-2-%e0%b8%9e%e0%b8%b1%e0%b8%99%e0%b8%a5%e0%b9%89%e0%b8%b2%e0%b8%99%e0%b8%94%e0%b8%ad%e0%b8%a5%e0%b8%a5%e0%b8%b2%e0%b8%a3%e0%b9%8c/
Bridge Data Centres: Bridge Data Centres Becomes Eastwater-Stecon Utilities First Data Centre Client — https://www.bridgedatacentres.com/bridge-data-centres-becomes-eastwater-stecon-utilities-first-data-centre-client/
W.Media: Bridge Data Centres inks water deal for its data center in Thailand — https://w.media/bridge-data-centres-inks-water-deal-for-its-data-center-in-thailand/
Wikipedia: Mueang Chonburi district — https://en.wikipedia.org/wiki/Mueang_Chonburi_district
Malaysian Investment Development Authority (MIDA): Bridge Data Centres announces construction of its fourth hyperscale data centre campus in Johor, Malaysia — https://www.mida.gov.my/media-release/bridge-data-centres-announces-construction-of-its-fourth-hyperscale-data-centre-campus-in-johor-malaysia/
The Iskandarian: The First Phase Hyperscale Data Centre in Johor Malaysia Commenced — https://theiskandarian.com/?p=21738
W.Media: How Bridge's MY06 is Rewriting the Rules of Data Centre Construction — https://w.media/how-bridges-my06-is-rewriting-the-rules-of-data-centre-construction/
Bridge Data Centres: Malaysia locations — https://www.bridgedatacentres.com/locations/malaysia/
Bridge Data Centres: Powering Malaysia's Digital Future — https://www.bridgedatacentres.com/powering-malaysias-digital-future/
Bridge Data Centres: Building Malaysia's Digital Future — https://www.bridgedatacentres.com/building-malaysias-digital-future/
Wikipedia: Sedenak — https://en.wikipedia.org/wiki/Sedenak
EqualOcean: Bridge Data Centres, TNB Sign MY07 400MW Agreement and Green Energy Partnership — https://equalocean.com/news/2025010221264-bridge-data-centres-tnb-sign-my07-400mw-agreement-green-energy-partnership
Bridge Data Centres: Malaysia locations — https://www.bridgedatacentres.com/locations/malaysia/
Bridge Data Centres: Building Malaysia's Digital Future — https://www.bridgedatacentres.com/building-malaysias-digital-future/
Baxtel: Bridge: Johor MY07 — https://baxtel.com/data-center/bridge-johor-my07
Wikipedia: Ulu Tiram — https://en.wikipedia.org/wiki/Ulu_Tiram
TechCrunch: Investments in French AI ecosystem reach $85B as Brookfield commits $20B — https://techcrunch.com/2025/02/09/investments-in-french-ai-ecosystem-reach-85b-as-brookfield-commits-20b
Enedis (via Marchés Online): Travaux d'extension électrique HTA pour le raccordement du site Data Center EVALLEY — https://www.marchesonline.com/appels-offres/avis/travaux-d-extension-electrique-hta-pour-le-raccordement/ao-9588877-1
info.fr: Nord : le comité de pilotage des data centers d'E-Valley réuni mardi sous l'égide du préfet — https://info.fr/nord-comite-pilotage-data-centers-e-valley-cambrai/
Brookfield Asset Management (via MFN): Brookfield To Advance AI Infrastructure in Sweden Through SEK 95 Billion Investment — https://mfn.se/one/a/brookfield-asset-management-inc/brookfield-to-advance-ai-infrastructure-in-sweden-through-sek-95-billion-investment-884da3a0
Dagens PS: AI-jätte etablerar sig i Strängnäs – tusentals nya jobb — https://www.dagensps.se/foretag/digitalisering-ai/ai-jatte-etablerar-sig-i-strangnas-tusentals-nya-jobb/
Wikipedia: Strängnäs — https://en.wikipedia.org/wiki/Str%C3%A4ngn%C3%A4s
Regione Piemonte (Piemonteinforma): Un data center nell'ex centrale di Trino — https://www.regione.piemonte.it/web/node/22790
CorCom (Corriere Comunicazioni): Data center, dal Cdm ok a investimenti per 8 miliardi. Urso: "Italia hub europeo del digitale" — https://corrierecomunicazioni.it/digital-economy/data-center-dal-cdm-ok-a-investimenti-per-8-miliardi-urso-italia-hub-europeo-del-digitale
Punto Informatico: Data center in Lombardia e Piemonte: via libera dal Cdm — https://www.punto-informatico.it/data-center-lombardia-piemonte-via-libera-cdm/
ItaliaOggi: Piemonte, 4 miliardi per il nuovo Cavour Hyperscale Campus — https://www.italiaoggi.it/economia-e-politica/economia-e-finanza/piemonte-4-miliardi-per-il-nuovo-cavour-hyperscale-campus-norkj7yw
Wikipedia: Centrale termoelettrica "Galileo Ferraris" — https://it.wikipedia.org/wiki/Centrale_termoelettrica_Galileo_Ferraris
CDC Data Centres: CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct — https://cdc.com/resources/news/cdc-data-centres-breaks-ground-on-new-state-of-the-art-data-centre-development-in-marsden-park-industrial-precinct/
NSW Planning Portal: Marsden Park Data Centre (SSD-70889211) — https://www.planningportal.nsw.gov.au/major-projects/projects/marsden-park-data-centre
W.Media: NSW govt approves CDC's 504 MW campus in Sydney — https://w.media/nsw-govt-approves-cdcs-504-mw-campus-in-sydney/
Startup Daily (Information Age): NSW gives the nod to a $3 billion CDC data centre in Western Sydney — https://www.startupdaily.net/?p=131381
CDC Data Centres: Sydney and regional NSW locations — https://cdc.com/locations/sydney-and-regional-nsw/
Wikipedia: Marsden Park, New South Wales — https://en.wikipedia.org/wiki/Marsden_Park,_New_South_Wales
Cipher Mining: Cipher Mining Signs 168 MW, 10-Year AI Hosting Agreement with Fluidstack (Form 8-K Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_ex9901.htm
Cipher Digital: Cipher Digital Provides Second Quarter 2026 Business Update (Form 8-K Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm
Cipher Digital: Cipher Digital business update presentation (Form 8-K Exhibit 99.2) — https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm
Cipher Digital: Cipher Digital Expands Barber Lake Lease Term to 20 Years, Increasing Revenue to Over $9 Billion (Form 8-K Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm
Wikipedia: Colorado City, Texas — https://en.wikipedia.org/wiki/Colorado_City,_Texas
Cipher Mining Inc. (now Cipher Digital Inc.) via SEC EDGAR: Cipher annual report on Form 10-K for fiscal year 2025 — https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm
Cipher Mining Inc. via SEC EDGAR: Cipher Mining provides third quarter 2025 business update (Form 8-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/nov3_earningspressreleasex.htm
Cipher Digital Inc. via SEC EDGAR: Cipher Digital Provides Second Quarter 2026 Business Update (Form 8-K Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm
Cipher Digital Inc. via SEC EDGAR: Cipher Digital business update presentation (Form 8-K Exhibit 99.2) — https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm
Cipher Mining Inc. via SEC EDGAR: Cipher Mining Form 8-K: Black Pearl Compute LLC 6.125% senior secured notes due 2031 — https://www.sec.gov/Archives/edgar/data/1819989/000095010326001966/dp241421_8k.htm
Wikipedia: Wink, Texas — https://en.wikipedia.org/wiki/Wink,_Texas
CloudHQ: GRU Campus — https://cloudhq.com/campus/gru-campus/
Capacity: CloudHQ breaks ground on first data centre campus in Brazil — https://capacityglobal.com/news/cloudhq-breaks-ground-on-first-data-centre-campus-in-brazil/
The Tech Capital: CloudHQ breaks ground on $3 billion data centre in Brazil - here's the plan — https://thetechcapital.com/cloudhq-breaks-ground-on-3-billion-data-centre-in-brazil-heres-the-plan/
Switchgear Magazine: CloudHQ powers São Paulo data campus — https://switchgear-magazine.com/tm-news/business/cloudhq-powers-sao-paulo-data-campus/
Construction Review Online: CloudHQ's Paulínia hyperscale campus powers up as Brazil's largest data hub enters delivery phase — https://constructionreviewonline.com/cloudhq-breaks-ground-on-the-new-paulinia-hyperscale-campus-in-brazil/
CloudHQ: QRO Campus — https://cloudhq.com/campus/qro-campus/
Xataka México: Inversión millonaria en Querétaro: CloudHQ construirá 6 centros de datos de hiperescala para potenciar la Inteligencia Artificial — https://www.xataka.com.mx/servicios/inversion-millonaria-queretaro-cloudhq-construira-6-centros-datos-hiperescala-para-potenciar-inteligencia-artificial
Telecom Review Americas: CloudHQ to Build Mexico's Largest Hyperscale Data Hub in Querétaro — https://www.telecomreviewamericas.com/articles/wholesale-and-capacity/cloudhq-to-build-mexicos-largest-hyperscale-data-hub-in-queretaro/
heise online: New data centres: CloudHQ invests USD 4.8 billion in Mexico — https://heise.de/-10678892
Por Esto: CloudHQ invertirá 4,800 mdd en 6 centros de datos en Querétaro: 900 MW para IA dentro del Plan México — https://www.poresto.com/mexico/2025/9/25/cloudhq-invertira-4800-mdd-en-6-centros-de-datos-en-queretaro-900-mw-para-ia-dentro-del-plan-mexico.html
Compass Datacenters: Compass Kicks Off Development Of Its First Hyperscale Data Center Campus in Illinois — https://www.compassdatacenters.com/news/compass-kicks-off-development-of-its-first-hyperscale-campus-in-illinois/
Compass Datacenters: Data Center Markets - Compass Datacenters — https://www.compassdatacenters.com/data-center-markets/
Compass Datacenters: Compass Datacenters Funds New Community Wellness Space at Hoffman Estates Health and Human Services — https://www.compassdatacenters.com/news/village-of-hoffman-estates/
Compass Datacenters: Compass project generates $10 billion investment in Lauderdale County — https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/
Compass Datacenters: Data Center Markets - Compass Datacenters — https://www.compassdatacenters.com/data-center-markets/
Core Scientific: Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site — https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site
U.S. Securities and Exchange Commission (Core Scientific filing): Core Scientific, Inc. Form 10-K for the fiscal year ended December 31, 2025 — https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm
Core Scientific: Core Scientific Announces Fourth Quarter Fiscal Year 2025 Results — https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results
Core Scientific: Denton, TX Data Center | High-Density at Scale — https://corescientific.com/high-density-data-centers/denton-texas/
Wikipedia: Denton, Texas — https://en.wikipedia.org/wiki/Denton,_Texas
Core Scientific: Core Scientific announces first quarter fiscal year 2026 results — https://investors.corescientific.com/news-events/press-releases/detail/136/core-scientific-announces-first-quarter-fiscal-year-2026-results
Core Scientific, Inc. via SEC EDGAR: Core Scientific, Inc. quarterly report on Form 10-Q for the period ended June 30, 2026 — https://www.sec.gov/Archives/edgar/data/0001839341/000183934126000014/core-20260630.htm
Core Scientific: Core Scientific Q2 2026 earnings presentation (Form 8-K, Exhibit 99.2) — https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001839341-26-000012/q2fy26earningsdeck728am.htm
Core Scientific: Core Scientific announces second quarter 2026 results — https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results
Wikipedia: Hunt County, Texas — https://en.wikipedia.org/wiki/Hunt_County,_Texas
Core Scientific: Muskogee 1 high-density data center — https://corescientific.com/high-density-data-centers/muskogee-ok/
Core Scientific, Inc. via SEC EDGAR: Core Scientific, Inc. Form 10-K for the fiscal year ended December 31, 2025 — https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm
Core Scientific: Core Scientific plans expansion to 1.5 gigawatts of gross power at Muskogee, Oklahoma campus — https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus
Core Scientific: Core Scientific Q2 2026 earnings presentation (Form 8-K, Exhibit 99.2) — https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001839341-26-000012/q2fy26earningsdeck728am.htm
Core Scientific: Core Scientific completes acquisition of Polaris DS, advancing planned Muskogee expansion to 1.5 GW of gross power — https://investors.corescientific.com/news-events/press-releases/detail/142/core-scientific-completes-acquisition-of-polaris-ds-advancing-planned-muskogee-expansion-to-1-5-gw-of-gross-power
Data Center Knowledge: Core Scientific's Muskogee bet: can crypto-era infrastructure fuel AI? — https://www.datacenterknowledge.com/build-design/core-scientific-bets-on-1-5-gw-ai-campus-in-oklahoma
Wikipedia: Muskogee, Oklahoma — https://en.wikipedia.org/wiki/Muskogee,_Oklahoma
Core Scientific: Core Scientific announces second quarter 2026 results — https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results
Core Scientific: Pecos, Texas data center (Cottonwood 1 & 2) — https://corescientific.com/high-density-data-centers/pecos-tx/
Core Scientific, Inc. via SEC EDGAR: Core Scientific, Inc. Form 10-K for the fiscal year ended December 31, 2025 — https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm
Core Scientific: Core Scientific announces first quarter fiscal year 2026 results — https://investors.corescientific.com/news-events/press-releases/detail/136/core-scientific-announces-first-quarter-fiscal-year-2026-results
Core Scientific: Core Scientific Q2 2026 earnings presentation (Form 8-K, Exhibit 99.2) — https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001839341-26-000012/q2fy26earningsdeck728am.htm
Core Scientific: Core Scientific announces second quarter 2026 results — https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results
Data Center Knowledge: Core Scientific's Muskogee bet: can crypto-era infrastructure fuel AI? — https://www.datacenterknowledge.com/build-design/core-scientific-bets-on-1-5-gw-ai-campus-in-oklahoma
Wikipedia: Pecos, Texas — https://en.wikipedia.org/wiki/Pecos,_Texas
Real Estate NJ: A.I. cloud startup CoreWeave to build $1 billion data center at Onyx's NEST campus in Kenilworth — https://re-nj.com/ai-startup-coreweave-to-build-1-billion-data-center-at-onyxs-nest-campus-in-kenilworth/
Real Estate NJ: CoreWeave begins $1.8 billion data center project in Kenilworth, landing first award under new EDA tax credit program — https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/
New Jersey Economic Development Authority: Next NJ Program - AI approvals table — https://www.njeda.gov/wp-content/uploads/2026/08/NextNJAI-1.pdf
CoreWeave: Kenilworth, NJ AI Data Center — https://www.coreweave.com/ai-data-center-development/kenilworth-new-jersey
ABC7 New York: Community rallies against construction of giant data center in small NJ town — https://abc7ny.com/post/community-rallies-giant-data-center-being-built-kenilworth-new-jersey/19053270/
Wikipedia: Kenilworth, New Jersey — https://en.wikipedia.org/wiki/Kenilworth,_New_Jersey
CoreWeave: CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania — https://coreweave.com/news/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania
Government Technology (LNP via Tribune Content Agency): Lancaster, Pa., Hearing to Revisit Data Center Zoning Decision — https://www.govtech.com/products/lancaster-pa-hearing-to-revisit-data-center-zoning-decision
Holland & Knight: Holland & Knight Advises Chirisa Technology Parks in $4 Billion Joint Venture Partnership for Lancaster Campus — https://www.hklaw.com/en/news/pressreleases/2025/09/hk-advises-chirisa-technology-parks-in-4-billion-joint-venture
WITF (LNP | LancasterOnline): Data center's second phase expected to cost up to $2.5 billion in Lancaster County — https://www.witf.org/2025/10/19/data-centers-second-phase-expected-to-cost-up-to-2-5-billion-in-lancaster-county/
Wikipedia: Lancaster, Pennsylvania — https://en.wikipedia.org/wiki/Lancaster,_Pennsylvania
CoreWeave: CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania — https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx
Crusoe: Crusoe announces new 900 MW AI factory campus in Abilene, Texas to support Microsoft AI infrastructure — https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure
The Register: Microsoft takes up residence next to OpenAI, Oracle at Crusoe's 900 MW Texas datacenter expansion — https://www.theregister.com/2026/03/27/microsoft_ai_crusoe/
Crusoe: Crusoe and Lancium announce 1.0 gigawatt AI data center campus in Childress, Texas — https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas
Crusoe: Crusoe developing data center campus in Armstrong County, Texas — https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas
Wikipedia: Abilene, Texas — https://en.wikipedia.org/wiki/Abilene,_Texas
Crusoe: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas — https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas
Lancium: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas — https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/
Wikipedia: Childress, Texas — https://en.wikipedia.org/wiki/Childress,_Texas
Tallgrass: Crusoe and Tallgrass Announce AI Data Center in Wyoming — https://tallgrass.com/newsroom/press-releases/Crusoe
Cleanview: Behind-the-meter data centers: Project Jade — https://cleanview.co/reports/behind-the-meter-data-centers/full-report/project-jade
Tallgrass: Tallgrass and Mitsubishi Power Americas Announce Turbine Allocation for Cheyenne Power Hub — https://tallgrass.com/newsroom/press-releases/tallgrass-and-mitsubishi-power-americas-announce-turbine-allocation-for-cheyenne-power-hub-051526
W.Media: CtrlS to build new AI-ready DC park near Hyderabad — https://w.media/ctrls-to-build-new-ai-ready-dc-park-near-hyderabad/
W.Media: CtrlS signs MoU with Telangana gov't: To invest Rs 10,000 crores into AI DC cluster — https://w.media/ctrls-signs-mou-with-telangana-govt-to-invest-rs-10000-crores-into-ai-dc-cluster/
APAC News Network: CtrlS to establish new datacentre park near Hyderabad to enhance company's IT capabilities — https://apacnewsnetwork.com/2025/01/ctrls-to-establish-new-datacentre-park-near-hyderabad-to-enhance-companys-it-capabilities
Wikipedia: Chandanvelly — https://en.wikipedia.org/wiki/Chandanvelly
American Public Power Association: Calpine Unveils 190-MW Agreement to Serve New Texas Data Center — https://www.publicpower.org/periodical/article/calpine-unveils-190-mw-agreement-serve-new-texas-data-center
Calpine: Calpine and CyrusOne Announce Phase 2 of Powered Land Agreement to Support Hyperscale Data Center at Thad Hill Energy Center in Texas — https://www.calpine.com/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas/
CyrusOne: Bosque County Data Center — https://www.cyrusone.com/data-centers/north-america/bosque-county-tx
CyrusOne: Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas — https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas
Wikipedia: Bosque County, Texas — https://en.wikipedia.org/wiki/Bosque_County,_Texas
CyrusOne: Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas — https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas
CyrusOne: Freestone County Data Center — https://www.cyrusone.com/data-centers/north-america/freestone-county-texas
Wikipedia: Fairfield, Texas — https://en.wikipedia.org/wiki/Fairfield,_Texas
Data4: Escaudain : Data4 sélectionné pour le projet de campus numérique de La Porte du Hainaut — https://www.data4group.com/wp-content/uploads/2025/12/CP-FINAL-Data4-Agglomeration-de-La-Porte-du-Hainaut.pdf
Data4: Data4 confirms its largest data center project in the North of France — https://www.data4group.com/wp-content/uploads/2026/06/Press-release_Data4-launches-a-new-campus-in-France.pdf
BeBeez International (DCD): Data4 confirms €5bn plan for 700MW AI data center in northern France — https://bebeez.eu/2026/06/15/data4-confirms-e5bn-plan-for-700mw-ai-data-center-in-northern-france/
Data4: Data4 lays the foundations on its first mega campus in Germany: a new gateway to AI, Cloud and Digital Sovereignty — https://www.data4group.com/wp-content/uploads/2025/09/FINAL_ENG_Press-Release-_Data4_Event_Hanau-1.pdf
BeBeez International (republishing DCD): Data4 breaks ground on data center project in Hanau, Germany — https://bebeez.eu/en/news/data4-breaks-ground-on-data-center-project-in-hanau-germany/
Capacity: Data centre of the month: Data4’s site in Hanau, Germany — https://capacityglobal.com/news/data4-hanau-data-centre-germany-data-centre-of-the-month/
Wikipedia: Großauheim — https://en.wikipedia.org/wiki/Gro%C3%9Fauheim
UK Government: More than 3,400 jobs and targeted support for local communities to help tackle the cost of living as Lanarkshire named latest AI Growth Zone — https://www.gov.uk/government/news/more-than-3400-jobs-and-targeted-support-for-local-communities-to-help-tackle-the-cost-of-living-as-lanarkshire-named-latest-ai-growth-zone
DataVita: Lanarkshire AI Growth Zone — https://www.datavita.co.uk/lanarkshire-ai-growth-zone
DataVita: DataVita, CoreWeave launch £1.5bn renewable AI infrastructure in Scotland — https://blog.datavita.co.uk/blog/datavita-and-coreweave-to-launch-ai-infrastructure-in-scotland-powered-by-renewable-energy-as-part-of-ps1-5bn-investment
DataVita: DataVita secures £300 million for data centre rollout in Scotland's AI Growth Zone, with backing from National Wealth Fund and major lenders — https://blog.datavita.co.uk/blog/datavita-secures-funding-data-centre-expansion
DataVita: DataVita submits plans for DV4, its third data centre at Chapelhall — https://blog.datavita.co.uk/blog/datavita-submits-plans-dv4-data-centre-chapelhall
NEOM: DataVolt signs agreement with NEOM to design and develop the region's first truly sustainable, net-zero AI factory campus in Oxagon — https://www.neom.com/en-us/newsroom/datavolt-signs-agreement-with-neom
NEOM: HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM — https://www.neom.com/en-us/newsroom/HUMAIN-and-DataVolt-to-develop-AI-data-center-in-NEOM
DataVolt: HUMAIN Partners with DataVolt to Jointly Develop 100MW of a 360MW AI Data Center Project in NEOM — https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/
Semafor: Saudi Arabian data center firm races to export compute from NEOM — https://www.semafor.com/article/09/07/2026/saudi-arabian-data-center-firm-races-to-export-compute-from-neom
Hogan Lovells Cadwalader: Hogan Lovells Cadwalader advises HUMAIN on AI data center development in Saudi Arabia — https://hlc.com/en/news/hogan-lovells-cadwalader-advises-humain-on-ai-data-center-development-in-saudi-arabia
Intelligent CIO APAC: DayOne breaks ground on hyperscale data center pioneering Thailand's digital future — https://www.intelligentcio.com/apac/?p=43549
DayOne Data Centers: DayOne Strengthens Thailand's Digital Hub with Amata as Chonburi Campus Expands Toward the Country's First 1GW Power Platform — https://dayonedc.com/news/dayone-strengthens-thailands-digital-hub-with-amata-as-chonburi-campus-expands-toward-the-countrys-first-1gw-power-platform
Bernama: DayOne, Amata In Deal To Build Thailand's First 1GW Power Platform — https://www.bernama.com/en/news.php?id=2489483
DayOne Data Centers (via AAP / Cision): DayOne Launches Inaugural Tech & AI Career Expo in Thailand, Showcasing Commitment to Digital Infrastructure and Talent Development — https://www.aap.com.au/aapreleases/cision20260425ae43618/
Wikipedia: Chonburi province — https://en.wikipedia.org/wiki/Chonburi_province
DayOne Data Centers: Our markets: Greater Bangkok — https://dayonedc.com/market/greater-bangkok
TechCrunch: Nvidia, Deutsche Telekom strike €1B partnership for a data center in Munich — https://techcrunch.com/2025/11/04/nvidia-deutsche-telekom-strike-e1b-partnership-for-a-data-center-in-munich
Deutsche Telekom: Deutschlands erste KI-Fabrik für die Industrie geht in München offiziell in Betrieb — https://www.telekom.com/de/newsroom/aktuelles/medieninformationen/2026/02/deutschlands-erste-ki-fabrik-fuer-die-industrie
heise online: Telekom data center to boost German AI performance by half — https://heise.de/-11165327
Germany Trade & Invest: Industrial strength meets AI infrastructure — https://www.gtai.de/en/invest/service/publications/markets-germany/industrial-strength-meets-ai-infrastructure-2011304
EcoDataCenter: EcoDataCenter 2 - Borlänge — https://ecodatacenter.tech/data-center/ecodatacenter2
Data Centre Review: EcoDataCenter announces plans for mega campus in Sweden — https://datacentrereview.com/?p=81016
W.Media: EcoDataCenter secures land for third Swedish data center campus — https://w.media/ecodatacenter-secures-land-for-third-swedish-data-center-campus/
Tech Insider: Mistral AI satsar €1,2 mdr i Sverige med EcoDataCenter [2026] — https://tech-insider.org/sv/mistral-ai-1-2-miljarder-sverige-ecodatacenter-borlange-2026/
Epoch AI: EcoDataCenter 2 (AI data center directory) — https://epoch.ai/data/ai-data-centers/directory/ecodatacenter-2
Wikipedia: Borlänge — https://en.wikipedia.org/wiki/Borl%C3%A4nge
EdgeConneX: EdgeConneX Commences Construction of 200MW AI-Ready Hyperscale Campus in Greater Osaka — https://www.edgeconnex.com/news/press-releases/edgeconnex-commences-construction-of-200mw-ai-ready-hyperscale-campus-in-greater-osaka/
EdgeConneX: EdgeConneX、関西エリアに200MWのAI対応ハイパースケールキャンパスの開発に着手 — https://www.edgeconnex.com/news/press-releases/edgeconnex%e3%80%81%e9%96%a2%e8%a5%bf%e3%82%a8%e3%83%aa%e3%82%a2%e3%81%ab200mw%e3%81%aeai%e5%af%be%e5%bf%9c%e3%83%8f%e3%82%a4%e3%83%91%e3%83%bc%e3%82%b9%e3%82%b1%e3%83%bc%e3%83%ab%e3%82%ad%e3%83%a3/
Wikipedia: Kyōtanabe — https://en.wikipedia.org/wiki/Ky%C5%8Dtanabe
EdgeCore Digital Infrastructure: EdgeCore Digital Infrastructure Announces Plans to Invest $17B+ in Louisa County, VA through the Development of 1.1+ Gigawatt Data Center Campus — https://edgecore.com/resources/press-releases/new-louisa-county-virginia-data-center-campus
EdgeCore Digital Infrastructure: Louisa County Data Centers — https://edgecore.com/locations/louisa-county-data-center
Bisnow: New $17B Project Continues Data Center Surge In Small Virginia County — https://www.bisnow.com/news/national/data-center/17b-campus-continues-data-center-surge-in-small-virginia-county-129918
EdgeCore Digital Infrastructure: EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW — https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/
InBusiness Phoenix: Data Center Developer Announces Expansion of Metro Phoenix Infrastructure — https://inbusinessphx.com/technology-innovation/data-center-developer-announces-expansion-of-metro-phoenix-infrastructure
EdgeCore Digital Infrastructure: Phoenix data center campus — https://edgecore.com/locations/phoenix-data-center
Elea Data Centers via PR Newswire: Elea announces Rio AI City, a landmark Brazilian data center project with capacity up to 3.2 GW of renewable energy supporting AI growth — https://www.prnewswire.com/news-releases/elea-announces-rio-ai-city-a-landmark-brazilian-data-center-project-with-capacity-up-to-3-2-gw-of-renewable-energy-supporting-ai-growth-302449289.html
Elea Data Centers via PR Newswire: Elea signs MoU with Oracle and Rio de Janeiro City Hall to advance data center project — https://www.prnewswire.com/news-releases/elea-signs-mou-with-oracle-and-rio-de-janeiro-city-hall-to-advance-data-center-project-302532403.html
Elea Data Centers via PR Newswire: Elea signs MoU with Tapestry to enhance assurance of Rio AI City's 1.5 GW energy capacity — https://www.prnewswire.com/news-releases/elea-signs-mou-with-tapestry-to-enhance-assurance-of-rio-ai-citys-1-5-gw-energy-capacity-302607345.html
Elea Data Centers: Rio AI City — https://eleadatacenters.com/rio-ai-city/
Elea Data Centers via PR Newswire: Elea Data Centers appoints new board of directors to accelerate AI-ready infrastructure expansion in Brazil — https://www.prnewswire.com/news-releases/elea-data-centers-appoints-new-board-of-directors-to-accelerate-ai-ready-infrastructure-expansion-in-brazil-302790277.html
Eni: Khazna Data Centers and Eni partner to develop 500 MW AI Data Center Campus near Milan — https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html
G42: Khazna Data Centers and Eni Partner to Develop 500 MW AI Data Center Campus Near Milan — https://www.g42.ai/resources/news/khazna-data-centers-and-eni-partner-develop-500-mw-ai-data-center-campus-near-milan
Il Sole 24 Ore: Data centres: EU gives the green light to the Eni-Khazna joint venture. Lombardy hub set to accelerate — https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj
Eunews: EU Commission approves Khazna–ENI joint venture, says it does “not raise competition concerns” — https://www.eunews.it/en/2026/08/10/eu-commission-approves-khazna-eni-joint-venture-says-it-does-not-raise-competition-concerns/
Wikipedia: Ferrera Erbognone — https://en.wikipedia.org/wiki/Ferrera_Erbognone
U.S. Securities and Exchange Commission (Fermi Inc. filing): Fermi Inc. Form 10-Q for the quarter ended June 30, 2026 — https://www.sec.gov/Archives/edgar/data/2071778/000207177826000051/frmi-20260630.htm
Fermi America: Fermi America home page — https://fermiamerica.com/
Fermi America: First Power Generation Assets Arrive at Project Matador — https://fermiamerica.com/first-power-generation-assets-arrive-at-project-matador/
Fermi America: Fermi Selects NAES to Operate Project Matador's Natural Gas Fleet — https://fermiamerica.com/fermi-selects-naes-to-operate-project-matadors-natural-gas-fleet/
Wikipedia: Pantex Plant — https://en.wikipedia.org/wiki/Pantex_Plant
U.S. Securities and Exchange Commission (Galaxy Digital filing): Galaxy Digital Inc. Form 10-K for the fiscal year ended December 31, 2025 — https://www.sec.gov/Archives/edgar/data/1859392/000185939226000016/glxy-20251231.htm
Galaxy: A Letter from the Founder & CEO (GLXY 2025 Annual Report) — https://www.galaxy.com/newsroom/2025-annual-report-and-ceo-letter
Galaxy: Galaxy Q2 2026 Unwrapped: The Code Economy Delivers — https://www.galaxy.com/newsroom/q226-unwrapped
Galaxy: Galaxy Announces On-Campus Emergency Services Partnership with Total Safety at Helios Data Center Campus — https://www.galaxy.com/newsroom/galaxy-announces-on-campus-emergency-services-partnership-with-total-safety-at-helios
Wikipedia: Dickens County, Texas — https://en.wikipedia.org/wiki/Dickens_County,_Texas
Google: Google's investments run deep in the heart of Texas — https://blog.google/inside-google/company-announcements/google-american-innovation-texas/
ABC 7 Amarillo: Google announces new data center in Armstrong County, Texas — https://www.abc7amarillo.com/news/local/google-announces-new-data-center-in-armstrong-county-texas-judge-adam-ensey-crusoe-energy-ercot-southwest-power-pool-claude-texas
New Project Media: ORIGINATION: Crusoe adds natural gas, storage to Texas Panhandle energy mix as project shifts to Google ownership — https://newprojectmedia.com/origination-crusoe-adds-natural-gas-storage-to-texas-panhandle-energy-mix-as-project-shifts-to-google-ownership/
TheEnergyMag: Crusoe Plans $1B Texas AI Data Center Expansion, Pursues Nuclear Power — https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight
Baxtel: Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link — https://baxtel.com/news/crusoe-confirms-google-ai-campus-in-texas-with-531mw-wind-link
The Tech Capital: Google taps Crusoe for new Texas AI data centre campus — https://thetechcapital.com/google-taps-crusoe-for-new-texas-ai-data-centre-campus/
Google: How Google is driving a new era of American innovation in Iowa — https://blog.google/feed/new-7-billion-investment-iowa/
Alliant Energy: Google Announces Data Center Project at Big Cedar Industrial Center — https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement
ConstructConnect: Google Doubles Down on Iowa with $7 Billion Data Center Investment — https://news.constructconnect.com/google-doubles-down-on-iowa-with-7-billion-data-center-investment
Epoch AI: Google Cedar Rapids | AI data centers — https://epoch.ai/data/ai-data-centers/directory/google-cedar-rapids
Google: Iowa - Google Data Center Location — https://datacenters.google/locations/iowa/
W.Media: Google to invest US$ 2 Billion to build its first DC and Cloud Region in Malaysia — https://w.media/google-to-invest-us-2-billion-to-build-its-first-dc-and-cloud-region-in-malaysia/
Google: Google Breaks Ground on US$2 Billion Malaysia Data Center and Cloud Region, Announces Support for New Sustainability and Skilling Initiatives — https://blog.google/intl/ms-my/company-news/inside-google/2024_10_google-breaks-ground-on-us2-billion/
Malaysian Investment Development Authority (MIDA), citing New Straits Times: Google's hyperscale data centre at Elmina Business Park breaks ground — https://www.mida.gov.my/mida-news/googles-hyperscale-data-centre-at-elmina-business-park-breaks-ground/
EdgeProp Malaysia: Sime Darby Property commences construction of Malaysia's first Google hyperscale data centre in City of Elmina — https://edgeprop.my/content/1910621/sime-darby-property-commences-construction-malaysia%E2%80%99s-first-google-hyperscale-data-centre-city-elmina
Google: Discover our data center locations — https://datacenters.google/locations/
Wikipedia: Elmina, Malaysia — https://en.wikipedia.org/wiki/Elmina,_Malaysia
Indiana Economic Development Corporation: Gov. Holcomb announces Google is building a $2B Data Center in Northeast Indiana — https://iedc.in.gov/events/news/details/2024/04/26/gov.-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana
Google: Indiana - Google Data Center Location — https://datacenters.google/locations/indiana/
Inside INdiana Business (Indianapolis Business Journal): Google to withdraw rezoning request for data center in Franklin Township — https://www.insideindianabusiness.com/?p=191728
Mirror Indy: Southsiders prevail in fight against Google data center — https://mirrorindy.org/google-withdraws-southside-data-center-proposal-franklin-township/
WRTV Indianapolis: Google withdraws rezoning petition for proposed data center in Franklin Township — https://www.wrtv.com/news/local-news/google-withdraws-rezoning-petition-for-proposed-data-center-in-franklin-township
Baxtel: Google: Indianapolis (Project Flo) Data Center — https://baxtel.com/data-center/google-indianapolis-project-flo
Wikipedia: Franklin Township, Marion County, Indiana — https://en.wikipedia.org/wiki/Franklin_Township,_Marion_County,_Indiana
Google: Google's investments run deep in the heart of Texas — https://blog.google/inside-google/company-announcements/google-american-innovation-texas/
Haskell County, Texas: Tax Abatement Agreement between Haskell County and Homebound Group LLC (Journey) — https://www.haskellcountytx.gov/upload/page/9220/docs/Homebound%20Group%20LLC.pdf
Haskell County, Texas: Tax Abatement Information — https://www.haskellcountytx.gov/page/haskell.Abatement
Texas Department of Licensing and Regulation: TABS project TABS2026023821: Journey 1A (JNR1A) — https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026023821
Texas Department of Licensing and Regulation: TABS project TABS2026023839: Journey 2A (JNR2A) — https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026023839
Missouri Public Service Commission (EFIS): Google announces $1 billion data center in Kansas City (exhibit ADS-D-4, Missouri PSC EFIS document 881306) — https://efis.psc.mo.gov/Document/Display/881306
KSHB 41: Google announces $1B data center in Kansas City's Northland — https://www.kshb.com/news/local-news/google-announces-1b-data-center-in-kansas-citys-northland
Startland News: Google to build $1B data center in Kansas City; aiming for 24/7 carbon-free energy use — https://www.startlandnews.com/2024/03/google-data-center-kansas-city/
KCTV5: Google to build $1 billion data center in Kansas City — https://www.kctv5.com/2024/03/20/google-build-1-billion-data-center-kansas-city/
The Tech Capital: Google eyes 315-acre hyperscale data center in Kansas — https://thetechcapital.com/google-eyes-315-acre-hyperscale-data-center-in-kansas/
Google: Kansas City, Missouri - Google Data Center Location — https://datacenters.google/kansas-city-missouri/
Baxtel: Google: Shale 1 Data Center — https://baxtel.com/data-center/google-project-shale-0a8fa63e-b8b8-4b88-8e64-5c693d39337c
Google: We're announcing a new data center and energy investments in Gray and Roberts Counties, Texas — https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/
Intersect: Google and Intersect Deepen Texas Roots with New Data Center and Energy Investments in Gray and Roberts Counties — https://www.intersect.com/news/google-and-intersect-deepen-texas-roots-with-new-data-center-and-energy-investments-in-gray-and-roberts-counties
POWER Magazine: Google Launches 1-GW-Plus Co-Located Data Center and Generation Complex in Texas Panhandle — https://www.powermag.com/google-launches-1-gw-plus-co-located-data-center-and-generation-complex-in-texas-panhandle/
Google: Locations of Google Data Centers — https://datacenters.google/locations/
Tulsa Flyer: Developers break ground on $1B data center near Tulsa — https://tulsaflyer.org/2025/10/30/government/post/developers-break-ground-on-1b-data-center-near-tulsa/
Construction Equipment Guide: Beale Breaks Ground On Project Clydesdale Data Campus — https://www.constructionequipmentguide.com/beale-breaks-ground-on-project-clydesdale-data-campus/69597
News 9: Google begins construction on 506-acre data center campus in Tulsa County — https://www.news9.com/data-centers-in-oklahoma/google-data-center-campus-tulsa-county-oklahoma
ConstructConnect: Google ID'd as Operator of Tulsa Area Data Center — https://news.constructconnect.com/google-idd-as-operator-of-tulsa-area-data-center
Construction Equipment Guide: Google, Beale Infrastructure Announce Okla. Data Center — https://www.constructionequipmentguide.com/google-beale-infrastructure-announce-okla-data-center/72160
Wikipedia: Owasso, Oklahoma — https://en.wikipedia.org/wiki/Owasso,_Oklahoma
City of Stillwater: Google has Acquired Land in Stillwater — https://stillwaterok.gov/CivicAlerts.asp?AID=332
KGOU (Oklahoma Public Media Exchange): Google will operate massive data center development in Stillwater — https://www.kgou.org/science-technology-and-environment/2025-03-13/google-will-operate-massive-data-center-development-in-stillwater
Trade and Industry Development: OK: Google Acquires Land in Stillwater for Development of Data Center Campus — https://www.tradeandindustrydev.com/region/oklahoma/news/ok-google-acquires-land-stillwater-development-34278
Baxtel: Google: Stillwater ID4 Data Center — https://baxtel.com/data-center/google-stillwater-id4
Wikipedia: Stillwater, Oklahoma — https://en.wikipedia.org/wiki/Stillwater,_Oklahoma
Google India: Our First AI Hub in India, Powered by a $15 Billion Investment — https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/
Google India: Google AI Hub - Scaling India's AI Infrastructure and Community Impact — https://blog.google/intl/en-in/google-ai-hub-scaling-indias-ai-infrastructure-and-community-impact/
Storyboard18: Google to break ground on $15 billion data centre hub in Andhra Pradesh on April 28 — https://www.storyboard18.com/digital/google-to-break-ground-on-15-billion-data-centre-hub-in-andhra-pradesh-on-april-28-94297.htm
W.Media: Google breaks ground for US$ 15 billion India AI hub in Vishakhapatnam — https://w.media/google-breaks-ground-for-us-15-billion-india-ai-hub-in-vishakhapatnam/
Khaleej Times: Google breaks ground on $15 billion Indian AI megahub — https://www.khaleejtimes.com/business/tech/google-breaks-ground-on-15-billion-indian-ai-megahub
Google: Our $1 billion investment in a new UK data centre — https://blog.google/around-the-globe/google-europe/united-kingdom/google-1-billion-investment-in-a-new-uk-data-centre/
Google: Our new Waltham Cross data center is part of our two-year, £5 billion investment to help power the UK's AI economy — https://blog.google/around-the-globe/google-europe/united-kingdom/waltham-cross-data-centre/
Google: Waltham Cross, United Kingdom - Google Data Center Location — https://datacenters.google/locations/waltham-cross/
Google: Google announces new $4 billion investment in Arkansas — https://blog.google/inside-google/company-announcements/google-american-innovation-arkansas/
Talk Business & Politics: Google announces plan to build $4 billion data center in West Memphis — https://talkbusiness.net/2025/10/google-announces-plan-to-build-4-billion-data-center-in-west-memphis/
POWER Magazine: Entergy Will Power $4-Billion Google Data Center in Arkansas — https://www.powermag.com/entergy-will-power-4-billion-google-data-center-in-arkansas/
The Daily Memphian: Google confirms West Memphis data center — https://dailymemphian.com/section/businessreal-estate/article/54862/google-west-memphis-data-center-entergy-arkansas-groot
Construction Briefing: Google linked to US$10bn data centre campus in US — https://www.constructionbriefing.com/news/google-linked-to-us10bn-data-centre-campus-in-us/8062290.article
Action News 5 (WMC): Google hiring for new West Memphis data center — https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/
Action News 5 (WMC): Docs reveal plans for $6 utility rate hike to help fund Google's data center project in West Memphis — https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/
Kildare Nationalist: Plans for €3bn data centre campus stalled — https://www.kildare-nationalist.ie/news/plans-for-3bn-data-centre-campus-stalled_arid-72032.html
Industrial Info Resources: Green Light for US$3 Billion Data Campus in Kildare — https://www.industrialinfo.com/news/article/green-light-for-us3-billion-data-campus-in-kildare--345564
Friends of the Earth Ireland: Campaigners appeal Herbata Data Centre decision in Naas — https://www.friendsoftheearth.ie/news/campaigners-appeal-herbata-data-centre-decision-in-naas/
An Coimisiún Pleanála: Case reference PL09.323677 — https://www.pleanala.ie/en-ie/case/323677
The Irish Times: 'We just don't want them': Hundreds gather in a Kildare town over data centre plans — https://www.irishtimes.com/ireland/2026/09/04/naas-has-a-message-for-the-bond-villains-we-dont-want-your-data-centres/
Wikipedia: Naas — https://en.wikipedia.org/wiki/Naas
Homer City Redevelopment: Project Overview — https://www.homercityredevelopment.com/project-overview
Homer City Redevelopment: FAQ — https://www.homercityredevelopment.com/faq
Pennsylvania Senate Republicans: Pittman Hails New Wave of Energy Advancement in Pennsylvania — https://www.pasenategop.com/news/pittman-hails-new-wave-of-energy-advancement-in-pennsylvania/
Yale Environment 360: To Feed Data Centers, Pennsylvania Faces a New Fracking Surge — https://e360.yale.edu/features/pennsylvania-data-centers-natural-gas
Homer City Redevelopment: Homer City Energy Campus Workforce Grows to More Than 1,800 Workers, Including Members of 9 Building and Construction Trade Unions — https://www.homercityredevelopment.com/post/homer-city-energy-campus-workforce-grows-to-more-than-1-800-workers-including-members-of-9-building
Wikipedia: Homer City Generating Station — https://en.wikipedia.org/wiki/Homer_City_Generating_Station
MEED: Humain tenders infrastructure for 6GW data centre campus — https://guest.meed.com/humain-tenders-6gw-data-centre-campus-infrastructure/
MEED: Contractor wins 6GW data centre campus infrastructure — https://guest.meed.com/contractor-wins-6gw-data-centre-campus-infrastructure/
Enterprise AM: Al Yamama takes the infrastructure contract for Humain's 6 GW Riyadh AI campus — https://enterpriseam.com/ksa/2026/09/27/al-yamama-takes-the-infrastructure-contract-for-humains-6-gw-riyadh-ai-campus/
Construction Review Online: Al-Yamama Wins Infrastructure Contract for 6GW Humain AI Data Center Campus in Riyadh — https://constructionreviewonline.com/al-yamama-wins-infrastructure-contract-for-6gw-humain-ai-data-center-campus-in-riyadh/
Arab News (Reuters): Saudi Arabia's Humain to launch data centers with US chips in early 2026, Bloomberg News reports — https://www.arabnews.com/node/2613050/business-economy
Capacity: How Humain plans to use US chips in new Saudi Arabia AI data centres — https://capacityglobal.com/news/humain-data-centre-construction-saudi-arabia/
Arab News (Reuters): Saudi Arabia's Humain to launch data centers with US chips in early 2026, Bloomberg News reports — https://www.arabnews.com/node/2613050/business-economy
Capacity: How Humain plans to use US chips in new Saudi Arabia AI data centres — https://capacityglobal.com/news/humain-data-centre-construction-saudi-arabia/
Arizona Center for Investigative Reporting: Did the Page City Council approve the sale of 500 acres for a data center? — https://azcir.org/news/2025/11/21/did-page-az-city-council-approve-the-sale-of-500-acres-for-a-data-center-yes/
Arizona's Family (KTVK/KPHO): Page residents push back on $10B data center proposal near Horseshoe Bend — https://www.azfamily.com/2025/12/18/page-residents-push-back-10b-data-center-proposal-near-horseshoe-bend/
Hoodline: Horseshoe Bend Uproar, Page Locals Rage Over 1GW Data Hub Deal — https://hoodline.com/2026/05/horseshoe-bend-uproar-page-locals-rage-over-1gw-data-hub-deal/
City of Page: Page Data Center FAQ — https://cityofpage.org/departments/economic-development/page-data-center-faq/
City of Page: Proposed Data Center Overlay District Text Amendment — https://cityofpage.org/proposed-data-center-overlay-district-text-amendment/
Wikipedia: Page, Arizona — https://en.wikipedia.org/wiki/Page,_Arizona
Hut 8 Corp. via SEC EDGAR: Hut 8 announces pricing of $4.25 billion of investment-grade senior secured notes for Beacon Point data center project (Form 8-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1964789/000110465926070744/tm2616926d1_ex99-1.htm
Hut 8 Corp. via SEC EDGAR: Hut 8 fully commercializes 1 GW Beacon Point AI data center campus with second 352 MW IT lease, bringing campus-level base-term contract value to $19.6 billion (Form 8-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm
Hut 8: Hut 8 commercializes first phase of 1 GW Beacon Point AI data center campus with 15-year, 352 MW IT lease — https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw
The Energy Mag: Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion — https://www.theenergymag.com/news/2026-05-06/hut-ai-beacon-point
Hut 8: Hut 8 reports second quarter 2026 results — https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results
Hut 8: Hut 8 closes $4.25 billion of investment-grade senior secured notes for Beacon Point data center project — https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data
Wikipedia: Nueces County, Texas — https://en.wikipedia.org/wiki/Nueces_County,_Texas
Hut 8: Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion — https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value
Hut 8: Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack — https://www.hut8.com/news-insights/press-releases/hut-8-announces-ai-infrastructure-partnership-with-anthropic-and-fluidstack
Expansion Solutions Magazine: Hut 8 Selects Southeast Louisiana for $10B AI Data Center Campus — https://www.expansionsolutionsmagazine.com/hut-8-selects-southeast-louisiana-for-10b-ai-data-center-campus/
T&D World: Hut 8 Selects Entergy, Southeast Louisiana for $10 Billion Artificial Intelligence Data Center — https://www.tdworld.com/smart-utility/news/55339947/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center
The Motley Fool (via Yahoo Finance): Why Hut 8 Stock Popped Today — https://finance.yahoo.com/news/why-hut-8-stock-popped-005207470.html
Hut 8: Hut 8 Reports Second Quarter 2026 Results — https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results
WAFB: First Look: West Feliciana's data center — https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/
Wikipedia: West Feliciana Parish, Louisiana — https://en.wikipedia.org/wiki/West_Feliciana_Parish,_Louisiana
W.Media: Morocco plans 500 MW green data center in Dakhla — https://w.media/morocco-plans-500-mw-green-data-center-in-dakhla/
Finances News Hebdo: Datacenters verts à Dakhla : le Maroc lance le campus « Igoudar Numérique » de 500 MW — https://www.fnh.ma/article/actualites-marocaines/datacenters-verts-dakhla-igoudar-numerique
The North Africa Post: Morocco's Data Center Boom Raises a Power Question — https://northafricapost.com/?p=99949
Wikipedia: Dakhla, Western Sahara — https://en.wikipedia.org/wiki/Dakhla,_Western_Sahara
The North Africa Post: Artificial Intelligence: U.S. firm Iozera to Invest $500 Mln in Data-center and AI Hub in Morocco — https://northafricapost.com/?p=77106
Daba Finance: Morocco Attracts Data Center Investments Despite Power, Demand Gaps — https://dabafinance.com/en/news/morocco-data-centers-ai-energy-europe
Le360: Data centers au Maroc: une nouvelle vague d'investissements portée par l'IA et la souveraineté numérique — https://fr.le360.ma/economie/data-centers-au-maroc-une-nouvelle-vague-dinvestissements-portee-par-lia-et-la-souverainete_5AWWI6OH7FFILPLGYDSUGMU2IA/
Wikipedia: Tétouan — https://en.wikipedia.org/wiki/Tetouan
IREN: Childress Data Center | 750MW AI-Optimised Facility — https://iren.com/data-centers/childress
U.S. Securities and Exchange Commission (IREN filing): IREN Ltd Form 10-K for the fiscal year ended June 30, 2026 — https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm
IREN: IREN Delivers Horizon 1 to Microsoft and Achieves NVIDIA Exemplar Cloud Status on GB300 NVL72 — https://www.sec.gov/Archives/edgar/data/1878848/000114036126032638/ef20080141_ex99-1.htm
IREN: IREN Reports FY26 Results — https://www.sec.gov/Archives/edgar/data/1878848/000187884826000051/irenreportsfy26results.htm
IREN: IREN Expands AI Cloud Capacity to 150,000 GPUs — https://www.sec.gov/Archives/edgar/data/1878848/000114036126007905/ny20064909x3_ex99-1.htm
Wikipedia: Childress, Texas — https://en.wikipedia.org/wiki/Childress,_Texas
IREN Ltd via SEC EDGAR: IREN business update and Q3 FY26 results (Form 8-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1878848/000187884826000025/irenreportsq3fy26results.htm
IREN Ltd via SEC EDGAR: IREN Ltd annual report on Form 10-K for the fiscal year ended June 30, 2026 — https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm
IREN: IREN announces 1.6GW data center campus in Oklahoma — https://iren.com/resources/news/iren-oklahoma-1-6gw-data-center-campus
News On 6: What to know: Kiowa data center planned for Pittsburg County — https://www.newson6.com/data-centers-in-oklahoma/what-to-know-kiowa-data-center-planned-for-pittsburg-county
KOKH Fox 25: Should Kiowa data center proposal go to a vote of the people? — https://okcfox.com/news/local/should-kiowa-data-center-proposal-go-to-a-vote-of-the-people
FOX23: Pittsburg County delays decision on proposed data center tax increment district — https://fox23.com/news/local/pittsburg-county-delays-decision-on-proposed-data-center-tax-increment-district-06-23-2026
Wikipedia: Kiowa, Oklahoma — https://en.wikipedia.org/wiki/Kiowa,_Oklahoma
IREN: Sweetwater Data Center | 2,000MW AI Campus in Texas — https://iren.com/data-centers/sweetwater
U.S. Securities and Exchange Commission (IREN filing): IREN Ltd Form 10-K for the fiscal year ended June 30, 2026 — https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm
IREN: IREN Reports FY26 Results — https://www.sec.gov/Archives/edgar/data/1878848/000187884826000051/irenreportsfy26results.htm
Wikipedia: Sweetwater, Texas — https://en.wikipedia.org/wiki/Sweetwater,_Texas
Bisnow: Joliet OKs $20B Data Center As Illinois Eyes Higher Developer Costs — https://www.bisnow.com/news/chicago/data-center-development/joliet-oks-20b-data-center-as-illinois-seeks-to-make-large-developers-pay-more-for-projects-133777
Hillwood and PowerHouse Data Centers: Yes to Joliet Jobs — https://joliettechnologycenter.com/
Il Giorno: Data Center, avanti tutta: interesse nazionale anche per Lacchiarella-Zibido. La mappa in Lombardia — https://www.ilgiorno.it/milano/economia/data-center-lacchiarella-zibido-cz1ai1qn
MondoMobileWeb: Data center, in Italia 7 investimenti strategici per oltre 25 miliardi di euro — https://www.mondomobileweb.it/?p=325209
Il Sole 24 Ore: Data centres: EU gives the green light to the Eni-Khazna joint venture. Lombardy hub set to accelerate — https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj
Wikipedia: Lacchiarella — https://en.wikipedia.org/wiki/Lacchiarella
Capacity Media: Kasi Cloud breaks ground on first Nigeria campus — https://capacityglobal.com/article/29zq9ki6a4ua8k9zv0q9s/data-economy/kasi-cloud-breaks-ground-on-first-nigeria-campus
ThisDay: Kasi Set to Launch Hyperscale AI-ready Data Centres in Lagos — https://www.thisdaylive.com/2026/05/18/kasi-set-to-launch-hyperscale-ai-ready-data-centres-in-lagos/
Brand Spur Nigeria: Kasi Cloud Commissions First Phase Of 100MW AI-Ready Hyperscale Data Centre In Lagos — https://brandspurng.com/?p=191649
Kasi Cloud: Kasi Cloud — https://www.kasicloud.com/
Wikipedia: Lekki — https://en.wikipedia.org/wiki/Lekki
Microsoft: Microsoft and G42 announce $1 billion comprehensive digital ecosystem initiative for Kenya — https://news.microsoft.com/2024/05/22/microsoft-and-g42-announce-1-billion-comprehensive-digital-ecosystem-initiative-for-kenya/
Gulf News: Microsoft, UAE's G42 announce $1 billion geothermal data centre in Kenya — https://gulfnews.com/business/markets/microsoft-uaes-g42-announce-1-billion-geothermal-data-centre-in-kenya-1.102753045
Semafor: Energy shortfall 'problem' scuppers Kenya's $1B Microsoft data center — https://semafor.com/article/05/06/2026/energy-shortfall-problem-scuppers-kenyas-1b-microsoft-data-center
Citizen Digital: Kenya's $1B Microsoft data centre project in limbo over power concerns — https://citizen.digital/article/kenyas-1b-microsoft-data-centre-project-in-limbo-over-power-concerns-n383281
Al Jazeera: Can Kenya's AI ambitions coexist with Naivasha's water needs? — https://www.aljazeera.com/economy/2026/8/24/can-kenyas-ai-ambitions-coexist-with-naivashas-water-needs
Wikipedia: Olkaria — https://en.wikipedia.org/wiki/Olkaria
W.Media: Khazna announces construction of 100 MW AI optimised Data Center in Ajman — https://w.media/khazna-announces-construction-of-100-mw-ai-optimised-data-center-in-ajman/
MEED: Construction begins on Khazna data centre in Ajman — https://www.meed.com/construction-begins-on-khazna-data-centre-in-ajman
MEED: Khazna breaks ground on new UAE data centre projects — https://guest.meed.com/?p=12676
Enterprise AM: Khazna to boost UAE data center infrastructure with 60 MW projects — https://enterpriseam.com/logistics/2025/04/22/khazna-to-boost-uae-data-center-infrastructure-with-60-mw-projects/
Khazna Data Centers: Khazna Data Centers to Add Over 1GW Hyperscale Capacity Across Multiple Countries By 2030 — https://khaznadatacenters.com/press-release/khazna-data-centers-to-add-over-1gw-hyperscale-capacity-across-multiple-countries-by-2030/
ITWeb Africa (Uptime Institute release via Business Wire): Khazna Awarded Uptime Tier III Certification of Design Documents for Ajman, UAE Facility, Largest in Company's Portfolio — https://itweb.africa/article/khazna-awarded-uptime-tier-iii-certification-of-design-documents-for-ajman-uae-facility-largest-in-companys-portfolio/lLn147mQVWz7J6Aa
Wikipedia: Ajman — https://en.wikipedia.org/wiki/Ajman
Khazna Data Centers: Khazna Data Centers names new country head and advances expansion plans in Saudi Arabia in support of Vision 2030 — https://khaznadatacenters.com/press-release/khazna-data-centers-names-new-country-head-and-advances-expansion-plans-in-saudi-arabia-in-support-of-vision-2030/
Enterprise AM: Dubai-based Khazna Data Centers lands in KSA — https://enterpriseam.com/ksa/2025/12/10/dubai-based-khazna-data-centers-lands-in-ksa/
Wikipedia: Dammam — https://en.wikipedia.org/wiki/Dammam
Mexico Business News: KIO Plans US$1.3 Billion Data Center in Queretaro — https://mexicobusiness.news/trade-and-investment/news/kio-plans-us13-billion-data-center-queretaro
W.Media: KIO Data Centers considering 100 MW expansion in Mexico — https://w.media/kio-data-centers-considering-100-mw-expansion-in-mexico/
Mexico Industry: KIO Data Centers supera los 900 millones de dólares invertidos; proyecta expansión hacia 2030 — https://mexicoindustry.com/noticia/kio-data-centers-supera-los-900-millones-de-dolares-invertidos-proyecta-expansion-hacia-2030
Samsung SDS: Samsung SDS Consortium Takes Major Step Forward in National AI Computing Center Project with Its First Official Site Visit — https://www.samsungsds.com/en/news/1293056_5252.html
Edaily: South Korea Joins the Global GPU War: Building a 2 Trillion Won AI Outpost in Haenam, South Jeolla Province — https://en.edaily.co.kr/news/eda202608035522/
Digital Today: Groundbreaking held for national AI computing center in Haenam, aims for 2028 completion — https://www.digitaltoday.co.kr/en/view/88544/groundbreaking-held-for-national-ai-computing-center-in-haenam-aims-for-2028-completion
Nocut News: Jeonnam Province secures national AI Computing Center — https://en.nocutnews.co.kr/news/6516549
Wikipedia: Haenam County — https://en.wikipedia.org/wiki/Haenam_County
Lambda: Lambda Doubles Down on Midwest Expansion, To Build AI Factory in Kansas City, MO — https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo
Wikipedia: Kansas City, Missouri — https://en.wikipedia.org/wiki/Kansas_City,_Missouri
Lancium: QTS and Lancium Announce Data Center Campus in Hall County, Texas — https://lancium.com/2026/07/13/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/
Wikipedia: Turkey, Texas — https://en.wikipedia.org/wiki/Turkey,_Texas
Meta Platforms: Hello, Beaver Dam! — https://datacenters.atmeta.com/2025/11/hello-beaver-dam/
Meta Platforms: Meta Beaver Dam Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Beaver-Dam-Data-Center.pdf
Meta Platforms: United States - Meta Data Centers — https://datacenters.atmeta.com/us-locations/
Meta Platforms: Hello, Bowling Green! — https://datacenters.atmeta.com/2025/04/hello-bowling-green/
BG Independent News: Power plant for Meta data center in Wood County fast tracked – approved by state with no public hearings — https://bgindependentmedia.org/?p=115392
Meta Platforms: Meta Bowling Green Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Bowling-Green-Data-Center.pdf
Meta Platforms: United States - Meta Data Centers — https://datacenters.atmeta.com/us-locations/
Meta Platforms: Hello, Cheyenne! — https://datacenters.atmeta.com/2024/07/hello-cheyenne/
Meta Platforms: Meta Cheyenne Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Cheyenne-Data-Center.pdf
Meta Platforms: United States - Meta Data Centers — https://datacenters.atmeta.com/us-locations/
Meta Platforms: Meta DeKalb Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-DeKalb-Data-Center.pdf
Office of the Governor of Illinois: Gov. Pritzker Celebrates Opening of Meta's DeKalb Data Center — https://gov.illinois.gov/news/press-release.28370.html
Daily Chronicle (Shaw Local): Meta takes DeKalb Data Center online — https://www.shawlocal.com/daily-chronicle/2023/11/30/meta-takes-dekalb-data-center-online
FOX 32 Chicago: Meta's new Illinois data center now operational — https://www.fox32chicago.com/news/meta-new-illinois-data-center-operational
FOX 26 Houston: Meta to spend $1.5 billion on AI data center in Texas — https://www.fox26houston.com/news/meta-ai-data-center-texas-el-paso
Construction Reporter: El Paso Electric Announces Plans for 366 Megawatt Electric Plant to Support Meta Data Center — https://constructionreporter.com/el-paso-electric-announces-plans-for-366-megawatt-electric-plant-to-support-meta-data-center/
Silicon UK: Meta Ramps Spending On El Paso Data Centre To $10bn — https://www.silicon.co.uk/cloud/datacenter/meta-data-centre-el-paso-629273
KFOX14: El Paso leaders get update on Meta data center project, city cites enforceable agreements — https://kfoxtv.com/news/local/el-paso-leaders-get-update-on-meta-data-center-project-city-cites-enforceable-agreements
Meta Platforms: Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso — https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/
Inside Climate News: Texas Electric Utility Only Considered Gas to Power $10 Billion Meta Data Center — https://insideclimatenews.org/news/24092026/el-paso-electric-only-considered-gas-to-power-meta-data-center/
Meta Platforms: Meta El Paso Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-El-Paso-Data-Center.pdf
Meta Platforms: Meta Gallatin Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Gallatin-Data-Center.pdf
W.Media: Meta Expands Gallatin Data Center with $1B Investment — https://w.media/meta-expands-gallatin-data-center-with-nearly-1b-total-investment/
Nashville Business Journal (via Gallatin Economic Development Agency): Meta, formerly known as Facebook, tees up another data center in Gallatin — https://www.gallatingetsit.com/newsroom/meta-formerly-known-as-facebook-tees-up-another-data-center-in-gallatin
Nashville Business Journal (via Gallatin Economic Development Agency): Meta's data centers in Gallatin are up and running — https://www.gallatingetsit.com/newsroom/metas-data-centers-in-gallatin-are-up-and-running
Louisiana Economic Development: Meta Selects Northeast Louisiana as Site of $10 Billion Artificial Intelligence Optimized Data Center; Governor Jeff Landry Calls Investment 'A New Chapter' for State — https://opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state
KALB: La. regulators approve Entergy power plants for Meta's AI data center — https://www.kalb.com/2025/08/21/la-regulators-approve-entergy-power-plants-metas-ai-data-center/
Data Center Frontier: Meta's $27B Hyperion Campus: A New Blueprint for AI Infrastructure Finance — https://www.datacenterfrontier.com/hyperscale/article/55325337/metas-27b-hyperion-campus-a-new-blueprint-for-ai-infrastructure-finance
Louisiana Economic Development: Meta Commits More Than $50 Billion for North Louisiana Project, Becoming One of the Largest Data Centers in History — https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history
WRKF: Meta is investing $40B more to expand Richland Parish data center project — https://www.wrkf.org/2026-07-14/meta-is-investing-40b-more-to-expand-richland-parish-data-center-project
Meta Platforms: Meta Richland Parish Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Richland-Parish-Data-Center.pdf
KTVE (myarklamiss.com): As development continues, the cost of Meta's data center in Richland Parish will be 3x more than originally projected — https://www.myarklamiss.com/news/as-development-continues-the-cost-of-metas-data-center-in-richland-parish-will-be-3x-more-than-originally-projected/amp
Meta Platforms: Hello, Kansas City! — https://datacenters.atmeta.com/2022/03/hello-kansas-city/
Meta Platforms: Kansas City, we are online! — https://datacenters.atmeta.com/2025/08/kansas-city-we-are-online/
Meta Platforms: Meta Kansas City Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Metas-Kansas-City-Data-Center.pdf
Meta Platforms: Meta Kuna Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Kuna-Data-Center.pdf
NBC 16: Facebook owners to invest $800 million in new Kuna data center — https://nbc16.com/news/nation-world/facebook-owners-announce-new-data-center-in-kuna
Bisnow: Meta Plans $800M Hyperscale Campus In Idaho As It Continues To Explore New Data Center Markets — https://www.bisnow.com/news/national/data-center/new-idaho-data-center-part-fits-metas-development-pattern-111978
Baxtel: Meta's $1.2B Data Center In Kuna, Idaho, Goes Live — https://baxtel.com/news/meta-s-1-2b-data-center-in-kuna-idaho-goes-live
KBOI 2 (CBS2 Idaho News): Meta opens new AI data center in Kuna, hopes to become "water positive" by 2030 — https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive
Wikipedia: Kuna, Idaho — https://en.wikipedia.org/wiki/Kuna,_Idaho
Indiana Economic Development Corporation: Gov. Braun Breaks Ground on $10B Meta Data Center Campus at LEAP District — https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district
Meta Platforms: Hello, Lebanon! — https://datacenters.atmeta.com/2026/02/hello-lebanon/
WRTV: Meta breaks ground on $10B data center campus in Lebanon — https://www.wrtv.com/news/local-news/meta-breaks-ground-on-10b-data-center-campus-in-lebanon
Indianapolis Star (via Yahoo News): Meta pledges responsible water, energy use at $10B Lebanon data center — https://www.yahoo.com/news/articles/meta-pledges-responsible-water-energy-101838480.html
Meta Platforms: Meta Lebanon Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Lebanon-Data-Center.pdf
Meta Platforms: Meta Mesa Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Mesa-Data-Center.pdf
Data Center Knowledge: Meta Is Adding Three Data Centers to Already Massive Mesa Campus — https://www.datacenterknowledge.com/hyperscalers/meta-is-adding-three-data-centers-to-already-massive-mesa-campus
Construction Dive: Meta selects DPR for $1B Arizona data center — https://www.constructiondive.com/news/meta-dpr-arizona-data-center-mesa-phoenix/701776/
KTAR News: New SRP solar facility to provide power for Meta data center in Mesa — https://ktar.com/arizona-news/new-srp-solar-facility-to-provide-power-for-meta-data-center-in-mesa
KTAR News: First phase of Meta's Mesa data center project open; more under construction — https://ktar.com/arizona-news/mesa-data-center-mesa
Wikipedia: Mesa, Arizona — https://en.wikipedia.org/wiki/Mesa,_Arizona
Meta Platforms: Hello, Montgomery! — https://datacenters.atmeta.com/2024/05/hello-montgomery/
Meta Platforms: Montgomery, we're growing! — https://datacenters.atmeta.com/2025/09/montgomery-were-growing/
Meta Platforms: Meta Montgomery Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Montgomery-Data-Center.pdf
Meta Platforms: United States - Meta Data Centers — https://datacenters.atmeta.com/us-locations/
Meta Platforms: Meta New Albany Data Center fact sheet — https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/
Spectrum News 1 (Associated Press): Meta lines up massive supply of nuclear power to energize AI data centers — https://spectrumnews1.com/oh/columbus/news/2026/01/09/meta-lines-up-massive-supply-of-nuclear-power-to-energize-ai-data-centers
Spectrum News 1: Meta's next massive build could become the world's first gigawatt-scale data center — https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-
Mount Vernon News: Ohio approves new natural gas power plant for data center — https://mountvernonnews.com/stories/675445301-ohio-approves-new-natural-gas-power-plant-for-data-center
American Public Power Association: Ohio Power Siting Board Approves Construction of Power Plant to Serve Load of Adjacent Data Center — https://www.publicpower.org/node/30607
Williams Companies: Socrates Power Solution Facilities — https://www.williams.com/expansion-project/socrates-power-solution-facilities/
SynMax: Drone Imagery Confirms Meta's Prometheus South Operating, Prometheus North Still Under Construction — https://blog.synmax.com/vulcan-exclusive/drone-imagery-confirms-metas-prometheus-south-operating-prometheus-north-still-under-construction
Meta Platforms: Breaking Ground on Meta's First Data Center in Canada — https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/
Meta Platforms: Hello, Sturgeon County! — https://datacenters.atmeta.com/2026/07/hello-sturgeon-county/
Meta Platforms: Meta Sturgeon Data Centre fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Metas-Sturgeon-Data-Center.pdf
Sturgeon Data Centre project website: Sturgeon Data Centre — https://sturgeondatacentre.com
iAgua: Meta ultima en Talavera un centro de datos de 1.000 M€ que se abastecerá de agua del Tajo por la red municipal — https://www.iagua.es/noticias/redaccion-iagua/meta-ultima-en-talavera-un-centro-de-datos-de-1-000-me-que-se-abastecera-de-agua-del-tajo-por-la-red-municipal
elDiario.es: Page anuncia la llegada “definitiva” del centro de datos de Meta a Talavera de la Reina — https://www.eldiario.es/castilla-la-mancha/provincias/toledo/page-anuncia-llegada-definitiva-centro-datos-meta-talavera-reina_1_13416975.amp.html
El Español (El Digital Castilla-La Mancha): Meta compra por 20,6 millones el suelo industrial para construir su macrocentro de datos en Talavera de la Reina — https://www.elespanol.com/eldigitalcastillalamancha/region/20241219/meta-compra-millones-suelo-industrial-construir-macrocentro-datos-talavera-reina/909909319_0.amp.html
Wikipedia: Talavera de la Reina — https://en.wikipedia.org/wiki/Talavera_de_la_Reina
Meta Platforms: Meta Temple Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Metas-Temple-Data-Center.pdf
KWTX: Facebook parent company to invest $800 million in Central Texas — https://www.kwtx.com/2022/03/31/facebook-parent-company-invest-800-million-central-texas/
Daily Commercial News (ConstructConnect): Meta's data centre in Temple is part of Texas' growth trend — https://canada.constructconnect.com/?p=261660
KWTX: Meta goes live in Temple with $1.2 billion AI data center — https://www.kwtx.com/2026/07/22/meta-goes-live-temple-with-12-billion-ai-data-center/
Wikipedia: Temple, Texas — https://en.wikipedia.org/wiki/Temple,_Texas
Meta Platforms: Hello, Tulsa! — https://datacenters.atmeta.com/2026/04/hello-tulsa/
Meta Platforms: Meta Tulsa Data Center fact sheet — https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Tulsa-Data-Center.pdf
Meta Platforms: United States - Meta Data Centers — https://datacenters.atmeta.com/us-locations/
Tulsa Data Center project website: Tulsa Data Center — https://tulsaokdatacenter.com/
MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique): MGX, Bpifrance, Mistral AI et NVIDIA annoncent la création d'une joint-venture pour développer en France le plus grand campus IA d'Europe — https://www.polytechnique.edu/sites/default/files/content/communiques/fichiers/2025-05/Communique%20Presse%20-%20MGX%2C%20Bpifrance%2C%20Mistral%20AI%20et%20NVIDIA%20annoncent%20la%20cre%CC%81ation%20d%E2%80%99une%20JV%20pour%20de%CC%81velopper%20en%20France%20le%20plus%20grand%20campus%20IA%20d%27Europe.pdf
Eiffage: Campus AI enters the implementation phase: Eiffage selected for deployment of shared infrastructure on the Fouju Campus — https://www.privacy.eiffage.com/files/live/sites/metal/files/publications/PR_Eiffage_Campus%2520AI%2520enters%2520the%2520implementation%2520phase_20260602.pdf
Communauté de communes Brie des Rivières et Châteaux: Calendrier du projet Campus IA — https://www.briedesrivieresetchateaux.fr/wp-content/uploads/2026/09/Calendrier_du_projet_Campus_IA_.pdf
Next: La préfecture de Seine-et-Marne autorise l'installation de Campus IA à Fouju — https://next.ink/brief-article/la-prefecture-de-seine-et-marne-autorise-linstallation-de-campus-ia-a-fouju/
Mac4Ever: Campus AI : Mistral, Bpifrance et MGX prévoient jusqu'à 3 GW de puissance IA en France — https://www.mac4ever.com/ia/196474-campus-ai-mistral-bpifrance-et-mgx-prevoient-jusqu-a-3-gw-de-puissance-ia-en-france
Vozpópuli: Aragón da luz verde a un centro de datos de Microsoft con una inversión de 2.000 millones — https://www.vozpopuli.com/economia/aragon-centro-datos-microsoft-inversion-2000-millones.html
elDiario.es: Microsoft avanza con su red de centros de datos en Zaragoza, donde proyecta una de sus mayores regiones en Europa — https://www.eldiario.es/aragon/sociedad/microsoft-avanza-red-centros-datos-zaragoza-proyecta-mayores-regiones-europa_1_12768636.html
Forbes España: Microsoft obtiene luz verde para su ambicioso proyecto de centros de datos en Aragón — https://forbes.es/empresas/828243/microsoft-obtiene-luz-verde-para-su-ambicioso-proyecto-de-centros-de-datos-en-aragon/
elDiario.es: La 'prioridad extranjera' para PP y Vox en Aragón: expropian suelo para un centro de datos de Microsoft a 2 euros el metro — https://www.eldiario.es/aragon/economia/prioridad-extranjera-pp-vox-aragon-expropian-suelo-centro-datos-microsoft-2-euros-metro_1_13417031.html
elDiario.es: ZeC presenta 25 alegaciones al plan de Microsoft y exige a la alcaldesa de Zaragoza paralizar un centro de datos — https://www.eldiario.es/aragon/politica/zec-presenta-25-alegaciones-plan-microsoft-exige-alcaldesa-zaragoza-paralizar-centro-datos_1_13487405.html
Vozpópuli: Aragón da luz verde a un centro de datos de Microsoft con una inversión de 2.000 millones — https://www.vozpopuli.com/economia/aragon-centro-datos-microsoft-inversion-2000-millones.html
Inspenet: Microsoft abrirá otro centro de datos en Aragón (el tercero) — https://inspenet.com/noticias/microsoft-abrira-centro-de-datos-en-aragon/
elDiario.es: Microsoft avanza con su red de centros de datos en Zaragoza, donde proyecta una de sus mayores regiones en Europa — https://www.eldiario.es/aragon/sociedad/microsoft-avanza-red-centros-datos-zaragoza-proyecta-mayores-regiones-europa_1_12768636.html
Forbes España: Microsoft obtiene luz verde para su ambicioso proyecto de centros de datos en Aragón — https://forbes.es/empresas/828243/microsoft-obtiene-luz-verde-para-su-ambicioso-proyecto-de-centros-de-datos-en-aragon/
elDiario.es: ZeC presenta 25 alegaciones al plan de Microsoft y exige a la alcaldesa de Zaragoza paralizar un centro de datos — https://www.eldiario.es/aragon/politica/zec-presenta-25-alegaciones-plan-microsoft-exige-alcaldesa-zaragoza-paralizar-centro-datos_1_13487405.html
elDiario.es: Microsoft avanza con su red de centros de datos en Zaragoza, donde proyecta una de sus mayores regiones en Europa — https://www.eldiario.es/aragon/sociedad/microsoft-avanza-red-centros-datos-zaragoza-proyecta-mayores-regiones-europa_1_12768636.html
Forbes España: Microsoft obtiene luz verde para su ambicioso proyecto de centros de datos en Aragón — https://forbes.es/empresas/828243/microsoft-obtiene-luz-verde-para-su-ambicioso-proyecto-de-centros-de-datos-en-aragon/
elDiario.es: La 'prioridad extranjera' para PP y Vox en Aragón: expropian suelo para un centro de datos de Microsoft a 2 euros el metro — https://www.eldiario.es/aragon/economia/prioridad-extranjera-pp-vox-aragon-expropian-suelo-centro-datos-microsoft-2-euros-metro_1_13417031.html
elDiario.es: ZeC presenta 25 alegaciones al plan de Microsoft y exige a la alcaldesa de Zaragoza paralizar un centro de datos — https://www.eldiario.es/aragon/politica/zec-presenta-25-alegaciones-plan-microsoft-exige-alcaldesa-zaragoza-paralizar-centro-datos_1_13487405.html
Official Microsoft Blog: Infinite scale: The architecture behind the Azure AI superfactory — https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/
The Atlanta Journal-Constitution: Microsoft's newest AI 'superfactory' opens at sprawling Fayetteville campus — https://www.ajc.com/business/2025/11/microsofts-newest-ai-superfactory-opens-at-sprawling-fayetteville-campus/
SiliconANGLE: Microsoft brings Atlanta-based AI 'super factory' online — https://siliconangle.com/2025/11/12/microsoft-brings-atlanta-based-ai-super-factory-online/
Epoch AI: Microsoft Fairwater Atlanta — https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta
Microsoft: Microsoft announces $3.3 billion investment in Wisconsin to spur artificial intelligence innovation and economic growth — https://news.microsoft.com/source/2024/05/08/microsoft-announces-3-3-billion-investment-in-wisconsin-to-spur-artificial-intelligence-innovation-and-economic-growth/
Microsoft On the Issues: Made in Wisconsin: The world's most powerful AI datacenter — https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/
Official Microsoft Blog: Inside the world's most powerful AI datacenter — https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/
Microsoft: Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin — https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/
Microsoft Local: Mount Pleasant datacenter project update — https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/
Spectrum News 1: Construction complete for first data center facility in Mount Pleasant — https://spectrumnews1.com/wi/milwaukee/news/2026/06/23/construction-data-center-facility-microsoft-mount-pleasant-.html
Associated Press (via News4JAX): Microsoft says it's 'slowing or pausing' some AI data center projects, including $1B plan for Ohio — https://www.news4jax.com/business/2025/04/09/microsoft-says-its-slowing-or-pausing-some-ai-data-center-projects-including-1b-plan-for-ohio/
Epoch AI: Microsoft Fairwater Wisconsin — https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin
W.Media: Microsoft unveils its largest AI data center yet; to spend US$ 7 billion on Wisconsin facility — https://w.media/microsoft-unveils-its-largest-ai-data-center-yet-to-spend-us-7-billion-on-wisconsin-facility/
POWER Magazine: Microsoft Announces $1 Billion Investment in Ohio Data Centers as Officials Ponder Power Demands — https://www.powermag.com/microsoft-announces-1-billion-investment-in-ohio-data-centers-as-officials-ponder-power-demands
Engineering News-Record: Microsoft Hits Pause Button on $1B in Data Centers in Ohio — https://www.enr.com/articles/60572-microsoft-hits-pause-button-on-1b-in-data-centers-in-ohio
WSYX/WTTE (Fox 28 Columbus): Microsoft 'not moving forward' with $1B Licking County data center plans right now — https://myfox28columbus.com/news/local/microsoft-backs-off-1b-licking-county-data-center-plans
Associated Press (via News4JAX): Microsoft says it's 'slowing or pausing' some AI data center projects, including $1B plan for Ohio — https://www.news4jax.com/business/2025/04/09/microsoft-says-its-slowing-or-pausing-some-ai-data-center-projects-including-1b-plan-for-ohio/
WSYX ABC 6: Heath breaks ground on Microsoft data center expected to bring hundreds of jobs — https://www.abc6onyourside.com/news/local/heath-columbus-ohio-break-ground-microsoft-data-center-expected-bring-hundreds-jobs-tech-technology-ai-artificial-intelligence-cloud-computing-digital-services
Microsoft Local: Heath datacenter construction updates — https://local.microsoft.com/blog/heath-datacenter-construction-updates/
Microsoft Local: Hebron datacenter construction update — https://local.microsoft.com/blog/hebron-datacenter-construction-update/
Microsoft: Microsoft bouwt aan toekomstbestendige datacentercampus in Middenmeer — https://local.microsoft.com/blog/microsoft-bouwt-aan-toekomstbestendige-datacentercampus-in-middenmeer/
Microsoft: Information market 3 December 2025: new datacentre development in Middenmeer — https://local.microsoft.com/wp-content/uploads/2026/01/Information-market-3-december-2025.pdf
Commissie voor de milieueffectrapportage: Uitbreiding Campus West Microsoft, provincie Noord-Holland: advies over reikwijdte en detailniveau van het milieueffectrapport — https://pas.commissiemer.nl/files/nl/4021/a4021rd.pdf
Wisconsin Public Radio: Microsoft wants to build 15 more data centers in Mount Pleasant — https://www.wpr.org/news/microsoft-15-more-data-centers-mount-pleasant
Wisconsin Public Radio: Mount Pleasant commission approves Microsoft's plans for data center expansion — https://www.wpr.org/news/mount-pleasant-approves-microsoft-data-center-expansion
Spectrum News 1: Microsoft to expand data center in Mount Pleasant — https://spectrumnews1.com/wi/milwaukee/news/2026/01/21/microsoft-to-expand-data-center-in-mount-pleasant-
Spectrum News 1: Mount Pleasant village board approves Microsoft data center expansion — https://spectrumnews1.com/wi/milwaukee/news/2026/01/27/mount-pleasant--microsoft--data-center-expansion--approval
Microsoft Local: Mount Pleasant datacenter project update — https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/
Epoch AI: Microsoft Fairwater Wisconsin — https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin
Wisconsin Public Radio: Microsoft wants to build 15 more data centers in Mount Pleasant — https://www.wpr.org/news/microsoft-15-more-data-centers-mount-pleasant
Wisconsin Public Radio: Mount Pleasant commission approves Microsoft's plans for data center expansion — https://www.wpr.org/news/mount-pleasant-approves-microsoft-data-center-expansion
Spectrum News 1: Microsoft to expand data center in Mount Pleasant — https://spectrumnews1.com/wi/milwaukee/news/2026/01/21/microsoft-to-expand-data-center-in-mount-pleasant-
Spectrum News 1: Mount Pleasant village board approves Microsoft data center expansion — https://spectrumnews1.com/wi/milwaukee/news/2026/01/27/mount-pleasant--microsoft--data-center-expansion--approval
Microsoft: Powering the next wave of AI: Expanding capacity with our new datacenter in Pecos — https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/
Orrick: Microsoft Expands Global Data Center Capacity with 2 GW Data Center and Co-Located Power Facility in West Texas — https://www.orrick.com/en/News/2026/07/Microsoft-Expands-Global-Data-Center-Capacity-with-2-GW-Data-Center-and-Co-Located-Power-Facility
The Energy Mag: Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power — https://theenergymag.com/news/2026-06-22/microsoft-2-gigawatt-ai-data-center-west-texas-onsite-gas
W.Media: Microsoft's upcoming data center campus in Texas to expand global capacity by 2 GW — https://w.media/microsofts-new-dc-pecos-texas/
Wikipedia: Pecos, Texas — https://en.wikipedia.org/wiki/Pecos,_Texas
Microsoft Local: Skelton Grange (Leeds) Datacentre Planning Application — https://local.microsoft.com/blog/skelton-grange-leeds-datacentre-planning-application/
Harworth Group: Harworth and Microsoft receive resolution to grant planning consent for hyperscale data centre and I&L space at Skelton Grange, Leeds — https://harworthgroup.com/2026/04/27/harworth-and-microsoft-receive-resolution-to-grant-planning-consent-for-hyperscale-data-centre-and-il-space-at-skelton-grange-leeds/
Construction Enquirer: Go-ahead for Microsoft's £4bn Leeds data hub push — https://www.constructionenquirer.com/2026/04/27/go-ahead-for-microsofts-4bn-leeds-data-hub-push/
The Construction Index: Data centre approved in Leeds — https://www.theconstructionindex.co.uk/news/view/data-centre-approved-in-leeds
Southern Business & Development (via Atlanta Business Chronicle): Microsoft confirmed as company seeking tax break for Fulton County, Ga. data center — https://southernbusiness.com/?p=644089
Southern Business & Development (via The Atlanta Journal-Constitution): New details revealed about Microsoft's $1.8B data center near Atlanta — https://southernbusiness.com/?p=644448
The Atlanta Journal-Constitution: Microsoft works to unwind tax breaks for its metro Atlanta data centers — https://www.ajc.com/business/2026/08/microsoft-aims-to-void-property-tax-breaks-for-its-data-centers-near-atlanta/
Wikipedia: Union City, Georgia — https://en.wikipedia.org/wiki/Union_City,_Georgia
Impact Assessment Agency of Canada: Mihta Askiy Data Center Project (reference 90036) — https://iaac-aeic.gc.ca/050/evaluations/proj/90036
Impact Assessment Agency of Canada: Public notice: Mihta Askiy Data Center Project, comments invited on the summary of the initial project description — https://iaac-aeic.gc.ca/050/evaluations/document/164258
Impact Assessment Agency of Canada: Notice of early decision with reasons: Mihta Askiy Data Center Project — https://iaac-aeic.gc.ca/050/evaluations/document/165286?culture=en-CA
Government of Alberta, Major Projects: Mihta Askiy Data Centre — https://majorprojects.alberta.ca/details/Mihta-Askiy-Data-Centre/12097
Bisnow: Apex Data Center Scrapped — https://www.bisnow.com/news/raleigh-durham/data-center/massive-raleigh-area-data-center-scrapped-133584
WRAL: Residents near proposed Apex data center relieved project is scrapped, says more work needed — https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/
ABC11 (WTVD): Data center developer pulls back from Apex for now — https://abc11.com/post/data-center-developer-pulls-back-apex-now/18685708/
WBRC: 'AI factory' being proposed along Lakeshore Parkway in Birmingham — https://www.wbrc.com/2026/02/11/ai-factory-being-proposed-along-lakeshore-parkway-birmingham/
Nebius: Nebius x Vineland, NJ fact sheet — https://assets.nebius.com/assets/729154ac-8d55-459f-9dd6-8f85a40da15b/NEW%20Vineland%20NJ%20Fact%20Sheet_7.10.26.pdf?cache-buster=2026-07-10T18:45:11.445Z
Wikipedia: Birmingham, Alabama — https://en.wikipedia.org/wiki/Birmingham,_Alabama
Nebius: Nebius breaks ground on gigawatt-scale AI factory in Independence, Missouri — https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri
Nebius: Nebius in Independence, Missouri project page — https://nebius.com/independencemo
Wikipedia: Independence, Missouri — https://en.wikipedia.org/wiki/Independence,_Missouri
Nebius: Nebius announces multi-billion dollar agreement with Microsoft for AI infrastructure — https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure
U.S. Securities and Exchange Commission (Nebius Group filing): Nebius Group N.V. Form 6-K filed September 8, 2025 — https://www.sec.gov/Archives/edgar/data/1513845/000110465925088312/tm2525580d1_6k.htm
Nebius: Nebius in Vineland, NJ project page — https://nebius.com/vinelandnj
Nebius: Nebius x Vineland, NJ fact sheet — https://assets.nebius.com/assets/729154ac-8d55-459f-9dd6-8f85a40da15b/NEW%20Vineland%20NJ%20Fact%20Sheet_7.10.26.pdf?cache-buster=2026-07-10T18:45:11.445Z
U.S. Securities and Exchange Commission (Nebius Group filing): Nebius Group N.V. Form F-3ASR registration statement — https://www.sec.gov/Archives/edgar/data/1513845/000110465925044092/tm2513807-3_f3asr.htm
Nebius: Nebius Q2 2026 letter to shareholders — https://assets.nebius.com/assets/a6ecfd85-a6cb-4967-8ef7-9a25bd261f9c/SHLQ226.pdf?cache-buster=2026-08-12T11:54:46.695Z
Wikipedia: Vineland, New Jersey — https://en.wikipedia.org/wiki/Vineland,_New_Jersey
NEXTDC: NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend — https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend
NEXTDC: M4 Technology Campus Approved — https://www.nextdc.com/news/m4-technology-campus-approved
NEXTDC: M4 Melbourne Data Centre — https://www.nextdc.com/data-centres/melbourne-data-centres/m4-melbourne
NEXTDC: NEXTDC Announces Massive Expansion Plans with Acquisition of S7 Data Centre Site in Sydney — https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7
NEXTDC: NEXTDC to Join OpenAI in Australia as an Infrastructure Partner — https://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia
NEXTDC: S7 Sydney Data Centre — https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney
Public Citizen: Public Citizen Applauds Brazoria County for Rejecting Tax Break for Massive Data Center — https://www.citizen.org/news/public-citizen-applauds-brazoria-county-for-rejecting-tax-break-for-massive-data-center/
Bisnow: Houston-Area County Rejects Tax Break For $3.5B Data Center Project — https://www.bisnow.com/houston/news/data-center-development/houston-area-county-rejects-tax-abatement-for-35b-data-center-development-133616
Wikipedia: Old Ocean, Texas — https://en.wikipedia.org/wiki/Old_Ocean,_Texas
Aker ASA: Nscale, Aker and OpenAI to establish Stargate Norway: a 100,000 NVIDIA GPU AI gigafactory powered by renewable energy in Northern Norway — https://www.mfn.se/ob/a/aker/nscale-aker-and-openai-to-establish-stargate-norway-a-100-000-nvidia-gpu-ai-gigafactory-powered-by-renewable-energy-in-northern-norway-bb68d573
Aker ASA: Aker-Nscale JV signs multi-billion dollar AI infrastructure agreement with Microsoft — https://mfn.se/ob/a/aker/aker-aker-nscale-jv-signs-multi-billion-dollar-ai-infrastructure-agreement-with-microsoft-cad81224
Nscale: Nscale Contracts Approximately 200,000 NVIDIA GB300 GPUs with Microsoft to Deliver NVIDIA AI Infrastructure Across Europe and the U.S. — https://nscale.com/press-releases/nscale-microsoft-2025
Aker ASA (via Placera): Aker completes investment in Nscale's Series C funding round — https://www.placera.se/pressmeddelanden/aker-aker-completes-investment-in-nscales-series-c-funding-round-20260327
Nscale: Nscale announces expanded deal with Microsoft in Norway — https://www.nscale.com/press-releases/nscale-microsoft-norway
Nscale: Nscale Secures $790 Million in Financing to Support AI Infrastructure Buildout in Norway — https://www.nscale.com/press-releases/nscale-secures-790-million-norway
Datacenter Forum: Nscale signs PPA with Vattenfall for Kvandal data center Norway — https://www.datacenter-forum.com/nscale/nscale-signs-ppa-with-vattenfall-for-kvandal-data-center-norway
Nscale: Nscale and Nordkraft Enter Strategic Partnership to Support Data Center Operations in Narvik — https://www.nscale.com/press-releases/nordscale
Sentia (via Inderes): HENT, a subsidiary of Sentia, has signed a contract for the expansion of Nscale's data center in the Narvik region — https://www.inderes.se/releases/hent-a-subsidiary-of-sentia-has-signed-a-contract-for-the-expansion-of-nscales-data-center-in-the-narvik-region
AmCham Norway: Microsoft contracts 30,000 GPUs from Nscale at Norway data center as OpenAI drops out of latest Stargate — https://amcham.no/microsoft-contracts-30000-gpus-from-nscale-at-norway-data-center-as-openai-drops-out-of-latest-stargate/
NTT DATA Group / NTT Global Data Centers: 国内最大級、千葉県印西・白井エリアで約250メガワット（MW）のデータセンターキャンパス開発を始動 — https://www.nttdata.com/global/ja/news/release/2026/041700/
W.Media: NTT Data plans a 200 MW data center campus in Japan — https://w.media/ntt-data-plans-a-200-mw-data-center-campus-in-japan/
Wikipedia: Shiroi — https://en.wikipedia.org/wiki/Shiroi
Casa dos Ventos: Omnia e Casa dos Ventos firmam maior contrato de autoprodução de energia renovável da América Latina para data centers — https://casadosventos.com.br/cases/case-omnia
Wikipedia (Portuguese): Casa dos Ventos — https://pt.wikipedia.org/wiki/Casa_dos_Ventos
Crusoe: Crusoe, Blue Owl Capital and Primary Digital Infrastructure Enter Second Phase of $15 Billion Joint Venture — https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture
SoftBank Group Corp.: OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — https://group.softbank/en/news/press/20250924
W.Media: Crusoe tops off final AI data center in Abilene, Texas — https://w.media/crusoe-tops-off-final-ai-data-center-in-abilene-texas/
Industrial Info Resources: Flagship Stargate Data Center Campus Expansion in Texas is Questioned — https://www.industrialinfo.com/iirenergy/industry-news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568
Epoch AI: OpenAI Stargate: where the US sites stand — https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand
Cleanview: Behind-the-meter data centers: Stargate Abilene — https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-abilene
Epoch AI: OpenAI Stargate Abilene (AI data center directory) — https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene
The Tech Capital: An Abilene update: What's happening at the first Stargate data centre? — https://thetechcapital.com/abilene-stargate-data-centre-update/
Crusoe: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas — https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas
SoftBank Group Corp.: OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — https://group.softbank/en/news/press/20250924
Data Center Knowledge (Bloomberg): OpenAI Expands Stargate With Five New Data Center Sites Across US — https://www.datacenterknowledge.com/data-center-site-selection/openai-expands-stargate-with-five-new-data-center-sites-across-us
Epoch AI: OpenAI Stargate: where the US sites stand — https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand
Cleanview: Behind-the-meter data centers: Stargate Project Jupiter — https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-jupiter
Bloom Energy: Oracle and Bloom Energy Announce $400,000 in Support for Roadrunner Food Bank to Expand Food Access in Santa Teresa and Sunland Park — https://www.bloomenergy.com/news/oracle-and-bloom-energy-announce-400000-in-support-for-roadrunner-food-bank-to-expand-food-access-in-santa-teresa-and-sunland-park/
SoftBank Group Corp.: OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — https://group.softbank/en/news/press/20250924
Data Center Knowledge (Bloomberg): OpenAI Expands Stargate With Five New Data Center Sites Across US — https://www.datacenterknowledge.com/data-center-site-selection/openai-expands-stargate-with-five-new-data-center-sites-across-us
Epoch AI: OpenAI Stargate: where the US sites stand — https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand
Related Companies: OpenAI, Oracle and Related Digital announce Stargate data center site in Michigan — https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site
Spectrum News: Michigan Public Service Commission approves DTE contracts for proposed Saline Township data center — https://spectrumlocalnews.com/mi/michigan/news/2025/12/20/mpsc-approves-dte-contracts
Oracle, Related Digital, Blackstone, OpenAI and Walbridge (via WebWire): Oracle, Related Digital, Blackstone, OpenAI, Walbridge and Governor Whitmer Celebrate Construction of Stargate Campus in Saline Township — https://www.webwire.com/ViewPressRel.asp?aId=355624
Spectrum News: PHOTOS: Construction continues on Related Digital's Saline Township data center — https://spectrumlocalnews.com/mi/michigan/news/2026/08/02/related-digital-saline-township-data-center-construction-progress
Epoch AI: OpenAI Stargate: where the US sites stand — https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand
REBusinessOnline: Vantage Data Centers to Invest $25B for Mega-Campus in Shackelford County, Texas — https://rebusinessonline.com/vantage-data-centers-to-invest-25b-for-mega-campus-in-shackleford-county-texas/
SoftBank Group Corp.: OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — https://group.softbank/en/news/press/20250924
W.Media: Vantage Data Centers breaks ground on data center campus in Texas — https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas/
Texas Department of Licensing and Regulation: TABS2026024068: Vantage DC Abilene - TX3 - Project Frontier, building TX301 — https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026024068
Texas Department of Licensing and Regulation: TABS2026024112: Vantage DC Abilene - TX3 - Project Frontier, building TX310 — https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026024112
Vantage Data Centers: Data Center Locations - North America — https://vantage-dc.com/data-center-locations/north-america/
Cleanview: Behind-the-meter data centers: Stargate Frontier — https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-frontier
Epoch AI: OpenAI Stargate: where the US sites stand — https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand
Ozaukee Press: Vantage chief calls complex large even by its standards — https://ozaukeepress.com/content/vantage-chief-calls-complex-large-even-its-standards
W.Media: OpenAI, Oracle and Vantage Data Centers announce Stargate data center site in Wisconsin — https://w.media/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/
Vantage Data Centers: Data Center Locations - North America — https://vantage-dc.com/data-center-locations/north-america/
Epoch AI: OpenAI Stargate: where the US sites stand — https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand
Wisconsin Public Radio: Oracle sues Wisconsin utility regulators over financial requirements for data centers — https://www.wpr.org/news/oracle-sues-wisconsin-utility-regulators-psc-financial-requirements-data-centers
Ozaukee Press: Another data center tops out — https://ozaukeepress.com/node/113525
FOX 11 News: Companies behind Port Washington data centers meet with neighbors — https://fox11online.com/news/state/port-washington-data-center-project-lighthouse-construction-open-house-neighbor-concerns-companies-representatives-vantage-oracle-openai
Wisconsin Watch: We Energies strikes deal to power Oracle data center with nuclear energy — https://wisconsinwatch.org/2026/10/wisconsin-we-energies-deal-oracle-data-center-nuclear-energy-power-point-beach-plant/
Princeton Digital Group: Princeton Digital Group Breaks Ground on Milestone USD 1 Billion, 120 MW Greater Jakarta Campus — https://princetondg.com/press-releases/princeton-digital-group-breaks-ground-on-milestone-usd-1-billion-120-mw-greater-jakarta-campus/
Princeton Digital Group: PDG Raising ~USD 856 Million Debt for its Hyperscale Data Center Expansion in Indonesia — https://princetondg.com/press-releases/pdg-raising-usd-856-million-debt-for-its-hyperscale-data-center-expansion-in-indonesia/
Princeton Digital Group: PDG Acquires 240 MW of Powered Land in Jakarta, Advancing Its Rapid Expansion Across Asia — https://princetondg.com/press-releases/pdg-acquires-240-mw-of-powered-land-in-jakarta-advancing-its-rapid-expansion-across-asia/
Princeton Digital Group: PDG Acquires 240 MW of Powered Land in Jakarta, Advancing Its Rapid Expansion Across Asia — https://princetondg.com/press-releases/pdg-acquires-240-mw-of-powered-land-in-jakarta-advancing-its-rapid-expansion-across-asia/
Princeton Digital Group: PDG Raising ~USD 856 Million Debt for its Hyperscale Data Center Expansion in Indonesia — https://princetondg.com/press-releases/pdg-raising-usd-856-million-debt-for-its-hyperscale-data-center-expansion-in-indonesia/
Converge Digest: PowerHouse plans 800 MW data center campus in Spotsylvania, VA — https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/
Lightwave: PowerHouse Data Centers announces purchase of 145 acres in Spotsylvania, Va. for PowerHouse 95 campus — https://www.lightwaveonline.com/data-center/article/14304356/powerhouse-data-centers-announces-purchase-of-145-acres-in-spotsylvania-va-for-powerhouse-95-campus
PowerHouse Data Centers: PowerHouse 95 — https://powerhousedata.com/data-center/powerhouse-95
Wikipedia: Spotsylvania County, Virginia — https://en.wikipedia.org/wiki/Spotsylvania_County,_Virginia
Bisnow: Austin Suburb Set To Decide On Annexation, Zoning For Data Center Campus — https://www.bisnow.com/news/austin-san-antonio/data-center/taylor-deciding-annexation-zoning-data-center-campus-powerhouse
KUT News: Taylor has struck a deal on a nearby data center, allowing it to annex the site and set conditions — https://www.kut.org/energy-environment/2026-10-02/taylor-annexing-data-center-development
KUT News: Taylor City Council approves deal to clear the way for a nearby data center and power plant — https://www.kut.org/energy-environment/2026-10-09/taylor-tx-annex-data-center-power-plant
Wikipedia: Taylor, Texas — https://en.wikipedia.org/wiki/Taylor,_Texas
PowerHouse Data Centers: Pennsylvania Data Center Partners and PowerHouse Data Centers Launch Joint Venture to Build Next-Gen 1.35 GW Hyperscale Data Center Campus in Carlisle, Pennsylvania — https://powerhousedata.com/news/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania
WHP580 Newsroom (iHeartMedia): Plans Approved for 18-Building Data Center in Pennsylvania — https://bob949.iheart.com/featured/whp580-newsroom/content/2026-01-09-plans-approved-for-18-building-data-center-in-pennsylvania/
Construction Review Online: $15 Billion AI Data Center Project in Pennsylvania Clears Key Milestone — https://constructionreviewonline.com/450-mw-substation-approved-for-15b-pennsylvania-digital-i-pax-ai-data-center-in-carlisle/
Wikipedia: Middlesex Township, Cumberland County, Pennsylvania — https://en.wikipedia.org/wiki/Middlesex_Township,_Cumberland_County,_Pennsylvania
PPL Corporation / Louisville Gas and Electric: LG&E announces first major data center electric customer — https://news.pplweb.com/2025-01-16-LG-E-announces-first-major-data-center-electric-customer
Data Center Frontier: Let's Go Build Some Data Centers: PowerHouse Drives Hyperscale and AI Infrastructure Across North America — https://www.datacenterfrontier.com/site-selection/article/55263723/lets-go-build-some-data-centers-powerhouse-drives-hyperscale-and-ai-infrastructure-across-north-america
WAVE: Louisville to welcome Kentucky's first Hyperscale Data Center — https://www.wdrbwave.com/2025/01/17/louisville-welcome-kentuckys-first-hyperscale-data-center/
PowerHouse Data Centers: PowerHouse Louisville — https://powerhousedata.com/data-center/ph-louisville
WAVE: Louisville data center opponents rally at Metro Hall, push for stronger regulations — https://www.wdrbwave.com/2026/07/18/louisville-data-center-opponents-rally-metro-hall-push-stronger-regulations/
Louisville Public Media: Louisville Metro Council approves data center moratorium as new proposal sparks controversy — https://www.lpm.org/news/2026-08-13/louisville-metro-council-approves-data-center-moratorium-as-new-proposal-sparks-controversy
Wikipedia: Louisville, Kentucky — https://en.wikipedia.org/wiki/Louisville,_Kentucky
Pima County: Project Blue FAQ — https://www.pima.gov/3552/Project-Blue-FAQ
Arizona Luminaria: Project Blue is back: Beale moving ahead with data center on county land — https://azluminaria.org/2025/08/27/project-blue-data-center-pima-county-beale-infrastructure-tep/
Arizona's Family (KTVK/KPHO): Tucson rejects Amazon-linked data center amid water, energy concerns — https://www.azfamily.com/2025/08/09/tucson-rejects-amazon-linked-data-center-amid-water-energy-concerns/
Arizona Capitol Times: ACC greenlights energy agreement for TEP to power Project Blue data center — https://azcapitoltimes.com/news/2025/12/04/acc-greenlights-energy-agreement-for-tep-to-power-project-blue-data-center/
KOLD News 13: Pima County Board of Supervisors gives green light to Project Blue — https://www.kold.com/2025/12/16/pima-county-votes-move-forward-with-project-blue
KOLD News 13: Construction begins on first hyper-scale data center in Pima County — https://www.kold.com/2026/04/25/construction-begins-first-hyper-scale-data-center-pima-county/
Chattahoochee Riverkeeper: Coweta County Project Sail Data Center FAQ — https://chattahoochee.org/wp-content/uploads/2026/03/Project-Sail-Fact-Sheet-March-2026.pdf
Prologis: Project Sail, Coweta County — https://www.cowetaprojectsail.com/coweta-lp/
Telecom Review Americas: A Massive Data Center Project Near Atlanta — https://www.telecomreviewamericas.com/articles/wholesale-and-capacity/a-massive-data-center-project-near-atlanta/
Propmodo: Prologis Wins Approval for Massive Georgia Data Center Project — https://propmodo.com/?p=179099
Wikipedia: Sargent, Georgia — https://en.wikipedia.org/wiki/Sargent,_Georgia
KPCW: 1.25GW data center approved on ranchland near Evanston, Wyoming — https://www.kpcw.org/state-regional/2026-06-19/1-25gw-data-center-approved-on-ranchland-near-evanston-wyoming
TownLift: Proposed AI data center near Evanston advances as Prometheus courts major tech clients — https://townlift.com/2026/06/proposed-ai-data-center-near-evanston-advances-as-prometheus-courts-major-tech-clients/
Baxtel: Wyoming Approves Prometheus Hyperscale's Gigawatt Data Center Campus — https://baxtel.com/news/wyoming-approves-prometheus-hyperscale-s-gigawatt-data-center-campus
Cowboy State Daily: 1.2-Gigawatt Data Center Near Evanston In Talks With Meta And Microsoft — https://cowboystatedaily.com/2026/02/14/data-center-near-evanston-is-talking-to-microsoft-meta/
Wikipedia: Evanston, Wyoming — https://en.wikipedia.org/wiki/Evanston,_Wyoming
PowerHouse Data Centers: PowerHouse and Provident Rewrite the Data Center Playbook with New Texas Hyperscale Campus — https://powerhousedata.com/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus
Dallas Innovates: Dallas' Provident Data Centers, Virginia's PowerHouse Partner on 'Hyperscale' North Texas Campus — https://dallasinnovates.com/dallas-provident-data-centers-virginias-powerhouse-partner-on-hyperscale-north-texas-campus/
PowerHouse Data Centers: PowerHouse Grand Prairie — https://powerhousedata.com/data-center/powerhouse-grand-prairie
Texas Department of Licensing and Regulation: TABS2026016734: AREP Power House Grand Prairie, Data Center Building 1 — https://www.tdlr.texas.gov/TABS/Projects/TABS2026016734
Wikipedia: Midlothian, Texas — https://en.wikipedia.org/wiki/Midlothian,_Texas
Court of Appeals of Virginia: Board of County Supervisors of Prince William County v. Oak Valley Homeowners Association, Inc., et al. (Record Nos. 1590-25-4, 1584-25-4, 1592-25-4, 2025-24-4) — https://www.vacourts.gov/opinions/opncavwp/1592254.pdf
Bisnow: Judge Throws Out Zoning Approval For 2,100-Acre Northern Virginia Data Center Project — https://www.bisnow.com/news/washington-dc/data-center/judge-throws-out-zoning-approval-for-2100-acre-northern-virginia-data-center-project-130496
Bisnow: Officials End Efforts To Build One Of World's Largest Data Center Clusters — https://www.bisnow.com/news/washington-dc/data-center-development/officials-end-fight-2100-acre-data-center-rezoning-killing-one-of-worlds-largest-planned-projects-134136
Bisnow: Developer Abandons Massive Virginia Data Center Plan After Court Ruling — https://www.bisnow.com/news/national/data-center-development/developer-backs-out-of-17-gw-virginia-data-center-plan-134341
Bisnow: Blackstone's QTS Abandons Digital Gateway Project, Ends Legal Fight — https://www.bisnow.com/news/washington-dc/data-center-development/blackstones-qts-abandons-digital-gateway-project-ends-lawsuit-135295
WTOP (republished from InsideNoVa): Digital Gateway data center project dies after final developer withdraws appeal — https://wtop.com/?p=29400462
American Battlefield Trust: Victory at Manassas! Prince William Digital Gateway Project Dead After Developer Drops Appeal — https://www.battlefields.org/news/victory-manassas-prince-william-digital-gateway-project-dead-after-developer-drops-appeal
Converge Digest: QTS Drops Digital Gateway Data Center Campus in VA — https://convergedigest.com/qts-drops-digital-gateway-data-center-campus-in-va/
QScale: QScale: From Data Processing to Food Self-Sufficiency — https://www.qscale.com/news/from-data-processing-to-food-self-sufficiency-financing
QScale: QScale Accelerates Its Expansion and Growth — https://www.qscale.com/news/qscale-accelerates-its-expansion-and-growth
QScale: QScale Welcomes Hewlett Packard Enterprise as First Anchor Tenant at Q01 Campus — https://www.qscale.com/news/hewlett-packard-enterprise-hpe-q01-campus
QScale: QScale Secures Up to $320 Million Funding to Accelerate Growth — https://www.qscale.com/news/320m-financing-growth
QScale: Goldman Sachs Alternatives to Acquire QScale, a Leading Canadian Data Center Platform — https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale
QScale: QScale Begins Construction of Its Second Building at the Q01 Campus, Adding 60 MW of AI-Ready Infrastructure in Quebec — https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure
QScale: Q01 Campus — https://www.qscale.com/q01-campus
UKTN: Northumberland Council approves plans for £10bn data centre — https://www.uktech.news/big-data/northumberland-council-approves-plans-for-10bn-data-centre-20250305
ACE Infrastructure Intelligence: New milestone reached on £10bn data centre project — https://www.acenet.co.uk/news/infrastructure-intelligence/new-milestone-reached-on-10bn-data-centre-project/
UK Government: US-UK pact will boost advances in drug discovery, create tens of thousands of jobs and transform lives — https://www.gov.uk/government/news/us-uk-pact-will-boost-advances-in-drug-discovery-create-tens-of-thousands-of-jobs-and-transform-lives
W.Media: QTS gained approval for data center project in Northumbria — https://w.media/qts-gained-approval-for-data-center-project-in-northumbria/
Corgan: QTS Data Center Campus Cambois — https://www.corgan.com/projects/qts-data-center-campus-cambois
Place North East: QTS doubles down as OpenAI pauses North East data centre ambitions — https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/
Data Centre Review: QTS reaffirms commitment to North East AI Growth Zone — https://datacentrereview.com/2026/04/qts-reaffirms-commitment-to-north-east-ai-growth-zone/
Keller: Keller lays foundations for huge data centre — https://www.keller.co.uk/news/keller-lays-foundations-huge-data-centre
QTS Data Centers: QTS Expands International Platform with the Strategic Acquisition of Two Data Centers in the Netherlands — https://q.com/news/qts-expands-international-platform-with-the-strategic-acquisition-of-two-data-centers-in-the-netherlands/
The Tech Capital: QTS Data Centers invests $1.5 billion in Dutch hyperscale expansion — https://thetechcapital.com/qts-data-centers-invests-1-5-billion-in-dutch-hyperscale-expansion/
Structure Research: QTS doubling down in northern Netherlands — https://www.structureresearch.net/?p=100674
Groningen Seaports: Ommelander advertorial Groningen Seaports, maart 2025 — https://www.groningen-seaports.com/wp-content/uploads/Website_Ommelander_ADV_GSP_maart2025.pdf
QTS Data Centers: Eemshaven, Netherlands data center — https://www.q.com/data-centers/netherlands-eemshaven
REBusinessOnline: QTS Buys 615 Acres in Fayetteville, Georgia for 'World's Largest Multi-Tenant Data Center Campus' — https://rebusinessonline.com/?p=324851
Bisnow: QTS' 'Project Excalibur' To Span 7M SF In Fayetteville — https://www.bisnow.com/atlanta/news/data-center/qts-project-excalibur-to-span-7m-sf-in-fayetteville-115472
The Citizen (Fayette County): State reviewing massive Fayetteville data center plans — https://thecitizen.com/?p=104756
The Citizen (Fayette County): Fayetteville approves development agreement for 612-acre QTS Data Center on Hwy. 54 West — https://thecitizen.com/?p=109827
The Citizen (Fayette County): QTS unveils new multi-use path as part of expanding community partnership in Fayetteville — https://thecitizen.com/?p=234517
The Atlanta Journal-Constitution: Microsoft's newest AI 'superfactory' opens at sprawling Fayetteville campus — https://www.ajc.com/business/2025/11/microsofts-newest-ai-superfactory-opens-at-sprawling-fayetteville-campus/
QTS Data Centers: Vimercate — https://q.com/data-centers/vimercate-en/
Prima Monza: Il primo data center della città si svela — https://primamonza.it/attualita/il-primo-data-center-della-citta-si-svela/
Giornale di Vimercate (press clipping hosted by CIAI): Su il sipario sul nuovo Data center — https://www.ciai.it/wp-content/uploads/2026/07/Giornale-Vimercate-30-6-26.pdf
Il Giorno: Il Campus Data Center fa paura: "Diciamo no al deserto di cemento" — https://www.ilgiorno.it/monza-brianza/cronaca/il-campus-data-center-fa-6bad3cb1
Cloudnews.tech: QTS prepares a 220 MW campus near Milan and accelerates its expansion — https://cloudnews.tech/qts-prepares-a-220-mw-campus-near-milan-and-accelerates-its-expansion/
Wikipedia: Vimercate — https://en.wikipedia.org/wiki/Vimercate
Baxtel: TPG teams up with Quantum Loophole to redevelop Old Alcoa Plant — https://baxtel.com/news/tpg-teams-up-with-quantum-loophole-to-redevelop-old-alcoa-plant
Cabling Installation & Maintenance: Quantum Loophole begins construction on massive Frederick, Md. data center campus — https://www.cablinginstall.com/data-center/article/14279126/quantum-loophole-begins-construction-on-massive-frederick-md-data-center-campus
Baxtel: TPG Real Estate takes full control of Quantum Frederick Project — https://baxtel.com/news/tpg-real-estate-takes-full-control-of-quantum-frederick-project
Baxtel: Aligned Tops out New Maryland Data Center — https://baxtel.com/news/aligned-tops-out-new-maryland-data-center
Wikipedia: Frederick, Maryland — https://en.wikipedia.org/wiki/Frederick,_Maryland
An Coimisiún Pleanála: Case reference PL25M.501596 — https://www.pleanala.ie/en-ie/case/501596
Westmeath Examiner: Data centre appeals to An Coimisiún Pleanála — https://www.westmeathexaminer.ie/?p=128147
Wikipedia: Rochfortbridge — https://en.wikipedia.org/wiki/Rochfortbridge
Reliance Industries Limited: Reliance and Meta to Develop AI-Enabled Data Centre in Jamnagar, Gujarat — https://www.ril.com/sites/default/files/2026-06/10062026_MR_Reliance_and_Meta_to_Develop_AI-Enabled_Data_Centre_in_Jamnagar_Gujarat.pdf
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms, Inc. annual report on Form 10-K for fiscal year 2025 — https://www.sec.gov/Archives/edgar/data/1167419/000110465926022322/riot-20251231x10k.htm
Riot Platforms, Inc. via SEC EDGAR: Riot announces fee simple acquisition of land and first data center lease with AMD at the Rockdale Site (Form 8-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms Form 8-K: second quarter 2026 results and Corsicana letter of intent — https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810x8k.htm
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms Q2 2026 earnings deck (Form 8-K, Exhibit 99.2) — https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d2.htm
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms, Inc. quarterly report on Form 10-Q for the period ended June 30, 2026 — https://www.sec.gov/Archives/edgar/data/1167419/000110465926093448/riot-20260630x10q.htm
Wikipedia: Navarro County, Texas — https://en.wikipedia.org/wiki/Navarro_County,_Texas
Riot Platforms, Inc. via SEC EDGAR: Riot announces fee simple acquisition of land and first data center lease with AMD at the Rockdale Site (Form 8-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms, Inc. annual report on Form 10-K for fiscal year 2025 — https://www.sec.gov/Archives/edgar/data/1167419/000110465926022322/riot-20251231x10k.htm
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms reports second quarter 2026 financial results and strategic highlights (Form 8-K, Exhibit 99.1) — https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d1.htm
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms Q2 2026 earnings deck (Form 8-K, Exhibit 99.2) — https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d2.htm
Riot Platforms, Inc. via SEC EDGAR: Riot Platforms, Inc. quarterly report on Form 10-Q for the period ended June 30, 2026 — https://www.sec.gov/Archives/edgar/data/1167419/000110465926093448/riot-20260630x10q.htm
Wikipedia: Rockdale, Texas — https://en.wikipedia.org/wiki/Rockdale,_Texas
Rowan Digital Infrastructure: Rowan Powers Texas Growth as Construction Begins on 300 MW Temple Data Center — https://rowan.com/rowan-powers-texas-growth-as-construction-begins-on-300-mw-temple-data-center/
Rowan Digital Infrastructure: Rowan Closes $3B Green Financing for Turnkey Hyperscale Campus in High-Growth Texas Market — https://rowan.com/rowan-closes-3b-green-financing-for-turnkey-hyperscale-campus-in-high-growth-texas-market/
Rowan Digital Infrastructure: Rowan to Invest $38 Million in Temple Water Infrastructure and Sammons Community Center — https://rowan.com/rowan-to-invest-38-million-in-temple-water-infrastructure-and-sammons-community-center/
Bisnow: Colorado Developer Secures $3B For Data Center Campus North Of Austin — https://www.bisnow.com/news/austin-san-antonio/data-center/sustainable-developer-bringing-data-center-campus-to-temple-134759
Gobierno de Aragón: Plan de Interés General de Aragón Green It Aragón — https://www.aragon.es/-/piga-green-it
Gobierno de Aragón (plan documentation filed by the promoter): Memoria técnica sobre el consumo de agua del Plan Green IT Aragón (Vol. IV, anexo 18) — https://www.aragon.es/documents/d/guest/vol_iv_anx_18_memoria_consumo_agua-1
elDiario.es: Otros tres centros de datos en Aragón: Samca anuncia una inversión de 2.627 millones en Luceni — https://www.eldiario.es/aragon/economia/tres-centros-datos-aragon-samca-anuncia-inversion-2-627-millones-luceni_1_12252656.html
El Español: Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras — https://www.elespanol.com/aragon/actualidad/20261005/cerca-millones-invertidos-centros-datos-aragon-esperan-rampa-salida-obras/1003744406849_0.html
El Español: Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos — https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html
Wikipedia: Luceni — https://en.wikipedia.org/wiki/Luceni
Scala Data Centers via PR Newswire: With an initial investment of USD 500 million, Scala Data Centers and Rio Grande do Sul government sign agreement for largest digital infrastructure project in the state of southern Brazil — https://www.prnewswire.com/news-releases/with-an-initial-investment-of-usd-500-million-scala-data-centers-and-rio-grande-do-sul-government-sign-agreement-for-largest-digital-infrastructure-project-in-the-state-of-southern-brazil-302245667.html
Scala Data Centers via PR Newswire: Mayor of Eldorado do Sul, Brazil, Approves Law Enabling the Construction of Latin America's First Data Center City — https://www.prnewswire.com/news-releases/mayor-of-eldorado-do-sul-brazil-approves-law-enabling-the-construction-of-latin-americas-first-data-center-city-302335569.html
Scala Data Centers via PR Newswire: Scala AI City: Brazil's Ministry of Mines and Energy approves 5 GW power connection for data center city in Rio Grande do Sul — https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html
Scala Data Centers via PR Newswire: Scala Data Centers inaugurates Phase 2 of Tamboré Campus with Governor Tarcísio de Freitas present, committing $1.13 billion — https://www.prnewswire.com/news-releases/scala-data-centers-inaugurates-phase-2-of-tambore-campus-with-governor-tarcisio-de-freitas-present-committing-1-13-billion-302224370.html
Scala Data Centers via PR Newswire: Scala Data Centers celebrates historic milestone with approval of the master plan for its Tamboré Campus in São Paulo, the largest and most advanced in Latin America with 600 MW of capacity — https://www.prnewswire.com/news-releases/scala-data-centers-celebrates-historic-milestone-with-approval-of-the-master-plan-for-its-tambore-campus-in-sao-paulo---the-largest-and-most-advanced-in-latin-america-with-600-mw-of-capacity-302599995.html
ESM Magazine: Schwarz Digits Invests €11bn In New Data Centre — https://www.esmmagazine.com/technology/schwarz-digits-invests-e11bn-in-new-data-centre-300560
Startbase: Schwarz Digits investiert 11 Milliarden Euro in digitale Souveränität — https://www.startbase.com/news/schwarz-digits-investiert-11-milliarden-euro-in-digitale-souveraenitaet/
The Tech Capital: Lidl and Kaufland owner advances $12 billion data centre project amid EU AI infrastructure talks — https://thetechcapital.com/lidl-and-kaufland-owner-advances-12-billion-data-centre-project-amid-eu-ai-infrastructure-talks/
Euronews: Un des plus grands centres de données IA d'Europe à 11 milliards d'euros ouvre dans le Brandebourg — https://fr.euronews.com/my-europe/2026/08/24/un-des-plus-grands-centres-de-donnees-ia-deurope-a-11-milliards-deuros-ouvre-dans-le-brand
W.Media: SDAIA lays foundation stone for 480MW Hexagon government data center in Riyadh — https://w.media/sdaia-lays-foundation-stone-for-480mw-hexagon-government-data-center-in-riyadh/
Sharikat Mubasher: Saudi Arabia lays cornerstone for Hexagon data center in Riyadh — https://en.sharikatmubasher.com/news/article/21526638/saudi-arabia-lays-cornerstone-for-hexagon-data-center-in-riyadh?lang=en
Oil & Gas News: SDAIA Hexagon Data Centre (project profile) — https://ognnews.com/ArticleOGN/461988/sdaia-hexagon-data-centre
Wikipedia: Riyadh — https://en.wikipedia.org/wiki/Riyadh
Sify Technologies: Data centre — https://www.sifytechnologies.com/europe/data-centre/
W.Media: Sify and partners to invest Rs 10,000 crores in Chennai DC over next five years: MP Vijaykumar — https://w.media/sify-and-partners-to-invest-rs-10000-crores-in-chennai-dc-over-next-five-years-mp-vijaykumar/
Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India): Sify Infinit Spaces Limited: Draft Red Herring Prospectus (filing version) — https://nsearchives.nseindia.com/corporate/Registration_17102025141743_DRHP_Fillingversion.pdf
Wikipedia: Siruseri — https://en.wikipedia.org/wiki/Siruseri
Indian Infrastructure: Sify launches North India's largest AI-ready data centre campus in Noida — https://indianinfrastructure.com/2025/03/11/sify-launches-north-indias-largest-ai-ready-data-centre-campus-in-noida/
Sify Technologies: Data centre — https://www.sifytechnologies.com/europe/data-centre/
Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India): Sify Infinit Spaces Limited: Draft Red Herring Prospectus (filing version) — https://nsearchives.nseindia.com/corporate/Registration_17102025141743_DRHP_Fillingversion.pdf
Sify Technologies: Noida data center — https://www.sifytechnologies.com/data-center/noida-data-center/
Wikipedia: Noida — https://en.wikipedia.org/wiki/Noida
Sify Technologies: Data centre — https://www.sifytechnologies.com/europe/data-centre/
Sify Technologies: Mumbai data center — https://www.sifytechnologies.com/data-center/mumbai-data-center/
Sify Infinit Spaces Limited (filed with SEBI; hosted by National Stock Exchange of India): Sify Infinit Spaces Limited: Draft Red Herring Prospectus (filing version) — https://nsearchives.nseindia.com/corporate/Registration_17102025141743_DRHP_Fillingversion.pdf
Wikipedia: Rabale — https://en.wikipedia.org/wiki/Rabale
AMCHAM Korea / The Chosun Daily: SK, AWS to build South Korea's largest AI data center in Ulsan (reprint of The Chosun Daily) — https://amchamkorea.org/pp/latest_news/members_news/read/?idx=2451
iTnews Asia: SK Group and AWS to build South Korea's largest AI data centre in Ulsan — https://www.itnews.asia/news/sk-group-and-aws-to-build-south-koreas-largest-ai-data-centre-in-ulsan-617900
Korea JoongAng Daily: SK Group breaks ground on AI-only data center in Ulsan — https://www.koreajoongangdaily.com/business/sk-group-breaks-ground-on-ai-only-data-center-in-ulsan/12451117
TelecomTV: Under the hood of SKT's Ulsan AI datacentre — https://www.telecomtv.com/content/ai/under-the-hood-of-skt-s-ulsan-ai-datacentre-53720/
Light Reading: SK Telecom creates SK Horizon in $2.2B data center spin-off deal — https://www.lightreading.com/data-centers/sk-telecom-creates-sk-horizon-in-2-2b-data-center-spin-off-deal
Construction Review Online: SK AI Data Center Ulsan: Chairman Says Site Nearing 900 Megawatts — https://constructionreviewonline.com/sk-ai-data-center-ulsan-chairman-says-site-nearing-900-megawatts/
SK Telecom: SK Telecom Launches AI Data Center Infrastructure Company 'SK Horizon' and Secures Investments from KKR and IMM — https://news.sktelecom.com/en/3290
SoftBank Corp.: SoftBank Corp. to Construct Large-scale AI Data Center that Utilizes Sharp Sakai Plant — https://www.softbank.jp/en/corp/news/press/sbkk/2024/20240607_01
SoftBank Corp.: Resolution on acquisition of land and buildings at Sharp's Sakai Plant for an AI data center (Japanese) — https://www.softbank.jp/corp/news/press/sbkk/2024/20241220_03
SoftBank Corp.: AIデータセンターの構築に向けて、シャープ堺工場の土地や建物の取得に関する契約を締結 — https://www.softbank.jp/corp/news/press/sbkk/2025/20250314_01
TechCrunch: SoftBank buys $676M old Sharp plant for its OpenAI collab in Japan — https://techcrunch.com/2025/03/14/softbank-buys-676m-old-sharp-plant-for-its-openai-collab-in-japan
SoftBank Corp. (SoftBank News): Activating AI for Society: SoftBank Corp.'s New Growth Strategy to Continuously Achieve Record-High Profits — https://www.softbank.jp/en/sbnews/entry/20260512_01
SoftBank Corp. (SoftBank News): SoftBank Corp.'s 40th Annual General Meeting of Shareholders: Building on Telecommunications Foundation to Unlock Potential of AI — https://www.softbank.jp/en/sbnews/entry/20260623_01
Sharp Corporation: New LCD Panel Plant under Construction in Sakai City to Start Operations in October 2009 — https://global.sharp/corporate/news/090408_2.html
SoftBank Group: SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France — https://group.softbank/en/news/press/20260531
Sesterce: SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France — https://www.sesterce.com/newsroom/softbank-group-sesterce-1gw-ai-data-center-bosquel-france
SoftBank Group: SoftBank Group to Build 5 GW of AI Data Center Capacity in France — https://group.softbank/en/news/press/20260531_0
SoftBank Corp.: 次世代社会インフラ構想の要となる大規模な計算基盤を備えたデータセンター「Core Brain」を構築 — https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/
Dempa Digital (Dempa Shimbun): 経産省、北海道苫小牧市のデータセンターに300億円補助 ソフトバンクが建設予定 — https://dempa-digital.com/?p=492112
SoftBank Corp.: 北海道苫小牧データセンター — https://www.softbank.jp/business/service/platform/datacenter/tomakomai
SoftBank Corp. (SoftBank News): Laying the Foundation for the AI Era: Construction Begins on "Hokkaido Tomakomai AI Data Center" — https://www.softbank.jp/en/sbnews/entry/20250501_01
W.Media: SoftBank breaks ground for AI data center in Hokkaido — https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/
SoftBank Corp. (SoftBank News): Building for the AI Era: An Inside Look at SoftBank Corp.'s Next-generation AI Data Center in Hokkaido — https://www.softbank.jp/en/sbnews/entry/20260225_01
SoftBank Corp. (SoftBank News): SoftBank Corp.'s 40th Annual General Meeting of Shareholders: Building on Telecommunications Foundation to Unlock Potential of AI — https://www.softbank.jp/en/sbnews/entry/20260623_01
News Radio 710 KEEL: Historic $12 Billion Dollar Investment in Shreveport by Amazon for New Data Centers — https://710keel.com/northwest-louisiana-data-centers/
WAFB (KSLA report): Amazon building $12 billion data center in Caddo & Bossier parishes, Gov. Landry announces — https://www.wafb.com/2026/02/23/more-data-centers-reportedly-coming-northwest-louisiana-major-announcement-coming-monday/
Shreveport-Bossier Journal: Court hearing set April 20 in challenge to Shreveport Amazon data center — https://shreveportbossierjournal.com/2026/04/09/court-hearing-set-april-20-in-challenge-to-shreveport-amazon-data-center/
Louisiana Economic Development: Amazon Grows Northwest Louisiana Planned Investment to $18 Billion With New Shreveport Campus — https://www.opportunitylouisiana.gov/news/amazon-grows-northwest-louisiana-planned-investment-to-18-billion-with-new-shreveport-campus
Institutional Real Estate, Inc.: Amazon earmarks $6b for third data center campus in northwest Louisiana — https://irei.com/news/amazon-earmarks-6b-for-third-data-center-campus-in-northwest-louisiana/
Wikipedia: Shreveport, Louisiana — https://en.wikipedia.org/wiki/Shreveport,_Louisiana
KSLA News 12: Campuses for newly announced Amazon data center spanning Bossier & Caddo parishes confirmed — https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/
WDBJ7: Sale approved of Pittsylvania County land to data center developer — https://www.wdbj7.com/2026/03/09/sale-approved-pittsylvania-county-land-data-center-developer/
WDBJ7: New details out on massive data center planned in Pittsylvania County — https://www.wdbj7.com/2026/04/30/new-details-massive-data-center-planned-pittsylvania-county/
WSET: Pittsylvania supervisors back $100B Berry Hill Data Center project — https://wset.com/news/local/pittsylvania-county-advances-100b-data-center-campus-proposal-despite-resident-concerns-berry-hill-july-2026
WSET: Berry Hill Data Center expected to be operational by July 2027 — https://wset.com/news/local/berry-hill-data-center-expected-to-be-operational-by-july-2027-stack-infrastructure-pittsylvania-county-virginia
Wikipedia: Pittsylvania County, Virginia — https://en.wikipedia.org/wiki/Pittsylvania_County,_Virginia
G42: Global Tech Alliance Launches Stargate UAE — https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
G42: G42 to lead a consortium with US partners to build 5GW UAE-US AI Campus — https://www.g42.ai/resources/news/g42-lead-consortium-us-partners-build-5gw-uae-us-ai-campus
G42 via PR Newswire: G42 Provides Update on Construction of Stargate UAE AI Infrastructure Cluster — https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html
The National: Stargate UAE's first phase to be completed in third quarter of 2026 — https://www.thenationalnews.com/business/2025/12/05/stargate-uaes-first-phase-to-be-completed-in-third-quarter-of-2026
The National: Stargate UAE data centre to cost more than $30bn, AI minister says — https://www.thenationalnews.com/future/technology/2026/01/26/stargate-uae-data-centre-to-cost-more-than-30bn-ai-minister-says/
Khaleej Times: Abu Dhabi's 5GW UAE-US AI Campus stays on track despite regional conflict — https://www.khaleejtimes.com/uae/abu-dhabi-5gw-uae-us-ai-campus-on-track-regional-conflict
Embassy of the United Arab Emirates, Washington DC: The UAE-US AI & Advanced Tech Partnership — https://www.uae-embassy.org/uae-us-cooperation/economic/forging-future-ai-together-uae-us-advanced-tech-cooperation
Start Campus: SINES Data Campus — https://www.startcampus.pt/
Data Center Frontier: Fresh Start: SINES DC Eyes Sustainable 1.2 GW IT Capacity as Europe's Largest Colocation Campus — https://datacenterfrontier.com/colocation/article/55133589/fresh-start-sines-dc-eyes-sustainable-12-gw-it-capacity-as-europes-largest-colocation-campus
Data Center Knowledge (Bloomberg): Microsoft to Rent Nscale AI Data Center Capacity in Portugal — https://www.datacenterknowledge.com/deals/microsoft-to-rent-nscale-ai-data-center-capacity-in-portugal
Essential Business: Start Campus in €2Bn deal to build Microsoft centre in Sines — https://www.essential-business.pt/2026/03/02/start-campus-in-e2bn-deal-to-build-microsoft-centre-in-sines/
Capacity: Data centre of the month: Start Campus SINES development in Portugal — https://capacityglobal.com/news/data-centre-of-the-month-start-campus-sines-portugal-interview/
Executive Digest (Lusa): Start Campus avança em fevereiro com segundo edifício do centro de dados de Sines — https://executivedigest.sapo.pt/?p=704935
Portal ERP: Start Campus reforça posição de Portugal na infraestrutura europeia de IA com expansão em Sines — https://portalerp.com/pt/noticia/start-campus-reforca-posicao-de-portugal-na-infraestrutura-europeia-de-ia-com-expansao-em-sines
W.Media: STT GDC Announces Plans to Build Sustainable Carrier-Neutral Data Center in the Philippines — https://w.media/stt-gdc-announces-plans-to-build-sustainable-carrier-neutral-data-center-in-the-philippines/
W.Media: STT GDC Selects Leighton Asia and First Balfour for Hyperscale DC Development in the Philippines — https://w.media/sttgdc-awards-contract-for-stt-fairview-1-data-center-development-the-philippines/
ST Telemedia Global Data Centres: STT Fairview 1 factsheet (version October 2024) — https://assets.sttelemediagdc.com/sttgdc/global_en/public/2024-11/STT_Fairview_1_Factsheet_vOct2024.pdf
ST Telemedia Global Data Centres (Philippines): STT GDC Philippines Advances the Country's Digital Readiness, Welcomes Globe, Radius and Source Telecoms as Connectivity Partners — https://www.sttgdc.com/ph-en/newsroom/stt-gdc-philippines-advances-country-digital-readiness-welcomes-globe-radius-source-telecoms-connectivity-partners
The Philippine Star: Ayala-led data center builder inks supply deal with Meralco — https://www.philstar.com/business/2026/04/20/2522112/ayala-led-data-center-builder-inks-supply-deal-meralco
Wikipedia: Quezon City — https://en.wikipedia.org/wiki/Quezon_City
Synapse Real Estate Corp. (hosted by the Town of Olds): Synapse Data Center Project Information Package — https://www.olds.ca/media/y3cp0anv/synapse-data-center-project-information-package.pdf
Town of Olds: Current Data Centre Projects in Olds — https://engage.olds.ca/data-centre-development
The Logic: Alberta regulator rejects proposal for massive data centre in Olds over deficient application — https://thelogic.co/briefing/alberta-regulator-rejects-proposal-for-massive-data-centre-in-olds-over-deficient-application/
Wikipedia: Olds, Alberta — https://en.wikipedia.org/wiki/Olds,_Alberta
TBC Partners: TBC Partners — https://www.tbcpartners.co.uk/
BeBeez International (republishing DatacenterDynamics): Application filed for data center campus near QTS' site in Northumberland, UK — https://bebeez.eu/2026/08/18/application-filed-for-data-center-campus-near-qts-site-in-northumberland-uk/
The Arabian Post: TCS commits ₹700 billion to Hyderabad AI campus — https://thearabianpost.com/tcs-commits-₹700-billion-to-hyderabad-ai-campus/
StartupFeed: TCS HyperVault to Build Rs 70,000 Cr AI Data Centre in Hyderabad — https://startupfeed.in/?p=11607
Sahi: TCS HyperVault to set up ₹70,000 crore AI data center in Telangana — https://www.sahi.com/news/tcs-hypervault-to-set-up-70-000-crore-ai-data-center-in-telangana-2185-PE1_COR
Wikipedia: Hyderabad — https://en.wikipedia.org/wiki/Hyderabad
W.Media: TCS adds Anakapalli and Pune sites to fuel its data center push — https://w.media/tcs-adds-anakapalli-and-pune-sites-to-fuel-its-data-center-push/
TeraWulf: TeraWulf expands digital and power infrastructure portfolio with strategic acquisitions in Kentucky and Maryland — https://investors.terawulf.com/news-events/press-releases/detail/129
TeraWulf: TeraWulf reports second quarter 2026 results — https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
The Baltimore Banner: Feds approve sale of Potomac River power plant to data center developer — https://www.thebanner.com/economy/growth-development/charles-county-coal-data-center-ZHX6HMX5BNDS7HH6X42MKV7A4A/
TeraWulf: TeraWulf reports first quarter 2026 results — https://investors.terawulf.com/news-events/press-releases/detail/140/terawulf-reports-first-quarter-2026-results
Wikipedia: Morgantown, Maryland — https://en.wikipedia.org/wiki/Morgantown,_Maryland
TeraWulf: TeraWulf Expands Strategic Partnership with Fluidstack Through New 168 MW AI Compute Joint Venture — https://investors.terawulf.com/news-events/press-releases/detail/121/terawulf-expands-strategic-partnership-with-fluidstack-through-new-168-mw-ai-compute-joint-venture
TeraWulf: TeraWulf and Fluidstack Announce Successful Pricing of Project Financing for 168 MW HPC Compute Joint Venture — https://investors.terawulf.com/news-events/press-releases/detail/128/terawulf-and-fluidstack-announce-successful-pricing-of-project-financing-for-168-mw-hpc-compute-joint-venture
U.S. Securities and Exchange Commission (TeraWulf filing): TeraWulf Inc. Form 10-K for the fiscal year ended December 31, 2025 — https://www.sec.gov/Archives/edgar/data/1083301/000108330126000031/wulf-20251231.htm
TeraWulf: TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack — https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack
TeraWulf: TeraWulf Reports Second Quarter 2026 Results — https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
Wikipedia: Abernathy, Texas — https://en.wikipedia.org/wiki/Abernathy,_Texas
TeraWulf: TeraWulf Expands Digital and Power Infrastructure Portfolio with Strategic Acquisitions in Kentucky and Maryland — https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland
TeraWulf: TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack — https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack
TeraWulf: TeraWulf Reports Second Quarter 2026 Results — https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
TeraWulf: Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus — https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus
Wikipedia: Hawesville, Kentucky — https://en.wikipedia.org/wiki/Hawesville,_Kentucky
TeraWulf: TeraWulf secures long-term ground lease at Cayuga site to expand high-performance computing infrastructure — https://investors.terawulf.com/news-events/press-releases/detail/113
TeraWulf: TeraWulf reports first quarter 2026 results — https://investors.terawulf.com/news-events/press-releases/detail/140/terawulf-reports-first-quarter-2026-results
TeraWulf: TeraWulf reports second quarter 2026 results — https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
WBNG: Tompkins County residents oppose AI data center on Cayuga Lake — https://www.wbng.com/2026/01/28/tompkins-county-residents-oppose-ai-data-center-cayuga-lake/
FingerLakes1.com: What's next for Lansing data center after state moratorium? — https://www.fingerlakes1.com/2026/07/22/whats-next-for-lansing-data-center-after-state-moratorium/
Wikipedia: Lansing, New York — https://en.wikipedia.org/wiki/Lansing,_New_York
TeraWulf: TeraWulf Reports First Quarter 2025 Results — https://investors.terawulf.com/news-events/press-releases/detail/107/terawulf-reports-first-quarter-2025-results
TeraWulf: TeraWulf Signs 200+ MW, 10-Year AI Hosting Agreements with Fluidstack — https://investors.terawulf.com/news-events/press-releases/detail/112/terawulf-signs-200-mw-10-year-ai-hosting-agreements-with-fluidstack
TeraWulf: TeraWulf Announces Fluidstack Expansion with 160 MW CB-5 Lease at Lake Mariner — https://investors.terawulf.com/news-events/press-releases/detail/114/terawulf-announces-fluidstack-expansion-with-160-mw-cb-5-lease-at-lake-mariner
U.S. Securities and Exchange Commission (TeraWulf filing): TeraWulf Inc. Form 10-K for the fiscal year ended December 31, 2025 — https://www.sec.gov/Archives/edgar/data/1083301/000108330126000031/wulf-20251231.htm
TeraWulf: TeraWulf Reports Fourth Quarter and Full Year 2025 Results — https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results
TeraWulf: TeraWulf Reports Second Quarter 2026 Results — https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
Wikipedia: Barker, Niagara County, New York — https://en.wikipedia.org/wiki/Barker,_Niagara_County,_New_York
TeraWulf: TeraWulf expands infrastructure platform with acquisition of 1+ GW Eastern Kentucky HPC campus — https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus
TeraWulf: TeraWulf reports second quarter 2026 results — https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
TeraWulf: TeraWulf expands contracted power capacity at its Muskie Data Campus to 1 GW — https://investors.terawulf.com/news-events/press-releases/detail/146/terawulf-expands-contracted-power-capacity-at-its-muskie-data-campus-to-1-gw
WEKU: New data center project announced in northeastern Kentucky — https://www.weku.org/text/the-commonwealth/2026-05-26/new-data-center-project-announced-in-northeastern-kentucky
WSAZ: Neighbors ask questions and address concerns in data center town hall — https://www.wsaz.com/2026/06/02/neighbors-ask-questions-address-concerns-data-center-town-hall/
WEKU: TeraWulf tells investors it could double the size of one of its Kentucky data center projects — https://www.weku.org/the-commonwealth/2026-08-06/terawulf-tells-investors-it-could-double-the-size-of-one-of-its-ky-data-center-projects
Wikipedia: Boyd County, Kentucky — https://en.wikipedia.org/wiki/Boyd_County,_Kentucky
TELETIME: Terranova terá megaestruturas e estuda expansão de data centers no Brasil — https://teletime.com.br/19/02/2026/terranova-tera-megaestruturas-e-estuda-expansao-de-data-centers-no-brasil/
W.Media: Terranova starts construction on US$ 500 million data center campus in Brazil — https://w.media/terranova-starts-construction-on-us-500-million-data-center-campus-in-brazil/
Construction Review Online: Terranova breaks ground on 216 MW Data Centre in Campinas, São Paulo — https://constructionreviewonline.com/terranova-breaks-ground-on-216-mw-data-centre-in-campinas-sao-paulo/
Correio da Manhã: Campinas terá data center de R$ 5 bilhões voltado à Inteligência Artificial — https://www.correiodamanha.com.br/nacional/sao-paulo/campinas/2026/08/312866-campinas-tera-data-center-de-rs-5-bilhoes-voltado-a-inteligencia-artificial.html
Correio da Manhã: Data center de R$ 5 bilhões em Campinas vira alvo do Ministério Público Federal e Estadual — https://www.correiodamanha.com.br/nacional/sao-paulo/campinas/2026/08/314378-data-center-de-rs-5-bi-em-campinas-conti-samia-petta-e-orlando-silva-pedem-suspensao-ao-mpf-e-ao-mp-sp.html
Wikipedia: Barão Geraldo — https://en.wikipedia.org/wiki/Bar%C3%A3o_Geraldo
TELETIME: Terranova terá megaestruturas e estuda expansão de data centers no Brasil — https://teletime.com.br/19/02/2026/terranova-tera-megaestruturas-e-estuda-expansao-de-data-centers-no-brasil/
Construction Review Online: Terranova breaks ground on 216 MW data centre in Campinas, São Paulo — https://constructionreviewonline.com/terranova-breaks-ground-on-216-mw-data-centre-in-campinas-sao-paulo/
Wikipedia: Praia Grande — https://en.wikipedia.org/wiki/Praia_Grande
Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada): Black Bear Power Plant: Summary of the Initial Project Description — https://iaac-aeic.gc.ca/050/documents/p88747/158276E.pdf
Impact Assessment Agency of Canada: Black Bear Power Plant Project (Canadian Impact Assessment Registry, reference 88747) — https://iaac-aeic.gc.ca/050/evaluations/proj/88747
Teton Digital: Black Bear — https://tetondigital.io/black-bear
Daily Hive: A $1.3B power plant and data centre is in the works northwest of Edmonton — https://dailyhive.com/edmonton/power-plant-data-centre-swan-hills
DeSmog: U.S. Developer Tied to Failed Bitcoin Venture Is Proposing Major Alberta Data Centre — https://www.desmog.com/2026/07/27/u-s-developer-tied-to-failed-bitcoin-venture-is-proposing-major-alberta-data-centre/
Arizona's Family (KTVK/KPHO): Developer wants to power the future of AI in Buckeye with new data center — https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center
KTAR News (Phoenix Business Journal): $20 billion data center campus gets green light in Buckeye — https://ktar.com/arizona-news/20-billion-data-center-campus-gets-green-light-in-buckeye
Baxtel: Tract announces new gigawatt-scale data center park in Phoenix, Arizona — https://baxtel.com/news/tract-announces-new-gigawatt-scale-data-center-park-in-phoenix-arizona
Construction Review Online: $20bn Tract Data Center Park in Buckeye Advances to Horizontal Infrastructure Preparation Phase — https://constructionreviewonline.com/tract-secures-approval-for-20-billion-data-center-in-buckeye/
Wikipedia: Buckeye, Arizona — https://en.wikipedia.org/wiki/Buckeye,_Arizona
KJZZ: APS says it can't commit to new data centers because of electric grid constraints — https://www.kjzz.org/business/2026-09-02/aps-says-it-cant-commit-to-new-data-centers-because-of-electric-grid-constraints
Bisnow: Data Center Infrastructure Developer Takes 343-Acre Chicago-Area Swing — https://www.bisnow.com/news/chicago/data-center-capital-markets/data-center-infrastructure-developer-takes-343-acre-chicago-area-swing-132919
Vantage Data Centers: Vantage Data Centers Secures $1.6B Investment in APAC Platform from GIC and ADIA — https://vantage-dc.com/news/vantage-data-centers-secures-1-6b-investment-in-apac-platform-from-gic-and-adia/
W.Media: Vantage Data Centers completes purchase of Yondr's 300MW data center in Johor; closes US$1.6B investment in APAC — https://w.media/vantage-data-centers-completes-purchase-of-yondrs-300mw-data-center-in-johor-closes-us1-6b-investment-in-apac/
Vantage Data Centers: Johor, Malaysia Data Center Campus — https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Wikipedia: Sedenak — https://en.wikipedia.org/wiki/Sedenak
Vantage Data Centers (press release via Media OutReach, Viet Nam News): Vantage Data Centers Announces Second Campus in Cyberjaya — https://vietnamnews.vn/media-outreach/1536601/vantage-data-centers-announces-second-campus-in-cyberjaya.html
Vantage Data Centers: Vantage Data Centers Breaks Ground on 256MW Cyberjaya Campus — https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-256mw-cyberjaya-campus/
Vantage Data Centers: Cyberjaya II, Malaysia Campus — https://vantage-dc.com/data-center-locations/apac/cyberjaya-ii-malaysia/
Wikipedia: Cyberjaya — https://en.wikipedia.org/wiki/Cyberjaya
elDiario.es: Un gigante de los 'data centers' ligado a un amigo de Trump desembarca en Zaragoza aliado con empresarios aragoneses — https://www.eldiario.es/aragon/politica/gigante-data-centers-amigo-trump-desembarca-zaragoza-aliado-empresarios-aragoneses_1_12301095.html
Libertad Digital: Vantage levantará un centro de datos de hiperescala en Aragón con 3.200 millones de inversión — https://www.libertaddigital.com/espana/2025-09-12/azcon-anuncia-una-inversion-de-3-200-millones-para-un-centro-de-datos-de-vantage-en-aragon-7294927/
El Español: ¿De dónde sacará Vantage los 5.000 metros cúbicos de agua que necesita para sus centros de datos en Villanueva de Gállego? — https://www.elespanol.com/aragon/economia/20260320/sacara-vantage-metros-cubicos-agua-necesita-centros-datos-villanueva-gallego/1003744176774_0.html
Wikipedia: Villanueva de Gállego — https://en.wikipedia.org/wiki/Villanueva_de_G%C3%A1llego
Baxtel: Vermaland Plans $33bn Data Center in Arizona — https://baxtel.com/news/vermaland-plans-33bn-data-center-in-arizona
Construction Reporter: Massive Proposed Southern Arizona Data Center Business Park Moving Forward — https://constructionreporter.com/massive-proposed-southern-arizona-data-center-business-park-moving-forward/
KJZZ: Largest proposed data center in Arizona to be scaled back 80% after opposition — https://www.kjzz.org/fronteras-desk/2026-05-28/largest-proposed-data-center-in-arizona-to-be-scaled-back-80-after-opposition
KJZZ: Pinal County will vote on La Osa, which could become one of Arizona's largest data center projects — https://www.kjzz.org/politics/2026-08-25/pinal-county-will-vote-on-la-osa-which-could-become-one-of-arizonas-largest-data-center-projects
KJZZ: Pinal County rejects massive La Osa data center. Residents want more rules for future projects — https://www.kjzz.org/politics/2026-08-26/pinal-county-rejects-massive-la-osa-data-center-residents-want-more-rules-for-future-projects
Wikipedia: Eloy, Arizona — https://en.wikipedia.org/wiki/Eloy,_Arizona
VIRTUS Data Centres: VIRTUS Unveils €3BN, 300MW Wustermark Megacampus Project — https://virtusdatacentres.com/press-releases/virtus-unveils-3bn-300mw-wustermark-megacampus-project
VIRTUS Data Centres: VIRTUS installs two of Europe's largest super-grid transformers at Wustermark campus in Brandenburg — https://virtusdatacentres.com/press-releases/virtus-installs-two-of-europes-largest-super-grid-transformers-at-wustermark-campus-in-brandenburg
VIRTUS Data Centres: Berlin Data Centres | Wustermark Campus — https://virtusdatacentres.com/locations/germany/berlin-data-centres-wustermark-campus
WBS Power (via PR Newswire): WBS Power Advances 3.2 GW Energy Infrastructure for Hyperscale Data Center Campus — https://tools.prnewswire.com/en-us/live/20823/release/20260324EN14682
World Nuclear News: Data centre to be built near planned Polish nuclear power plant — https://wnn.world-nuclear.org/articles/data-centre-to-be-built-near-planned-polish-nuclear-power-plant
Gramwzielone.pl: Deweloper z rynku OZE postawi ogromne centrum danych na Pomorzu — https://www.gramwzielone.pl/?p=20353659
Wikipedia: Lublewo Lęborskie — https://en.wikipedia.org/wiki/Lublewo_L%C4%99borskie
Wikipedia: Gmina Choczewo — https://en.wikipedia.org/wiki/Gmina_Choczewo
Calgary.Tech: Kevin O'Leary leads visionary $70 billion AI data centre project in Alberta — https://calgary.tech/2024/12/09/kevin-oleary-leads-visionary-70-billion-ai-data-centre-project-in-alberta/
Natural Gas World: VC unveils plan for 7.5 GW data centre in Alberta — https://www.naturalgasworld.com/vc-unveils-plan-for-7.5-gw-data-centre-in-alberta-118787
Government of Alberta, Major Projects: Wonder Valley AI Data Centre Park (Phase 1) — https://majorprojects.alberta.ca/details/Wonder-Valley-AI-Data-Centre-Park/11477
O'Leary Digital Limited via PR Newswire: O'Leary Digital Forms Joint Venture to Advance 7.5 GW Wonder Valley Utah Campus; Alberta Permitting Underway — https://tools.prnewswire.com/en-us/live/20823/release/20260217EN90212
The Logic (republished by Geothermal Canada): The truth about Wonder Valley, Kevin O'Leary's data-centre dream — https://www.geothermalcanada.org/news/2025/12/17/the-truth-about-wonder-valley
Alberta Environmental Appeals Board: Standing Decision: Sturgeon Lake Cree Nation v Designated Director under the Water Act, re: Municipal District of Greenview No. 16, 2026 ABEAB 9 — https://www.eab.gov.ab.ca/media/r2slqi1d/eab-25-014-md-of-greenview-final.pdf
Hamilton Spectator (republished by Canada WaterPortal): First Nation's appeal on Wonder Valley water dismissed — https://waterportal.ca/water-news/wonder-valley-licence/
O'Leary Digital: Wonder Valley FAQ — https://www.olearydigital.ai/faq
Western Standard: Judge rejects Kevin O'Leary-backed data centre bid to halt First Nation challenge — https://www.westernstandard.news/news/judge-rejects-kevin-oleary-backed-data-centre-bid-to-halt-first-nation-challenge/75984
WMC Action News 5: xAI purchasing 1 million square feet of property in Southwest Memphis for expansion — https://www.actionnews5.com/2025/03/07/xai-purchasing-1-million-square-feet-property-southwest-memphis-expansion
Memphis Light, Gas and Water: MLGW update regarding utility support for xAI — https://www.mlgw.com/images/content/files/pdf/new/5-5-25%20xAI%20Update.pdf
DeSoto County News: xAI buys Southaven property — https://desotocountynews.com/desoto-county-news/xai-buys-southaven-property/
Mississippi Free Press: Mississippi permit board grants xAI's request for 41 Southaven gas turbines to power Memphis data center — https://www.mississippifreepress.org/mississippi-permit-board-grants-xais-request-for-41-southaven-gas-turbines-to-power-memphis-data-center/
Southern Environmental Law Center: Groups appeal air permit for xAI's personal power plant in North Mississippi — https://www.selc.org/press-release/groups-appeal-air-permit-for-xais-personal-power-plant/
Anthropic: Anthropic raises $65B in Series H funding at $965B post-money valuation — https://www.anthropic.com/news/series-h
WMC Action News 5: xAI announces fourth data center; turbines to be removed from Southaven site — https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/
Epoch AI: Colossus 2 | AI data centers — https://epoch.ai/data/ai-data-centers/directory/colossus-2
Cleanview: Colossus 1 & 2 | Behind-the-Meter Data Centers — https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus
WMC Action News 5: Elon Musk's xAI to build multi-billion-dollar supercomputer project in Memphis — https://www.actionnews5.com/2024/06/05/elon-musk-build-multi-billion-dollar-ai-supercomputer-project-memphis/
Memphis Light, Gas and Water: MLGW update regarding utility support for xAI — https://www.mlgw.com/images/content/files/pdf/new/5-5-25%20xAI%20Update.pdf
WMC Action News 5: Health dept. grants permit for xAI turbines — https://www.actionnews5.com/2025/07/02/health-dept-grants-permit-xai-turbines/
WMC Action News 5: xAI raises billions of dollars for expansion amid rapid growth in Memphis metro — https://www.actionnews5.com/2026/01/07/xai-raises-billions-dollars-expansion-amid-rapid-growth-memphis-metro
Anthropic: Higher usage limits for Claude and a compute deal with SpaceX — https://www.anthropic.com/news/higher-limits-spacex
Epoch AI: Colossus 1 | AI data centers — https://epoch.ai/data/ai-data-centers/directory/colossus-1
Cleanview: Colossus 1 & 2 | Behind-the-Meter Data Centers — https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus
Office of Governor Tate Reeves: Tech leader xAI investing more than $20 billion in Southaven — https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/
WREG (via Yahoo News): xAI investing $20B in Southaven, Mississippi facility, governor says — https://www.yahoo.com/news/articles/ms-governor-confirms-major-announcement-173629625.html
Converge Digest: xAI Commits $20B to 2-GW AI Data Center in Mississippi — https://convergedigest.com/xai-commits-20b-to-2-gw-ai-data-center-in-mississippi/
WMC Action News 5: xAI announces fourth data center; turbines to be removed from Southaven site — https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/
Cleanview: Colossus 1 & 2 | Behind-the-Meter Data Centers — https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus
GDS Holdings Limited (SEC Form 6-K exhibit): GDS Holdings Limited Reports First Quarter 2022 Results — https://www.sec.gov/Archives/edgar/data/1526125/000110465922062648/tm2215932d2_ex99-1.htm
YTL Power International Berhad: YTL to Advance AI Development in Malaysia in Collaboration with NVIDIA — https://www.ytlpowerinternational.com/press-releases/ytl-to-advance-ai-development-in-malaysia-in-collaboration-with-nvidia/
EdgeProp Malaysia (The Edge): YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational — https://api.edgeprop.my/content/1914263/ytl-power-completes-first-nvidia-powered-ai-data-centre-johor-ytl-ai-cloud-now-operational
W.Media: YTL Power completes Nvidia-powered AI data centre in Johor — https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/
EdgeProp Malaysia (The Edge): YTL Power to develop new gigawatt data centre campus in Johor — https://www.edgeprop.my/content/1917178/ytl-power-develop-new-gigawatt-data-centre-campus-johor
