  "schema_version": "1.0",
  "reviewed_at": "2026-10-13",
  "source_repository": "semiconductor_atlas",
  "source_directory": "datacenters/projects",
  "canonical_dataset": "verified_construction_core/2026-10-13",
  "canonical_inputs_sha256": {
    "projects.csv": "e702d4683282d2dabcdc6b26d63a61fbf230befd69f643f8bbc38a7365c82378",
    "sites.csv": "ac05d2208251f84a8a323700ab266f21d9c115a941f2763485e373ad56e29aed",
    "evidence.csv": "9c15e7b71c3e5debc78a8fd4b6f5cc31f2c7b583a2b1d181001a469de4c2cb7d"
  },
  "review_basis": "Manual identity and scope review of all local source JSON records against current release project/site tables and linked evidence metadata. This is a local-record reconciliation, not a new live verification of every external source claim.",
  "relationship_definitions": {
    "exact_project_match": "The same named development and current project scope; enrich existing project but keep source-specific capacity and date scope.",
    "same_site_distinct_scope": "Known same campus/site, but source encompasses broader campus or additional phases; preserve a separate source-scope project at the existing site.",
    "multi_site_program": "A source record explicitly covers more than one physical site; attach context without creating or merging a counted physical site.",
    "unique_source_record": "No matching named development found in the current release. Independent source record, not a claim of surveyed physical uniqueness.",
    "unresolved_identity": "Potential source-internal duplicate or umbrella/tenant relationship lacks enough identity evidence; retain full record outside independent counts until resolved."
  },
  "counts": {
    "source_records": 231,
    "canonical_projects": 201,
    "canonical_sites": 198,
    "exact_project_match": 11,
    "multi_site_program": 6,
    "same_site_distinct_scope": 21,
    "unique_source_record": 191,
    "unresolved_identity": 2
  },
  "rules": [
    "Never match solely on coordinates, town/county names, generic operator names, or regional program announcements.",
    "Preserve whole-campus versus building/phase scopes, and do not sum overlapping campus/phase capacity.",
    "A partially operational campus can contain an under-construction phase; these statuses are not inherently contradictory.",
    "A later source review date does not prove a later physical observation. Never overwrite selected physical status automatically.",
    "Retain existing reviewed geometry and all uncertainty; source administrative centroids do not supersede it.",
    "Local-record identity reconciliation does not revalidate external claims or convert estimated/projected metrics to observed facts."
  ],
  "records": [
    {
      "source_id": "acs-la-puebla-de-alfinden",
      "source_file": "acs-la-puebla-de-alfinden.json",
      "source_sha256": "69e8908bd90e2f014e7389846f8d9d7ba1b72c66e97d81c599cdd97fc5ec0265",
      "source_name": "ACS DC La Puebla data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragon",
        "admin2": "Zaragoza",
        "locality": "La Puebla de Alfindén",
        "lat": 41.634,
        "lon": -0.748,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s6"
        ],
        "note": "Town centroid from the La Puebla de Alfindén Wikipedia article. The regional plan describes the plot but no cited source gives coordinates for it."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.aragon.es/-/piga-acs-dc-la-puebla",
        "https://www.aragon.es/-/piga-acs-modificacion%201",
        "https://www.hoyaragon.es/articulo/noticias-aragon/acs/20250627135338101330.html",
        "https://www.elespanol.com/aragon/actualidad/20261005/cerca-millones-invertidos-centros-datos-aragon-esperan-rampa-salida-obras/1003744406849_0.html",
        "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
        "https://en.wikipedia.org/wiki/La_Puebla_de_Alfind%C3%A9n"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve ACS DC La Puebla data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "adaniconnex-hyderabad",
      "source_file": "adaniconnex-hyderabad.json",
      "source_sha256": "508b7ad271f69810c514c007242d12f6a36e300dcd10a8788ecfbd34ed33a5ab",
      "source_name": "AdaniConneX Hyderabad data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Telangana",
        "locality": "Hyderabad",
        "lat": 17.3888,
        "lon": 78.4611,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Sources name Hyderabad only. Coordinates are the OpenStreetMap Nominatim centroid of Hyderabad, not the site."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.adaniconnex.com/data-centers",
        "https://resources.adaniconnex.com/press-release/adaniconnexs-hyderabad-site-gets-five-star-grading-from-british-safety-council",
        "https://www.adani.com/newsroom/media-releases/Adani-Commits-USD-100-Bn-to-Sovereign-AI-Infrastructure"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AdaniConneX Hyderabad data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "ea847e06-abc6-5935-ad21-a3c0adbec711",
          "project_stable_key": "curated:capitaland-dc-itph-hyderabad:current-facility-build",
          "site_id": "vcc-site-f764d5138ed8928c53bc",
          "physical_site_stable_key": "curated:capitaland-dc-itph-hyderabad",
          "name": "CapitaLand DC ITPH Hyderabad Current Facility Build",
          "status": "under_construction",
          "status_as_of": "2026-07-29",
          "latitude": 17.43532415,
          "longitude": 78.38405032,
          "status_source_url": "https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf",
          "geometry_source_url": "https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-data-centreitphhyderabad.html",
          "reason": "CapitaLand ITPH is a different named developer/project; Hyderabad city proximity does not establish identity."
        }
      ]
    },
    {
      "source_id": "adaniconnex-navi-mumbai",
      "source_file": "adaniconnex-navi-mumbai.json",
      "source_sha256": "193775fdbca5097dbd6c024a44e410dc247bfb83b30db731a1223388de798d11",
      "source_name": "AdaniConneX Navi Mumbai data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Maharashtra",
        "locality": "Navi Mumbai",
        "lat": 19.0308,
        "lon": 73.0199,
        "precision": "locality",
        "source_ids": [
          "s1"
        ],
        "note": "The company names Navi Mumbai only. Coordinates are the OpenStreetMap Nominatim centroid of Navi Mumbai, not the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.adaniconnex.com/data-centers"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AdaniConneX Navi Mumbai data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "e62026de-3394-51f7-8823-44ee0da1801c",
          "project_stable_key": "curated:capitaland-dc-navi-mumbai-campus:tower-2",
          "site_id": "vcc-site-07ef7b0d529815ef1fe5",
          "physical_site_stable_key": "curated:capitaland-dc-navi-mumbai-campus",
          "name": "CapitaLand DC Navi Mumbai Tower 2",
          "status": "under_construction",
          "status_as_of": "2026-07-29",
          "latitude": 19.175772,
          "longitude": 73.000187,
          "status_source_url": "https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf",
          "geometry_source_url": "https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html",
          "reason": "CapitaLand Tower 2 is a different developer/project."
        },
        {
          "project_id": "118053c0-38ee-5fc1-9c4d-f4875cc3c32e",
          "project_stable_key": "curated:raiden-infotech-turbhe-midc-data-centre-campus:ec-531703-current-build",
          "site_id": "vcc-site-53d6b726e740613f2b41",
          "physical_site_stable_key": "curated:raiden-infotech-turbhe-midc-data-centre-campus",
          "name": "Raiden Infotech Turbhe MIDC Data Centre EC 531703 Current Build",
          "status": "under_construction",
          "status_as_of": "2026-08-03",
          "latitude": 19.055427473257335,
          "longitude": 73.02339212361213,
          "status_source_url": "https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=1544616&refId=1237477223&refType=COMPLIANCE&uuid=448f19a4-30c8-4bdd-8381-d845615e1f8d&version=1.1",
          "geometry_source_url": "https://parivesh.nic.in/dms/okm/downloadDocument?docTypemappingId=40829&refId=123711148&refType=caf&uuid=82bd367c-609c-46be-ab68-0d537b8e1d8e&version=1.0",
          "reason": "Raiden Infotech Turbhe is separately named; no identity evidence connects it to AdaniConneX."
        }
      ]
    },
    {
      "source_id": "adaniconnex-noida",
      "source_file": "adaniconnex-noida.json",
      "source_sha256": "02bf4b77017bb110b1b9fbfbd23a963b0ad025113b0d9a7b53c88560701891ee",
      "source_name": "AdaniConneX Noida data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Uttar Pradesh",
        "admin2": "Gautam Buddha Nagar",
        "locality": "Noida",
        "lat": 28.57,
        "lon": 77.32,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Sources name Noida only. Coordinates are the Noida city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.adaniconnex.com/data-centers",
        "https://resources.adaniconnex.com/press-release/adaniconnex-raises-usd-213-mn-construction-financing-facility"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AdaniConneX Noida data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "sify-noida-02",
          "relationship": "separate_named_developments",
          "reason": "Distinct AdaniConneX and Sify named developments; exactly shared coordinates are Noida city locators."
        }
      ]
    },
    {
      "source_id": "adaniconnex-pune",
      "source_file": "adaniconnex-pune.json",
      "source_sha256": "1e1befbb85b31275c876195ef6f9e930a3a0b09253f8bedd90d5a4b86a03b86a",
      "source_name": "AdaniConneX Pune data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Maharashtra",
        "admin2": "Pune",
        "locality": "Pune",
        "lat": 18.5211,
        "lon": 73.8553,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Sources name Pune only. Coordinates are the Pune city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-07-29",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.adaniconnex.com/data-centers",
        "https://www.adani.com/newsroom/media-releases/adani-enterprises-ltd-announces-q1-fy27-results",
        "https://www.adani.com/newsroom/media-releases/Adani-Commits-USD-100-Bn-to-Sovereign-AI-Infrastructure"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-52b1e1c3038357306a39",
      "canonical_project_id": null,
      "related_project_ids": [
        "48eb54d5-dd3f-51a3-aeed-1ddce1949763"
      ],
      "related_site_ids": [
        "vcc-site-52b1e1c3038357306a39"
      ],
      "reason": "Pune campus context includes operating first and second phases and 250 MW potential; existing record specifically selects PNQ04 current construction. Preserve campus metrics and operating status separately from PNQ04.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "48eb54d5-dd3f-51a3-aeed-1ddce1949763",
          "project_stable_key": "curated:adaniconnex-pune-data-center-campus:pnq04-current-build",
          "site_id": "vcc-site-52b1e1c3038357306a39",
          "physical_site_stable_key": "curated:adaniconnex-pune-data-center-campus",
          "name": "AdaniConneX Pune PNQ04 Current Build",
          "status": "under_construction",
          "status_as_of": "2026-06-01",
          "latitude": 18.6467083333,
          "longitude": 73.8072666667,
          "status_source_url": "https://resources.adaniconnex.com/blog/scaling-indias-data-centres-responsibly-for-the-ai-era-bridging-people-planet-and-growth",
          "geometry_source_url": "https://www.adaniconnex.com/-/media/Project/AdaniConneX/AdaniConneX-AboutUs-Assets/Certifications/Post-EC-compliance-report-PNQ26--with-Anneure.pdf"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-52b1e1c3038357306a39",
          "distance_km": 14.856,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "48eb54d5-dd3f-51a3-aeed-1ddce1949763",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-07-29",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-01",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "airtrunk-hyd1-chandanvelly",
      "source_file": "airtrunk-hyd1-chandanvelly.json",
      "source_sha256": "27d193e65f9d912a85ab0065cc236870fc7c001c8e7433fe5752dd934220ab08",
      "source_name": "AirTrunk HYD1 Hyderabad",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Telangana",
        "locality": "Chandanvelly",
        "lat": 17.2327,
        "lon": 78.1713,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4"
        ],
        "note": "AirTrunk names Chandanvelly, Hyderabad, without an address; the point is the Chandanvelly village coordinate from its Wikipedia article, so it marks the village rather than the parcel."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://airtrunk.com/location/hyd1-hyderabad/",
        "https://airtrunk.com/?p=16687",
        "https://w.media/airtunk-acquires-lumina-cloudinfra-makes-foray-into-india/",
        "https://en.wikipedia.org/wiki/Chandanvelly"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AirTrunk HYD1 Hyderabad as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "ctrls-chandanvelly-hyderabad",
          "relationship": "separate_named_developments",
          "reason": "Distinct AirTrunk HYD1 and CtrlS campus announcements share only the Chandanvelly locality locator."
        }
      ]
    },
    {
      "source_id": "airtrunk-jhb1-johor",
      "source_file": "airtrunk-jhb1-johor.json",
      "source_sha256": "5b578168c8367fe8d6fe866aaa05ffd0ece5be1a9e4a67e907ed93babaeab172",
      "source_name": "AirTrunk JHB1",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Johor Bahru District",
        "lat": 1.5367,
        "lon": 103.7206,
        "precision": "admin2",
        "source_ids": [
          "s1"
        ],
        "note": "AirTrunk places JHB1 in Johor Bahru without an address; coordinates are the OpenStreetMap Nominatim centroid of the Johor Bahru administrative area, which includes Iskandar Puteri."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2024-08-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://airtrunk.com/airtrunk-opens-ai-ready-data-centre-in-malaysia-accelerating-innovation-and-the-energy-transition/",
        "https://airtrunk.com/airtrunk-jhb1100mw-expansion-underway/",
        "https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/",
        "https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AirTrunk JHB1 as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "airtrunk-jhb2-iskandar-puteri",
      "source_file": "airtrunk-jhb2-iskandar-puteri.json",
      "source_sha256": "0b495ab41f673590844d48d51e7e7f81c6ac98fdba1296399f86729ceae7cdd3",
      "source_name": "AirTrunk JHB2",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Johor Bahru District",
        "locality": "Iskandar Puteri",
        "lat": 1.4523,
        "lon": 103.6145,
        "precision": "locality",
        "source_ids": [
          "s1"
        ],
        "note": "AirTrunk names Iskandar Puteri without an address; coordinates are the OpenStreetMap Nominatim centroid of Iskandar Puteri."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-29",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/",
        "https://airtrunk.com/data-centres/jhb2/",
        "https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/",
        "https://airtrunk.com/airtrunk-secures-us2-325b-green-financing-to-support-sustainable-digital-infrastructure-growth-in-malaysia/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AirTrunk JHB2 as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "airtrunk-jhb3-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB3 physical identity."
        },
        {
          "source_id": "airtrunk-jhb4-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB4 physical identity."
        }
      ]
    },
    {
      "source_id": "airtrunk-jhb3-iskandar-puteri",
      "source_file": "airtrunk-jhb3-iskandar-puteri.json",
      "source_sha256": "7c1fb46f123ac4e328ad4bc084ccc8eae3e11bb13329500ccce4da6872f63da1",
      "source_name": "AirTrunk JHB3 Johor Bahru",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Johor Bahru District",
        "locality": "Iskandar Puteri",
        "lat": 1.4222,
        "lon": 103.65,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4"
        ],
        "note": "AirTrunk and W.Media name Iskandar Puteri without an address; the point is the Iskandar Puteri coordinate from its Wikipedia article, so it marks the city rather than the campus."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-30",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/",
        "https://airtrunk.com/location/jhb3-johor-bahru/",
        "https://w.media/airtrunk-to-invest-us-3-billion-in-johor-to-build-two-hyperscale-campuses-totaling-280mw-capacity/",
        "https://en.wikipedia.org/wiki/Iskandar_Puteri"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AirTrunk JHB3 Johor Bahru as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "airtrunk-jhb4-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate JHB3 and JHB4 campuses, different site areas and 138/142 MW scopes; shared city centroid is not a shared site."
        },
        {
          "source_id": "airtrunk-jhb2-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB3 physical identity."
        }
      ]
    },
    {
      "source_id": "airtrunk-jhb4-iskandar-puteri",
      "source_file": "airtrunk-jhb4-iskandar-puteri.json",
      "source_sha256": "72508586d108a51e0f5dc5e2fd339c16d5c4aa33110cf6e353ec8f47193054b4",
      "source_name": "AirTrunk JHB4 Johor Bahru",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Johor Bahru District",
        "locality": "Iskandar Puteri",
        "lat": 1.4222,
        "lon": 103.65,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4"
        ],
        "note": "AirTrunk and W.Media name Iskandar Puteri without an address; the point is the Iskandar Puteri coordinate from its Wikipedia article, so it marks the city rather than the campus."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-30",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/",
        "https://airtrunk.com/location/jhb4-johor-bahru/",
        "https://w.media/airtrunk-to-invest-us-3-billion-in-johor-to-build-two-hyperscale-campuses-totaling-280mw-capacity/",
        "https://en.wikipedia.org/wiki/Iskandar_Puteri"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AirTrunk JHB4 Johor Bahru as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "airtrunk-jhb3-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate JHB3 and JHB4 campuses, different site areas and 138/142 MW scopes; shared city centroid is not a shared site."
        },
        {
          "source_id": "airtrunk-jhb2-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB4 physical identity."
        }
      ]
    },
    {
      "source_id": "airtrunk-kurri-kurri",
      "source_file": "airtrunk-kurri-kurri.json",
      "source_sha256": "8744c8432a1ec7ae76b18ea57f26cb38f3af00f679b2e71aa89d74bbbf2da60b",
      "source_name": "AirTrunk Kurri Kurri Data Centre",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "AU",
        "admin1": "New South Wales",
        "admin2": "City of Cessnock",
        "locality": "Loxford (Kurri Kurri)",
        "lat": -32.8167,
        "lon": 151.4833,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4",
          "s6"
        ],
        "note": "Sources name the former Kurri Kurri smelter site on Hart Road, Loxford, without coordinates; the point is the Kurri Kurri town coordinate from its Wikipedia article, so it marks the neighbouring town rather than the site."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-09-21",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://airtrunk.com/kurri-kurri/",
        "https://www.planningportal.nsw.gov.au/major-projects/projects/kurri-kurri-data-centre",
        "https://w.media/?p=43650",
        "https://newcastleweekly.com.au/540mw-ai-data-centre-planned-for-kurri-kurri/",
        "https://www.newcastleherald.com.au/story/9328857/kurri-data-centre-energy-whale-needs-its-own-power-supply/",
        "https://en.wikipedia.org/wiki/Kurri_Kurri"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AirTrunk Kurri Kurri Data Centre as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "airtrunk-tok1-inzai",
      "source_file": "airtrunk-tok1-inzai.json",
      "source_sha256": "34d989830b304f3052a15d3c5eacb4540ee9112e50b3d3dbdca7af3d32398cc8",
      "source_name": "AirTrunk TOK1 Tokyo East",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "JP",
        "admin1": "Chiba Prefecture",
        "locality": "Inzai",
        "lat": 35.8323,
        "lon": 140.1453,
        "precision": "locality",
        "source_ids": [
          "s1"
        ],
        "note": "AirTrunk's TOK1 page places the campus in Inzai's data center hub without an address; coordinates are the OpenStreetMap Nominatim centroid of Inzai City."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-03-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://airtrunk.com/data-centres/tok1/",
        "https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/",
        "https://airtrunk.com/airtrunk-breaks-ground-on-40mw-phase-of-tok1-japans-largest-hyperscale-data-centre-campus/",
        "https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AirTrunk TOK1 Tokyo East as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aker-nscale-korgen",
      "source_file": "aker-nscale-korgen.json",
      "source_sha256": "503b32dd135f5fe7679802d2ab9ad4eda2bfb77b188ea5de8830a7d7cfeb20f7",
      "source_name": "Aker Nscale Korgen AI data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "NO",
        "admin1": "Nordland",
        "admin2": "Hemnes Municipality",
        "locality": "Korgen",
        "lat": 66.0766,
        "lon": 13.8219,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Korgen village centroid from Nominatim; sources say the plot is in a designated area at Korgen, possibly at Nedre Røssåga power station, but do not give a parcel."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-10-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://en.highnorthnews.com/business/aker-nscale-planning-another-ai-data-center-in-northern-norway/118322",
        "https://www.datacenter-forum.com/nscale/aker-nscale-plans-to-build-large-ai-data-center-in-northern-norway",
        "https://thetechcapital.com/nscale-expands-ai-infrastructure-with-new-250-mw-data-centre-project-in-norway/",
        "https://www.placera.se/pressmeddelanden/aker-aker-completes-investment-in-nscales-series-c-funding-round-20260327"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Aker Nscale Korgen AI data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "applied-digital-delta-forge-1",
      "source_file": "applied-digital-delta-forge-1.json",
      "source_sha256": "683e94b0ef0d2a832d315284bdbcbe096c8934d7431d72e9b99e4e5b3eb466e8",
      "source_name": "Applied Digital Delta Forge 1",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Louisiana",
        "admin2": "Rapides Parish",
        "locality": "Boyce",
        "lat": 31.3906,
        "lon": -92.67,
        "precision": "locality",
        "source_ids": [
          "s3",
          "s4",
          "s5"
        ],
        "note": "Town centroid of Boyce from its Wikipedia coordinates (s5), which also places Boyce in Rapides Parish. The July 2026 results release (s3) names Boyce, Louisiana; earlier releases described only a southern US state. No parcel found."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai",
        "https://ir.applieddigital.com/news-events/press-releases/detail/149/applied-digital-announces-new-u-s-based-high",
        "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
        "https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm",
        "https://en.wikipedia.org/wiki/Boyce,_Louisiana"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-60a52daa24c85edeb3a2",
      "canonical_project_id": "b7744ad5-aa48-5977-a70e-3d6a588f468d",
      "related_project_ids": [
        "b7744ad5-aa48-5977-a70e-3d6a588f468d"
      ],
      "related_site_ids": [
        "vcc-site-60a52daa24c85edeb3a2"
      ],
      "reason": "Same named Delta Forge 1 development in Boyce near Alexandria; source and release share the issuer July 2026 results URL. Existing current build and source initial two-facility development describe the same project.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "b7744ad5-aa48-5977-a70e-3d6a588f468d",
          "project_stable_key": "curated:applied-digital-delta-forge-1-alexandria:current-build",
          "site_id": "vcc-site-60a52daa24c85edeb3a2",
          "physical_site_stable_key": "curated:applied-digital-delta-forge-1-alexandria",
          "name": "Delta Forge 1 Current Construction",
          "status": "under_construction",
          "status_as_of": "2026-07-27",
          "latitude": 31.38257035,
          "longitude": -92.68620569018782,
          "status_source_url": "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
          "geometry_source_url": "https://api.openstreetmap.org/api/0.6/way/1545345944/full.json"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-60a52daa24c85edeb3a2",
          "distance_km": 1.779,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year"
      ],
      "status_comparisons": [
        {
          "project_id": "b7744ad5-aa48-5977-a70e-3d6a588f468d",
          "source_status": "under_construction",
          "source_status_as_of": "2026-10-07",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-27",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "applied-digital-delta-forge-2",
      "source_file": "applied-digital-delta-forge-2.json",
      "source_sha256": "b03b12cab07c4066e18d739678497dce456d5b49fe18a96ae318d911486a5d5d",
      "source_name": "Applied Digital Delta Forge 2",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Alabama",
        "admin2": "Tuscaloosa County",
        "locality": "Brookwood",
        "lat": 33.2397,
        "lon": -87.3278,
        "precision": "locality",
        "source_ids": [
          "s3",
          "s4",
          "s5"
        ],
        "note": "Local reports place the campus north of the 17000 block of Brookwood Parkway. No geocoder was used; coordinates are the Brookwood city point from its Wikipedia article."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2",
        "https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm",
        "https://abc3340.com/news/local/alabama-32-billion-ai-data-center-campus-announced-in-brookwood-brookwood-mayor-joe-barger-september-2026",
        "https://www.fox10tv.com/2026/09/25/applied-digital-confirms-32-billion-data-center-campus-brookwood/",
        "https://en.wikipedia.org/wiki/Brookwood,_Alabama"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Applied Digital Delta Forge 2 as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "applied-digital-polaris-forge-1",
      "source_file": "applied-digital-polaris-forge-1.json",
      "source_sha256": "60c9d000b3220b2cc23d8ae0919df487da9838af251bd0a6dc5435df2b7b159e",
      "source_name": "Applied Digital Polaris Forge 1",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "North Dakota",
        "admin2": "Dickey County",
        "locality": "Ellendale",
        "lat": 46.0042,
        "lon": -98.5253,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s6",
          "s7",
          "s9"
        ],
        "note": "Town centroid of Ellendale from its Wikipedia coordinates (s9), which also places the town in Dickey County; the company sources name the town but give no street address or parcel."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with",
        "https://ir.applieddigital.com/news-events/press-releases/detail/133/applied-digital-achieves-ready-for-service-for-phase-1-at",
        "https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at",
        "https://ir.applieddigital.com/news-events/press-releases/detail/150/applied-digital-announces-300-million-senior-secured",
        "https://ir.applieddigital.com/_assets/_f6377ac165e571402492e7df82cea1ee/appliedblockchaininc/news/2026-06-09_Applied_Digital_Announces_Pricing_of_1_59_Billion__156.pdf",
        "https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai",
        "https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm",
        "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
        "https://en.wikipedia.org/wiki/Ellendale,_North_Dakota"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-0ac82fd201fa1878b892",
      "canonical_project_id": null,
      "related_project_ids": [
        "20ee1eea-91bf-52aa-a464-c4a38d436f9e"
      ],
      "related_site_ids": [
        "vcc-site-0ac82fd201fa1878b892"
      ],
      "reason": "Same Ellendale campus, confirmed by shared issuer results source. Source includes operating ELN buildings and planned total campus; existing record selects the remaining construction expansion.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "20ee1eea-91bf-52aa-a464-c4a38d436f9e",
          "project_stable_key": "curated:applied-digital-polaris-forge-1:current-expansion",
          "site_id": "vcc-site-0ac82fd201fa1878b892",
          "physical_site_stable_key": "epoch-ai:data-center:ae2c8749-c97f-5512-a0ad-a40ed8df37ce",
          "name": "Polaris Forge 1 Current Expansion",
          "status": "under_construction",
          "status_as_of": "2026-07-27",
          "latitude": 46.014383,
          "longitude": -98.574269,
          "status_source_url": "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
          "geometry_source_url": "https://ceris.deq.nd.gov/ext/ncore/downloadfile/6356745512656156278"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-0ac82fd201fa1878b892",
          "distance_km": 3.948,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year"
      ],
      "status_comparisons": [
        {
          "project_id": "20ee1eea-91bf-52aa-a464-c4a38d436f9e",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-10-07",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-27",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "applied-digital-polaris-forge-2",
      "source_file": "applied-digital-polaris-forge-2.json",
      "source_sha256": "047b9b505b31894458144560324dbb84fcdb981e323fb2a820e72ffb50852454",
      "source_name": "Applied Digital Polaris Forge 2",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "North Dakota",
        "admin2": "Cass County",
        "locality": "Harwood",
        "lat": 46.9769,
        "lon": -96.8811,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4",
          "s6"
        ],
        "note": "Town centroid of Harwood from its Wikipedia coordinates (s6), which also places Harwood in Cass County; company sources say only that the campus is near Harwood and give no parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge",
        "https://markets.financialcontent.com/franklincredit/article/gnwcq-2025-10-22-applied-digital-announces-5-billion-ai-factory-lease-with-us-based-investment-grade-hyperscaler-at-polaris-forge-2-nd-campus",
        "https://www.valleynewslive.com/2026/03/10/applied-digital-closes-215b-deal-build-out-harwood-ai-campus/",
        "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
        "https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm",
        "https://en.wikipedia.org/wiki/Harwood,_North_Dakota"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-847f0ddc67e6e40ce38a",
      "canonical_project_id": null,
      "related_project_ids": [
        "12407b2e-a44d-5c8d-aa62-c7b64045e20f"
      ],
      "related_site_ids": [
        "vcc-site-847f0ddc67e6e40ce38a"
      ],
      "reason": "Same Harwood campus, confirmed by shared issuer results source. Source includes 1 GW campus potential and first 200 MW leases; existing current construction is a narrower active-build scope.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "12407b2e-a44d-5c8d-aa62-c7b64045e20f",
          "project_stable_key": "curated:applied-digital-polaris-forge-2-harwood:current-construction",
          "site_id": "vcc-site-847f0ddc67e6e40ce38a",
          "physical_site_stable_key": "curated:applied-digital-polaris-forge-2-harwood",
          "name": "Polaris Forge 2 Current Construction",
          "status": "under_construction",
          "status_as_of": "2026-07-27",
          "latitude": 46.96693921427165,
          "longitude": -96.86849216498359,
          "status_source_url": "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
          "geometry_source_url": "https://gisweb.casscountynd.gov/arcgis/rest/services/OpenData/OpenData/FeatureServer/7/query?where=GISPIN%3D%2775000000120020%27&outFields=OBJECTID,GISPIN,DASHPIN,Name,PropertyAddress,ACRES,Section,LandCity,LandSt,LandZip&returnGeometry=true&outSR=4326&f=pjson"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-847f0ddc67e6e40ce38a",
          "distance_km": 1.464,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year"
      ],
      "status_comparisons": [
        {
          "project_id": "12407b2e-a44d-5c8d-aa62-c7b64045e20f",
          "source_status": "under_construction",
          "source_status_as_of": "2026-10-07",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-27",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "applied-digital-polaris-forge-3",
      "source_file": "applied-digital-polaris-forge-3.json",
      "source_sha256": "765b34903aa389a6b11907ae3e16f2574c29e545b9fa29cb2d211a3518e4b8ae",
      "source_name": "Applied Digital Polaris Forge 3",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "North Dakota",
        "admin2": "Oliver County",
        "locality": "Center",
        "lat": 47.115,
        "lon": -101.2978,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s3",
          "s4"
        ],
        "note": "Town centroid of Center from its Wikipedia coordinates (s4). The October 2026 earnings release (s3) names Center, Oliver County; no parcel or address has been found."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://ir.applieddigital.com/news-events/press-releases/detail/152/applied-digital-reaches-significant-milestone-surpassing-1",
        "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
        "https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000057/apldq127earningsrelease.htm",
        "https://en.wikipedia.org/wiki/Center,_North_Dakota"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Applied Digital Polaris Forge 3 as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "art-data-centres-ennis",
      "source_file": "art-data-centres-ennis.json",
      "source_sha256": "b211091ff27ae35941b0c37d43341e3df0fc68010f2f6c45b94fe17ebb8ace73",
      "source_name": "Art Data Centres Ennis campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IE",
        "admin1": "County Clare",
        "locality": "Ennis",
        "lat": 52.8463,
        "lon": -8.9807,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Ennis town centroid from its Wikipedia article. Clare FM places the site beside the Tulla Road on the town's eastern side near M18 junction 13, but no cited source gives coordinates."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-03-25",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.clare.fm/news/high-court-clears-way-for-construction-of-e1-6bn-ennis-data-centre-project/",
        "https://www.industrialinfo.com/iirenergy/industry-news/article/court-clears-way-for-major-irish-data-center--355133",
        "https://bebeez.eu/en/news/art-data-centres-ennis-campus-judicial-review-gets-dismissed/",
        "https://en.wikipedia.org/wiki/Ennis"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Art Data Centres Ennis campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "atnorth-haugaland-nor01",
      "source_file": "atnorth-haugaland-nor01.json",
      "source_sha256": "0e23df66801d383feec8e86c8dc5fcceccfd0906ed6b26d498cadd6b6c7dd286",
      "source_name": "atNorth NOR01 Haugaland mega site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "NO",
        "admin1": "Rogaland",
        "admin2": "Tysvær Municipality",
        "locality": "Haugaland Business Park",
        "lat": 59.3154,
        "lon": 5.4252,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "atNorth names Haugaland Business Park in Tysvær; the business park was geocoded with OpenStreetMap, but the specific plot within it was not identified."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.atnorth.com/news/atnorth-expands-to-norway-with-new-mega-site-in-haugaland/",
        "https://www.atnorth.com/nordic-data-centers/norway-data-centers/haugaland-nor01/",
        "https://rcrtech.com/ai-infrastructure-news/atnorth-ai-demand-norway/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve atNorth NOR01 Haugaland mega site as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "atnorth-salo-fin05",
      "source_file": "atnorth-salo-fin05.json",
      "source_sha256": "b232b45c60aab63fc845fadadb304a28ccbf6e63d347d5c42ff3837fb50d61a7",
      "source_name": "atNorth FIN05 Salo mega site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "FI",
        "admin1": "Southwest Finland",
        "admin2": "Salo",
        "locality": "Salo",
        "lat": 60.3879,
        "lon": 23.1249,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Sources name Salo without a street address; the coordinates are the Nominatim point for Salo's central district (Salon suuralue)."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.atnorth.com/news/atnorth-to-develop-new-data-center-in-salo-finland/",
        "https://www.atnorth.com/nordic-data-centers/finland-data-centers/salo-fin05/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve atNorth FIN05 Salo mega site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "atnorth-solleftea-swe04",
      "source_file": "atnorth-solleftea-swe04.json",
      "source_sha256": "34a817b565e9c05e94e96586d55fc27c3c37e1588ab116b74dbb5d49d816d843",
      "source_name": "atNorth SWE04 Sollefteå mega site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SE",
        "admin1": "Västernorrland County",
        "admin2": "Sollefteå Municipality",
        "locality": "Långsele",
        "lat": 63.1785,
        "lon": 17.0671,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "Site is the Hamre property (Hamre 4:87 after subdivision) in Hamre Industrial Park, Långsele; the Långsele village centroid from Nominatim is used because the parcel was not geocoded."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.atnorth.com/news/new-300mw-mega-site-in-solleftea-sweden/",
        "https://www.atnorth.com/nordic-data-centers/sweden-data-centers/solleftea-swe04/",
        "https://www.atnorth.com/wp-content/uploads/2026/06/SWE04-Samradsunderlag-260616.pdf"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve atNorth SWE04 Sollefteå mega site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "atnorth-varde-den02",
      "source_file": "atnorth-varde-den02.json",
      "source_sha256": "4b7bf069a7c1e0b13db06d04a550709ccba9f7849ec8c0fdbf87ed931c04d47a",
      "source_name": "atNorth DEN02 Varde mega site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "DK",
        "admin1": "Region of Southern Denmark",
        "admin2": "Varde Municipality",
        "locality": "Ølgod",
        "lat": 55.8058,
        "lon": 8.6181,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s3"
        ],
        "note": "Local press places the site at Krageris, north and northeast of Ølgod; Krageris was not found in Nominatim, so the Ølgod village centroid is used."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-11",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.atnorth.com/nordic-data-centers/denmark-data-centers/varde-mega-site/",
        "https://www.atnorth.com/in-the-news/atnorths-data-center-to-supply-district-heating/",
        "https://www.atnorth.com/in-the-news/local-firms-prepare-for-major-project-in-varde/",
        "https://www.atnorth.com/news/selected-group-will-utilize-surplus-heat-from-atnorths-den02-data-center/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve atNorth DEN02 Varde mega site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-clinton-hinds-county-mississippi",
      "source_file": "aws-clinton-hinds-county-mississippi.json",
      "source_sha256": "197d305dbb364c7d07b35ffedf1a982ef5ce5ce6f55bd1ad9f80480fb7a264b7",
      "source_name": "AWS Clinton data center (former Delphi plant)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Mississippi",
        "admin2": "Hinds County",
        "locality": "Clinton",
        "lat": 32.3583,
        "lon": -90.3556,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Coordinates are the Clinton city point from its Wikipedia article (Nominatim was unavailable). One local TV report places the site on Industrial Park Drive but calls it the former Milwaukee Tool factory, which conflicts with the Delphi identification, so no site point is used."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-06-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/",
        "https://www.wlox.com/2026/04/09/gov-reeves-local-leaders-announce-amazons-plans-invest-25-billion-across-mississippi/",
        "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
        "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
        "https://www.mississippifreepress.org/amazon-is-expanding-data-centers-in-central-mississippi-governor-announces/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AWS Clinton data center (former Delphi plant) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-douglas-county-georgia",
      "source_file": "aws-douglas-county-georgia.json",
      "source_sha256": "a6d2fb8d84da9a7b9eb13c865f28c08b4601c2c86680e165731651fe03f85cca",
      "source_name": "AWS Douglas County data center campuses",
      "source_scope": "multi_site_program",
      "source_location": {
        "country": "US",
        "admin1": "Georgia",
        "admin2": "Douglas County",
        "lat": 33.7,
        "lon": -84.77,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Amazon did not disclose the sites; coordinates are the Douglas County point from its Wikipedia article (Nominatim was unavailable)."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-01-08",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://elevatedouglas.com/wp-content/uploads/2025/01/AWS-Douglas-County-Release-01072025.pdf",
        "https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/",
        "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure"
      ],
      "relationship": "multi_site_program",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "Source describes undisclosed plural AWS campuses across Douglas County and a wider Douglas/Butts investment program. The county centroid is regional context; no exact physical site or one-campus scope can be inferred.",
      "integration_action": "retain_program_context_without_new_site_or_project",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "geometry_policy": "Do not render the regional representative point as a physical project/site. Retain the full program record and named component list until individually scoped sites are resolved.",
      "unmapped_components": [
        {
          "name": "Undisclosed AWS Douglas County campuses",
          "reason": "Source explicitly says exact sites were not disclosed; no supported individual site count or coordinates."
        }
      ]
    },
    {
      "source_id": "aws-fayette-county-ohio",
      "source_file": "aws-fayette-county-ohio.json",
      "source_sha256": "85ad47d479b5f28757e0d4c6497199eb478e8eb90dbff4149207dc31c317c713",
      "source_name": "AWS Fayette County data center site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Ohio",
        "admin2": "Fayette County",
        "lat": 39.56,
        "lon": -83.45,
        "precision": "admin2",
        "source_ids": [
          "s1"
        ],
        "note": "Amazon names only the county; coordinates are the Fayette County point from its Wikipedia article (Nominatim was unavailable)."
      },
      "source_status": "announced",
      "source_status_as_of": "2024-12-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.aboutamazon.com/news/aws/aws-continues-to-invest-in-ohio"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AWS Fayette County data center site as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-hobart-indiana",
      "source_file": "aws-hobart-indiana.json",
      "source_sha256": "f2ce9535d16087690864b90f1781cf9f90ad27c1059a9800bd5680af3178790d",
      "source_name": "Amazon Web Services Hobart data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Indiana",
        "admin2": "Lake County",
        "locality": "Hobart",
        "lat": 41.5286,
        "lon": -87.2675,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s3",
          "s6"
        ],
        "note": "Coordinates are the Hobart city coordinates from its Wikipedia page. The cited sources name the city but give no parcel or street location."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-25",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers",
        "https://www.21alivenews.com/2025/11/25/hobart-reaches-agreement-with-amazon-next-gen-data-center/",
        "https://fox32chicago.com/news/hobart-approves-11b-amazon-data-center-details-still-unclear",
        "https://www.fox32chicago.com/news/lawsuit-seeks-block-amazon-data-center-permit-hobart-ind",
        "https://www.wbur.org/hereandnow/2026/08/25/indiana-power-data-centers",
        "https://en.wikipedia.org/wiki/Hobart,_Indiana"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Amazon Web Services Hobart data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-king-george-county-virginia",
      "source_file": "aws-king-george-county-virginia.json",
      "source_sha256": "46efdd86f1bee352e35c0512fed5126aa422d0e62080316c1b1b464761c54c0c",
      "source_name": "Amazon Web Services King George County campus (Birchwood site)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Virginia",
        "admin2": "King George County",
        "locality": "Sealston",
        "lat": 38.2614,
        "lon": -77.3319,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s6"
        ],
        "note": "Coordinates are the Sealston community coordinates from its Wikipedia page. Sources place the campus at the former Birchwood power plant on State Route 3 in the Sealston area but give no parcel coordinates."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.bisnow.com/news/national/data-center/amazon-data-center-campus-planned-for-king-george-county-va-as-project-clears-key-hurdle-120212",
        "https://www.hirschlerlaw.com/newsroom-news-historic-rezoning-massive-data-center-king-george-county",
        "https://www.bisnow.com/news/national/data-center/virginia-county-backtracks-on-agreement-with-amazon-for-6b-data-center-campus-122327",
        "https://www.fredericksburgfreepress.com/?p=107200",
        "https://baxtel.com/data-center/amazon-king-george-va",
        "https://en.wikipedia.org/wiki/Sealston,_Virginia"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Amazon Web Services King George County campus (Birchwood site) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-lake-anna-technology-campus-louisa-county",
      "source_file": "aws-lake-anna-technology-campus-louisa-county.json",
      "source_sha256": "edf751299048511326a12a3de25e631fd2958e0919d7c2d236a39862ab624d49",
      "source_name": "AWS Lake Anna Technology Campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Virginia",
        "admin2": "Louisa County",
        "lat": 38.0606,
        "lon": -77.7894,
        "precision": "approximate_site",
        "source_ids": [
          "s2",
          "s3"
        ],
        "note": "The campus sits at Kentucky Springs Road (Route 652) and Haley Drive (Route 700), next to the North Anna Power Station. Geocoding was unavailable, so coordinates are the power station's location from its Wikipedia article; the campus lies beside it."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-03-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.louisacounty.gov/CivicAlerts.aspx?AID=363&ARC=2233",
        "https://lakeannalife.com/amazon-planning-to-commence-work-at-lake-anna-technology-campus/",
        "https://www.louisacounty.gov/m/faq?cat=40",
        "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AWS Lake Anna Technology Campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-madison-county-mississippi",
      "source_file": "aws-madison-county-mississippi.json",
      "source_sha256": "787d65c414039f3b5aa1a7add8d347afd2a896f2b842895637b1f1c1ddb37d35",
      "source_name": "AWS Madison County data center project (Canton and Ridgeland campuses)",
      "source_scope": "multi_site_program",
      "source_location": {
        "country": "US",
        "admin1": "Mississippi",
        "admin2": "Madison County",
        "lat": 32.63,
        "lon": -90.03,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s3",
          "s6"
        ],
        "note": "The record covers one project with two campuses announced together: the Canton mega site (off Highway 22 and Nissan Parkway) and the Ridgeland site (Highland Colony Parkway and West County Line Road). Because the campuses are apart, coordinates are the Madison County point from its Wikipedia article."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-18",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://archive.vicksburgnews.com/amazon-web-services-plans-to-invest-10-billion-creating-1000-jobs-to-establish-data-center-complexes-in-mississippi/",
        "https://picayuneitem.com/?p=144178",
        "https://vicksburgnews.com/aws-plans-10-billion-data-center-investment-in-mississippi/",
        "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
        "https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/",
        "https://www.wlox.com/2026/04/09/gov-reeves-local-leaders-announce-amazons-plans-invest-25-billion-across-mississippi/",
        "https://www.wlbt.com/2026/08/18/madison-county-amazon-spar-over-data-center-tax-values/"
      ],
      "relationship": "multi_site_program",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "The source explicitly combines two separate AWS campuses: the Madison County Mega Site near Canton and Ridgeland near West County Line Road. Different completion states are reported. Preserve the program context without inventing a single physical site or assigning combined investment/capacity to either campus.",
      "integration_action": "retain_program_context_without_new_site_or_project",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "geometry_policy": "Do not render the regional representative point as a physical project/site. Retain the full program record and named component list until individually scoped sites are resolved.",
      "unmapped_components": [
        {
          "name": "AWS Madison County Mega Site near Canton",
          "reason": "Source identifies five completed buildings at Canton but provides only a county representative point for the program."
        },
        {
          "name": "AWS Ridgeland campus near West County Line Road",
          "reason": "Source explicitly names this as the second campus and says no buildings complete as of August 2026; needs its own locator and scoped facts."
        }
      ]
    },
    {
      "source_id": "aws-project-rainier-new-carlisle",
      "source_file": "aws-project-rainier-new-carlisle.json",
      "source_sha256": "3b7a34a1562fe2d14287f8706f517b88b84b80c42b6c7373b0d0cf97e261546d",
      "source_name": "AWS New Carlisle data center campus (Project Rainier)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Indiana",
        "admin2": "St. Joseph County",
        "locality": "New Carlisle",
        "lat": 41.7006,
        "lon": -86.4964,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s5",
          "s6"
        ],
        "note": "Sources place the campus in the Indiana Enterprise Center near New Carlisle but give no parcel or address; coordinates are the New Carlisle town point from its Wikipedia article (Nominatim was unavailable)."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-07-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
        "https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use",
        "https://convergedigest.com/aws-activates-project-rainier-data-center-campus/",
        "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
        "https://wsbt.com/news/local/first-look-at-amazons-new-carlisle-data-centers-administration-building-campus-11-billion-dollar-investment-recruit-workers-technical-careers-multiple-buildings",
        "https://www.wndu.com/2026/07/23/amazon-web-services-investment-st-joseph-county-data-center-campus-surpasses-138-billion/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AWS New Carlisle data center campus (Project Rainier) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-richmond-county-north-carolina",
      "source_file": "aws-richmond-county-north-carolina.json",
      "source_sha256": "4f97dccd7654b4406aadcab82064d70b4bdefaaea8f45c1f88d456313a5a895f",
      "source_name": "AWS Richmond County data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "North Carolina",
        "admin2": "Richmond County",
        "lat": 35.0,
        "lon": -79.76,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "The opened sources name only Richmond County (the announcement was held in Hamlet); coordinates are the county point from its Wikipedia article (Nominatim was unavailable)."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://abc11.com/16658676",
        "https://www.witn.com/2025/06/04/amazon-planning-10b-investment-north-carolina-data-center-ai-campus/",
        "https://www.aboutamazon.com/news/aws/aws-investment-north-carolina-ai-cloud-infrastructure",
        "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AWS Richmond County data center campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "aws-salem-township-pennsylvania",
      "source_file": "aws-salem-township-pennsylvania.json",
      "source_sha256": "c993320812fc50d933736bb71f6e817a7ac63c5c196656835649e75edb4e0cc4",
      "source_name": "AWS Salem Township Innovation Campus (Susquehanna)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Pennsylvania",
        "admin2": "Luzerne County",
        "locality": "Salem Township",
        "lat": 41.0889,
        "lon": -76.1489,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Sources place the campus adjacent to the Susquehanna Steam Electric Station but give no address; coordinates are the plant location from its Wikipedia article, so the campus point is approximate."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://local21news.com/news/local/talen-energy-announces-sale-of-data-center-campus-to-amazon",
        "https://phillyvoice.com/amazon-pennsylvania-data-center-salem-luzerne-county",
        "https://www.publicpower.org/periodical/article/talen-energy-expands-nuclear-energy-relationship-with-amazon",
        "https://wnn.world-nuclear.org/articles/new-supply-agreement-expands-talen-amazon-partnership",
        "https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation",
        "https://www.amazoninnovationinpa.com/salem-township-innovation-campus/",
        "https://www.amazoninnovationinpa.com/projects-across-pennsylvania/"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-b065c16b51237fbb767f",
      "canonical_project_id": null,
      "related_project_ids": [
        "c73ac912-e44d-5477-84f5-c5beb4813518"
      ],
      "related_site_ids": [
        "vcc-site-b065c16b51237fbb767f"
      ],
      "reason": "Same acquired Cumulus/AWS Salem Township campus beside Susquehanna, with shared Amazon campus URL. Source spans the operating campus and long-term buildout; existing record selects active campus construction.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "approximate_locator_not_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "c73ac912-e44d-5477-84f5-c5beb4813518",
          "project_stable_key": "curated:amazon-salem-township-innovation-campus:active-buildout",
          "site_id": "vcc-site-b065c16b51237fbb767f",
          "physical_site_stable_key": "curated:amazon-salem-township-innovation-campus",
          "name": "Amazon Salem Township Active Campus Buildout",
          "status": "under_construction",
          "status_as_of": "2026-07-19",
          "latitude": 41.0839907,
          "longitude": -76.14337485,
          "status_source_url": "https://www.amazoninnovationinpa.com/salem-township-innovation-campus/",
          "geometry_source_url": "https://www.openstreetmap.org/way/1334234458"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-b065c16b51237fbb767f",
          "distance_km": 0.716,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://www.amazoninnovationinpa.com/salem-township-innovation-campus/"
      ],
      "status_comparisons": [
        {
          "project_id": "c73ac912-e44d-5477-84f5-c5beb4813518",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-10-09",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-19",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "aws-vicksburg-warren-county-mississippi",
      "source_file": "aws-vicksburg-warren-county-mississippi.json",
      "source_sha256": "6949c11c8bd0d18cf3e974952a3984290ab3afa7d024b48705c446ff2c41ee1e",
      "source_name": "AWS Vicksburg data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Mississippi",
        "admin2": "Warren County",
        "locality": "Vicksburg",
        "lat": 32.3525,
        "lon": -90.8775,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "No site, parcel or road has been published; coordinates are the Vicksburg city point from its Wikipedia article (Nominatim was unavailable)."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/",
        "https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/",
        "https://www.mississippifreepress.org/amazon-to-build-3b-ai-data-center-in-vicksburg-as-gov-reeves-proclaims-arrival-of-the-digital-delta/",
        "https://www.aboutamazon.com/md/news/company-news/amazon-3-billion-mississippi-data-center-investment",
        "https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve AWS Vicksburg data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "azora-tillion-villamayor-de-gallego",
      "source_file": "azora-tillion-villamayor-de-gallego.json",
      "source_sha256": "7672ac9acef3f6c9df3185493ac1a59755652cde94ebcd069bdc3e0e107ea297",
      "source_name": "Tillion Aragón data center campus (Azora), Villamayor de Gállego",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragon",
        "admin2": "Zaragoza",
        "locality": "Villamayor de Gállego",
        "lat": 41.68556,
        "lon": -0.77389,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Town centroid from the Villamayor de Gállego Wikipedia article. Azora places the site near Villamayor de Gállego, less than 3 km from the transmission substation, but no cited source gives coordinates."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://azora.com/en/blog/azora-to-invest-e2-billion-in-zaragoza-data-centre/",
        "https://www.aragon.es/-/piga-tillion-aragon",
        "https://www.elespanol.com/aragon/actualidad/20261005/cerca-millones-invertidos-centros-datos-aragon-esperan-rampa-salida-obras/1003744406849_0.html",
        "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
        "https://en.wikipedia.org/wiki/Villamayor_de_G%C3%A1llego"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Tillion Aragón data center campus (Azora), Villamayor de Gállego as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "microsoft-aragon-villamayor-de-gallego",
          "relationship": "separate_named_developments",
          "reason": "Distinct Azora/Tillion and Microsoft projects; shared Villamayor municipality point is not a parcel or alias."
        }
      ]
    },
    {
      "source_id": "balico-pittsylvania-county",
      "source_file": "balico-pittsylvania-county.json",
      "source_sha256": "187f5a2de7c8f9378e59d8a0fe49dce0518a84b249a609e39ddd2b81afddbb19",
      "source_name": "Balico gas-powered data center campus, Pittsylvania County",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Virginia",
        "admin2": "Pittsylvania County",
        "locality": "Chatham",
        "lat": 36.8256,
        "lon": -79.3975,
        "precision": "locality",
        "source_ids": [
          "s3",
          "s4",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia centroid of the town of Chatham (s5). Sources place the land near Chatham (s3, s4) in the county's Banister district (s1) but name no roads; the parcels were not geocoded."
      },
      "source_status": "cancelled",
      "source_status_as_of": "2025-04-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://cardinalnews.org/2024/11/04/data-center-proposal-in-pittsylvania-withdrawn-for-now/",
        "https://www.wvtf.org/news/2025-04-14/balico-withdraws-application-to-build-data-centers-in-pittsylvania-county",
        "https://www.wdbj7.com/2025/04/14/company-withdraws-data-center-proposal-residents-express-skepticism/",
        "https://cardinalnews.org/2025/04/16/pittsylvania-rejects-data-center-project-that-has-dominated-county-conversation-for-6-months/",
        "https://en.wikipedia.org/wiki/Chatham,_Virginia"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Balico gas-powered data center campus, Pittsylvania County as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "stack-berry-hill-pittsylvania-county",
          "relationship": "separate_named_developments",
          "reason": "Rejected Balico Banister/Chatham plan and STACK Berry Hill megasite have distinct proponent and site descriptions; centroid proximity is not site overlap."
        }
      ]
    },
    {
      "source_id": "beacon-ai-centers-heartland",
      "source_file": "beacon-ai-centers-heartland.json",
      "source_sha256": "472c330bc6e95626a2ae8848324378d0552a0e8ad176bf05a030ee210ad939f7",
      "source_name": "Beacon AI Centers Heartland campus (Sturgeon County)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "admin2": "Sturgeon County",
        "locality": "About 7 km east of Gibbons",
        "lat": 53.84032,
        "lon": -113.192246,
        "precision": "site",
        "source_ids": [
          "s1",
          "s4"
        ],
        "note": "Decimal coordinates stated in the federal project description summary, which places the project just north-northeast of Highway 643 and Range Road 223 (NW and SW quarters of Section 15-56-22-W4M)."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-03-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iaac-aeic.gc.ca/050/documents/p90123/164350E.pdf",
        "https://www.iaac-aeic.gc.ca/050/evaluations/proj/90123",
        "https://iaac-aeic.gc.ca/050/evaluations/document/165326?culture=en-CA",
        "https://media.auc.ab.ca/prd-wp-uploads/Shared%20Documents/Projects/30518-BeaconAICentersHeartlandProject.pdf"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Beacon AI Centers Heartland campus (Sturgeon County) as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "d1538d73-e301-5203-9e49-924b20051374",
          "project_stable_key": "curated:meta-sturgeon-county-alberta-data-center:current-campus-build",
          "site_id": "vcc-site-b8522efc1a60fe3072e4",
          "physical_site_stable_key": "curated:meta-sturgeon-county-alberta-data-center",
          "name": "Meta Sturgeon County Alberta Current Campus Build",
          "status": "under_construction",
          "status_as_of": "2026-07-08",
          "latitude": 53.8180670512532,
          "longitude": -113.18668173255557,
          "status_source_url": "https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/",
          "geometry_source_url": "https://geospatial.alberta.ca/titan/rest/services/ags_apps/ags_apps_alberta_township_system/MapServer/2/query",
          "reason": "Beacon Heartland is a separately named 317-acre project at Section 15-56-22-W4M; Meta has its own DP-26-0028 campus. They are nearby, not the same identified project."
        }
      ]
    },
    {
      "source_id": "beacon-ai-centers-indus",
      "source_file": "beacon-ai-centers-indus.json",
      "source_sha256": "5636ef89c413d8c5dafae870de69a96e134a3db571451a38f452970216f333b5",
      "source_name": "Beacon AI Centers Indus campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "admin2": "Rocky View County",
        "locality": "Indus",
        "lat": 50.9434,
        "lon": -113.8072,
        "precision": "site",
        "source_ids": [
          "s1",
          "s4"
        ],
        "note": "Decimal coordinates given in the proponent's initial project description (legal land description in section 11-23-28-W4M, south of Township Road 232), rounded to four decimals."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iaac-aeic.gc.ca/050/documents/p90121/164415E.pdf",
        "https://iaac-aeic.gc.ca/050/evaluations/proj/90121",
        "https://iaac-aeic.gc.ca/050/evaluations/document/164341",
        "https://www.rockyview.ca/news-and-events/news/rocky-view-county-participates-alberta-utilities-commission-review-proposed",
        "https://www.rockyview.ca/build-plan-and-develop/planning/planning-projects-underway/beacon-ai-hub-area-structure-plan",
        "https://www.rockyview.ca/news-and-events/news/rocky-view-county-affirms-commitment-responsible-ai-data-centre-development",
        "https://www.bnnbloomberg.ca/business/politics/2026/07/28/councillors-in-rural-county-bordering-calgary-vote-to-pause-data-centres/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Beacon AI Centers Indus campus as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "bell-ai-fabric-sherwood-saskatchewan",
      "source_file": "bell-ai-fabric-sherwood-saskatchewan.json",
      "source_sha256": "b9459e91be9778e53640bf83151969fff7795be0edbd0d71666ce677c12c8b71",
      "source_name": "Bell AI Fabric Sherwood campus (Regina area)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Saskatchewan",
        "admin2": "Rural Municipality of Sherwood No. 159",
        "locality": "Regina area",
        "lat": 50.473,
        "lon": -104.627,
        "precision": "admin2",
        "source_ids": [
          "s2"
        ],
        "note": "Bell names only the rural municipality. Coordinates are the RM's published reference point (Wikipedia infobox); because the RM surrounds Regina, this point is near the city and is not the campus site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.bce.ca/news-and-media/newsroom?article=bell-ai-fabric-to-expand-nation-building-project-in-saskatchewan-with-up-to-900-mw-of-additional-power",
        "https://www.bce.ca/news-and-media/newsroom?article=bell-ai-fabric-provides-construction-update-in-saskatchewan-announces-1-million-mental-health-commitment",
        "https://www.saskatchewan.ca/government/news-and-media/2026/september/14/single-largest-private-sector-capital-investment-in-history-of-canada-through-bell-ais-saskatchewan"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bell AI Fabric Sherwood campus (Regina area) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "bitdeer-clarington-ohio",
      "source_file": "bitdeer-clarington-ohio.json",
      "source_sha256": "815585f768f64af8591e94affcecb6c1e622f535ace83d659a7d80945b952c8d",
      "source_name": "Bitdeer Clarington data center site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Ohio",
        "admin2": "Monroe County",
        "locality": "Clarington",
        "lat": 39.7728,
        "lon": -80.8708,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "Bitdeer names only Clarington, Ohio. Coordinates are the village point from its Wikipedia article, which also gives the county; the site itself is not pinpointed."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/0001899123/000121390025098957/ea026118901ex99-1_bitdeer.htm",
        "https://www.sec.gov/Archives/edgar/data/1899123/000121390026013949/ea027632501ex99-1_bitdeer.htm",
        "https://www.sec.gov/Archives/edgar/data/1899123/000121390026028021/ea028179501ex99-1.htm",
        "https://www.sec.gov/Archives/edgar/data/1899123/000121390026086938/ea030131301ex99-1.htm",
        "https://en.wikipedia.org/wiki/Clarington,_Ohio"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bitdeer Clarington data center site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "bitdeer-fox-creek",
      "source_file": "bitdeer-fox-creek.json",
      "source_sha256": "644dbce5e9ae4b1ed14316380a9c634ed698ce4680a4910ee39cf1a953852712",
      "source_name": "Bitdeer Fox Creek energy and computing facility",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "admin2": "Municipal District of Greenview No. 16",
        "locality": "Fox Creek (about 1.5 km from the town)",
        "lat": 54.395,
        "lon": -116.80917,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s4"
        ],
        "note": "Town coordinates from the Fox Creek Wikipedia page; Bitdeer places the site about 1.5 km from the town but gives no exact location."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://calgary.tech/2025/02/04/bitdeer-acquires-101-mw-alberta-site-for-bitcoin-mining-expansion/",
        "https://www.bnnbloomberg.ca/press-releases/2026/06/02/bitdeer-breaks-ground-on-new-energy-and-digital-infrastructure-facility-in-alberta-canada/",
        "https://www.sec.gov/Archives/edgar/data/0001899123/000121390026086938/ea030131301ex99-1.htm",
        "https://en.wikipedia.org/wiki/Fox_Creek,_Alberta"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bitdeer Fox Creek energy and computing facility as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "bitdeer-shalersville-portage-county",
      "source_file": "bitdeer-shalersville-portage-county.json",
      "source_sha256": "c79a8d515bddd387e67e885356fb497b4310ca7ff7253ea3108e5ff7afa1ac00",
      "source_name": "Bitdeer and Geis Shalersville AI data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Ohio",
        "admin2": "Portage County",
        "locality": "Shalersville Township",
        "lat": 41.2456,
        "lon": -81.2603,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4",
          "s5",
          "s6"
        ],
        "note": "Sources place the site at the Turnpike Commerce Center just north of the Ohio Turnpike in Shalersville Township, without coordinates. The point is the township coordinate from its Wikipedia article, not the site."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-10-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.news5cleveland.com/news/local-news/local-developer-global-tech-firm-plan-major-data-center-project-in-portage-county",
        "https://theportager.com/asian-crypto-mining-company-and-geis-partner-to-bring-data-center-to-shalersville",
        "https://theenergymag.com/news/2026-06-17/bitdeer-ohio-ai-pushback",
        "https://theportager.com/shalersville-holds-off-on-zoning-changes-to-allow-a-data-center",
        "https://theportager.com/shalersville-redefines-industrial-zoning-adding-obstacles-to-data-center-proposal",
        "https://en.wikipedia.org/wiki/Shalersville_Township,_Portage_County,_Ohio"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bitdeer and Geis Shalersville AI data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "bitdeer-weathersfield-ohio",
      "source_file": "bitdeer-weathersfield-ohio.json",
      "source_sha256": "1f44177ccd7d8c6879a60f226ec4bfbc0a373b0278fd2eceee51165abf471a07",
      "source_name": "Bitdeer Weathersfield (Niles) development site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Ohio",
        "admin2": "Trumbull County",
        "locality": "Weathersfield Township (Niles)",
        "lat": 41.1783,
        "lon": -80.7578,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4"
        ],
        "note": "Bitdeer names the site Niles and later Weathersfield, Ohio, without an address. The point is the Weathersfield Township coordinate from its Wikipedia article, which lists much of the city of Niles among the township's populated places; it is not the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/0001899123/000121390025098957/ea026118901ex99-1_bitdeer.htm",
        "https://www.sec.gov/Archives/edgar/data/0001899123/000121390025107866/ea026473802ex99-1_bitdeer.htm",
        "https://www.sec.gov/Archives/edgar/data/1899123/000121390026086938/ea030131301ex99-1.htm",
        "https://en.wikipedia.org/wiki/Weathersfield_Township,_Trumbull_County,_Ohio"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bitdeer Weathersfield (Niles) development site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "blackstone-calatorao",
      "source_file": "blackstone-calatorao.json",
      "source_sha256": "809006638c4dc4beaaf5db9656e3859be9545d10813d822fab2e462375c982ab",
      "source_name": "QTS Calatorao data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragón",
        "admin2": "Zaragoza",
        "locality": "Calatorao",
        "lat": 41.5222,
        "lon": -1.3464,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Nominatim centroid of the municipality of Calatorao; sources place the site on industrial land beside the A-2 about 7 km from the town centre, without a parcel."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-08-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://brainsre.news/blackstone-7500-millones-data-center-aragon/",
        "https://www.investmentmonitor.ai/news/blackstone-to-make-8-2bn-data-centre-investment-in-spain",
        "https://www.merca2.es/2024/10/15/aragon-centros-datos-blackstone-2029461/",
        "https://www.eldiario.es/aragon/politica/explosion-centros-datos-aragon-opacidad-choque-institucional-riesgo-colapso_1_12559021.amp.html",
        "https://q.com/data-centers/calatorao-en/",
        "https://q.com/data-centers/calatorao/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve QTS Calatorao data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "box2bit-epila",
      "source_file": "box2bit-epila.json",
      "source_sha256": "a99fa29b66fcadba9d70771d692d5e178477fd287bdac88d6b28ca5fc1d0c1a5",
      "source_name": "Box2Bit Epilon data center campus (Épila)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragón",
        "admin2": "Zaragoza",
        "locality": "Épila",
        "lat": 41.6,
        "lon": -1.283,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s6"
        ],
        "note": "Town coordinates from the Épila Wikipedia article. Aragón Digital says the site has two accesses from the A-2 near the bonÀrea development; no parcel boundary is published."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-15",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.aragonhoy.es/consejos-de-gobierno/respaldo-gobierno-aragon-proyecto-box2bit-creara-1-800-puestos-epila-103723",
        "https://www.aragondigital.es/articulo/economia/dga-precisa-detalles-centro-datos-box2bit-epila-primera-fase-1125-millones/20260128124944963318.html",
        "https://www.eldiario.es/aragon/economia/empresa-box2bit-invertira-3-900-millones-euros-centro-datos-epila-renunciar-carinena_1_12942482.html",
        "https://www.hoyaragon.es/articulo/noticias-aragon/box2bit-epila-centro-datos-carinena/20260129112439121735.html",
        "https://forbes.es/?p=956076",
        "https://en.wikipedia.org/wiki/%C3%89pila"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Box2Bit Epilon data center campus (Épila) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "bridge-chonburi-khlong-tamru",
      "source_file": "bridge-chonburi-khlong-tamru.json",
      "source_sha256": "992562ae9e719643e27163f3519ce78a60d35967399c53797c2e8ec14572b9a8",
      "source_name": "Bridge Data Centres Chonburi hyperscale campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "TH",
        "admin1": "Chonburi",
        "admin2": "Mueang Chonburi District",
        "locality": "Khlong Tamru",
        "lat": 13.3619,
        "lon": 100.9792,
        "precision": "admin2",
        "source_ids": [
          "s2",
          "s3",
          "s4"
        ],
        "note": "Bridge names Khlong Tamru subdistrict in Chonburi Province and W.Media adds Mueang District, without an address; the point is the district coordinate from the Mueang Chonburi district Wikipedia article, so it marks the district rather than the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-10-21",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.bridgedatacentres.com/bridge-data-centres-%e0%b8%a5%e0%b8%87%e0%b8%97%e0%b8%b8%e0%b8%99-1-2-%e0%b8%9e%e0%b8%b1%e0%b8%99%e0%b8%a5%e0%b9%89%e0%b8%b2%e0%b8%99%e0%b8%94%e0%b8%ad%e0%b8%a5%e0%b8%a5%e0%b8%b2%e0%b8%a3%e0%b9%8c/",
        "https://www.bridgedatacentres.com/bridge-data-centres-becomes-eastwater-stecon-utilities-first-data-centre-client/",
        "https://w.media/bridge-data-centres-inks-water-deal-for-its-data-center-in-thailand/",
        "https://en.wikipedia.org/wiki/Mueang_Chonburi_district"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bridge Data Centres Chonburi hyperscale campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "bridge-my06-sedenak",
      "source_file": "bridge-my06-sedenak.json",
      "source_sha256": "78f13f500d6cc2dafa6bf621af9ae35dbef461ac3bd436f22bfffaec0546fca5",
      "source_name": "Bridge Data Centres MY06, Sedenak Tech Park",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Kulai District",
        "locality": "Sedenak (Sedenak Tech Park)",
        "lat": 1.7137,
        "lon": 103.5248,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s6",
          "s7"
        ],
        "note": "Sources place the campus in Kidex Sedenak, within the Sedenak Technology Valley (Sedenak Tech Park), without an address; the point is the Sedenak coordinate from its Wikipedia article, so it marks the locality rather than the parcel."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-09-15",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.mida.gov.my/media-release/bridge-data-centres-announces-construction-of-its-fourth-hyperscale-data-centre-campus-in-johor-malaysia/",
        "https://theiskandarian.com/?p=21738",
        "https://w.media/how-bridges-my06-is-rewriting-the-rules-of-data-centre-construction/",
        "https://www.bridgedatacentres.com/locations/malaysia/",
        "https://www.bridgedatacentres.com/powering-malaysias-digital-future/",
        "https://www.bridgedatacentres.com/building-malaysias-digital-future/",
        "https://en.wikipedia.org/wiki/Sedenak"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bridge Data Centres MY06, Sedenak Tech Park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "vantage-jhb1-sedenak",
          "relationship": "separate_named_developments",
          "reason": "Bridge MY06 and Vantage JHB1 are separately named campuses in Sedenak Tech Park; identical park/locality coordinates are not evidence of co-location."
        }
      ]
    },
    {
      "source_id": "bridge-my07-ulu-tiram",
      "source_file": "bridge-my07-ulu-tiram.json",
      "source_sha256": "1cb93221f01bff0430124f313930a046c9a4d8ccc8a17ae9743d98f8c33a300c",
      "source_name": "Bridge Data Centres MY07, Ulu Tiram",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Johor Bahru District",
        "locality": "Ulu Tiram",
        "lat": 1.6,
        "lon": 103.8203,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "Sources name Ulu Tiram without an address; the point is the Ulu Tiram coordinate from its Wikipedia article, so it marks the town rather than the campus."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-09-02",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://equalocean.com/news/2025010221264-bridge-data-centres-tnb-sign-my07-400mw-agreement-green-energy-partnership",
        "https://www.bridgedatacentres.com/locations/malaysia/",
        "https://www.bridgedatacentres.com/building-malaysias-digital-future/",
        "https://baxtel.com/data-center/bridge-johor-my07",
        "https://en.wikipedia.org/wiki/Ulu_Tiram"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Bridge Data Centres MY07, Ulu Tiram as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "brookfield-cambrai",
      "source_file": "brookfield-cambrai.json",
      "source_sha256": "d9e4fe305b4ad667bb9ea27e210e6e6172e41a537eca390f04600fd26b3a208d",
      "source_name": "Data4 Cambrai E-Valley campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "FR",
        "admin1": "Hauts-de-France",
        "locality": "Épinoy (E-Valley, former Cambrai air base)",
        "lat": 50.22,
        "lon": 3.1765,
        "precision": "approximate_site",
        "source_ids": [
          "s2",
          "s3"
        ],
        "note": "Nominatim position of the E-Valley information board on Avenue de France, Épinoy, inside the former BA 103 base; sources identify the base and E-Valley but not the data center parcel."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-11",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://techcrunch.com/2025/02/09/investments-in-french-ai-ecosystem-reach-85b-as-brookfield-commits-20b",
        "https://www.marchesonline.com/appels-offres/avis/travaux-d-extension-electrique-hta-pour-le-raccordement/ao-9588877-1",
        "https://info.fr/nord-comite-pilotage-data-centers-e-valley-cambrai/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Data4 Cambrai E-Valley campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "brookfield-strangnas",
      "source_file": "brookfield-strangnas.json",
      "source_sha256": "13eea0a5bcc56bfddfb3df6637cade823395af20037b134a81d39aa5ec051415",
      "source_name": "Brookfield AI center, Strängnäs",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SE",
        "admin1": "Södermanland County",
        "admin2": "Strängnäs Municipality",
        "locality": "Strängnäs",
        "lat": 59.367,
        "lon": 17.033,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Town centroid from the Strängnäs Wikipedia article. Dagens PS places the site at Gorsingeberget on the outskirts of Strängnäs, but no cited source gives a parcel or coordinates, so the site itself is not pinpointed."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-06-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://mfn.se/one/a/brookfield-asset-management-inc/brookfield-to-advance-ai-infrastructure-in-sweden-through-sek-95-billion-investment-884da3a0",
        "https://www.dagensps.se/foretag/digitalisering-ai/ai-jatte-etablerar-sig-i-strangnas-tusentals-nya-jobb/",
        "https://en.wikipedia.org/wiki/Str%C3%A4ngn%C3%A4s"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Brookfield AI center, Strängnäs as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "cavour-trino",
      "source_file": "cavour-trino.json",
      "source_sha256": "becea76bc83c8fcb0caaf6e4f33f3647ae803303e606ee3f5a0a4e775e3c4681",
      "source_name": "Cavour Hyperscale Campus (Trino)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IT",
        "admin1": "Piemonte",
        "admin2": "Vercelli",
        "locality": "Trino",
        "lat": 45.25206,
        "lon": 8.19393,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s5"
        ],
        "note": "Coordinates of the former Galileo Ferraris thermoelectric plant (frazione Leri Cavour, Trino) from its Italian Wikipedia article; the campus boundary has not been published."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.regione.piemonte.it/web/node/22790",
        "https://corrierecomunicazioni.it/digital-economy/data-center-dal-cdm-ok-a-investimenti-per-8-miliardi-urso-italia-hub-europeo-del-digitale",
        "https://www.punto-informatico.it/data-center-lombardia-piemonte-via-libera-cdm/",
        "https://www.italiaoggi.it/economia-e-politica/economia-e-finanza/piemonte-4-miliardi-per-il-nuovo-cavour-hyperscale-campus-norkj7yw",
        "https://it.wikipedia.org/wiki/Centrale_termoelettrica_Galileo_Ferraris"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Cavour Hyperscale Campus (Trino) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "cdc-marsden-park",
      "source_file": "cdc-marsden-park.json",
      "source_sha256": "9dd6eb6e5ee39f6394d44a010c9191d933d4d79390405618aacb0ddebb7f150f",
      "source_name": "CDC Data Centres Marsden Park campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "AU",
        "admin1": "New South Wales",
        "admin2": "City of Blacktown",
        "locality": "Marsden Park",
        "lat": -33.6892,
        "lon": 150.8028,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s6"
        ],
        "note": "Sources name the Marsden Park Industrial Precinct without a street address; the point is the Marsden Park suburb coordinate from its Wikipedia article, so it marks the suburb rather than the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://cdc.com/resources/news/cdc-data-centres-breaks-ground-on-new-state-of-the-art-data-centre-development-in-marsden-park-industrial-precinct/",
        "https://www.planningportal.nsw.gov.au/major-projects/projects/marsden-park-data-centre",
        "https://w.media/nsw-govt-approves-cdcs-504-mw-campus-in-sydney/",
        "https://www.startupdaily.net/?p=131381",
        "https://cdc.com/locations/sydney-and-regional-nsw/",
        "https://en.wikipedia.org/wiki/Marsden_Park,_New_South_Wales"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-37ddc3b143bf9ea08d1c",
      "canonical_project_id": "164033cb-411d-5ffb-ab5d-b04bdecfa1ac",
      "related_project_ids": [
        "164033cb-411d-5ffb-ab5d-b04bdecfa1ac"
      ],
      "related_site_ids": [
        "vcc-site-37ddc3b143bf9ea08d1c"
      ],
      "reason": "Same CDC six-building Marsden Park development and early-construction scope. The source suburb centroid does not replace the reviewed campus locator.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "164033cb-411d-5ffb-ab5d-b04bdecfa1ac",
          "project_stable_key": "curated:cdc-marsden-park-campus:early-construction",
          "site_id": "vcc-site-37ddc3b143bf9ea08d1c",
          "physical_site_stable_key": "curated:cdc-marsden-park-campus",
          "name": "CDC Marsden Park Early Construction",
          "status": "under_construction",
          "status_as_of": "2026-07-21",
          "latitude": -33.72368555,
          "longitude": 150.8363658,
          "status_source_url": "https://cdc.com.au/locations/sydney/",
          "geometry_source_url": "https://api.openstreetmap.org/api/0.6/way/1336972876/full.json"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-37ddc3b143bf9ea08d1c",
          "distance_km": 4.934,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "164033cb-411d-5ffb-ab5d-b04bdecfa1ac",
          "source_status": "under_construction",
          "source_status_as_of": "2026-10-09",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-21",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "cipher-barber-lake",
      "source_file": "cipher-barber-lake.json",
      "source_sha256": "3b80933abba304d18d78b0ea2c435b0243f7519c19186ac4a394940d0100ae0c",
      "source_name": "Cipher Barber Lake data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "locality": "Colorado City",
        "lat": 32.3961,
        "lon": -100.8622,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "Town coordinates from Wikipedia; Cipher places the Barber Lake site in Colorado City but gives no address or county."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-25",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_ex9901.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm",
        "https://en.wikipedia.org/wiki/Colorado_City,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Cipher Barber Lake data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "cipher-black-pearl",
      "source_file": "cipher-black-pearl.json",
      "source_sha256": "124821f366946a55c69c9521d4b42d0003c2b861addb05b39bc4d74530ce1d02",
      "source_name": "Cipher Black Pearl data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Winkler County",
        "locality": "Wink",
        "lat": 31.7545,
        "lon": -103.1541,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s5",
          "s6"
        ],
        "note": "Filings place the facility in or near Wink but give no street address. Coordinates are the Wink town point from its Wikipedia article, which also gives the county."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/nov3_earningspressreleasex.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/q226_earningsxprxdraftxvf.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000095010326001966/dp241421_8k.htm",
        "https://en.wikipedia.org/wiki/Wink,_Texas"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-6bedc032f2f6fb914715",
      "canonical_project_id": null,
      "related_project_ids": [
        "f595ca9f-e584-5dcb-bf76-38b346f6e4aa"
      ],
      "related_site_ids": [
        "vcc-site-6bedc032f2f6fb914715"
      ],
      "reason": "Same Cipher Black Pearl facility near Wink, with mining conversion, operating phase I and phase II. Existing record specifically selects AWS phase II current construction; campus partial operation does not complete phase II.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "f595ca9f-e584-5dcb-bf76-38b346f6e4aa",
          "project_stable_key": "curated:cipher-digital-black-pearl-wink-texas-data-center-campus:aws-phase-2-site-preparation",
          "site_id": "vcc-site-6bedc032f2f6fb914715",
          "physical_site_stable_key": "curated:cipher-digital-black-pearl-wink-texas-data-center-campus",
          "name": "Cipher Digital Black Pearl Phase II Current Build",
          "status": "under_construction",
          "status_as_of": "2026-08-04",
          "latitude": 31.6913247,
          "longitude": -103.0669994,
          "status_source_url": "https://www.globenewswire.com/news-release/2026/08/04/3338166/0/en/cipher-digital-provides-second-quarter-2026-business-update.html",
          "geometry_source_url": "https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?where=full_addr%3D%2711786%20COUNTY%20ROAD%20209%27%20AND%20county%3D%27Winkler%27&outFields=*&returnGeometry=true&outSR=4326&f=json"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-6bedc032f2f6fb914715",
          "distance_km": 10.827,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "f595ca9f-e584-5dcb-bf76-38b346f6e4aa",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-08-04",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-04",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "cloudhq-gru-paulinia",
      "source_file": "cloudhq-gru-paulinia.json",
      "source_sha256": "4faf2ad916d74ed2d2f6795bd9016689c4edec70387e1d00fa72c750cb7b3fe7",
      "source_name": "CloudHQ GRU Campus (Paulínia)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "BR",
        "admin1": "São Paulo",
        "admin2": "Paulínia",
        "locality": "Paulínia",
        "lat": -22.77089,
        "lon": -47.10425,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Coordinates are the point published on CloudHQ's campus page; they were not checked against a parcel boundary."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-08",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://cloudhq.com/campus/gru-campus/",
        "https://capacityglobal.com/news/cloudhq-breaks-ground-on-first-data-centre-campus-in-brazil/",
        "https://thetechcapital.com/cloudhq-breaks-ground-on-3-billion-data-centre-in-brazil-heres-the-plan/",
        "https://switchgear-magazine.com/tm-news/business/cloudhq-powers-sao-paulo-data-campus/",
        "https://constructionreviewonline.com/cloudhq-breaks-ground-on-the-new-paulinia-hyperscale-campus-in-brazil/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve CloudHQ GRU Campus (Paulínia) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "cloudhq-queretaro",
      "source_file": "cloudhq-queretaro.json",
      "source_sha256": "5fd2c88c37f9c7bee7bffdc8b8a21dea3b560a1ceaf3fbdb0c169bd91f2e3224",
      "source_name": "CloudHQ QRO Campus (Querétaro)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MX",
        "admin1": "Querétaro",
        "locality": "Querétaro (beside Querétaro Intercontinental Airport)",
        "lat": 20.61983,
        "lon": -100.1474,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Coordinates are the point published on CloudHQ's campus page. News reports place the 52-hectare site on the west side of the airport; the published point was not checked against a parcel boundary."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-09-30",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://cloudhq.com/campus/qro-campus/",
        "https://www.xataka.com.mx/servicios/inversion-millonaria-queretaro-cloudhq-construira-6-centros-datos-hiperescala-para-potenciar-inteligencia-artificial",
        "https://www.telecomreviewamericas.com/articles/wholesale-and-capacity/cloudhq-to-build-mexicos-largest-hyperscale-data-hub-in-queretaro/",
        "https://heise.de/-10678892",
        "https://www.poresto.com/mexico/2025/9/25/cloudhq-invertira-4800-mdd-en-6-centros-de-datos-en-queretaro-900-mw-para-ia-dentro-del-plan-mexico.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve CloudHQ QRO Campus (Querétaro) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "compass-hoffman-estates",
      "source_file": "compass-hoffman-estates.json",
      "source_sha256": "1d62a6f63aaab6fadf204a5ca1b338fd573dc7a9b53aabcfda4c99edea4b850d",
      "source_name": "Compass Datacenters Hoffman Estates campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Illinois",
        "admin2": "Cook County",
        "locality": "Hoffman Estates",
        "lat": 42.0639,
        "lon": -88.1469,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Wikipedia coordinates for Hoffman Estates. The campus occupies the former Sears headquarters site in the village; no cited source gives site coordinates."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-06",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.compassdatacenters.com/news/compass-kicks-off-development-of-its-first-hyperscale-campus-in-illinois/",
        "https://www.compassdatacenters.com/data-center-markets/",
        "https://www.compassdatacenters.com/news/village-of-hoffman-estates/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Compass Datacenters Hoffman Estates campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "compass-meridian-mississippi",
      "source_file": "compass-meridian-mississippi.json",
      "source_sha256": "8a912593f9baab1d2ffa6c2d31b0051dfe27418b9f4236cdf8a31320ca63e2f2",
      "source_name": "Compass Datacenters Meridian campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Mississippi",
        "admin2": "Lauderdale County",
        "locality": "Meridian",
        "lat": 32.3747,
        "lon": -88.7042,
        "precision": "locality",
        "source_ids": [
          "s1"
        ],
        "note": "Wikipedia coordinates for Meridian. Compass places the campus in the Meridian I-20/59 Industrial Park; no cited source gives site coordinates."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/",
        "https://www.compassdatacenters.com/data-center-markets/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Compass Datacenters Meridian campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "core-scientific-denton",
      "source_file": "core-scientific-denton.json",
      "source_sha256": "3b4b3bed3d3924cd80354b7fe4e8046dc61b921015c350a1addc79cb1de64371",
      "source_name": "Core Scientific Denton data center (CoreWeave)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "locality": "Denton",
        "lat": 33.2164,
        "lon": -97.1292,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s4",
          "s5"
        ],
        "note": "City coordinates from Wikipedia. Core Scientific gives the address 8171 Jim Christal Rd, Denton, TX 76207, but it was not geocoded in this review."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site",
        "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
        "https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results",
        "https://corescientific.com/high-density-data-centers/denton-texas/",
        "https://en.wikipedia.org/wiki/Denton,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Core Scientific Denton data center (CoreWeave) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "core-scientific-hunt-county",
      "source_file": "core-scientific-hunt-county.json",
      "source_sha256": "61c43fa75b12f88f291bc31c1b01b8a78db6f7ebe4a12cc7e070d7fc3737330f",
      "source_name": "Core Scientific Hunt County data center site",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Hunt County",
        "lat": 33.12,
        "lon": -96.09,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Core Scientific names Hunt County only. Coordinates are the Hunt County point from its Wikipedia article, not the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-28",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.corescientific.com/news-events/press-releases/detail/136/core-scientific-announces-first-quarter-fiscal-year-2026-results",
        "https://www.sec.gov/Archives/edgar/data/0001839341/000183934126000014/core-20260630.htm",
        "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001839341-26-000012/q2fy26earningsdeck728am.htm",
        "https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results",
        "https://en.wikipedia.org/wiki/Hunt_County,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Core Scientific Hunt County data center site as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "core-scientific-muskogee",
      "source_file": "core-scientific-muskogee.json",
      "source_sha256": "4ff4d625085967457118e956c79aa03fb78ac1451d63af8873ff9dd0a01cf086",
      "source_name": "Core Scientific Muskogee data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Oklahoma",
        "admin2": "Muskogee County",
        "locality": "Muskogee",
        "lat": 35.7433,
        "lon": -95.3567,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s7"
        ],
        "note": "Core Scientific gives the street address 1525 West 43rd Street South, Muskogee. No geocoder was used, so coordinates are the Muskogee city point from its Wikipedia article, which also names the county."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-07-28",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://corescientific.com/high-density-data-centers/muskogee-ok/",
        "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
        "https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus",
        "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001839341-26-000012/q2fy26earningsdeck728am.htm",
        "https://investors.corescientific.com/news-events/press-releases/detail/142/core-scientific-completes-acquisition-of-polaris-ds-advancing-planned-muskogee-expansion-to-1-5-gw-of-gross-power",
        "https://www.datacenterknowledge.com/build-design/core-scientific-bets-on-1-5-gw-ai-campus-in-oklahoma",
        "https://en.wikipedia.org/wiki/Muskogee,_Oklahoma",
        "https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Core Scientific Muskogee data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "core-scientific-pecos",
      "source_file": "core-scientific-pecos.json",
      "source_sha256": "f0dbb6853792968c8fcef8cfecfdb01c8c050c163f8ef8bd8513f51c0e7d2c78",
      "source_name": "Core Scientific Pecos data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Reeves County",
        "locality": "Pecos",
        "lat": 31.4156,
        "lon": -103.5,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s7"
        ],
        "note": "Core Scientific gives the address as FM 2119, Pecos, TX 79772, which is not a point location. Coordinates are the Pecos city point from its Wikipedia article, which also names the county."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-28",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://corescientific.com/high-density-data-centers/pecos-tx/",
        "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
        "https://investors.corescientific.com/news-events/press-releases/detail/136/core-scientific-announces-first-quarter-fiscal-year-2026-results",
        "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001839341-26-000012/q2fy26earningsdeck728am.htm",
        "https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results",
        "https://www.datacenterknowledge.com/build-design/core-scientific-bets-on-1-5-gw-ai-campus-in-oklahoma",
        "https://en.wikipedia.org/wiki/Pecos,_Texas"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-779f30ba676706e8e5db",
      "canonical_project_id": null,
      "related_project_ids": [
        "709cd37b-7f3a-5313-b3e2-a18ddc0885ec"
      ],
      "related_site_ids": [
        "vcc-site-779f30ba676706e8e5db"
      ],
      "reason": "Same Core Scientific Cottonwood/Pecos campus on FM 2119, linked by the same operator facility URL. Source describes the whole mining-to-HDC campus and proposed 1.5 GW expansion; existing record selects initial HDC vertical construction.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "709cd37b-7f3a-5313-b3e2-a18ddc0885ec",
          "project_stable_key": "curated:core-scientific-pecos-cottonwood-campus:initial-hdc-current-build",
          "site_id": "vcc-site-779f30ba676706e8e5db",
          "physical_site_stable_key": "curated:core-scientific-pecos-cottonwood-campus",
          "name": "Core Scientific Pecos Initial HDC Current Build",
          "status": "under_construction",
          "status_as_of": "2026-06-02",
          "latitude": 31.5341897,
          "longitude": -103.8026586,
          "status_source_url": "https://www.linkedin.com/posts/adamtsullivan_corescientific-aiinfrastructure-datacenters-activity-7467608574056300546-4pYw",
          "geometry_source_url": "https://nominatim.openstreetmap.org/lookup?osm_ids=R20669718&format=jsonv2&addressdetails=1&polygon_geojson=1"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-779f30ba676706e8e5db",
          "distance_km": 31.587,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://corescientific.com/high-density-data-centers/pecos-tx/"
      ],
      "status_comparisons": [
        {
          "project_id": "709cd37b-7f3a-5313-b3e2-a18ddc0885ec",
          "source_status": "announced",
          "source_status_as_of": "2026-07-28",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-02",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus.",
      "source_relations": [
        {
          "source_id": "microsoft-pecos-texas",
          "relationship": "separate_named_developments",
          "reason": "Core Scientific Cottonwood on FM 2119 and Microsoft/Chevron Project Kilby are distinct named developments; shared city coordinate does not imply identity."
        }
      ]
    },
    {
      "source_id": "coreweave-kenilworth-new-jersey",
      "source_file": "coreweave-kenilworth-new-jersey.json",
      "source_sha256": "b7429ba09a0b37d2d037486979baf5b75d8dba97e709effd93ad4ed9e649b99a",
      "source_name": "CoreWeave Kenilworth NEST 11 AI data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "New Jersey",
        "admin2": "Union County",
        "locality": "Kenilworth",
        "lat": 40.6781,
        "lon": -74.2881,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4",
          "s6"
        ],
        "note": "Borough centroid from the Wikipedia infobox for Kenilworth (s6), which also gives Union County. Sources place the building at 2000 Galloping Hill Road on the roughly 108-acre NEST campus, but no geocoder was used, so the point is the borough centroid rather than the building."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://re-nj.com/ai-startup-coreweave-to-build-1-billion-data-center-at-onyxs-nest-campus-in-kenilworth/",
        "https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/",
        "https://www.njeda.gov/wp-content/uploads/2026/08/NextNJAI-1.pdf",
        "https://www.coreweave.com/ai-data-center-development/kenilworth-new-jersey",
        "https://abc7ny.com/post/community-rallies-giant-data-center-being-built-kenilworth-new-jersey/19053270/",
        "https://en.wikipedia.org/wiki/Kenilworth,_New_Jersey"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve CoreWeave Kenilworth NEST 11 AI data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "coreweave-lancaster-pennsylvania",
      "source_file": "coreweave-lancaster-pennsylvania.json",
      "source_sha256": "a356ca1ca775478ada1545334dce0cb31ac058488deb6e1e43780d99e5f75f91",
      "source_name": "CoreWeave Lancaster AI data center (Lancaster AI Hub)",
      "source_scope": "multi_site_program",
      "source_location": {
        "country": "US",
        "admin1": "Pennsylvania",
        "admin2": "Lancaster County",
        "locality": "Lancaster",
        "lat": 40.0397,
        "lon": -76.3044,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4",
          "s5"
        ],
        "note": "City centroid from Wikipedia (s5). Sources give addresses at 216 Greenfield Road and 1375 Harrisburg Pike, but these were not geocoded, so the point is the city centroid rather than either site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2025-10-19",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://coreweave.com/news/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania",
        "https://www.govtech.com/products/lancaster-pa-hearing-to-revisit-data-center-zoning-decision",
        "https://www.hklaw.com/en/news/pressreleases/2025/09/hk-advises-chirisa-technology-parks-in-4-billion-joint-venture",
        "https://www.witf.org/2025/10/19/data-centers-second-phase-expected-to-cost-up-to-2-5-billion-in-lancaster-county/",
        "https://en.wikipedia.org/wiki/Lancaster,_Pennsylvania",
        "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx"
      ],
      "relationship": "multi_site_program",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [
        "b75695b9-38e3-58ec-baf2-039179ab353a"
      ],
      "related_site_ids": [
        "vcc-site-9b9b5ef71cedda52fd47"
      ],
      "reason": "Source explicitly bundles Greenfield Road phase 1/phase 2 and a planned Harrisburg Pike site. Only the Greenfield Phase 1 adaptive-reuse project is in the current release; attach the broad source as program context, retain Harrisburg Pike as an unmapped component, and do not treat a Lancaster city centroid as either site.",
      "integration_action": "attach_context_without_new_site_or_project",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "canonical_records": [
        {
          "project_id": "b75695b9-38e3-58ec-baf2-039179ab353a",
          "project_stable_key": "curated:coreweave-chirisa-lancaster-greenfield-road-campus:phase-1-adaptive-reuse",
          "site_id": "vcc-site-9b9b5ef71cedda52fd47",
          "physical_site_stable_key": "curated:coreweave-chirisa-lancaster-greenfield-road-campus",
          "name": "CoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse Project",
          "status": "under_construction",
          "status_as_of": "2026-07-22",
          "latitude": 40.048690947149,
          "longitude": -76.25609093817,
          "status_source_url": "https://chirisatechnologyparks.com/",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-9b9b5ef71cedda52fd47",
          "distance_km": 4.232,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "b75695b9-38e3-58ec-baf2-039179ab353a",
          "source_status": "under_construction",
          "source_status_as_of": "2025-10-19",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-22",
          "flag": "source_status_predates_canonical_observation"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus.",
      "unmapped_components": [
        {
          "name": "1375 Harrisburg Pike planned site",
          "reason": "Explicit separate address in source summary; not geocoded and no matching current release project."
        }
      ]
    },
    {
      "source_id": "crusoe-abilene-microsoft",
      "source_file": "crusoe-abilene-microsoft.json",
      "source_sha256": "5bcb1d90b7891d23c03ca1ae3e3c95f57da435b4fbcf1af917fa37ff33dedeb4",
      "source_name": "Crusoe Abilene AI factory campus for Microsoft",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "locality": "Abilene",
        "lat": 32.45,
        "lon": -99.75,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s5"
        ],
        "note": "Crusoe places the campus in Abilene, adjacent to its existing campus, without an address. Coordinates are the Abilene city point from its Wikipedia article; the city spans Taylor and Jones counties, so no county is recorded."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-07-15",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure",
        "https://www.theregister.com/2026/03/27/microsoft_ai_crusoe/",
        "https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas",
        "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
        "https://en.wikipedia.org/wiki/Abilene,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Crusoe Abilene AI factory campus for Microsoft as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "938feeec-a323-56e0-b6ce-2590fe58e623",
          "project_stable_key": "curated:lancium-clean-campus-abilene-ai-data-center:remaining-six-building-expansion",
          "site_id": "vcc-site-85b3549bb55293336132",
          "physical_site_stable_key": "curated:lancium-clean-campus-abilene-ai-data-center",
          "name": "Lancium Clean Campus Abilene Remaining Six-Building Expansion",
          "status": "under_construction",
          "status_as_of": "2026-06-04",
          "latitude": 32.509551980071,
          "longitude": -99.774790370504,
          "status_source_url": "https://www.oracle.com/data-centers/",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/",
          "reason": "Source explicitly calls this the second, adjacent Crusoe campus for Microsoft, with two 336 MW IT buildings; existing project is original Oracle/OpenAI eight-building campus."
        }
      ],
      "source_relations": [
        {
          "source_id": "openai-stargate-abilene",
          "relationship": "separate_adjacent_campuses",
          "reason": "Source explicitly describes Microsoft campus as second and adjacent to original Oracle/OpenAI campus; distinct building programs and tenants."
        }
      ]
    },
    {
      "source_id": "crusoe-lancium-childress-texas",
      "source_file": "crusoe-lancium-childress-texas.json",
      "source_sha256": "ac584d99cba53770df1c187c4d5a09cbdd16010a4dcd712152cb0803e738b736",
      "source_name": "Crusoe and Lancium Childress AI data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Childress County",
        "locality": "Childress",
        "lat": 34.4281,
        "lon": -100.215,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "City centroid of Childress from Wikipedia (s3); the announcements name the city and county but give no address for the 270-acre site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-15",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas",
        "https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/",
        "https://en.wikipedia.org/wiki/Childress,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Crusoe and Lancium Childress AI data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "iren-childress",
          "relationship": "separate_named_developments",
          "reason": "Crusoe/Lancium newly announced campus and IREN mining/HPC conversion campus are separately described operators/developments, sharing only the Childress town centroid."
        }
      ]
    },
    {
      "source_id": "crusoe-tallgrass-cheyenne",
      "source_file": "crusoe-tallgrass-cheyenne.json",
      "source_sha256": "b391bcd30fc2637b774d52c8bc51e3aad0fb4f9ff5c96910c1e96e9e8c36ac10",
      "source_name": "Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wyoming",
        "admin2": "Laramie County",
        "lat": 41.2737,
        "lon": -104.7268,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Laramie County centroid from OpenStreetMap Nominatim. The announcement says only southeast Wyoming near Tallgrass's CO2 sequestration hub; analyst Cleanview places the project in Laramie County outside Cheyenne. No address or parcel was found."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-07-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://tallgrass.com/newsroom/press-releases/Crusoe",
        "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/project-jade",
        "https://tallgrass.com/newsroom/press-releases/tallgrass-and-mitsubishi-power-americas-announce-turbine-allocation-for-cheyenne-power-hub-051526"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "31635fdf-a7a6-52c8-91dc-f64e5c7d10d3",
          "project_stable_key": "curated:related-digital-cheyenne-campus:phase-1",
          "site_id": "vcc-site-c879bad0c737049a2484",
          "physical_site_stable_key": "curated:related-digital-cheyenne-campus",
          "name": "Related Digital Cheyenne Phase 1",
          "status": "under_construction",
          "status_as_of": "2026-07-20",
          "latitude": 41.1426277,
          "longitude": -104.7015111,
          "status_source_url": "https://www.related-digital.com/wyoming",
          "geometry_source_url": "https://www.related-digital.com/wyoming",
          "reason": "Crusoe/Tallgrass Project Jade/Switchgrass program is not Related Digital Cheyenne; parties and site descriptions differ."
        }
      ]
    },
    {
      "source_id": "ctrls-chandanvelly-hyderabad",
      "source_file": "ctrls-chandanvelly-hyderabad.json",
      "source_sha256": "a0d9b7273ed148ab2ef4c769a6636861cd032a95a13290a6ac885bc1cd293278",
      "source_name": "CtrlS Chandanvelly AI-ready data center park",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Telangana",
        "locality": "Chandanvelly",
        "lat": 17.2327,
        "lon": 78.1713,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4"
        ],
        "note": "Sources name the Chandanvelly Industrial Park near Hyderabad without an address; the point is the Chandanvelly village coordinate from its Wikipedia article, so it marks the village rather than the parcel."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-01-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://w.media/ctrls-to-build-new-ai-ready-dc-park-near-hyderabad/",
        "https://w.media/ctrls-signs-mou-with-telangana-govt-to-invest-rs-10000-crores-into-ai-dc-cluster/",
        "https://apacnewsnetwork.com/2025/01/ctrls-to-establish-new-datacentre-park-near-hyderabad-to-enhance-companys-it-capabilities",
        "https://en.wikipedia.org/wiki/Chandanvelly"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve CtrlS Chandanvelly AI-ready data center park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "airtrunk-hyd1-chandanvelly",
          "relationship": "separate_named_developments",
          "reason": "Distinct AirTrunk HYD1 and CtrlS campus announcements share only the Chandanvelly locality locator."
        }
      ]
    },
    {
      "source_id": "cyrusone-bosque-county",
      "source_file": "cyrusone-bosque-county.json",
      "source_sha256": "0ae3d7456b03642277e888689587f215de4fe669bbeeaab08bbb159f55dbc633",
      "source_name": "CyrusOne Bosque County data center campus (Thad Hill)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Bosque County",
        "lat": 31.9,
        "lon": -97.63,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia point for Bosque County (s5). Sources place the campus next to the Thad Hill Energy Center in Bosque County but give no address; the site was not geocoded."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2025-11-03",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.publicpower.org/periodical/article/calpine-unveils-190-mw-agreement-serve-new-texas-data-center",
        "https://www.calpine.com/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas/",
        "https://www.cyrusone.com/data-centers/north-america/bosque-county-tx",
        "https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas",
        "https://en.wikipedia.org/wiki/Bosque_County,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve CyrusOne Bosque County data center campus (Thad Hill) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "cyrusone-freestone-county",
      "source_file": "cyrusone-freestone-county.json",
      "source_sha256": "22c351fc2b421eadbc333afa86249fe4f8d42edb299ae8e7f126ad5eabef25e8",
      "source_name": "CyrusOne Freestone County data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Freestone County",
        "locality": "Fairfield",
        "lat": 31.7183,
        "lon": -96.1697,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Coordinates are the Wikipedia centroid of Fairfield (s3). CyrusOne gives the Freestone Energy Center's Fairfield address (on FM 488) as the reference point and has no address for the data center itself; the site was not geocoded."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas",
        "https://www.cyrusone.com/data-centers/north-america/freestone-county-texas",
        "https://en.wikipedia.org/wiki/Fairfield,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve CyrusOne Freestone County data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "data4-escaudain",
      "source_file": "data4-escaudain.json",
      "source_sha256": "a84981d51ef8268204daf75b0de64409f5a4063cb3205fca1f692c9212bfbb26",
      "source_name": "Data4 Escaudain campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "FR",
        "admin1": "Hauts-de-France",
        "admin2": "Nord",
        "locality": "Escaudain",
        "lat": 50.3333,
        "lon": 3.3438,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Nominatim centroid of the commune of Escaudain; the site is the Parc des Soufflantes (former Usinor plant), which could not be geocoded more precisely."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-15",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.data4group.com/wp-content/uploads/2025/12/CP-FINAL-Data4-Agglomeration-de-La-Porte-du-Hainaut.pdf",
        "https://www.data4group.com/wp-content/uploads/2026/06/Press-release_Data4-launches-a-new-campus-in-France.pdf",
        "https://bebeez.eu/2026/06/15/data4-confirms-e5bn-plan-for-700mw-ai-data-center-in-northern-france/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Data4 Escaudain campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "data4-hanau",
      "source_file": "data4-hanau.json",
      "source_sha256": "791d141e25245bcc7d686f47847df75d56210d60a0775c795417c0b531aaf6e4",
      "source_name": "Data4 Hanau campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "DE",
        "admin1": "Hesse",
        "admin2": "Main-Kinzig-Kreis",
        "locality": "Hanau (Großauheim)",
        "lat": 50.1,
        "lon": 8.95,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Centroid of the Großauheim district of Hanau from its Wikipedia article. Data4 places the campus on the former Großauheim military base but no cited source gives coordinates for the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-03-11",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.data4group.com/wp-content/uploads/2025/09/FINAL_ENG_Press-Release-_Data4_Event_Hanau-1.pdf",
        "https://bebeez.eu/en/news/data4-breaks-ground-on-data-center-project-in-hanau-germany/",
        "https://capacityglobal.com/news/data4-hanau-data-centre-germany-data-centre-of-the-month/",
        "https://en.wikipedia.org/wiki/Gro%C3%9Fauheim"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Data4 Hanau campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "datavita-lanarkshire-ai-growth-zone",
      "source_file": "datavita-lanarkshire-ai-growth-zone.json",
      "source_sha256": "071c683461798ce72e22d218da92316080ce8de85d1bf4c142586431880b5440",
      "source_name": "DataVita Lanarkshire AI Growth Zone campus (Chapelhall)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "GB",
        "admin1": "Scotland",
        "admin2": "North Lanarkshire",
        "locality": "Chapelhall",
        "lat": 55.835,
        "lon": -3.9444,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s5"
        ],
        "note": "The UK government places the site in Airdrie; DataVita locates the DV4 expansion at Lancaster Avenue, Chapelhall, next to its existing DV1 and DV3. Coordinates are an approximate point near Lancaster Avenue; individual building plots were not identified."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-02",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.gov.uk/government/news/more-than-3400-jobs-and-targeted-support-for-local-communities-to-help-tackle-the-cost-of-living-as-lanarkshire-named-latest-ai-growth-zone",
        "https://www.datavita.co.uk/lanarkshire-ai-growth-zone",
        "https://blog.datavita.co.uk/blog/datavita-and-coreweave-to-launch-ai-infrastructure-in-scotland-powered-by-renewable-energy-as-part-of-ps1-5bn-investment",
        "https://blog.datavita.co.uk/blog/datavita-secures-funding-data-centre-expansion",
        "https://blog.datavita.co.uk/blog/datavita-submits-plans-dv4-data-centre-chapelhall"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve DataVita Lanarkshire AI Growth Zone campus (Chapelhall) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "datavolt-oxagon",
      "source_file": "datavolt-oxagon.json",
      "source_sha256": "79f79d176b9e284611718789a59964c7f458094219717cf28126b09478697cda",
      "source_name": "DataVolt Oxagon AI data centre campus (NEOM)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SA",
        "admin1": "Tabuk Province",
        "locality": "Oxagon, NEOM",
        "lat": 27.5679,
        "lon": 35.546,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Sources name Oxagon in NEOM but not a parcel. Coordinates are the OpenStreetMap Nominatim result for Oxagon (a construction land-use area in Duba governorate, Tabuk region)."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.neom.com/en-us/newsroom/datavolt-signs-agreement-with-neom",
        "https://www.neom.com/en-us/newsroom/HUMAIN-and-DataVolt-to-develop-AI-data-center-in-NEOM",
        "https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/",
        "https://www.semafor.com/article/09/07/2026/saudi-arabian-data-center-firm-races-to-export-compute-from-neom",
        "https://hlc.com/en/news/hogan-lovells-cadwalader-advises-humain-on-ai-data-center-development-in-saudi-arabia"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve DataVolt Oxagon AI data centre campus (NEOM) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "dayone-chonburi-tech-park",
      "source_file": "dayone-chonburi-tech-park.json",
      "source_sha256": "406cbcfb19c7d3619d246ed8413cc9677c7df47c2f64acd4197bb1aa097a8ceb",
      "source_name": "DayOne Chonburi Tech Park (CTP) data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "TH",
        "admin1": "Chonburi",
        "locality": "AMATA City Chonburi industrial estate",
        "lat": 13.217,
        "lon": 101.183,
        "precision": "admin1",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Sources place the campus in the AMATA City estate in Chonburi province but give no district or address. The point is the province coordinate from the Chonburi province Wikipedia article, so it marks the province, not the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-26",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.intelligentcio.com/apac/?p=43549",
        "https://dayonedc.com/news/dayone-strengthens-thailands-digital-hub-with-amata-as-chonburi-campus-expands-toward-the-countrys-first-1gw-power-platform",
        "https://www.bernama.com/en/news.php?id=2489483",
        "https://www.aap.com.au/aapreleases/cision20260425ae43618/",
        "https://en.wikipedia.org/wiki/Chonburi_province",
        "https://dayonedc.com/market/greater-bangkok"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve DayOne Chonburi Tech Park (CTP) data center campus as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "deutsche-telekom-nvidia-munich",
      "source_file": "deutsche-telekom-nvidia-munich.json",
      "source_sha256": "0bdaff010bf1a8c44d17b5bd5b045011b3d5bd572c1cfed6e77f8170f2476655",
      "source_name": "Deutsche Telekom Industrial AI Cloud, Munich Tucherpark",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "DE",
        "admin1": "Bavaria",
        "admin2": "Munich",
        "locality": "Munich (Tucherpark)",
        "lat": 48.1527,
        "lon": 11.5991,
        "precision": "approximate_site",
        "source_ids": [
          "s2",
          "s3"
        ],
        "note": "Nominatim geocode of the street Am Tucherpark in Munich; sources name the Tucherpark complex beside the Eisbach but give no street address."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-02-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://techcrunch.com/2025/11/04/nvidia-deutsche-telekom-strike-e1b-partnership-for-a-data-center-in-munich",
        "https://www.telekom.com/de/newsroom/aktuelles/medieninformationen/2026/02/deutschlands-erste-ki-fabrik-fuer-die-industrie",
        "https://heise.de/-11165327",
        "https://www.gtai.de/en/invest/service/publications/markets-germany/industrial-strength-meets-ai-infrastructure-2011304"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Deutsche Telekom Industrial AI Cloud, Munich Tucherpark as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "ecodatacenter-borlange",
      "source_file": "ecodatacenter-borlange.json",
      "source_sha256": "22f4efdb0cc62fabb4a17b46633dd24c700e80231d5308739e5d58dfd457c8c3",
      "source_name": "EcoDataCenter 2 Borlänge campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SE",
        "admin1": "Dalarna County",
        "admin2": "Borlänge Municipality",
        "locality": "Borlänge",
        "lat": 60.48556,
        "lon": 15.43639,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s6"
        ],
        "note": "Borlänge town centroid from its Wikipedia article. EcoDataCenter gives the street address Kvarnsvedsvägen 420 on the former Kvarnsveden mill site, but no cited source gives coordinates for it."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://ecodatacenter.tech/data-center/ecodatacenter2",
        "https://datacentrereview.com/?p=81016",
        "https://w.media/ecodatacenter-secures-land-for-third-swedish-data-center-campus/",
        "https://tech-insider.org/sv/mistral-ai-1-2-miljarder-sverige-ecodatacenter-borlange-2026/",
        "https://epoch.ai/data/ai-data-centers/directory/ecodatacenter-2",
        "https://en.wikipedia.org/wiki/Borl%C3%A4nge"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve EcoDataCenter 2 Borlänge campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "edgeconnex-kyotanabe-greater-osaka",
      "source_file": "edgeconnex-kyotanabe-greater-osaka.json",
      "source_sha256": "e89b5db4e44d53f27e422e080352cc57c0fa3770c237f7b238dbb10325239fba",
      "source_name": "EdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "JP",
        "admin1": "Kyoto Prefecture",
        "locality": "Kyotanabe",
        "lat": 34.81444,
        "lon": 135.76778,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "The releases name the Kagoya Tatara Campus and place it in Kyotanabe City through a quote from the city's mayor; no address is given. The point and the prefecture come from the Kyotanabe Wikipedia article, so the point marks the city rather than the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-03-18",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.edgeconnex.com/news/press-releases/edgeconnex-commences-construction-of-200mw-ai-ready-hyperscale-campus-in-greater-osaka/",
        "https://www.edgeconnex.com/news/press-releases/edgeconnex%e3%80%81%e9%96%a2%e8%a5%bf%e3%82%a8%e3%83%aa%e3%82%a2%e3%81%ab200mw%e3%81%aeai%e5%af%be%e5%bf%9c%e3%83%8f%e3%82%a4%e3%83%91%e3%83%bc%e3%82%b9%e3%82%b1%e3%83%bc%e3%83%ab%e3%82%ad%e3%83%a3/",
        "https://en.wikipedia.org/wiki/Ky%C5%8Dtanabe"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve EdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "edgecore-louisa-county",
      "source_file": "edgecore-louisa-county.json",
      "source_sha256": "03299f12f0a76a4f50b67c04e4b16a9b2a4f7a40e3d0d0899a50213b7da8c69b",
      "source_name": "EdgeCore Louisa County campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Virginia",
        "admin2": "Louisa County",
        "lat": 37.99,
        "lon": -77.96,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "Wikipedia coordinates for Louisa County, Virginia. EdgeCore places the campus in the Shannon Hill Regional Business Park, which no cited source locates precisely."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://edgecore.com/resources/press-releases/new-louisa-county-virginia-data-center-campus",
        "https://edgecore.com/locations/louisa-county-data-center",
        "https://www.bisnow.com/news/national/data-center/17b-campus-continues-data-center-surge-in-small-virginia-county-129918"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve EdgeCore Louisa County campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "edgecore-mesa",
      "source_file": "edgecore-mesa.json",
      "source_sha256": "d32b94b194c30dba40bff79ef74b21ea7a36e3842c000a463ca9cc87f9e2155a",
      "source_name": "EdgeCore Mesa data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Arizona",
        "locality": "Mesa",
        "lat": 33.3442,
        "lon": -111.6196,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "Point from the local OpenStreetMap layer (datacenters/layers/osm/features.geojson): a building footprint tagged EdgeCore at South Everton Terrace, Mesa (OSM way 808979618). It marks one existing building, not the centroid of the expanded 84-acre campus. The cited sources name Mesa but give no street address."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2025-05-21",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/",
        "https://inbusinessphx.com/technology-innovation/data-center-developer-announces-expansion-of-metro-phoenix-infrastructure",
        "https://edgecore.com/locations/phoenix-data-center"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve EdgeCore Mesa data center campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "elea-rio-ai-city",
      "source_file": "elea-rio-ai-city.json",
      "source_sha256": "bea824de52d0566c84e4c3cb72e56bdb01896bd26b66fb8ddcfc551363f23849",
      "source_name": "Rio AI City (Elea Data Centers)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "BR",
        "admin1": "Rio de Janeiro",
        "locality": "Rio de Janeiro (Olympic Park area)",
        "lat": -22.977,
        "lon": -43.394,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Sources place the project in Rio de Janeiro's Olympic Park area without a parcel; coordinates are the Barra Olympic Park reference point (Wikipedia). Whether the existing RJO1 building sits inside the park was not stated."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.prnewswire.com/news-releases/elea-announces-rio-ai-city-a-landmark-brazilian-data-center-project-with-capacity-up-to-3-2-gw-of-renewable-energy-supporting-ai-growth-302449289.html",
        "https://www.prnewswire.com/news-releases/elea-signs-mou-with-oracle-and-rio-de-janeiro-city-hall-to-advance-data-center-project-302532403.html",
        "https://www.prnewswire.com/news-releases/elea-signs-mou-with-tapestry-to-enhance-assurance-of-rio-ai-citys-1-5-gw-energy-capacity-302607345.html",
        "https://eleadatacenters.com/rio-ai-city/",
        "https://www.prnewswire.com/news-releases/elea-data-centers-appoints-new-board-of-directors-to-accelerate-ai-ready-infrastructure-expansion-in-brazil-302790277.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Rio AI City (Elea Data Centers) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "eni-khazna-ferrera-erbognone",
      "source_file": "eni-khazna-ferrera-erbognone.json",
      "source_sha256": "5d6f173907b551c8d0863cbddd6acafe7403c26409eb13fbd0fcf1d906bac40b",
      "source_name": "Eni and Khazna AI data center campus, Ferrera Erbognone",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IT",
        "admin1": "Lombardy",
        "admin2": "Province of Pavia",
        "locality": "Ferrera Erbognone",
        "lat": 45.117,
        "lon": 8.867,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Municipality centroid from the Ferrera Erbognone Wikipedia article. Sources name the municipality only."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html",
        "https://www.g42.ai/resources/news/khazna-data-centers-and-eni-partner-develop-500-mw-ai-data-center-campus-near-milan",
        "https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj",
        "https://www.eunews.it/en/2026/08/10/eu-commission-approves-khazna-eni-joint-venture-says-it-does-not-raise-competition-concerns/",
        "https://en.wikipedia.org/wiki/Ferrera_Erbognone"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Eni and Khazna AI data center campus, Ferrera Erbognone as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "fermi-america-hypergrid-amarillo",
      "source_file": "fermi-america-hypergrid-amarillo.json",
      "source_sha256": "6786d8491cf40bc05c7f858cd71723904c90a9d20f4f2f58191976ba20257d88",
      "source_name": "Fermi America Project Matador campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Carson County",
        "lat": 35.3116,
        "lon": -101.5597,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4",
          "s5"
        ],
        "note": "Coordinates of the Pantex Plant from Wikipedia (s5). Fermi says its campus is next to the Pantex complex (s2), in Carson County (s1, s4) and near Amarillo (s3); the campus covers thousands of acres, so the point is only approximate."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-28",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/2071778/000207177826000051/frmi-20260630.htm",
        "https://fermiamerica.com/",
        "https://fermiamerica.com/first-power-generation-assets-arrive-at-project-matador/",
        "https://fermiamerica.com/fermi-selects-naes-to-operate-project-matadors-natural-gas-fleet/",
        "https://en.wikipedia.org/wiki/Pantex_Plant"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Fermi America Project Matador campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "galaxy-helios",
      "source_file": "galaxy-helios.json",
      "source_sha256": "576000b87be4d233c49e6a85f4fd2ae5cd2af4523170cf71c15b7b097f6711e3",
      "source_name": "Galaxy Helios data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Dickens County",
        "lat": 33.62,
        "lon": -100.78,
        "precision": "admin2",
        "source_ids": [
          "s3",
          "s4",
          "s5"
        ],
        "note": "County coordinates from Wikipedia; Galaxy names Dickens County but gives no street address."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-12",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1859392/000185939226000016/glxy-20251231.htm",
        "https://www.galaxy.com/newsroom/2025-annual-report-and-ceo-letter",
        "https://www.galaxy.com/newsroom/q226-unwrapped",
        "https://www.galaxy.com/newsroom/galaxy-announces-on-campus-emergency-services-partnership-with-total-safety-at-helios",
        "https://en.wikipedia.org/wiki/Dickens_County,_Texas"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-43bf6c7b8c9e9dfc51d0",
      "canonical_project_id": null,
      "related_project_ids": [
        "2f422325-bd08-5072-a93f-dde01520f486"
      ],
      "related_site_ids": [
        "vcc-site-43bf6c7b8c9e9dfc51d0"
      ],
      "reason": "Same Galaxy Helios campus in Dickens County. Source includes operating phase I and three-phase CoreWeave leases; existing record selects phase II 260 MW critical-IT construction.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "2f422325-bd08-5072-a93f-dde01520f486",
          "project_stable_key": "curated:galaxy-helios-data-center-campus:phase-2-260mw-critical-it-build",
          "site_id": "vcc-site-43bf6c7b8c9e9dfc51d0",
          "physical_site_stable_key": "curated:galaxy-helios-data-center-campus",
          "name": "Galaxy Helios Phase II 260 MW Critical IT Build",
          "status": "under_construction",
          "status_as_of": "2026-07-06",
          "latitude": 33.780636279018,
          "longitude": -100.867099886006,
          "status_source_url": "https://www.galaxy.com/newsroom/galaxy-completes-phase-i-of-its-helios-data-center-campus",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=984%20County%20Road%20112%20Afton%20TX%2079220&benchmark=Public_AR_Current&format=json"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-43bf6c7b8c9e9dfc51d0",
          "distance_km": 19.595,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "2f422325-bd08-5072-a93f-dde01520f486",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-08-12",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-06",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "google-armstrong-county-texas",
      "source_file": "google-armstrong-county-texas.json",
      "source_sha256": "0c7f0624ec1a0b34a9cc12a70a1d339937093460edf1399776a95394fe95aa87",
      "source_name": "Google Armstrong County data center campus (Crusoe Goodnight)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Armstrong County",
        "locality": "Claude",
        "lat": 35.1081,
        "lon": -101.3627,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s4"
        ],
        "note": "Town centroid of Claude via Nominatim. Sources place the roughly 1,300-acre site near Claude but give no street address."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blog.google/inside-google/company-announcements/google-american-innovation-texas/",
        "https://www.abc7amarillo.com/news/local/google-announces-new-data-center-in-armstrong-county-texas-judge-adam-ensey-crusoe-energy-ercot-southwest-power-pool-claude-texas",
        "https://newprojectmedia.com/origination-crusoe-adds-natural-gas-storage-to-texas-panhandle-energy-mix-as-project-shifts-to-google-ownership/",
        "https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight",
        "https://baxtel.com/news/crusoe-confirms-google-ai-campus-in-texas-with-531mw-wind-link",
        "https://thetechcapital.com/google-taps-crusoe-for-new-texas-ai-data-centre-campus/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Armstrong County data center campus (Crusoe Goodnight) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-cedar-rapids-iowa",
      "source_file": "google-cedar-rapids-iowa.json",
      "source_sha256": "c55c97d359b260455d387067bb433e03a369ead4131b9e2ab51887de398ec2b6",
      "source_name": "Google Cedar Rapids data center campus (Big Cedar Industrial Center)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Iowa",
        "admin2": "Linn County",
        "locality": "Cedar Rapids",
        "lat": 41.9172,
        "lon": -91.7254,
        "precision": "approximate_site",
        "source_ids": [
          "s2"
        ],
        "note": "OpenStreetMap point for the Big Cedar Industrial Center in Cedar Rapids, which the site owner names as the campus location; the Google parcel within the industrial center is not pinpointed."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blog.google/feed/new-7-billion-investment-iowa/",
        "https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement",
        "https://news.constructconnect.com/google-doubles-down-on-iowa-with-7-billion-data-center-investment",
        "https://epoch.ai/data/ai-data-centers/directory/google-cedar-rapids",
        "https://datacenters.google/locations/iowa/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Cedar Rapids data center campus (Big Cedar Industrial Center) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "ae6f1b86-660b-54e9-bdb0-d29bfeedc551",
          "project_stable_key": "curated:qts-cedar-rapids-data-center-campus:current-campus-development",
          "site_id": "vcc-site-d60291ccffe6616c33cc",
          "physical_site_stable_key": "curated:qts-cedar-rapids-data-center-campus",
          "name": "QTS Cedar Rapids Current Campus Development",
          "status": "under_construction",
          "status_as_of": "2026-07-15",
          "latitude": 41.907294,
          "longitude": -91.754301,
          "status_source_url": "https://q.com/data-centers/cedar-rapids/",
          "geometry_source_url": "https://q.com/data-centers/cedar-rapids/",
          "reason": "Google and QTS Cedar Rapids are separately named campus developers; town proximity is insufficient for a tenant/campus alias."
        }
      ]
    },
    {
      "source_id": "google-elmina-selangor",
      "source_file": "google-elmina-selangor.json",
      "source_sha256": "e513cad282c7d6e19ea62971b18d671a13f3f11a2c76718cd805fe2b8e2d21bb",
      "source_name": "Google Malaysia data center, Elmina Business Park",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Selangor",
        "admin2": "Petaling District",
        "locality": "Elmina (Elmina Business Park)",
        "lat": 3.1992,
        "lon": 101.5006,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4",
          "s6"
        ],
        "note": "Sources name Elmina Business Park in Selangor without an address; the point is the coordinate of the Elmina township from its Wikipedia article, so it marks the township rather than the parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://w.media/google-to-invest-us-2-billion-to-build-its-first-dc-and-cloud-region-in-malaysia/",
        "https://blog.google/intl/ms-my/company-news/inside-google/2024_10_google-breaks-ground-on-us2-billion/",
        "https://www.mida.gov.my/mida-news/googles-hyperscale-data-centre-at-elmina-business-park-breaks-ground/",
        "https://edgeprop.my/content/1910621/sime-darby-property-commences-construction-malaysia%E2%80%99s-first-google-hyperscale-data-centre-city-elmina",
        "https://datacenters.google/locations/",
        "https://en.wikipedia.org/wiki/Elmina,_Malaysia"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-a9577b8feaea08be317c",
      "canonical_project_id": "e56ff51f-930c-5c5b-bc82-7add264e576e",
      "related_project_ids": [
        "e56ff51f-930c-5c5b-bc82-7add264e576e"
      ],
      "related_site_ids": [
        "vcc-site-a9577b8feaea08be317c"
      ],
      "reason": "Same first Google Malaysia data-center campus in Elmina Business Park developed by Sime Darby Property; both records describe the current campus development.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "e56ff51f-930c-5c5b-bc82-7add264e576e",
          "project_stable_key": "curated:google-elmina-business-park-data-center:current-campus-build",
          "site_id": "vcc-site-a9577b8feaea08be317c",
          "physical_site_stable_key": "wikidata:Q136745002",
          "name": "Google Elmina Current Campus Construction",
          "status": "under_construction",
          "status_as_of": "2026-08-15",
          "latitude": 3.222618484316103,
          "longitude": 101.51973036271843,
          "status_source_url": "https://mediaselangor.com/en/2026/08/390529",
          "geometry_source_url": "https://www.wikidata.org/wiki/Special:EntityData/Q136745002.json"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-a9577b8feaea08be317c",
          "distance_km": 3.36,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://blog.google/intl/ms-my/company-news/inside-google/2024_10_google-breaks-ground-on-us2-billion/"
      ],
      "status_comparisons": [
        {
          "project_id": "e56ff51f-930c-5c5b-bc82-7add264e576e",
          "source_status": "under_construction",
          "source_status_as_of": "2026-10-09",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-15",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "google-fort-wayne-indiana",
      "source_file": "google-fort-wayne-indiana.json",
      "source_sha256": "5e6ad02fb65f107b646fa311ed2098ca115ec58fb9a0cea0337e6a836a4c16a0",
      "source_name": "Google Fort Wayne data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Indiana",
        "admin2": "Allen County",
        "locality": "Fort Wayne",
        "lat": 41.018,
        "lon": -85.058,
        "precision": "approximate_site",
        "source_ids": [
          "s1"
        ],
        "note": "Approximate intersection of East Tillman Road and Adams Center Road, derived from OpenStreetMap geometry for the two roads named by the state announcement; the parcel itself is not mapped."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iedc.in.gov/events/news/details/2024/04/26/gov.-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana",
        "https://datacenters.google/locations/indiana/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Fort Wayne data center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-franklin-township-indianapolis",
      "source_file": "google-franklin-township-indianapolis.json",
      "source_sha256": "d62835d6345deff459e3f4590dc504bb0f455f540e3328a806a60b43e7110bdc",
      "source_name": "Google Franklin Township data center proposal (Project Flo)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Indiana",
        "admin2": "Marion County",
        "locality": "Franklin Township, Indianapolis",
        "lat": 39.6803,
        "lon": -86.0275,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Coordinates are the Franklin Township coordinates from its Wikipedia page. Sources name the township but give no parcel location, so the site is not pinpointed."
      },
      "source_status": "cancelled",
      "source_status_as_of": "2025-09-22",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.insideindianabusiness.com/?p=191728",
        "https://mirrorindy.org/google-withdraws-southside-data-center-proposal-franklin-township/",
        "https://www.wrtv.com/news/local-news/google-withdraws-rezoning-petition-for-proposed-data-center-in-franklin-township",
        "https://baxtel.com/data-center/google-indianapolis-project-flo",
        "https://en.wikipedia.org/wiki/Franklin_Township,_Marion_County,_Indiana"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Franklin Township data center proposal (Project Flo) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-journey-haskell-county-texas",
      "source_file": "google-journey-haskell-county-texas.json",
      "source_sha256": "4d6f9f730200b3e47c33ed49b417b5d32b0deaee99603b5012770896c4c87783",
      "source_name": "Google Journey data center campus (Haskell County)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Haskell County",
        "locality": "Haskell",
        "lat": 33.1564,
        "lon": -99.5683,
        "precision": "approximate_site",
        "source_ids": [
          "s2",
          "s4",
          "s5"
        ],
        "note": "OpenStreetMap geometry of Red Creek Road in Haskell County. The abatement exhibit places the 300-acre tract on the west side of Red Creek Road about two miles south of US Highway 380; the registered address is 1362 Red Creek Rd, which could not be resolved to a point."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-06-25",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blog.google/inside-google/company-announcements/google-american-innovation-texas/",
        "https://www.haskellcountytx.gov/upload/page/9220/docs/Homebound%20Group%20LLC.pdf",
        "https://www.haskellcountytx.gov/page/haskell.Abatement",
        "https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026023821",
        "https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026023839"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Journey data center campus (Haskell County) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-kansas-city-north-missouri",
      "source_file": "google-kansas-city-north-missouri.json",
      "source_sha256": "379285710e5e7a644ccdcd6da60bd24089a439f25f01b411566cf304514db23d",
      "source_name": "Google Kansas City data center campus (Hunt Midwest Business Center)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Missouri",
        "admin2": "Clay County",
        "locality": "Kansas City",
        "lat": 39.168,
        "lon": -94.4788,
        "precision": "approximate_site",
        "source_ids": [
          "s2",
          "s3",
          "s4"
        ],
        "note": "Approximate point on NE Parvin Road east of Interstate 435, within the Hunt Midwest Business Center that sources name as the site; the business park covers about 2,500 acres, so the data center parcel within it is not pinpointed."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://efis.psc.mo.gov/Document/Display/881306",
        "https://www.kshb.com/news/local-news/google-announces-1b-data-center-in-kansas-citys-northland",
        "https://www.startlandnews.com/2024/03/google-data-center-kansas-city/",
        "https://www.kctv5.com/2024/03/20/google-build-1-billion-data-center-kansas-city/",
        "https://thetechcapital.com/google-eyes-315-acre-hyperscale-data-center-in-kansas/",
        "https://datacenters.google/kansas-city-missouri/",
        "https://baxtel.com/data-center/google-project-shale-0a8fa63e-b8b8-4b88-8e64-5c693d39337c"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Kansas City data center campus (Hunt Midwest Business Center) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-meitner-energy-center-texas",
      "source_file": "google-meitner-energy-center-texas.json",
      "source_sha256": "6197bfa49b0be6fa6095b27096c5b72f6ed98a335030e50e4428b7b894e78f1f",
      "source_name": "Google Meitner Energy Center data center (Gray and Roberts counties)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Gray County",
        "locality": "Pampa",
        "lat": 35.5363,
        "lon": -100.9602,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Town centroid of Pampa via Nominatim. The project spans Gray and Roberts counties, and Google's location list includes a Pampa, Texas site in development that matches it; no site address or parcel has been published."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-06-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/",
        "https://www.intersect.com/news/google-and-intersect-deepen-texas-roots-with-new-data-center-and-energy-investments-in-gray-and-roberts-counties",
        "https://www.powermag.com/google-launches-1-gw-plus-co-located-data-center-and-generation-complex-in-texas-panhandle/",
        "https://datacenters.google/locations/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Meitner Energy Center data center (Gray and Roberts counties) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-owasso-project-clydesdale",
      "source_file": "google-owasso-project-clydesdale.json",
      "source_sha256": "e154f3ad7667aea5efc74f50a11b3f6d107811a595c49c3f51636b211857d773",
      "source_name": "Project Clydesdale data center campus (Google, Tulsa County)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Oklahoma",
        "admin2": "Tulsa County",
        "locality": "Owasso",
        "lat": 36.2878,
        "lon": -95.8311,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4",
          "s6"
        ],
        "note": "Sources place the campus in unincorporated Tulsa County just west of Owasso, on land bounded by East 76th Street North, East 86th Street North, North Yale Avenue and North Sheridan Road. No coordinates are published, so the point is the Owasso town coordinate from its Wikipedia article and marks the neighbouring town, not the parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://tulsaflyer.org/2025/10/30/government/post/developers-break-ground-on-1b-data-center-near-tulsa/",
        "https://www.constructionequipmentguide.com/beale-breaks-ground-on-project-clydesdale-data-campus/69597",
        "https://www.news9.com/data-centers-in-oklahoma/google-data-center-campus-tulsa-county-oklahoma",
        "https://news.constructconnect.com/google-idd-as-operator-of-tulsa-area-data-center",
        "https://www.constructionequipmentguide.com/google-beale-infrastructure-announce-okla-data-center/72160",
        "https://en.wikipedia.org/wiki/Owasso,_Oklahoma"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-137a78b7abc74703d577",
      "canonical_project_id": "0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c",
      "related_project_ids": [
        "0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c"
      ],
      "related_site_ids": [
        "vcc-site-137a78b7abc74703d577"
      ],
      "reason": "Project Clydesdale alias, Beale developer, Google operator and Tulsa County west-of-Owasso location identify the same campus development. Source town centroid is not the campus.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c",
          "project_stable_key": "curated:beale-tulsa-county-project-clydesdale-campus:current-campus-build",
          "site_id": "vcc-site-137a78b7abc74703d577",
          "physical_site_stable_key": "curated:beale-tulsa-county-project-clydesdale-campus",
          "name": "Google / Beale Tulsa County Project Clydesdale Campus Construction",
          "status": "under_construction",
          "status_as_of": "2026-08-19",
          "latitude": 36.26982717564227,
          "longitude": -95.91092189697753,
          "status_source_url": "https://bealeinfra.com/google-and-beale-infrastructure-building-new-data-center-campus-in-tulsa-county/",
          "geometry_source_url": "https://tulsaplanning.org/tmapc/agendas/exhibits/Accelerated%20Release%20of%20Permits%20-%20Staff%20Report%20v03.pdf"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-137a78b7abc74703d577",
          "distance_km": 7.429,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c",
          "source_status": "under_construction",
          "source_status_as_of": "2026-09-01",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-19",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "google-stillwater-oklahoma",
      "source_file": "google-stillwater-oklahoma.json",
      "source_sha256": "35a7d2fc395b8a80c638ffc3a1982197916f1db32f23f9e35208a9c7dd149d1f",
      "source_name": "Google Stillwater data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Oklahoma",
        "admin2": "Payne County",
        "locality": "Stillwater",
        "lat": 36.116,
        "lon": -97.059,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Coordinates are the Stillwater city coordinates from its Wikipedia page. Sources place the site at the intersection of Perkins and Richmond Roads but give no parcel coordinates, and no geocoder was used."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://stillwaterok.gov/CivicAlerts.asp?AID=332",
        "https://www.kgou.org/science-technology-and-environment/2025-03-13/google-will-operate-massive-data-center-development-in-stillwater",
        "https://www.tradeandindustrydev.com/region/oklahoma/news/ok-google-acquires-land-stillwater-development-34278",
        "https://baxtel.com/data-center/google-stillwater-id4",
        "https://en.wikipedia.org/wiki/Stillwater,_Oklahoma"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Stillwater data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-visakhapatnam-ai-hub",
      "source_file": "google-visakhapatnam-ai-hub.json",
      "source_sha256": "a9a1e3a15d83c51f1f62c0ca73230737139656a82499cfd2ecdd3fbccab05869",
      "source_name": "Google AI hub, Visakhapatnam",
      "source_scope": "multi_site_program",
      "source_location": {
        "country": "IN",
        "admin1": "Andhra Pradesh",
        "admin2": "Visakhapatnam district",
        "locality": "Tarluvada",
        "lat": 17.9056,
        "lon": 83.329,
        "precision": "locality",
        "source_ids": [
          "s3",
          "s4"
        ],
        "note": "Village centroid of Tarluvada (OpenStreetMap); Tarluvada holds the largest of the three parcels. The other parcels are at Adavivaram and Rambilli, so this point does not represent the whole hub."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-28",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/",
        "https://blog.google/intl/en-in/google-ai-hub-scaling-indias-ai-infrastructure-and-community-impact/",
        "https://www.storyboard18.com/digital/google-to-break-ground-on-15-billion-data-centre-hub-in-andhra-pradesh-on-april-28-94297.htm",
        "https://w.media/google-breaks-ground-for-us-15-billion-india-ai-hub-in-vishakhapatnam/",
        "https://www.khaleejtimes.com/business/tech/google-breaks-ground-on-15-billion-indian-ai-megahub"
      ],
      "relationship": "multi_site_program",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "Source explicitly describes a three-campus AI hub at Tarluvada, Adavivaram and Rambilli with combined 1 GW capacity. The supplied Tarluvada locality point cannot locate the whole regional program; retain the hub as program context pending individual campus records.",
      "integration_action": "retain_program_context_without_new_site_or_project",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "geometry_policy": "Do not render the regional representative point as a physical project/site. Retain the full program record and named component list until individually scoped sites are resolved.",
      "unmapped_components": [
        {
          "name": "Tarluvada campus",
          "reason": "Explicitly named campus component of the combined Visakhapatnam hub; source does not provide independently scoped site coordinates, capacity or status."
        },
        {
          "name": "Adavivaram campus",
          "reason": "Explicitly named campus component of the combined Visakhapatnam hub; source does not provide independently scoped site coordinates, capacity or status."
        },
        {
          "name": "Rambilli campus",
          "reason": "Explicitly named campus component of the combined Visakhapatnam hub; source does not provide independently scoped site coordinates, capacity or status."
        }
      ]
    },
    {
      "source_id": "google-waltham-cross-uk",
      "source_file": "google-waltham-cross-uk.json",
      "source_sha256": "5e6dc9f27aa333dc00c400fa71bf41ef507f208a3899f03cff1e944e4c43d1c8",
      "source_name": "Google Waltham Cross data centre",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "GB",
        "admin1": "England",
        "admin2": "Hertfordshire",
        "locality": "Waltham Cross",
        "lat": 51.6858,
        "lon": -0.033,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Town centroid of Waltham Cross via Nominatim; Google's sources name the town but not the street address."
      },
      "source_status": "operational",
      "source_status_as_of": "2025-09-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blog.google/around-the-globe/google-europe/united-kingdom/google-1-billion-investment-in-a-new-uk-data-centre/",
        "https://blog.google/around-the-globe/google-europe/united-kingdom/waltham-cross-data-centre/",
        "https://datacenters.google/locations/waltham-cross/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google Waltham Cross data centre as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "google-west-memphis-arkansas",
      "source_file": "google-west-memphis-arkansas.json",
      "source_sha256": "1218050e330271598a27a21bc7c628a27a7dcccaa69ae6d90d6e4d09b2adbf90",
      "source_name": "Google West Memphis data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Arkansas",
        "admin2": "Crittenden County",
        "locality": "West Memphis",
        "lat": 35.1163,
        "lon": -90.2115,
        "precision": "approximate_site",
        "source_ids": [
          "s4",
          "s6",
          "s7"
        ],
        "note": "OpenStreetMap geometry of the southern end of Bollinger Road in West Memphis; sources place the campus at the south end of Bollinger Road. One source also gives 1500 South Loop Drive, which could not be resolved to a point. The campus parcel itself is not mapped here."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-02-26",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blog.google/inside-google/company-announcements/google-american-innovation-arkansas/",
        "https://talkbusiness.net/2025/10/google-announces-plan-to-build-4-billion-data-center-in-west-memphis/",
        "https://www.powermag.com/entergy-will-power-4-billion-google-data-center-in-arkansas/",
        "https://dailymemphian.com/section/businessreal-estate/article/54862/google-west-memphis-data-center-entergy-arkansas-groot",
        "https://www.constructionbriefing.com/news/google-linked-to-us10bn-data-centre-campus-in-us/8062290.article",
        "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
        "https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Google West Memphis data center campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "herbata-naas",
      "source_file": "herbata-naas.json",
      "source_sha256": "73ff476080154154700912d847ba718a795f983505a7b6347ee8a344a6cc4570",
      "source_name": "Herbata data centre campus (Naas)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IE",
        "admin1": "Kildare",
        "locality": "Naas",
        "lat": 53.217,
        "lon": -6.663,
        "precision": "locality",
        "source_ids": [
          "s4",
          "s5",
          "s6"
        ],
        "note": "Town coordinates from the Naas Wikipedia article. The appeal case lists the townlands of Halverstown, Jigginstown and Newhall, and reports place the site next to the M7 and a business park; no parcel point is published."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.kildare-nationalist.ie/news/plans-for-3bn-data-centre-campus-stalled_arid-72032.html",
        "https://www.industrialinfo.com/news/article/green-light-for-us3-billion-data-campus-in-kildare--345564",
        "https://www.friendsoftheearth.ie/news/campaigners-appeal-herbata-data-centre-decision-in-naas/",
        "https://www.pleanala.ie/en-ie/case/323677",
        "https://www.irishtimes.com/ireland/2026/09/04/naas-has-a-message-for-the-bond-villains-we-dont-want-your-data-centres/",
        "https://en.wikipedia.org/wiki/Naas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Herbata data centre campus (Naas) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "homer-city-redevelopment",
      "source_file": "homer-city-redevelopment.json",
      "source_sha256": "d0717abb8b9441401da026b4470274bec5ee412c94ed706de4ad41dd1c89dda7",
      "source_name": "Homer City Energy Campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Pennsylvania",
        "admin2": "Indiana County",
        "locality": "Center Township",
        "lat": 40.5108,
        "lon": -79.1936,
        "precision": "approximate_site",
        "source_ids": [
          "s3",
          "s4",
          "s6"
        ],
        "note": "Coordinates of the former Homer City Generating Station from Wikipedia (s6), which places it in Center Township near the borough of Homer City; the campus is built on the former station site, which covers a large area, so the point is approximate."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.homercityredevelopment.com/project-overview",
        "https://www.homercityredevelopment.com/faq",
        "https://www.pasenategop.com/news/pittman-hails-new-wave-of-energy-advancement-in-pennsylvania/",
        "https://e360.yale.edu/features/pennsylvania-data-centers-natural-gas",
        "https://www.homercityredevelopment.com/post/homer-city-energy-campus-workforce-grows-to-more-than-1-800-workers-including-members-of-9-building",
        "https://en.wikipedia.org/wiki/Homer_City_Generating_Station"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Homer City Energy Campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "humain-al-saad-riyadh",
      "source_file": "humain-al-saad-riyadh.json",
      "source_sha256": "bc3510e464d38087ca63b8e8813a3fa561fa124aa2fbbf7cc3e8d37cf3d497be",
      "source_name": "HUMAIN Al-Saad hyperscale AI data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SA",
        "admin1": "Riyadh Province",
        "locality": "Riyadh",
        "lat": 24.6389,
        "lon": 46.716,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4"
        ],
        "note": "Sources place the site in the Al-Saad area of east Riyadh. OpenStreetMap Nominatim did not resolve that district, so coordinates are the Riyadh city centroid from Nominatim."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-09-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://guest.meed.com/humain-tenders-6gw-data-centre-campus-infrastructure/",
        "https://guest.meed.com/contractor-wins-6gw-data-centre-campus-infrastructure/",
        "https://enterpriseam.com/ksa/2026/09/27/al-yamama-takes-the-infrastructure-contract-for-humains-6-gw-riyadh-ai-campus/",
        "https://constructionreviewonline.com/al-yamama-wins-infrastructure-contract-for-6gw-humain-ai-data-center-campus-in-riyadh/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "Named 6 GW Al-Saad campus in east Riyadh has no matching development in the current release. Preserve it as the source campus anchor; the earlier undifferentiated HUMAIN Riyadh 100 MW record is held because its relationship to Al-Saad is unproven. Do not sum both as independent projects.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry",
        "source_anchor_with_unresolved_possible_earlier_phase"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "humain-riyadh",
          "relationship": "unresolved_possible_same_campus",
          "reason": "Same developer and Riyadh centroid, but no source links the initial 100 MW site to the 6 GW Al-Saad proposal."
        }
      ]
    },
    {
      "source_id": "humain-dammam",
      "source_file": "humain-dammam.json",
      "source_sha256": "466341e154fa7fe2a30d1b4b4d02a5a2b8fe8d4f4240ab1a972ddbf599bed805",
      "source_name": "HUMAIN Dammam AI data centre",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SA",
        "admin1": "Eastern Province",
        "locality": "Dammam",
        "lat": 26.433,
        "lon": 50.1,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Sources name Dammam only. Coordinates are the Dammam city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2025-08-26",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.arabnews.com/node/2613050/business-economy",
        "https://capacityglobal.com/news/humain-data-centre-construction-saudi-arabia/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve HUMAIN Dammam AI data centre as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "khazna-dammam",
          "relationship": "separate_named_developments",
          "reason": "Distinct HUMAIN initial Dammam build and Khazna first Saudi campus announcement; shared Dammam city coordinates do not establish the same physical site."
        }
      ]
    },
    {
      "source_id": "humain-riyadh",
      "source_file": "humain-riyadh.json",
      "source_sha256": "a35d1696225f55a2d41adc97b203afaa5237294fc779cd1d3d817857e5756ab1",
      "source_name": "HUMAIN Riyadh AI data centre",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SA",
        "admin1": "Riyadh Province",
        "locality": "Riyadh",
        "lat": 24.6389,
        "lon": 46.716,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Sources name Riyadh only. Coordinates are the OpenStreetMap Nominatim centroid of Riyadh city, not the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2025-08-26",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.arabnews.com/node/2613050/business-economy",
        "https://capacityglobal.com/news/humain-data-centre-construction-saudi-arabia/"
      ],
      "relationship": "unresolved_identity",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "The 2025 initial 100 MW Riyadh site has no district or address. The 2026 6 GW Al-Saad campus may be a later umbrella or a separate location; identical Riyadh centroid and same developer do not resolve the relationship.",
      "integration_action": "retain_source_record_in_identity_hold",
      "hold_related_source_ids": [
        "humain-al-saad-riyadh"
      ],
      "flags": [
        "administrative_locator_not_project_geometry",
        "possible_source_internal_duplicate_hold"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "humain-al-saad-riyadh",
          "relationship": "unresolved_possible_same_campus",
          "reason": "Same developer and Riyadh centroid, but no source links the initial 100 MW site to the 6 GW Al-Saad proposal."
        }
      ]
    },
    {
      "source_id": "huntley-page-arizona",
      "source_file": "huntley-page-arizona.json",
      "source_sha256": "5ffdef31fd7f5c480616237bf78c6d912d7c2c7fa1e9e8bb1aea2fb910570a10",
      "source_name": "Page, Arizona data center site (Huntley LLC)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Arizona",
        "locality": "Page",
        "lat": 36.9142,
        "lon": -111.5033,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s6"
        ],
        "note": "Coordinates are the Wikipedia centroid of Page (s6). The city says the land lies on the southwest side of Page near Highway 98, about two miles from Horseshoe Bend, and that the exact building location is undetermined; other reports describe it as next to Horseshoe Bend."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://azcir.org/news/2025/11/21/did-page-az-city-council-approve-the-sale-of-500-acres-for-a-data-center-yes/",
        "https://www.azfamily.com/2025/12/18/page-residents-push-back-10b-data-center-proposal-near-horseshoe-bend/",
        "https://hoodline.com/2026/05/horseshoe-bend-uproar-page-locals-rage-over-1gw-data-hub-deal/",
        "https://cityofpage.org/departments/economic-development/page-data-center-faq/",
        "https://cityofpage.org/proposed-data-center-overlay-district-text-amendment/",
        "https://en.wikipedia.org/wiki/Page,_Arizona"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Page, Arizona data center site (Huntley LLC) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "hut8-beacon-point",
      "source_file": "hut8-beacon-point.json",
      "source_sha256": "d8b20c31668fe64a618d09db8c4fde048f5a1629adca59b4d144c1c8b0696b70",
      "source_name": "Hut 8 Beacon Point AI data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Nueces County",
        "lat": 27.74,
        "lon": -97.52,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s7"
        ],
        "note": "Filings name Nueces County only, with no town, address or parcel. Coordinates are the Nueces County point from its Wikipedia article."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1964789/000110465926070744/tm2616926d1_ex99-1.htm",
        "https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm",
        "https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw",
        "https://www.theenergymag.com/news/2026-05-06/hut-ai-beacon-point",
        "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
        "https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data",
        "https://en.wikipedia.org/wiki/Nueces_County,_Texas"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-a15d402305ed80ba8cba",
      "canonical_project_id": null,
      "related_project_ids": [
        "9563b94b-4d68-5f38-b2b2-ce63346ebbe8"
      ],
      "related_site_ids": [
        "vcc-site-a15d402305ed80ba8cba"
      ],
      "reason": "Same Hut 8 Beacon Point campus and shared issuer quarterly source. Source includes both 352 MW phases and 1 GW utility capacity; existing project is explicitly the first 352 MW critical-IT lease build.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "9563b94b-4d68-5f38-b2b2-ce63346ebbe8",
          "project_stable_key": "curated:hut8-beacon-point-ai-data-center-campus:first-phase-352mw-critical-it-lease",
          "site_id": "vcc-site-a15d402305ed80ba8cba",
          "physical_site_stable_key": "curated:hut8-beacon-point-ai-data-center-campus",
          "name": "Hut 8 Beacon Point First Phase 352 MW Critical IT Lease",
          "status": "under_construction",
          "status_as_of": "2026-08-04",
          "latitude": 27.834525,
          "longitude": -97.614758,
          "status_source_url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
          "geometry_source_url": "https://www.hut8.com/data-centers/beacon-point"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-a15d402305ed80ba8cba",
          "distance_km": 14.049,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"
      ],
      "status_comparisons": [
        {
          "project_id": "9563b94b-4d68-5f38-b2b2-ce63346ebbe8",
          "source_status": "under_construction",
          "source_status_as_of": "2026-08-04",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-04",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "hut8-river-bend-louisiana",
      "source_file": "hut8-river-bend-louisiana.json",
      "source_sha256": "a57ccc13004e57961708a310b651c4b92ffd423c798405ef1944b84fd1f8f50e",
      "source_name": "Hut 8 River Bend AI data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Louisiana",
        "admin2": "West Feliciana Parish",
        "lat": 30.87,
        "lon": -91.42,
        "precision": "admin2",
        "source_ids": [
          "s3",
          "s4",
          "s7",
          "s8"
        ],
        "note": "Parish coordinates from Wikipedia; the sources name the parish but not a street address or town."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
        "https://www.hut8.com/news-insights/press-releases/hut-8-announces-ai-infrastructure-partnership-with-anthropic-and-fluidstack",
        "https://www.expansionsolutionsmagazine.com/hut-8-selects-southeast-louisiana-for-10b-ai-data-center-campus/",
        "https://www.tdworld.com/smart-utility/news/55339947/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
        "https://finance.yahoo.com/news/why-hut-8-stock-popped-005207470.html",
        "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
        "https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/",
        "https://en.wikipedia.org/wiki/West_Feliciana_Parish,_Louisiana"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-1f215e81ecc04c69b5d6",
      "canonical_project_id": null,
      "related_project_ids": [
        "3e074273-f5f7-5785-ab10-232a5ebd5c6b"
      ],
      "related_site_ids": [
        "vcc-site-1f215e81ecc04c69b5d6"
      ],
      "reason": "Same Hut 8 River Bend campus in West Feliciana Parish and shared issuer quarterly source. Source combines phase I 245 MW critical IT with potential 1 GW campus growth; existing record is the scoped 245 MW current build.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "3e074273-f5f7-5785-ab10-232a5ebd5c6b",
          "project_stable_key": "curated:hut8-river-bend-ai-data-center-campus:245mw-critical-it-current-build",
          "site_id": "vcc-site-1f215e81ecc04c69b5d6",
          "physical_site_stable_key": "curated:hut8-river-bend-ai-data-center-campus",
          "name": "Hut 8 River Bend 245 MW Critical IT Current Build",
          "status": "under_construction",
          "status_as_of": "2026-08-04",
          "latitude": 30.727892,
          "longitude": -91.299513,
          "status_source_url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
          "geometry_source_url": "https://www.hut8.com/data-centers/river-bend"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-1f215e81ecc04c69b5d6",
          "distance_km": 19.548,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"
      ],
      "status_comparisons": [
        {
          "project_id": "3e074273-f5f7-5785-ab10-232a5ebd5c6b",
          "source_status": "under_construction",
          "source_status_as_of": "2026-10-05",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-04",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "igoudar-dakhla",
      "source_file": "igoudar-dakhla.json",
      "source_sha256": "bc97c6d07929d1c6b16a281fe06098aa913af9173a42a3ce229d35c03fc7a2fe",
      "source_name": "Igoudar Dakhla green data centre complex",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "EH",
        "admin1": "Dakhla-Oued Ed-Dahab",
        "locality": "Dakhla",
        "lat": 23.70806,
        "lon": -15.94556,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "City coordinates from the Dakhla Wikipedia page; no site within Dakhla has been named. Dakhla is in Western Sahara (ISO code EH), a disputed territory administered by Morocco; the sources present the project as a Moroccan national programme."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://w.media/morocco-plans-500-mw-green-data-center-in-dakhla/",
        "https://www.fnh.ma/article/actualites-marocaines/datacenters-verts-dakhla-igoudar-numerique",
        "https://northafricapost.com/?p=99949",
        "https://en.wikipedia.org/wiki/Dakhla,_Western_Sahara"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Igoudar Dakhla green data centre complex as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "iozera-tetouan",
      "source_file": "iozera-tetouan.json",
      "source_sha256": "d53902702df572eb2238334138cbbf7311864aec2d7e52db268893fe8065768a",
      "source_name": "Iozera Tetouan AI data center and hub",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MA",
        "admin1": "Tanger-Tetouan-Al Hoceima",
        "locality": "Tetouan",
        "lat": 35.567,
        "lon": -5.367,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4"
        ],
        "note": "City coordinates from the Tétouan Wikipedia article; the opened sources name only the city, not a site within it."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://northafricapost.com/?p=77106",
        "https://dabafinance.com/en/news/morocco-data-centers-ai-energy-europe",
        "https://fr.le360.ma/economie/data-centers-au-maroc-une-nouvelle-vague-dinvestissements-portee-par-lia-et-la-souverainete_5AWWI6OH7FFILPLGYDSUGMU2IA/",
        "https://en.wikipedia.org/wiki/Tetouan"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Iozera Tetouan AI data center and hub as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "iren-childress",
      "source_file": "iren-childress.json",
      "source_sha256": "ec58905442d037bd132f45a7b3b3ba14f7d327d7290df9045cef7f2bfee9aad9",
      "source_name": "IREN Childress data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "locality": "Childress",
        "lat": 34.4281,
        "lon": -100.215,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s6"
        ],
        "note": "City coordinates from Wikipedia; IREN names the site after Childress but publishes no street address or county."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iren.com/data-centers/childress",
        "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm",
        "https://www.sec.gov/Archives/edgar/data/1878848/000114036126032638/ef20080141_ex99-1.htm",
        "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000051/irenreportsfy26results.htm",
        "https://www.sec.gov/Archives/edgar/data/1878848/000114036126007905/ny20064909x3_ex99-1.htm",
        "https://en.wikipedia.org/wiki/Childress,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve IREN Childress data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "crusoe-lancium-childress-texas",
          "relationship": "separate_named_developments",
          "reason": "Crusoe/Lancium newly announced campus and IREN mining/HPC conversion campus are separately described operators/developments, sharing only the Childress town centroid."
        }
      ]
    },
    {
      "source_id": "iren-kiowa-oklahoma",
      "source_file": "iren-kiowa-oklahoma.json",
      "source_sha256": "4a3ace409a629d60e47a5528714fc7c45226403ff6c0c3f85f00097d4d710368",
      "source_name": "IREN Kiowa data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Oklahoma",
        "admin2": "Pittsburg County",
        "locality": "Kiowa",
        "lat": 34.7228,
        "lon": -95.9025,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s4",
          "s5",
          "s7"
        ],
        "note": "Local reports place the site just south of Kiowa between US 69 and Kiowa Lake Road, with no exact address set. Coordinates are the Kiowa town point from its Wikipedia article, which also gives the county."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-09-08",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000025/irenreportsq3fy26results.htm",
        "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm",
        "https://iren.com/resources/news/iren-oklahoma-1-6gw-data-center-campus",
        "https://www.newson6.com/data-centers-in-oklahoma/what-to-know-kiowa-data-center-planned-for-pittsburg-county",
        "https://okcfox.com/news/local/should-kiowa-data-center-proposal-go-to-a-vote-of-the-people",
        "https://fox23.com/news/local/pittsburg-county-delays-decision-on-proposed-data-center-tax-increment-district-06-23-2026",
        "https://en.wikipedia.org/wiki/Kiowa,_Oklahoma"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve IREN Kiowa data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "iren-sweetwater",
      "source_file": "iren-sweetwater.json",
      "source_sha256": "04372d647b2ed62798a6637b8452af7d3c88ec18dbc1b447d74cdadabcfea59b",
      "source_name": "IREN Sweetwater hub",
      "source_scope": "multi_site_program",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "locality": "Sweetwater",
        "lat": 32.4858,
        "lon": -100.4083,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Coordinates of the town of Sweetwater from Wikipedia. IREN names the hub after Sweetwater but does not give addresses, and the two sites may not both be in the same county, so no county is recorded."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iren.com/data-centers/sweetwater",
        "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm",
        "https://www.sec.gov/Archives/edgar/data/1878848/000187884826000051/irenreportsfy26results.htm",
        "https://en.wikipedia.org/wiki/Sweetwater,_Texas"
      ],
      "relationship": "multi_site_program",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "Source explicitly describes a two-site hub: 1,400 MW Sweetwater 1 on 1,700 acres and 600 MW Sweetwater 2 on 500 acres, with separate ERCOT connections and energization schedules. One Sweetwater town point must not be treated as either physical site or a single campus.",
      "integration_action": "retain_program_context_without_new_site_or_project",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "geometry_policy": "Do not render the regional representative point as a physical project/site. Retain the full program record and named component list until individually scoped sites are resolved.",
      "unmapped_components": [
        {
          "name": "IREN Sweetwater 1",
          "reason": "Named 1,400 MW/1,700-acre site with separate grid connection; no individually scoped site locator in the source record."
        },
        {
          "name": "IREN Sweetwater 2",
          "reason": "Named 600 MW/500-acre site with separate grid connection; no individually scoped site locator in the source record."
        }
      ]
    },
    {
      "source_id": "joliet-technology-center",
      "source_file": "joliet-technology-center.json",
      "source_sha256": "3886e89173d173234c8cc643d1c254eadfdbf60c5f2da58b2b6f56093dcfd499",
      "source_name": "Joliet Technology Center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Illinois",
        "admin2": "Will County",
        "locality": "Joliet",
        "lat": 41.5297,
        "lon": -88.0728,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Wikipedia coordinates for Joliet. Neither source gives a street address or parcel; the developers' site describes the location only as away from homes and near distribution uses and a racetrack."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-03-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.bisnow.com/news/chicago/data-center-development/joliet-oks-20b-data-center-as-illinois-seeks-to-make-large-developers-pay-more-for-projects-133777",
        "https://joliettechnologycenter.com/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Joliet Technology Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "k2-zibido-san-giacomo-lacchiarella",
      "source_file": "k2-zibido-san-giacomo-lacchiarella.json",
      "source_sha256": "65e323793e800cbf2f4bf4e14ca9a4a3119900b41a4eb935c6246f4598f0125d",
      "source_name": "K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IT",
        "admin1": "Lombardy",
        "admin2": "Metropolitan City of Milan",
        "locality": "Lacchiarella",
        "lat": 45.317,
        "lon": 9.133,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Lacchiarella municipal centroid from its Wikipedia article. The campus spans Zibido San Giacomo and Lacchiarella; no cited source gives site coordinates, so the point only marks one of the two municipalities."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-18",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.ilgiorno.it/milano/economia/data-center-lacchiarella-zibido-cz1ai1qn",
        "https://www.mondomobileweb.it/?p=325209",
        "https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj",
        "https://en.wikipedia.org/wiki/Lacchiarella"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "kasi-cloud-lekki",
      "source_file": "kasi-cloud-lekki.json",
      "source_sha256": "994ea8e104afde12c65f813d40d155ca02a8c101e0bc1c913dc8351b5ba5abb3",
      "source_name": "Kasi Cloud LOS campus (Lekki, Lagos)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "NG",
        "admin1": "Lagos State",
        "locality": "Lekki",
        "lat": 6.493394,
        "lon": 3.720668,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "Coordinates of Lekki from its Wikipedia article. Capacity Media places the site in the Maiyegun area of Lekki, ThisDay along the Lagos-Calabar coastal highway, and Kasi's website lists the campus in Lekki, Lagos; no exact point is published."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-05-19",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://capacityglobal.com/article/29zq9ki6a4ua8k9zv0q9s/data-economy/kasi-cloud-breaks-ground-on-first-nigeria-campus",
        "https://www.thisdaylive.com/2026/05/18/kasi-set-to-launch-hyperscale-ai-ready-data-centres-in-lagos/",
        "https://brandspurng.com/?p=191649",
        "https://www.kasicloud.com/",
        "https://en.wikipedia.org/wiki/Lekki"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Kasi Cloud LOS campus (Lekki, Lagos) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "kenya-olkaria-geothermal-campus",
      "source_file": "kenya-olkaria-geothermal-campus.json",
      "source_sha256": "11768a9fed052699236b66e6ae89134af107e75d8352c0365721b700cbf034ce",
      "source_name": "G42 and Microsoft Olkaria geothermal data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "KE",
        "locality": "Olkaria (near Lake Naivasha)",
        "lat": -0.885737,
        "lon": 36.269989,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s5",
          "s6"
        ],
        "note": "Sources name Olkaria only. Coordinates are those given for the Olkaria geothermal area on its Wikipedia page, not a data centre parcel."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://news.microsoft.com/2024/05/22/microsoft-and-g42-announce-1-billion-comprehensive-digital-ecosystem-initiative-for-kenya/",
        "https://gulfnews.com/business/markets/microsoft-uaes-g42-announce-1-billion-geothermal-data-centre-in-kenya-1.102753045",
        "https://semafor.com/article/05/06/2026/energy-shortfall-problem-scuppers-kenyas-1b-microsoft-data-center",
        "https://citizen.digital/article/kenyas-1b-microsoft-data-centre-project-in-limbo-over-power-concerns-n383281",
        "https://www.aljazeera.com/economy/2026/8/24/can-kenyas-ai-ambitions-coexist-with-naivashas-water-needs",
        "https://en.wikipedia.org/wiki/Olkaria"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve G42 and Microsoft Olkaria geothermal data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "khazna-ajman",
      "source_file": "khazna-ajman.json",
      "source_sha256": "82d8630757274ce07e8fde11a9a428eac9be985349014b73dfb8a8b2ec206b6d",
      "source_name": "Khazna QAJ1 AI data center (Ajman)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "AE",
        "admin1": "Ajman",
        "lat": 25.41361,
        "lon": 55.44556,
        "precision": "admin1",
        "source_ids": [
          "s1",
          "s2",
          "s7"
        ],
        "note": "Sources name only Ajman. Coordinates are the Ajman city point from its Wikipedia article and stand in for the emirate; the plot location is not published."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2025-10-14",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://w.media/khazna-announces-construction-of-100-mw-ai-optimised-data-center-in-ajman/",
        "https://www.meed.com/construction-begins-on-khazna-data-centre-in-ajman",
        "https://guest.meed.com/?p=12676",
        "https://enterpriseam.com/logistics/2025/04/22/khazna-to-boost-uae-data-center-infrastructure-with-60-mw-projects/",
        "https://khaznadatacenters.com/press-release/khazna-data-centers-to-add-over-1gw-hyperscale-capacity-across-multiple-countries-by-2030/",
        "https://itweb.africa/article/khazna-awarded-uptime-tier-iii-certification-of-design-documents-for-ajman-uae-facility-largest-in-companys-portfolio/lLn147mQVWz7J6Aa",
        "https://en.wikipedia.org/wiki/Ajman"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Khazna QAJ1 AI data center (Ajman) as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "khazna-dammam",
      "source_file": "khazna-dammam.json",
      "source_sha256": "f19050947ae5568fa5f98f4930fc8602d507e4457dbfe76d32681da66b6dd84a",
      "source_name": "Khazna Data Centers Dammam campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SA",
        "admin1": "Eastern Province",
        "locality": "Dammam",
        "lat": 26.433,
        "lon": 50.1,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "City coordinates from the Dammam Wikipedia page; Khazna has not published the plot location."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-12-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://khaznadatacenters.com/press-release/khazna-data-centers-names-new-country-head-and-advances-expansion-plans-in-saudi-arabia-in-support-of-vision-2030/",
        "https://enterpriseam.com/ksa/2025/12/10/dubai-based-khazna-data-centers-lands-in-ksa/",
        "https://en.wikipedia.org/wiki/Dammam"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Khazna Data Centers Dammam campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "humain-dammam",
          "relationship": "separate_named_developments",
          "reason": "Distinct HUMAIN initial Dammam build and Khazna first Saudi campus announcement; shared Dammam city coordinates do not establish the same physical site."
        }
      ]
    },
    {
      "source_id": "kio-qro3-queretaro",
      "source_file": "kio-qro3-queretaro.json",
      "source_sha256": "db1d0876190d32b57c15af331c157c0063aa181630c7fe763819a57447fb0fa7",
      "source_name": "KIO Data Centers QRO3, Querétaro",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MX",
        "admin1": "Querétaro",
        "locality": "El Marqués Industrial Park",
        "lat": 20.56636,
        "lon": -100.256724,
        "precision": "approximate_site",
        "source_ids": [
          "s1"
        ],
        "note": "Mexico Business News places QRO3 on KIO's campus in the El Marqués Industrial Park. The point is the existing building tagged 'Centro de datos KIO QRO1 y QRO2' in the local OpenStreetMap layer (datacenters/layers/osm/features.geojson, OSM way 741133962); exactly where QRO3 would sit on or near that campus is not reported."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-08-17",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://mexicobusiness.news/trade-and-investment/news/kio-plans-us13-billion-data-center-queretaro",
        "https://w.media/kio-data-centers-considering-100-mw-expansion-in-mexico/",
        "https://mexicoindustry.com/noticia/kio-data-centers-supera-los-900-millones-de-dolares-invertidos-proyecta-expansion-hacia-2030"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve KIO Data Centers QRO3, Querétaro as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "koacc-national-ai-computing-center-haenam",
      "source_file": "koacc-national-ai-computing-center-haenam.json",
      "source_sha256": "a64947cf5b3716010c3735a51d48124215a1957d02f68fc802561f9aed175ce0",
      "source_name": "National AI Computing Center, Solaseado (Haenam)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "KR",
        "admin1": "South Jeolla (Gwangju-Jeonnam)",
        "admin2": "Haenam County",
        "locality": "Sani-myeon (Solaseado)",
        "lat": 34.5742,
        "lon": 126.5975,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4",
          "s5"
        ],
        "note": "Sources place the site in the Solaseado data center park in Sani-myeon, Haenam County, without coordinates; the point is the Haenam County coordinate from its Wikipedia article, so it marks the county, not the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-03",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.samsungsds.com/en/news/1293056_5252.html",
        "https://en.edaily.co.kr/news/eda202608035522/",
        "https://www.digitaltoday.co.kr/en/view/88544/groundbreaking-held-for-national-ai-computing-center-in-haenam-aims-for-2028-completion",
        "https://en.nocutnews.co.kr/news/6516549",
        "https://en.wikipedia.org/wiki/Haenam_County"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve National AI Computing Center, Solaseado (Haenam) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "lambda-kansas-city",
      "source_file": "lambda-kansas-city.json",
      "source_sha256": "cd25d4a17c604d3f2f290c09e8314a008e2475ea9db2f828366e5bc71b204ee1",
      "source_name": "Lambda Kansas City AI factory",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Missouri",
        "locality": "Kansas City",
        "lat": 39.0997,
        "lon": -94.5783,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City centroid from Wikipedia (s2). The announcement places the facility in the Northland part of Kansas City but gives no address, so the point is not at the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-10-28",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
        "https://en.wikipedia.org/wiki/Kansas_City,_Missouri"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Lambda Kansas City AI factory as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "meta-kansas-city",
          "relationship": "separate_named_developments",
          "reason": "Separate Lambda AI factory and Meta campus; coordinates are the same Kansas City civic location, not facility evidence."
        }
      ]
    },
    {
      "source_id": "lancium-qts-hall-county-texas",
      "source_file": "lancium-qts-hall-county-texas.json",
      "source_sha256": "b7e19b3b09d5f4b313ad66063c4a0eaabaaf7ac5a4284b936f9342ebd50f009f",
      "source_name": "QTS and Lancium Hall County data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Hall County",
        "locality": "Turkey",
        "lat": 34.3939,
        "lon": -100.8953,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Town centroid of Turkey from Wikipedia (s2); the announcement says only that the campus is near Turkey in Hall County."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-13",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://lancium.com/2026/07/13/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/",
        "https://en.wikipedia.org/wiki/Turkey,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve QTS and Lancium Hall County data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-beaver-dam",
      "source_file": "meta-beaver-dam.json",
      "source_sha256": "7eb8591c3b911da58bb84aec866f72b6ea62ec59b6102afaaa0f8df5f6d437e9",
      "source_name": "Meta Beaver Dam data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wisconsin",
        "locality": "Beaver Dam",
        "lat": 43.4578,
        "lon": -88.8373,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City point from OpenStreetMap Nominatim; Meta names the city but no site or road."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/11/hello-beaver-dam/",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Beaver-Dam-Data-Center.pdf",
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Beaver Dam data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-bowling-green",
      "source_file": "meta-bowling-green.json",
      "source_sha256": "edc77570c4cfff3a8564a642b195d028af90ea8e2cec2b97147e264cf066a96e",
      "source_name": "Meta Bowling Green data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Ohio",
        "admin2": "Wood County",
        "locality": "Middleton Township",
        "lat": 41.4743,
        "lon": -83.6661,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Township point from OpenStreetMap Nominatim. BG Independent places the adjacent power plant at the northeast corner of Ohio 582 and Mercer Road, but no source gives the data center parcel itself."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/04/hello-bowling-green/",
        "https://bgindependentmedia.org/?p=115392",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Bowling-Green-Data-Center.pdf",
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Bowling Green data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-cheyenne",
      "source_file": "meta-cheyenne.json",
      "source_sha256": "aa8f9f96c934b5e097a08c76fda9bc4c871718f2baadf9ebf6b926473933da82",
      "source_name": "Meta Cheyenne data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wyoming",
        "locality": "Cheyenne",
        "lat": 41.14,
        "lon": -104.8202,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City point from OpenStreetMap Nominatim; Meta names Cheyenne but gives no site or road."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/07/hello-cheyenne/",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Cheyenne-Data-Center.pdf",
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Cheyenne data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "31635fdf-a7a6-52c8-91dc-f64e5c7d10d3",
          "project_stable_key": "curated:related-digital-cheyenne-campus:phase-1",
          "site_id": "vcc-site-c879bad0c737049a2484",
          "physical_site_stable_key": "curated:related-digital-cheyenne-campus",
          "name": "Related Digital Cheyenne Phase 1",
          "status": "under_construction",
          "status_as_of": "2026-07-20",
          "latitude": 41.1426277,
          "longitude": -104.7015111,
          "status_source_url": "https://www.related-digital.com/wyoming",
          "geometry_source_url": "https://www.related-digital.com/wyoming",
          "reason": "Meta campus is distinct from Related Digital Cheyenne; no site or tenant alias is established."
        }
      ]
    },
    {
      "source_id": "meta-dekalb-illinois",
      "source_file": "meta-dekalb-illinois.json",
      "source_sha256": "86b8ee006c2da6114811df03b2f7b0f09c2c87026810f557fa1c4624a1b8468d",
      "source_name": "Meta DeKalb Data Center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Illinois",
        "admin2": "DeKalb County",
        "locality": "DeKalb",
        "lat": 41.8894,
        "lon": -88.7265,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "Mean of three building outlines tagged as Meta-operated data centers in the local OpenStreetMap layer (ways 1312792611, 1312792612, 1312792613) on DeKalb's south side, consistent with the cited address on Metaverse Way off I-88. The point is a building centroid average, not a surveyed parcel."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2023-12-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-DeKalb-Data-Center.pdf",
        "https://gov.illinois.gov/news/press-release.28370.html",
        "https://www.shawlocal.com/daily-chronicle/2023/11/30/meta-takes-dekalb-data-center-online",
        "https://www.fox32chicago.com/news/meta-new-illinois-data-center-operational"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta DeKalb Data Center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-el-paso",
      "source_file": "meta-el-paso.json",
      "source_sha256": "0894098cfa0f72755af68c6960065e94ba5d2ec92d995958cb1cf4ed4adc1a9e",
      "source_name": "Meta El Paso data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "El Paso County",
        "locality": "El Paso",
        "lat": 31.9868,
        "lon": -106.426,
        "precision": "approximate_site",
        "source_ids": [
          "s2",
          "s4"
        ],
        "note": "Sources place the campus in northeast El Paso off Stan Roberts Sr. Avenue and US 54. Coordinates are a Nominatim point on Stan Roberts Sr. Avenue near that junction, not the parcel centroid."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.fox26houston.com/news/meta-ai-data-center-texas-el-paso",
        "https://constructionreporter.com/el-paso-electric-announces-plans-for-366-megawatt-electric-plant-to-support-meta-data-center/",
        "https://www.silicon.co.uk/cloud/datacenter/meta-data-centre-el-paso-629273",
        "https://kfoxtv.com/news/local/el-paso-leaders-get-update-on-meta-data-center-project-city-cites-enforceable-agreements",
        "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
        "https://insideclimatenews.org/news/24092026/el-paso-electric-only-considered-gas-to-power-meta-data-center/",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-El-Paso-Data-Center.pdf"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-f711d13af70d9b633456",
      "canonical_project_id": "337ace90-652d-52fe-a856-fe9b04b5966f",
      "related_project_ids": [
        "337ace90-652d-52fe-a856-fe9b04b5966f"
      ],
      "related_site_ids": [
        "vcc-site-f711d13af70d9b633456"
      ],
      "reason": "Same Meta northeast El Paso campus development, operator and 2028 delivery program. Retain all sourced campus capacity definitions without assigning them to an individual building.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "canonical_records": [
        {
          "project_id": "337ace90-652d-52fe-a856-fe9b04b5966f",
          "project_stable_key": "curated:meta-el-paso-texas-data-center:current-development",
          "site_id": "vcc-site-f711d13af70d9b633456",
          "physical_site_stable_key": "curated:meta-el-paso-texas-data-center",
          "name": "Meta El Paso Current Development",
          "status": "under_construction",
          "status_as_of": "2026-07-28",
          "latitude": 31.9940441,
          "longitude": -106.3631625,
          "status_source_url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
          "geometry_source_url": "https://nominatim.openstreetmap.org/search?q=Meta%20El%20Paso&countrycodes=us&format=jsonv2&polygon_geojson=1"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-f711d13af70d9b633456",
          "distance_km": 5.981,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/"
      ],
      "status_comparisons": [
        {
          "project_id": "337ace90-652d-52fe-a856-fe9b04b5966f",
          "source_status": "under_construction",
          "source_status_as_of": "2026-09-24",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-28",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "meta-gallatin-tennessee",
      "source_file": "meta-gallatin-tennessee.json",
      "source_sha256": "6e125273de54ce3b1289c2a306cc0123f7b97628ada0ccfb1d3a290960d7d315",
      "source_name": "Meta Gallatin Data Center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Tennessee",
        "admin2": "Sumner County",
        "locality": "Gallatin",
        "lat": 36.4085,
        "lon": -86.3716,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3",
          "s4"
        ],
        "note": "Centroid of the area named Gallatin Data Center and tagged as Meta-operated in the local OpenStreetMap layer (way 1213758201); Meta-tagged data center buildings lie within about 500 m of it. Sources name only the city and county."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2024-11-15",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Gallatin-Data-Center.pdf",
        "https://w.media/meta-expands-gallatin-data-center-with-nearly-1b-total-investment/",
        "https://www.gallatingetsit.com/newsroom/meta-formerly-known-as-facebook-tees-up-another-data-center-in-gallatin",
        "https://www.gallatingetsit.com/newsroom/metas-data-centers-in-gallatin-are-up-and-running"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Gallatin Data Center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-hyperion-richland-parish",
      "source_file": "meta-hyperion-richland-parish.json",
      "source_sha256": "60f52885979d54cae121ce62142985ac61bf565dea5b18fd463e8c93e21ca115",
      "source_name": "Meta Richland Parish data center (Hyperion)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Louisiana",
        "admin2": "Richland Parish",
        "locality": "Holly Ridge",
        "lat": 32.4676,
        "lon": -91.6268,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "Sources place the campus on the former Franklin Farm megasite between Rayville and Delhi; the 2026 state release is datelined Holly Ridge and WRKF refers to the Holly Ridge site. Coordinates are the Holly Ridge community point from OpenStreetMap Nominatim, not a surveyed site boundary."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-07-14",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state",
        "https://www.kalb.com/2025/08/21/la-regulators-approve-entergy-power-plants-metas-ai-data-center/",
        "https://www.datacenterfrontier.com/hyperscale/article/55325337/metas-27b-hyperion-campus-a-new-blueprint-for-ai-infrastructure-finance",
        "https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history",
        "https://www.wrkf.org/2026-07-14/meta-is-investing-40b-more-to-expand-richland-parish-data-center-project",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Richland-Parish-Data-Center.pdf",
        "https://www.myarklamiss.com/news/as-development-continues-the-cost-of-metas-data-center-in-richland-parish-will-be-3x-more-than-originally-projected/amp"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-33110c77390f92dc4432",
      "canonical_project_id": null,
      "related_project_ids": [
        "1404f5cd-04ee-57ea-8f73-91992fea0552"
      ],
      "related_site_ids": [
        "vcc-site-33110c77390f92dc4432"
      ],
      "reason": "Same Meta Franklin Farm/Richland Parish Hyperion campus. Source includes the 5 GW long-term campus expansion; release evidence explicitly delimits observed phase 1/phase 2 construction, so preserve a broader campus scope.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "1404f5cd-04ee-57ea-8f73-91992fea0552",
          "project_stable_key": "curated:meta-richland-parish-data-center:current-development",
          "site_id": "vcc-site-33110c77390f92dc4432",
          "physical_site_stable_key": "curated:meta-richland-parish-data-center",
          "name": "Meta Richland Parish Current Development",
          "status": "under_construction",
          "status_as_of": "2026-07-16",
          "latitude": 32.5289242,
          "longitude": -91.6360844,
          "status_source_url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "geometry_source_url": "https://nominatim.openstreetmap.org/search?q=Meta%20Richland%20Parish&countrycodes=us&format=jsonv2&polygon_geojson=1"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-33110c77390f92dc4432",
          "distance_km": 6.874,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "1404f5cd-04ee-57ea-8f73-91992fea0552",
          "source_status": "under_construction",
          "source_status_as_of": "2026-07-14",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-16",
          "flag": "source_status_predates_canonical_observation"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "meta-kansas-city",
      "source_file": "meta-kansas-city.json",
      "source_sha256": "90783635a2e19f4cfe10614b875a4690b0e8996639338f412d62ff279250bd0c",
      "source_name": "Meta Kansas City data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Missouri",
        "locality": "Kansas City",
        "lat": 39.1001,
        "lon": -94.5781,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City point from OpenStreetMap Nominatim; Meta names Kansas City but not the site. Meta's local funding goes to Clay County, Platte County and Kansas City-area groups, but no parcel is published."
      },
      "source_status": "operational",
      "source_status_as_of": "2025-08-20",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/2022/03/hello-kansas-city/",
        "https://datacenters.atmeta.com/2025/08/kansas-city-we-are-online/",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Metas-Kansas-City-Data-Center.pdf"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Kansas City data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "lambda-kansas-city",
          "relationship": "separate_named_developments",
          "reason": "Separate Lambda AI factory and Meta campus; coordinates are the same Kansas City civic location, not facility evidence."
        }
      ]
    },
    {
      "source_id": "meta-kuna-idaho",
      "source_file": "meta-kuna-idaho.json",
      "source_sha256": "397dff5079f887f8d2b1476159a463e5af374ccd257777bb900b4f7ee5f27e73",
      "source_name": "Meta Kuna Data Center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Idaho",
        "admin2": "Ada County",
        "locality": "Kuna",
        "lat": 43.4903,
        "lon": -116.3717,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s4",
          "s6"
        ],
        "note": "Coordinates are the Kuna city coordinates from its Wikipedia page. Sources name the city and county but give no address or parcel."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-09-03",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Kuna-Data-Center.pdf",
        "https://nbc16.com/news/nation-world/facebook-owners-announce-new-data-center-in-kuna",
        "https://www.bisnow.com/news/national/data-center/new-idaho-data-center-part-fits-metas-development-pattern-111978",
        "https://baxtel.com/news/meta-s-1-2b-data-center-in-kuna-idaho-goes-live",
        "https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive",
        "https://en.wikipedia.org/wiki/Kuna,_Idaho"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Kuna Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-lebanon-indiana",
      "source_file": "meta-lebanon-indiana.json",
      "source_sha256": "8938b741ef6e72dec099f0f8279e5e719ceca9e359833888c3908cbc207b172e",
      "source_name": "Meta Lebanon data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Indiana",
        "locality": "Lebanon",
        "lat": 40.0484,
        "lon": -86.4692,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City point from OpenStreetMap Nominatim; sources place the campus in Lebanon's LEAP district but give no parcel or address."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-02-11",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district",
        "https://datacenters.atmeta.com/2026/02/hello-lebanon/",
        "https://www.wrtv.com/news/local-news/meta-breaks-ground-on-10b-data-center-campus-in-lebanon",
        "https://www.yahoo.com/news/articles/meta-pledges-responsible-water-energy-101838480.html",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Lebanon-Data-Center.pdf"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-3c5c88d7f501e957c28a",
      "canonical_project_id": "1f430ea1-a0e6-5a91-b3e7-3f002b331cf6",
      "related_project_ids": [
        "1f430ea1-a0e6-5a91-b3e7-3f002b331cf6"
      ],
      "related_site_ids": [
        "vcc-site-3c5c88d7f501e957c28a"
      ],
      "reason": "Same Meta LEAP district Lebanon campus with February 2026 groundbreaking and phased current development. No competing Meta Lebanon site is present in the release.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "1f430ea1-a0e6-5a91-b3e7-3f002b331cf6",
          "project_stable_key": "curated:meta-lebanon-indiana-data-center:current-development",
          "site_id": "vcc-site-3c5c88d7f501e957c28a",
          "physical_site_stable_key": "curated:meta-lebanon-indiana-data-center",
          "name": "Meta Lebanon Indiana Current Development",
          "status": "under_construction",
          "status_as_of": "2026-07-06",
          "latitude": 40.06429731968878,
          "longitude": -86.53099064914196,
          "status_source_url": "https://lebanon.in.gov/wp-content/uploads/2026/01/07.06.2026-Board-of-Zoning-Appeals-Mtg-Minutes.pdf",
          "geometry_source_url": "https://gisdata.in.gov/server/rest/services/Hosted/DOWUnity_ATS_Records_PROD/FeatureServer/0/query?where=folder_id%3D%27FW-33468-0%27&outFields=*&f=pjson&returnGeometry=true&outSR=4326"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-3c5c88d7f501e957c28a",
          "distance_km": 5.548,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "1f430ea1-a0e6-5a91-b3e7-3f002b331cf6",
          "source_status": "under_construction",
          "source_status_as_of": "2026-02-11",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-06",
          "flag": "source_status_predates_canonical_observation"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "meta-mesa-arizona",
      "source_file": "meta-mesa-arizona.json",
      "source_sha256": "bd117cd7cdcf6360cf8e778d8064cf2b9baaf689dc24bf195152b3752916351d",
      "source_name": "Meta Mesa Data Center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Arizona",
        "admin2": "Maricopa County",
        "locality": "Mesa",
        "lat": 33.4222,
        "lon": -111.8228,
        "precision": "locality",
        "source_ids": [
          "s4",
          "s5",
          "s6"
        ],
        "note": "Coordinates are the Mesa city coordinates from its Wikipedia page, not the site. Sources give the street address (3841 S. Ellsworth Road, at the southeast corner of Elliot and Ellsworth Roads), but it was not converted to coordinates because no geocoder was used."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2025-01-31",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Mesa-Data-Center.pdf",
        "https://www.datacenterknowledge.com/hyperscalers/meta-is-adding-three-data-centers-to-already-massive-mesa-campus",
        "https://www.constructiondive.com/news/meta-dpr-arizona-data-center-mesa-phoenix/701776/",
        "https://ktar.com/arizona-news/new-srp-solar-facility-to-provide-power-for-meta-data-center-in-mesa",
        "https://ktar.com/arizona-news/mesa-data-center-mesa",
        "https://en.wikipedia.org/wiki/Mesa,_Arizona"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Mesa Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-montgomery",
      "source_file": "meta-montgomery.json",
      "source_sha256": "7dd60b5baf9ed99f11101e2450870cf030b35efe48cf582b94f66282faa15b24",
      "source_name": "Meta Montgomery data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Alabama",
        "locality": "Montgomery",
        "lat": 32.3777,
        "lon": -86.3091,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City point from OpenStreetMap Nominatim; Meta gives no site address."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/05/hello-montgomery/",
        "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Montgomery-Data-Center.pdf",
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Montgomery data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-prometheus-new-albany",
      "source_file": "meta-prometheus-new-albany.json",
      "source_sha256": "b6f72dafc8710a216c3285bd79b3d24ef810f911becf05924066caf8a62c4716",
      "source_name": "Meta New Albany data center campus (Prometheus)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Ohio",
        "locality": "New Albany",
        "lat": 40.0812,
        "lon": -82.8088,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City point from OpenStreetMap Nominatim; the cited sources name New Albany but give no site address for the data center buildings."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-09-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/",
        "https://spectrumnews1.com/oh/columbus/news/2026/01/09/meta-lines-up-massive-supply-of-nuclear-power-to-energize-ai-data-centers",
        "https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-",
        "https://mountvernonnews.com/stories/675445301-ohio-approves-new-natural-gas-power-plant-for-data-center",
        "https://www.publicpower.org/node/30607",
        "https://www.williams.com/expansion-project/socrates-power-solution-facilities/",
        "https://blog.synmax.com/vulcan-exclusive/drone-imagery-confirms-metas-prometheus-south-operating-prometheus-north-still-under-construction"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta New Albany data center campus (Prometheus) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "f8377a0f-dc89-5b7a-8257-25f25cdbac43",
          "project_stable_key": "curated:microsoft-new-albany-oh-datacenter:initial-site-preparation",
          "site_id": "vcc-site-c0945d7c74abf8504604",
          "physical_site_stable_key": "curated:microsoft-new-albany-oh-datacenter",
          "name": "Microsoft New Albany Initial Site Preparation",
          "status": "site_preparation",
          "status_as_of": "2026-07-01",
          "latitude": 40.103804132848,
          "longitude": -82.753523444119,
          "status_source_url": "https://local.microsoft.com/blog/newalbany-datacenter-construction-update/",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/",
          "reason": "Meta Prometheus campus is a different operator/development from Microsoft New Albany."
        }
      ]
    },
    {
      "source_id": "meta-sturgeon-county",
      "source_file": "meta-sturgeon-county.json",
      "source_sha256": "d0ae668e45f579791ab709030d30b6d4fe85af0b8eb74a9c96bd855c9a6a23eb",
      "source_name": "Meta Sturgeon data centre",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "admin2": "Sturgeon County",
        "lat": 53.8422,
        "lon": -113.5407,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "County point from OpenStreetMap Nominatim; Meta names Sturgeon County but no specific site, and the project website places it in the Edmonton region."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-07-08",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/",
        "https://datacenters.atmeta.com/2026/07/hello-sturgeon-county/",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Metas-Sturgeon-Data-Center.pdf",
        "https://sturgeondatacentre.com"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-b8522efc1a60fe3072e4",
      "canonical_project_id": "d1538d73-e301-5203-9e49-924b20051374",
      "related_project_ids": [
        "d1538d73-e301-5203-9e49-924b20051374"
      ],
      "related_site_ids": [
        "vcc-site-b8522efc1a60fe3072e4"
      ],
      "reason": "Same Meta first Canadian campus in Sturgeon County; the exact Meta groundbreaking URL is shared. The source county centroid is not the permit-located site. Nearby Beacon Heartland is a separate project.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "d1538d73-e301-5203-9e49-924b20051374",
          "project_stable_key": "curated:meta-sturgeon-county-alberta-data-center:current-campus-build",
          "site_id": "vcc-site-b8522efc1a60fe3072e4",
          "physical_site_stable_key": "curated:meta-sturgeon-county-alberta-data-center",
          "name": "Meta Sturgeon County Alberta Current Campus Build",
          "status": "under_construction",
          "status_as_of": "2026-07-08",
          "latitude": 53.8180670512532,
          "longitude": -113.18668173255557,
          "status_source_url": "https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/",
          "geometry_source_url": "https://geospatial.alberta.ca/titan/rest/services/ags_apps/ags_apps_alberta_township_system/MapServer/2/query"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-b8522efc1a60fe3072e4",
          "distance_km": 23.387,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/"
      ],
      "status_comparisons": [
        {
          "project_id": "d1538d73-e301-5203-9e49-924b20051374",
          "source_status": "under_construction",
          "source_status_as_of": "2026-07-08",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-08",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "meta-talavera-de-la-reina",
      "source_file": "meta-talavera-de-la-reina.json",
      "source_sha256": "e6e2fdb7e7e6e29fc768be8d0b31773855f532f5b9085086dccaf83ef9b17461",
      "source_name": "Meta Talavera de la Reina data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Castilla-La Mancha",
        "admin2": "Toledo",
        "locality": "Talavera de la Reina",
        "lat": 39.95833,
        "lon": -4.83278,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4"
        ],
        "note": "Town centroid from the Talavera de la Reina Wikipedia article. Sources place the campus in the second phase of the Torrehierro industrial area, about 12 km from the town centre, but give no coordinates, so the site is not pinpointed."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-28",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.iagua.es/noticias/redaccion-iagua/meta-ultima-en-talavera-un-centro-de-datos-de-1-000-me-que-se-abastecera-de-agua-del-tajo-por-la-red-municipal",
        "https://www.eldiario.es/castilla-la-mancha/provincias/toledo/page-anuncia-llegada-definitiva-centro-datos-meta-talavera-reina_1_13416975.amp.html",
        "https://www.elespanol.com/eldigitalcastillalamancha/region/20241219/meta-compra-millones-suelo-industrial-construir-macrocentro-datos-talavera-reina/909909319_0.amp.html",
        "https://en.wikipedia.org/wiki/Talavera_de_la_Reina"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Talavera de la Reina data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "meta-temple-texas",
      "source_file": "meta-temple-texas.json",
      "source_sha256": "57beadebfbaafe4e0a2fe464360d3ea773f0de86d0280307faf5062160b1f8eb",
      "source_name": "Meta Temple Data Center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Bell County",
        "locality": "Temple",
        "lat": 31.1056,
        "lon": -97.4208,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s4",
          "s5"
        ],
        "note": "Coordinates are the Temple city coordinates from its Wikipedia page. Sources place the site off NW H K Dodgen Loop and Industrial Boulevard but give no parcel coordinates, so the campus itself is not pinpointed."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-07-22",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Metas-Temple-Data-Center.pdf",
        "https://www.kwtx.com/2022/03/31/facebook-parent-company-invest-800-million-central-texas/",
        "https://canada.constructconnect.com/?p=261660",
        "https://www.kwtx.com/2026/07/22/meta-goes-live-temple-with-12-billion-ai-data-center/",
        "https://en.wikipedia.org/wiki/Temple,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Temple Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "rowan-project-temple",
          "relationship": "separate_named_developments",
          "reason": "Meta operating Temple campus and Rowan Project Temple are separately named developments; both use the Temple city point."
        }
      ]
    },
    {
      "source_id": "meta-tulsa",
      "source_file": "meta-tulsa.json",
      "source_sha256": "21982c96a5436f7a01f4e5c426091cf6da72f941fd0b0c811a85ee25ab307f9e",
      "source_name": "Meta Tulsa data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Oklahoma",
        "locality": "Tulsa",
        "lat": 36.1563,
        "lon": -95.9928,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "City point from OpenStreetMap Nominatim; Meta places the site in East Tulsa but names no road or parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/04/hello-tulsa/",
        "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Tulsa-Data-Center.pdf",
        "https://datacenters.atmeta.com/us-locations/",
        "https://tulsaokdatacenter.com/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Meta Tulsa data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c",
          "project_stable_key": "curated:beale-tulsa-county-project-clydesdale-campus:current-campus-build",
          "site_id": "vcc-site-137a78b7abc74703d577",
          "physical_site_stable_key": "curated:beale-tulsa-county-project-clydesdale-campus",
          "name": "Google / Beale Tulsa County Project Clydesdale Campus Construction",
          "status": "under_construction",
          "status_as_of": "2026-08-19",
          "latitude": 36.26982717564227,
          "longitude": -95.91092189697753,
          "status_source_url": "https://bealeinfra.com/google-and-beale-infrastructure-building-new-data-center-campus-in-tulsa-county/",
          "geometry_source_url": "https://tulsaplanning.org/tmapc/agendas/exhibits/Accelerated%20Release%20of%20Permits%20-%20Staff%20Report%20v03.pdf",
          "reason": "Google/Beale Clydesdale is explicitly a Google development, not the separately named Meta Tulsa development."
        }
      ]
    },
    {
      "source_id": "mgx-bpifrance-mistral-nvidia-campus",
      "source_file": "mgx-bpifrance-mistral-nvidia-campus.json",
      "source_sha256": "37a8693b1b77e0a121c59e3f185ab30784a069428fa03b8dbaf87ea2426957ff",
      "source_name": "Campus AI Fouju",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "FR",
        "admin1": "Île-de-France",
        "admin2": "Seine-et-Marne",
        "locality": "Fouju",
        "lat": 48.5864,
        "lon": 2.7785,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s3",
          "s4"
        ],
        "note": "Nominatim centroid of the commune of Fouju; sources name the commune but not a parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.polytechnique.edu/sites/default/files/content/communiques/fichiers/2025-05/Communique%20Presse%20-%20MGX%2C%20Bpifrance%2C%20Mistral%20AI%20et%20NVIDIA%20annoncent%20la%20cre%CC%81ation%20d%E2%80%99une%20JV%20pour%20de%CC%81velopper%20en%20France%20le%20plus%20grand%20campus%20IA%20d%27Europe.pdf",
        "https://www.privacy.eiffage.com/files/live/sites/metal/files/publications/PR_Eiffage_Campus%2520AI%2520enters%2520the%2520implementation%2520phase_20260602.pdf",
        "https://www.briedesrivieresetchateaux.fr/wp-content/uploads/2026/09/Calendrier_du_projet_Campus_IA_.pdf",
        "https://next.ink/brief-article/la-prefecture-de-seine-et-marne-autorise-linstallation-de-campus-ia-a-fouju/",
        "https://www.mac4ever.com/ia/196474-campus-ai-mistral-bpifrance-et-mgx-prevoient-jusqu-a-3-gw-de-puissance-ia-en-france"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Campus AI Fouju as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "microsoft-aragon-la-muela",
      "source_file": "microsoft-aragon-la-muela.json",
      "source_sha256": "efd0447e6f6308425b1d0a4001efc814f2cfaba03698f5b737d43c892ce434e4",
      "source_name": "Microsoft La Muela datacenter campus (Aragón)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragón",
        "admin2": "Zaragoza",
        "locality": "La Muela",
        "lat": 41.6068,
        "lon": -1.0832,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s4"
        ],
        "note": "Nominatim point for the Polígono Industrial Centrovía in La Muela, which sources name as the site area (the campus involves an expansion of the estate); the 146-hectare boundary is not published in the sources."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-09-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.vozpopuli.com/economia/aragon-centro-datos-microsoft-inversion-2000-millones.html",
        "https://www.eldiario.es/aragon/sociedad/microsoft-avanza-red-centros-datos-zaragoza-proyecta-mayores-regiones-europa_1_12768636.html",
        "https://forbes.es/empresas/828243/microsoft-obtiene-luz-verde-para-su-ambicioso-proyecto-de-centros-de-datos-en-aragon/",
        "https://www.eldiario.es/aragon/economia/prioridad-extranjera-pp-vox-aragon-expropian-suelo-centro-datos-microsoft-2-euros-metro_1_13417031.html",
        "https://www.eldiario.es/aragon/politica/zec-presenta-25-alegaciones-plan-microsoft-exige-alcaldesa-zaragoza-paralizar-centro-datos_1_13487405.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft La Muela datacenter campus (Aragón) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "microsoft-aragon-villamayor-de-gallego",
      "source_file": "microsoft-aragon-villamayor-de-gallego.json",
      "source_sha256": "8eb76b8b42ab11dd1da0f4f4644713db3c5a4e7f7dbea86b60f474218de34810",
      "source_name": "Microsoft Villamayor de Gállego datacenter campus (Aragón)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragón",
        "admin2": "Zaragoza",
        "locality": "Villamayor de Gállego",
        "lat": 41.6857,
        "lon": -0.774,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Municipality centroid from Nominatim. Sources place the campus on Villamayor de Gállego land associated with the Polígono Malpica, whose named substation (Malpica) serves it; the parcel itself is not identified."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-09-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.vozpopuli.com/economia/aragon-centro-datos-microsoft-inversion-2000-millones.html",
        "https://inspenet.com/noticias/microsoft-abrira-centro-de-datos-en-aragon/",
        "https://www.eldiario.es/aragon/sociedad/microsoft-avanza-red-centros-datos-zaragoza-proyecta-mayores-regiones-europa_1_12768636.html",
        "https://forbes.es/empresas/828243/microsoft-obtiene-luz-verde-para-su-ambicioso-proyecto-de-centros-de-datos-en-aragon/",
        "https://www.eldiario.es/aragon/politica/zec-presenta-25-alegaciones-plan-microsoft-exige-alcaldesa-zaragoza-paralizar-centro-datos_1_13487405.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Villamayor de Gállego datacenter campus (Aragón) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "azora-tillion-villamayor-de-gallego",
          "relationship": "separate_named_developments",
          "reason": "Distinct Azora/Tillion and Microsoft projects; shared Villamayor municipality point is not a parcel or alias."
        }
      ]
    },
    {
      "source_id": "microsoft-aragon-zaragoza-puerto-venecia",
      "source_file": "microsoft-aragon-zaragoza-puerto-venecia.json",
      "source_sha256": "3d59dcc594169abc505b4a4bbbfd8e5aadcd23b47f5b4b3c67ed1368e41c7fc5",
      "source_name": "Microsoft Zaragoza (Puerto Venecia) datacenter campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragón",
        "admin2": "Zaragoza",
        "locality": "Zaragoza",
        "lat": 41.6088,
        "lon": -0.8872,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "Nominatim point for Puerto Venecia (Torrero-La Paz district); sources place the campus next to Puerto Venecia and Parque Venecia, but the parcel boundary is not published."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-09-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.eldiario.es/aragon/sociedad/microsoft-avanza-red-centros-datos-zaragoza-proyecta-mayores-regiones-europa_1_12768636.html",
        "https://forbes.es/empresas/828243/microsoft-obtiene-luz-verde-para-su-ambicioso-proyecto-de-centros-de-datos-en-aragon/",
        "https://www.eldiario.es/aragon/economia/prioridad-extranjera-pp-vox-aragon-expropian-suelo-centro-datos-microsoft-2-euros-metro_1_13417031.html",
        "https://www.eldiario.es/aragon/politica/zec-presenta-25-alegaciones-plan-microsoft-exige-alcaldesa-zaragoza-paralizar-centro-datos_1_13487405.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Zaragoza (Puerto Venecia) datacenter campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "microsoft-fairwater-atlanta",
      "source_file": "microsoft-fairwater-atlanta.json",
      "source_sha256": "8f6255bfc725608da634774ac5542f3d5049653fc59d56958bb346fd5f3875b9",
      "source_name": "Microsoft Fairwater AI datacenter, Atlanta (Fayetteville)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Georgia",
        "admin2": "Fayette County",
        "locality": "Fayetteville",
        "lat": 33.4487,
        "lon": -84.4549,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s4"
        ],
        "note": "Town centroid from Nominatim. A Microsoft spokesperson confirmed Fayetteville but declined to give the exact location; the AJC tied the facility to the QTS campus from permitting records, which is not company-confirmed."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/",
        "https://www.ajc.com/business/2025/11/microsofts-newest-ai-superfactory-opens-at-sprawling-fayetteville-campus/",
        "https://siliconangle.com/2025/11/12/microsoft-brings-atlanta-based-ai-super-factory-online/",
        "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta"
      ],
      "relationship": "unresolved_identity",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "AJC permitting research and Epoch link Microsoft Fairwater Atlanta to the QTS Fayetteville campus, but the source explicitly says the companies have not confirmed it. Hold the tenant-labelled record from independent counts; preserve its claims and reported relation to the separately documented QTS campus.",
      "integration_action": "retain_source_record_in_identity_hold",
      "hold_related_source_ids": [
        "qts-fayetteville-georgia"
      ],
      "flags": [
        "administrative_locator_not_project_geometry",
        "possible_source_internal_duplicate_hold"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "qts-fayetteville-georgia",
          "relationship": "reported_same_campus_tenant_scope",
          "reason": "Both records cite the same AJC permitting investigation; tenant/campus linkage is reported but not company-confirmed. QTS remains the campus anchor; Fairwater record is held from independent site/project counts."
        }
      ]
    },
    {
      "source_id": "microsoft-fairwater-mount-pleasant",
      "source_file": "microsoft-fairwater-mount-pleasant.json",
      "source_sha256": "ea9e84e4dd1d4c42e8dbd631f1f0f88952818db18088dae02c7f40ab2563e660",
      "source_name": "Microsoft Fairwater AI datacenter, Mount Pleasant",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wisconsin",
        "admin2": "Racine County",
        "locality": "Mount Pleasant",
        "lat": 42.6761,
        "lon": -87.9001,
        "precision": "site",
        "source_ids": [
          "s1",
          "s4",
          "s5",
          "s6"
        ],
        "note": "Microsoft's construction page headings place Phase 1 at 'KR & 90' and Phase 2 at 'KR & H' (County Road KR with 90th Street and County Road H); Spectrum News says the site was originally slated for Foxconn. Coordinates are the OpenStreetMap feature named Microsoft Fairwater AI Datacenter (via Nominatim); OSM maps Phase 2 slightly further west at about 42.6780, -87.9076."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-06-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://news.microsoft.com/source/2024/05/08/microsoft-announces-3-3-billion-investment-in-wisconsin-to-spur-artificial-intelligence-innovation-and-economic-growth/",
        "https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/",
        "https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/",
        "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
        "https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/",
        "https://spectrumnews1.com/wi/milwaukee/news/2026/06/23/construction-data-center-facility-microsoft-mount-pleasant-.html",
        "https://www.news4jax.com/business/2025/04/09/microsoft-says-its-slowing-or-pausing-some-ai-data-center-projects-including-1b-plan-for-ohio/",
        "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin",
        "https://w.media/microsoft-unveils-its-largest-ai-data-center-yet-to-spend-us-7-billion-on-wisconsin-facility/"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-fcc06643c640f5d8cce2",
      "canonical_project_id": null,
      "related_project_ids": [
        "ccb7fe0e-f94d-58ca-8d36-695a9cd48d56"
      ],
      "related_site_ids": [
        "vcc-site-fcc06643c640f5d8cce2"
      ],
      "reason": "Source explicitly covers completed phase 1 plus adjacent phase 2 at County Road KR; existing record is specifically the second facility. Durand Avenue and International Drive are separate later locations and remain separate records.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "source_site_point_not_surveyed_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "ccb7fe0e-f94d-58ca-8d36-695a9cd48d56",
          "project_stable_key": "curated:microsoft-mount-pleasant-datacenter-campus:second-facility",
          "site_id": "vcc-site-fcc06643c640f5d8cce2",
          "physical_site_stable_key": "curated:microsoft-mount-pleasant-datacenter-campus",
          "name": "Microsoft Mount Pleasant Second Datacenter Facility",
          "status": "under_construction",
          "status_as_of": "2026-06-23",
          "latitude": 42.676507349999994,
          "longitude": -87.91034345,
          "status_source_url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
          "geometry_source_url": "https://www.openstreetmap.org/way/1528490094"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-fcc06643c640f5d8cce2",
          "distance_km": 0.839,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/"
      ],
      "status_comparisons": [
        {
          "project_id": "ccb7fe0e-f94d-58ca-8d36-695a9cd48d56",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-06-23",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-23",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus.",
      "source_relations": [
        {
          "source_id": "microsoft-mount-pleasant-durand-avenue",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and Durand/Hewitt Memorial Phase 3 occupy separately described development parcels."
        },
        {
          "source_id": "microsoft-mount-pleasant-international-drive",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and International Drive six-building campus occupy separately described development parcels."
        }
      ]
    },
    {
      "source_id": "microsoft-licking-county-ohio",
      "source_file": "microsoft-licking-county-ohio.json",
      "source_sha256": "4efd2bbab8400f3312e0d7e8b453b7bf64695c7208d12e44522b6d32b8cd9cae",
      "source_name": "Microsoft Licking County three-site datacenter program (New Albany, Heath, Hebron)",
      "source_scope": "multi_site_program",
      "source_location": {
        "country": "US",
        "admin1": "Ohio",
        "admin2": "Licking County",
        "lat": 40.1318,
        "lon": -82.4628,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s6",
          "s7"
        ],
        "note": "County centroid from Nominatim, because the record covers a three-site program in different municipalities (New Albany, Heath and Hebron). Microsoft's pages place the Heath construction entrance on Thornwood Drive and a temporary Hebron construction entrance on Canyon Road."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-07-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.powermag.com/microsoft-announces-1-billion-investment-in-ohio-data-centers-as-officials-ponder-power-demands",
        "https://www.enr.com/articles/60572-microsoft-hits-pause-button-on-1b-in-data-centers-in-ohio",
        "https://myfox28columbus.com/news/local/microsoft-backs-off-1b-licking-county-data-center-plans",
        "https://www.news4jax.com/business/2025/04/09/microsoft-says-its-slowing-or-pausing-some-ai-data-center-projects-including-1b-plan-for-ohio/",
        "https://www.abc6onyourside.com/news/local/heath-columbus-ohio-break-ground-microsoft-data-center-expected-bring-hundreds-jobs-tech-technology-ai-artificial-intelligence-cloud-computing-digital-services",
        "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
        "https://local.microsoft.com/blog/hebron-datacenter-construction-update/"
      ],
      "relationship": "multi_site_program",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [
        "edf978b4-fbe8-5f8a-9fe0-bd1e9f33e1d2",
        "86bcbcd1-702d-5afa-aeb8-1cb145224b97",
        "f8377a0f-dc89-5b7a-8257-25f25cdbac43"
      ],
      "related_site_ids": [
        "vcc-site-487fd7b91c213d078d2d",
        "vcc-site-1589f325b3b39da5fb19",
        "vcc-site-c0945d7c74abf8504604"
      ],
      "reason": "Source explicitly describes separate Microsoft campuses in Heath, Hebron and New Albany. Each already has its own release identity and site locator; attach regional context to all three without merging their statuses or capacities. Source statement that no New Albany update was found differs from the release's July 2026 official New Albany observation.",
      "integration_action": "attach_context_without_new_site_or_project",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "canonical_records": [
        {
          "project_id": "edf978b4-fbe8-5f8a-9fe0-bd1e9f33e1d2",
          "project_stable_key": "curated:microsoft-heath-oh-datacenter:initial-site-preparation",
          "site_id": "vcc-site-487fd7b91c213d078d2d",
          "physical_site_stable_key": "curated:microsoft-heath-oh-datacenter",
          "name": "Microsoft Heath Initial Site Preparation",
          "status": "site_preparation",
          "status_as_of": "2026-07-01",
          "latitude": 40.025835523589,
          "longitude": -82.480274580568,
          "status_source_url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/"
        },
        {
          "project_id": "86bcbcd1-702d-5afa-aeb8-1cb145224b97",
          "project_stable_key": "curated:microsoft-hebron-oh-datacenter:initial-site-preparation",
          "site_id": "vcc-site-1589f325b3b39da5fb19",
          "physical_site_stable_key": "curated:microsoft-hebron-oh-datacenter",
          "name": "Microsoft Hebron Initial Site Preparation",
          "status": "site_preparation",
          "status_as_of": "2026-07-01",
          "latitude": 39.972018466398,
          "longitude": -82.488898833962,
          "status_source_url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/"
        },
        {
          "project_id": "f8377a0f-dc89-5b7a-8257-25f25cdbac43",
          "project_stable_key": "curated:microsoft-new-albany-oh-datacenter:initial-site-preparation",
          "site_id": "vcc-site-c0945d7c74abf8504604",
          "physical_site_stable_key": "curated:microsoft-new-albany-oh-datacenter",
          "name": "Microsoft New Albany Initial Site Preparation",
          "status": "site_preparation",
          "status_as_of": "2026-07-01",
          "latitude": 40.103804132848,
          "longitude": -82.753523444119,
          "status_source_url": "https://local.microsoft.com/blog/newalbany-datacenter-construction-update/",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-487fd7b91c213d078d2d",
          "distance_km": 11.876,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        },
        {
          "site_id": "vcc-site-1589f325b3b39da5fb19",
          "distance_km": 17.905,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        },
        {
          "site_id": "vcc-site-c0945d7c74abf8504604",
          "distance_km": 24.916,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
        "https://local.microsoft.com/blog/hebron-datacenter-construction-update/"
      ],
      "status_comparisons": [
        {
          "project_id": "edf978b4-fbe8-5f8a-9fe0-bd1e9f33e1d2",
          "source_status": "under_construction",
          "source_status_as_of": "2026-07-01",
          "canonical_status": "site_preparation",
          "canonical_status_as_of": "2026-07-01",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        },
        {
          "project_id": "86bcbcd1-702d-5afa-aeb8-1cb145224b97",
          "source_status": "under_construction",
          "source_status_as_of": "2026-07-01",
          "canonical_status": "site_preparation",
          "canonical_status_as_of": "2026-07-01",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        },
        {
          "project_id": "f8377a0f-dc89-5b7a-8257-25f25cdbac43",
          "source_status": "under_construction",
          "source_status_as_of": "2026-07-01",
          "canonical_status": "site_preparation",
          "canonical_status_as_of": "2026-07-01",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "microsoft-middenmeer-campus-west",
      "source_file": "microsoft-middenmeer-campus-west.json",
      "source_sha256": "36216e5a3351f393ffc7ae1eeec910c6afabd6432d5782c5a7a2d32e6fb41bf5",
      "source_name": "Microsoft Middenmeer Campus West expansion (Agriport Plot B)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "NL",
        "admin1": "Noord-Holland",
        "admin2": "Hollands Kroon",
        "locality": "Middenmeer",
        "lat": 52.78304,
        "lon": 5.025355,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Point of OSM way 1428523639 in the local OpenStreetMap layer, a Microsoft area tagged as a proposed datacenter expansion west of Microsoft's existing Agriport buildings; it is consistent with Microsoft's description of Plot B west of the A7 but is not confirmed by Microsoft."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-03-25",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://local.microsoft.com/blog/microsoft-bouwt-aan-toekomstbestendige-datacentercampus-in-middenmeer/",
        "https://local.microsoft.com/wp-content/uploads/2026/01/Information-market-3-december-2025.pdf",
        "https://pas.commissiemer.nl/files/nl/4021/a4021rd.pdf"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Middenmeer Campus West expansion (Agriport Plot B) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "microsoft-mount-pleasant-durand-avenue",
      "source_file": "microsoft-mount-pleasant-durand-avenue.json",
      "source_sha256": "6422e87f57229adc149c7a4308ef6b5c4fde411ea62bb970a4792f4fa2287863",
      "source_name": "Microsoft Mount Pleasant Durand Avenue datacenter campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wisconsin",
        "admin2": "Racine County",
        "locality": "Mount Pleasant",
        "lat": 42.6965,
        "lon": -87.947,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s5"
        ],
        "note": "Approximate point where Durand Avenue meets Hewitt Memorial Drive, the two roads Microsoft names for Phase 3, from Nominatim lookups of each road in Mount Pleasant. The 791-acre parcel boundary is not published in the sources."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-07-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.wpr.org/news/microsoft-15-more-data-centers-mount-pleasant",
        "https://www.wpr.org/news/mount-pleasant-approves-microsoft-data-center-expansion",
        "https://spectrumnews1.com/wi/milwaukee/news/2026/01/21/microsoft-to-expand-data-center-in-mount-pleasant-",
        "https://spectrumnews1.com/wi/milwaukee/news/2026/01/27/mount-pleasant--microsoft--data-center-expansion--approval",
        "https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/",
        "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Mount Pleasant Durand Avenue datacenter campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "ccb7fe0e-f94d-58ca-8d36-695a9cd48d56",
          "project_stable_key": "curated:microsoft-mount-pleasant-datacenter-campus:second-facility",
          "site_id": "vcc-site-fcc06643c640f5d8cce2",
          "physical_site_stable_key": "curated:microsoft-mount-pleasant-datacenter-campus",
          "name": "Microsoft Mount Pleasant Second Datacenter Facility",
          "status": "under_construction",
          "status_as_of": "2026-06-23",
          "latitude": 42.676507349999994,
          "longitude": -87.91034345,
          "status_source_url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
          "geometry_source_url": "https://www.openstreetmap.org/way/1528490094",
          "reason": "Durand/Hewitt Memorial Phase 3 is a separate 791-acre parcel and nine-building campus, not the County Road KR second facility."
        }
      ],
      "source_relations": [
        {
          "source_id": "microsoft-fairwater-mount-pleasant",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and Durand/Hewitt Memorial Phase 3 occupy separately described development parcels."
        },
        {
          "source_id": "microsoft-mount-pleasant-international-drive",
          "relationship": "separate_campus_parcels",
          "reason": "Distinct 791-acre nine-building Durand campus and 530-acre six-building International Drive campus."
        }
      ]
    },
    {
      "source_id": "microsoft-mount-pleasant-international-drive",
      "source_file": "microsoft-mount-pleasant-international-drive.json",
      "source_sha256": "43af0729feb6272f0be5d311a2eef5919b68162be01373e3449d95b38cce8061",
      "source_name": "Microsoft Mount Pleasant International Drive datacenter campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wisconsin",
        "admin2": "Racine County",
        "locality": "Mount Pleasant",
        "lat": 42.7112,
        "lon": -87.9339,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "Nominatim point for International Drive in Mount Pleasant, the road the sources name for the campus; the parcel boundary is not published."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-01-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.wpr.org/news/microsoft-15-more-data-centers-mount-pleasant",
        "https://www.wpr.org/news/mount-pleasant-approves-microsoft-data-center-expansion",
        "https://spectrumnews1.com/wi/milwaukee/news/2026/01/21/microsoft-to-expand-data-center-in-mount-pleasant-",
        "https://spectrumnews1.com/wi/milwaukee/news/2026/01/27/mount-pleasant--microsoft--data-center-expansion--approval"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Mount Pleasant International Drive datacenter campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "ccb7fe0e-f94d-58ca-8d36-695a9cd48d56",
          "project_stable_key": "curated:microsoft-mount-pleasant-datacenter-campus:second-facility",
          "site_id": "vcc-site-fcc06643c640f5d8cce2",
          "physical_site_stable_key": "curated:microsoft-mount-pleasant-datacenter-campus",
          "name": "Microsoft Mount Pleasant Second Datacenter Facility",
          "status": "under_construction",
          "status_as_of": "2026-06-23",
          "latitude": 42.676507349999994,
          "longitude": -87.91034345,
          "status_source_url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
          "geometry_source_url": "https://www.openstreetmap.org/way/1528490094",
          "reason": "International Drive is a separate 530-acre six-building campus, not the County Road KR second facility."
        }
      ],
      "source_relations": [
        {
          "source_id": "microsoft-fairwater-mount-pleasant",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and International Drive six-building campus occupy separately described development parcels."
        },
        {
          "source_id": "microsoft-mount-pleasant-durand-avenue",
          "relationship": "separate_campus_parcels",
          "reason": "Distinct 791-acre nine-building Durand campus and 530-acre six-building International Drive campus."
        }
      ]
    },
    {
      "source_id": "microsoft-pecos-texas",
      "source_file": "microsoft-pecos-texas.json",
      "source_sha256": "c0d45bed51b7d96a8403eadd894ba6f1f35864bc709679ea7c66616e9ec68367",
      "source_name": "Microsoft Pecos datacenter campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Reeves County",
        "locality": "Pecos",
        "lat": 31.4156,
        "lon": -103.5,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s5"
        ],
        "note": "Coordinates are the Pecos city coordinates from its Wikipedia page. Sources name Pecos and Reeves County but give no site or acreage."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-02",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
        "https://www.orrick.com/en/News/2026/07/Microsoft-Expands-Global-Data-Center-Capacity-with-2-GW-Data-Center-and-Co-Located-Power-Facility",
        "https://theenergymag.com/news/2026-06-22/microsoft-2-gigawatt-ai-data-center-west-texas-onsite-gas",
        "https://w.media/microsofts-new-dc-pecos-texas/",
        "https://en.wikipedia.org/wiki/Pecos,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Pecos datacenter campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "core-scientific-pecos",
          "relationship": "separate_named_developments",
          "reason": "Core Scientific Cottonwood on FM 2119 and Microsoft/Chevron Project Kilby are distinct named developments; shared city coordinate does not imply identity."
        }
      ]
    },
    {
      "source_id": "microsoft-skelton-grange-leeds",
      "source_file": "microsoft-skelton-grange-leeds.json",
      "source_sha256": "b82fadf68164fb6e8c94dbab887d58ac27d54e0e1b8f7680f42944caef1a52c1",
      "source_name": "Microsoft Skelton Grange datacentre campus, Leeds",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "GB",
        "admin1": "England",
        "admin2": "Leeds",
        "locality": "Stourton",
        "lat": 53.7758,
        "lon": -1.4978,
        "precision": "approximate_site",
        "source_ids": [
          "s2",
          "s3"
        ],
        "note": "Nominatim point on Skelton Grange Road, Stourton (LS10 1RS), next to the former power station land the sources name; the exact plot boundaries are not published in the sources."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://local.microsoft.com/blog/skelton-grange-leeds-datacentre-planning-application/",
        "https://harworthgroup.com/2026/04/27/harworth-and-microsoft-receive-resolution-to-grant-planning-consent-for-hyperscale-data-centre-and-il-space-at-skelton-grange-leeds/",
        "https://www.constructionenquirer.com/2026/04/27/go-ahead-for-microsofts-4bn-leeds-data-hub-push/",
        "https://www.theconstructionindex.co.uk/news/view/data-centre-approved-in-leeds"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Skelton Grange datacentre campus, Leeds as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "microsoft-union-city-georgia",
      "source_file": "microsoft-union-city-georgia.json",
      "source_sha256": "1e2e606e7579a4e77734966e44470d65f99e68221ef42b1e75044a4414e8918c",
      "source_name": "Microsoft Union City data center campus (EdgeConneX)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Georgia",
        "admin2": "Fulton County",
        "locality": "Union City",
        "lat": 33.605,
        "lon": -84.4936,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4"
        ],
        "note": "The July 2024 regional-impact report gives the street address 4810 Stonewall Tell Road but no coordinates. The point is the Union City coordinate from its Wikipedia article, so it marks the city rather than the parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-06",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://southernbusiness.com/?p=644089",
        "https://southernbusiness.com/?p=644448",
        "https://www.ajc.com/business/2026/08/microsoft-aims-to-void-property-tax-breaks-for-its-data-centers-near-atlanta/",
        "https://en.wikipedia.org/wiki/Union_City,_Georgia"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Microsoft Union City data center campus (EdgeConneX) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "mihta-askiy-data-centre-peace-river",
      "source_file": "mihta-askiy-data-centre-peace-river.json",
      "source_sha256": "dd0a7cfef6137c5abc692fe4c038fbc892ff099589f9d381518962a07637ddcf",
      "source_name": "Mihta Askiy Data Centre",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "admin2": "Northern Sunrise County",
        "locality": "Peace River (about 40 km northeast)",
        "lat": 56.3814,
        "lon": -116.7479,
        "precision": "approximate_site",
        "source_ids": [
          "s4",
          "s2"
        ],
        "note": "Point from the Government of Alberta major projects inventory, which notes its map location is not exact; rounded to four decimals. The federal notice places the project about 40 km northeast of Peace River."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iaac-aeic.gc.ca/050/evaluations/proj/90036",
        "https://iaac-aeic.gc.ca/050/evaluations/document/164258",
        "https://iaac-aeic.gc.ca/050/evaluations/document/165286?culture=en-CA",
        "https://majorprojects.alberta.ca/details/Mihta-Askiy-Data-Centre/12097"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Mihta Askiy Data Centre as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "natelli-new-hill-digital-campus",
      "source_file": "natelli-new-hill-digital-campus.json",
      "source_sha256": "334fcb46e99a2440902633f2788d2445a18859a2d38dd97a94c3b9b36d81d1ad",
      "source_name": "New Hill Digital Campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "North Carolina",
        "admin2": "Wake County",
        "locality": "New Hill",
        "lat": 35.6811,
        "lon": -78.9356,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s1"
        ],
        "note": "Wikipedia coordinates for the New Hill community. WRAL places the site on Shearon Harris Road beside the Shearon Harris nuclear plant, a few kilometres south of this point; no cited source gives site coordinates."
      },
      "source_status": "cancelled",
      "source_status_as_of": "2026-03-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.bisnow.com/news/raleigh-durham/data-center/massive-raleigh-area-data-center-scrapped-133584",
        "https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/",
        "https://abc11.com/post/data-center-developer-pulls-back-apex-now/18685708/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve New Hill Digital Campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "nebius-birmingham-alabama",
      "source_file": "nebius-birmingham-alabama.json",
      "source_sha256": "815d32dbd9fa778b0e8a34c8bc358d75d8df7eb8fe861b6f652544f90f75ccff",
      "source_name": "Nebius Birmingham AI factory (Lakeshore Parkway)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Alabama",
        "locality": "Birmingham",
        "lat": 33.5175,
        "lon": -86.8094,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "City centroid from the Wikipedia infobox for Birmingham (s3). The report places the site off Lakeshore Parkway without an address, so the point is the city centroid, not the site. Birmingham spans Jefferson and Shelby counties, so no county is given."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-02-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.wbrc.com/2026/02/11/ai-factory-being-proposed-along-lakeshore-parkway-birmingham/",
        "https://assets.nebius.com/assets/729154ac-8d55-459f-9dd6-8f85a40da15b/NEW%20Vineland%20NJ%20Fact%20Sheet_7.10.26.pdf?cache-buster=2026-07-10T18:45:11.445Z",
        "https://en.wikipedia.org/wiki/Birmingham,_Alabama"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Nebius Birmingham AI factory (Lakeshore Parkway) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "nebius-independence-missouri",
      "source_file": "nebius-independence-missouri.json",
      "source_sha256": "1b9ccbaaf57cd5c5e551035623b45f974f59cb70ae4edeabd2e8373c17083989",
      "source_name": "Nebius Independence AI factory",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Missouri",
        "locality": "Independence",
        "lat": 39.0925,
        "lon": -94.4139,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "City centroid from the Wikipedia infobox for Independence (s3). The groundbreaking release places the roughly 400-acre site in eastern Independence and the project page puts it at Route 78 and Little Blue Parkway, but no geocoder was used, so the point is the city centroid rather than the site. The city spans Jackson and Clay counties, so no county is given."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri",
        "https://nebius.com/independencemo",
        "https://en.wikipedia.org/wiki/Independence,_Missouri"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Nebius Independence AI factory as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "nebius-vineland-new-jersey",
      "source_file": "nebius-vineland-new-jersey.json",
      "source_sha256": "df44ac009bdf86a5fb958e27f7860e8b4dc55f2e03f7644c90ff1552c2941dae",
      "source_name": "Nebius Vineland AI factory",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "New Jersey",
        "admin2": "Cumberland County",
        "locality": "Vineland",
        "lat": 39.465,
        "lon": -75.0064,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4",
          "s7"
        ],
        "note": "City centroid from the Wikipedia infobox for Vineland (s7), which also gives Cumberland County. No street address or parcel appears in the cited sources."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure",
        "https://www.sec.gov/Archives/edgar/data/1513845/000110465925088312/tm2525580d1_6k.htm",
        "https://nebius.com/vinelandnj",
        "https://assets.nebius.com/assets/729154ac-8d55-459f-9dd6-8f85a40da15b/NEW%20Vineland%20NJ%20Fact%20Sheet_7.10.26.pdf?cache-buster=2026-07-10T18:45:11.445Z",
        "https://www.sec.gov/Archives/edgar/data/1513845/000110465925044092/tm2513807-3_f3asr.htm",
        "https://assets.nebius.com/assets/a6ecfd85-a6cb-4967-8ef7-9a25bd261f9c/SHLQ226.pdf?cache-buster=2026-08-12T11:54:46.695Z",
        "https://en.wikipedia.org/wiki/Vineland,_New_Jersey"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-c14008c0552564c11274",
      "canonical_project_id": null,
      "related_project_ids": [
        "5ace12f8-658e-5956-9173-d78e625d4df9"
      ],
      "related_site_ids": [
        "vcc-site-c14008c0552564c11274"
      ],
      "reason": "Same DataOne-owned Vineland campus with Nebius as tenant; canonical evidence includes the exact Nebius project page. Source is campus-wide while existing record selects Phase 2 expansion. A tenant label is not a separate physical site.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "5ace12f8-658e-5956-9173-d78e625d4df9",
          "project_stable_key": "curated:dataone-vineland-ai-data-center-campus:phase-2-expansion-current-build",
          "site_id": "vcc-site-c14008c0552564c11274",
          "physical_site_stable_key": "curated:dataone-vineland-ai-data-center-campus",
          "name": "DataOne Vineland Phase 2 Expansion Current Build",
          "status": "under_construction",
          "status_as_of": "2026-08-07",
          "latitude": 39.42519221884926,
          "longitude": -75.01347153097437,
          "status_source_url": "https://www.vinelandcity.org/wp-content/uploads/2026/08/Data-One-Meeting-Post-8.7.pdf",
          "geometry_source_url": "https://gisportal.vinelandcity.org/arcgis/rest/services/Cadastre/Parcel_Public_Viewer/MapServer/0/query?f=pjson&where=BLOCK%3D%277503%27%20AND%20LOT%3D%2735.01%27&outFields=OBJECTID_1,MUN,BLOCK,LOT,UNIQUEID,ParcelAddr,Owner&returnGeometry=true&outSR=4326&datumTransformation=1188"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-c14008c0552564c11274",
          "distance_km": 4.468,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://nebius.com/vinelandnj"
      ],
      "status_comparisons": [
        {
          "project_id": "5ace12f8-658e-5956-9173-d78e625d4df9",
          "source_status": "under_construction",
          "source_status_as_of": "2026-10-09",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-07",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "nextdc-m4-port-melbourne",
      "source_file": "nextdc-m4-port-melbourne.json",
      "source_sha256": "1e5605f20f502c7f1a5e664d6e05704db6b4deae003c6b58f2c4736315a30533",
      "source_name": "NEXTDC M4 Melbourne",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "AU",
        "admin1": "Victoria",
        "locality": "Port Melbourne",
        "lat": -37.833,
        "lon": 144.9124,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "NEXTDC gives the address 127 Todd Road, Port Melbourne. OpenStreetMap Nominatim matched Todd Road but not the house number, so coordinates are a point on Todd Road near the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-01-19",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend",
        "https://www.nextdc.com/news/m4-technology-campus-approved",
        "https://www.nextdc.com/data-centres/melbourne-data-centres/m4-melbourne"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-78289e1b65e2284a986f",
      "canonical_project_id": null,
      "related_project_ids": [
        "8715738f-39ac-5058-a01a-b62758b49831"
      ],
      "related_site_ids": [
        "vcc-site-78289e1b65e2284a986f"
      ],
      "reason": "Same NEXTDC M4 campus at 127 Todd Road, Port Melbourne. Source retains the approved full campus while existing record selects June 2026 initial early works; its older announced status must not replace the observed site preparation.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "approximate_locator_not_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "8715738f-39ac-5058-a01a-b62758b49831",
          "project_stable_key": "curated:nextdc-m4-melbourne:initial-early-works",
          "site_id": "vcc-site-78289e1b65e2284a986f",
          "physical_site_stable_key": "curated:nextdc-m4-melbourne",
          "name": "NEXTDC M4 Initial Early Works",
          "status": "site_preparation",
          "status_as_of": "2026-06-30",
          "latitude": -37.82870623280992,
          "longitude": 144.91146374858133,
          "status_source_url": "https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf",
          "geometry_source_url": "https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0/query?where=pfi%20IN%20%28%27214016983%27%2C%27460240432%27%29&outFields=*&outSR=4326&returnGeometry=true&f=pjson"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-78289e1b65e2284a986f",
          "distance_km": 0.484,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend"
      ],
      "status_comparisons": [
        {
          "project_id": "8715738f-39ac-5058-a01a-b62758b49831",
          "source_status": "announced",
          "source_status_as_of": "2026-01-19",
          "canonical_status": "site_preparation",
          "canonical_status_as_of": "2026-06-30",
          "flag": "source_status_predates_canonical_observation"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "nextdc-s7-eastern-creek",
      "source_file": "nextdc-s7-eastern-creek.json",
      "source_sha256": "8bf5c57e463069295572989c14e27565e89723b7cdefb27f1e9daa04a7847d72",
      "source_name": "NEXTDC S7 Sydney",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "AU",
        "admin1": "New South Wales",
        "locality": "Eastern Creek",
        "lat": -33.8059,
        "lon": 150.85,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "NEXTDC names the suburb of Eastern Creek, about 45 km west of the Sydney CBD, without a street address; coordinates are the OpenStreetMap Nominatim centroid of the suburb."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-12-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7",
        "https://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia",
        "https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve NEXTDC S7 Sydney as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "3761e59a-fe39-523d-83a6-9fbfa9feec85",
          "project_stable_key": "curated:nextdc-s4-sydney:initial-development",
          "site_id": "vcc-site-8d8b8d427f99ad4fa5a1",
          "physical_site_stable_key": "curated:nextdc-s4-sydney",
          "name": "NEXTDC S4 Initial Development",
          "status": "under_construction",
          "status_as_of": "2026-06-30",
          "latitude": -33.82784,
          "longitude": 150.82457,
          "status_source_url": "https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf",
          "geometry_source_url": "https://www.planningportal.nsw.gov.au/major-projects/projects/nextdc-s4-data-centre-horsley-park",
          "reason": "NEXTDC S7 and S4 are different named facilities."
        },
        {
          "project_id": "2e2b9d40-5024-5e6d-bbb2-56a8b16b9c16",
          "project_stable_key": "curated:cdc-eastern-creek-campus:ec5-current-build",
          "site_id": "vcc-site-3c1f872aa59b74b065ea",
          "physical_site_stable_key": "curated:cdc-eastern-creek-campus",
          "name": "CDC Eastern Creek EC5 Current Build",
          "status": "under_construction",
          "status_as_of": "2026-07-21",
          "latitude": -33.818072,
          "longitude": 150.837668,
          "status_source_url": "https://cdc.com.au/locations/sydney/",
          "geometry_source_url": "https://www.planningportal.nsw.gov.au/major-projects/projects/roberts-road-data-centre",
          "reason": "CDC EC5 is a different operator/facility."
        },
        {
          "project_id": "5c366d64-4bb5-5c28-ab62-ec20d60fb31a",
          "project_stable_key": "curated:cdc-eastern-creek-campus:ec6-current-build",
          "site_id": "vcc-site-3c1f872aa59b74b065ea",
          "physical_site_stable_key": "curated:cdc-eastern-creek-campus",
          "name": "CDC Eastern Creek EC6 Current Build",
          "status": "under_construction",
          "status_as_of": "2026-07-21",
          "latitude": -33.818072,
          "longitude": 150.837668,
          "status_source_url": "https://cdc.com.au/locations/sydney/",
          "geometry_source_url": "https://www.planningportal.nsw.gov.au/major-projects/projects/roberts-road-data-centre",
          "reason": "CDC EC6 is a different operator/facility."
        }
      ]
    },
    {
      "source_id": "nightpeak-old-ocean",
      "source_file": "nightpeak-old-ocean.json",
      "source_sha256": "aae418f9117b06832c493a7904a452ee9123ad2a0c3e4b8234ec8e08733b7a8a",
      "source_name": "Old Ocean Data Center (Nightpeak Energy)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Brazoria County",
        "locality": "Old Ocean (near Sweeny)",
        "lat": 29.0797,
        "lon": -95.7494,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Bisnow, citing county meeting documents, places the 158-acre site outside Sweeny, and the campus is named after Old Ocean, an unincorporated community about 5 miles northwest of Sweeny. The point is Old Ocean's coordinate from its Wikipedia article, not the parcel."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-03-11",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.citizen.org/news/public-citizen-applauds-brazoria-county-for-rejecting-tax-break-for-massive-data-center/",
        "https://www.bisnow.com/houston/news/data-center-development/houston-area-county-rejects-tax-abatement-for-35b-data-center-development-133616",
        "https://en.wikipedia.org/wiki/Old_Ocean,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Old Ocean Data Center (Nightpeak Energy) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "nscale-kvandal-narvik",
      "source_file": "nscale-kvandal-narvik.json",
      "source_sha256": "93bc05c4c106396860938b0b6d6dee41ccbb96ea63d1c7546db16651b1bdf1da",
      "source_name": "Nscale Kvandal AI data center (Narvik)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "NO",
        "admin1": "Nordland",
        "admin2": "Narvik Municipality",
        "locality": "Kvandal",
        "lat": 68.2899,
        "lon": 17.0865,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s8",
          "s9"
        ],
        "note": "Sources place the site at Kvandal, just outside Narvik, and Nscale says the operator's main office is on site in Bjerkvik. Kvandal itself was not resolved to a point, so a Narvik municipality centroid is used."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-02",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.mfn.se/ob/a/aker/nscale-aker-and-openai-to-establish-stargate-norway-a-100-000-nvidia-gpu-ai-gigafactory-powered-by-renewable-energy-in-northern-norway-bb68d573",
        "https://mfn.se/ob/a/aker/aker-aker-nscale-jv-signs-multi-billion-dollar-ai-infrastructure-agreement-with-microsoft-cad81224",
        "https://nscale.com/press-releases/nscale-microsoft-2025",
        "https://www.placera.se/pressmeddelanden/aker-aker-completes-investment-in-nscales-series-c-funding-round-20260327",
        "https://www.nscale.com/press-releases/nscale-microsoft-norway",
        "https://www.nscale.com/press-releases/nscale-secures-790-million-norway",
        "https://www.datacenter-forum.com/nscale/nscale-signs-ppa-with-vattenfall-for-kvandal-data-center-norway",
        "https://www.nscale.com/press-releases/nordscale",
        "https://www.inderes.se/releases/hent-a-subsidiary-of-sentia-has-signed-a-contract-for-the-expansion-of-nscales-data-center-in-the-narvik-region",
        "https://amcham.no/microsoft-contracts-30000-gpus-from-nscale-at-norway-data-center-as-openai-drops-out-of-latest-stargate/"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-2fb799e38497b94b3ed1",
      "canonical_project_id": null,
      "related_project_ids": [
        "97f12a4b-6526-5c76-94b3-6562420ffe99"
      ],
      "related_site_ids": [
        "vcc-site-2fb799e38497b94b3ed1"
      ],
      "reason": "Same Kvandal/Bjerkvik Nscale campus, with exact shared Nordscale issuer source. Source encompasses Stargate Norway and three-building/100 MW development; existing record is the initial 25 MW EPC build. Its municipality centroid is 38 km away from the reviewed parcel locator.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "97f12a4b-6526-5c76-94b3-6562420ffe99",
          "project_stable_key": "curated:nscale-kvandal-narvik-ai-data-center-campus:initial-25mw-epc-current-build",
          "site_id": "vcc-site-2fb799e38497b94b3ed1",
          "physical_site_stable_key": "curated:nscale-kvandal-narvik-ai-data-center-campus",
          "name": "Nscale Kvandal Initial 25 MW EPC Current Build",
          "status": "under_construction",
          "status_as_of": "2026-07-06",
          "latitude": 68.575252,
          "longitude": 17.580056,
          "status_source_url": "https://www.nscale.com/press-releases/nordscale",
          "geometry_source_url": "https://wfs.geonorge.no/skwms1/wfs.matrikkelen-eiendomskart-teig?service=WFS&version=2.0.0&request=GetFeature&typeNames=app%3ATeig&count=20&srsName=EPSG%3A4326&NAMESPACES=xmlns%28app%2Chttp%3A%2F%2Fskjema.geonorge.no%2FSOSI%2Fproduktspesifikasjon%2FMatrikkelen-Eiendomskart-Teig%2F20211101%29&FILTER=%3Cfes%3AFilter+xmlns%3Afes%3D%22http%3A%2F%2Fwww.opengis.net%2Ffes%2F2.0%22+xmlns%3Aapp%3D%22http%3A%2F%2Fskjema.geonorge.no%2FSOSI%2Fproduktspesifikasjon%2FMatrikkelen-Eiendomskart-Teig%2F20211101%22%3E%3Cfes%3AAnd%3E%3Cfes%3APropertyIsEqualTo%3E%3Cfes%3AValueReference%3Eapp%3Akommunenummer%3C%2Ffes%3AValueReference%3E%3Cfes%3ALiteral%3E1806%3C%2Ffes%3ALiteral%3E%3C%2Ffes%3APropertyIsEqualTo%3E%3Cfes%3APropertyIsEqualTo%3E%3Cfes%3AValueReference%3Eapp%3AmatrikkelnummerTekst%3C%2Ffes%3AValueReference%3E%3Cfes%3ALiteral%3E10%2F760%3C%2Ffes%3ALiteral%3E%3C%2Ffes%3APropertyIsEqualTo%3E%3C%2Ffes%3AAnd%3E%3C%2Ffes%3AFilter%3E"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-2fb799e38497b94b3ed1",
          "distance_km": 37.6,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://www.nscale.com/press-releases/nordscale"
      ],
      "status_comparisons": [
        {
          "project_id": "97f12a4b-6526-5c76-94b3-6562420ffe99",
          "source_status": "under_construction",
          "source_status_as_of": "2026-09-02",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-07-06",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "ntt-gdc-tokyo-tky12-shiroi",
      "source_file": "ntt-gdc-tokyo-tky12-shiroi.json",
      "source_sha256": "7d3b6bf29b3d9f3b4cfaafe76a0e0867e49d33ed83b25c0d5df1abf52ec66528",
      "source_name": "NTT Global Data Centers Tokyo TKY12 campus, Shiroi",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "JP",
        "admin1": "Chiba Prefecture",
        "locality": "Shiroi",
        "lat": 35.791472,
        "lon": 140.056306,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "NTT names Shiroi City, Chiba Prefecture, without an address. The point is the Shiroi city coordinate from its Wikipedia article, so it marks the city rather than the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-22",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.nttdata.com/global/ja/news/release/2026/041700/",
        "https://w.media/ntt-data-plans-a-200-mw-data-center-campus-in-japan/",
        "https://en.wikipedia.org/wiki/Shiroi"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve NTT Global Data Centers Tokyo TKY12 campus, Shiroi as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "1f33fed8-b0f9-50e2-8fac-56d135325c27",
          "project_stable_key": "curated:iij-shiroi-data-center-campus:phase-3-server-building",
          "site_id": "vcc-site-38f7e55e7e55aaed6c27",
          "physical_site_stable_key": "curated:iij-shiroi-data-center-campus",
          "name": "IIJ Shiroi DCC Phase 3 Server Building",
          "status": "under_construction",
          "status_as_of": "2026-06-25",
          "latitude": 35.799113,
          "longitude": 140.099553,
          "status_source_url": "https://www.iij.ad.jp/en/ir/policy/risk/",
          "geometry_source_url": "https://www.e-stat.go.jp/gis/statmap-search/data?dlserveyId=A002005212020&code=12232&coordSys=1&format=shape&downloadType=5&datum=2011",
          "reason": "NTT TKY12 and IIJ Shiroi phase 3 are different operators and named developments."
        }
      ]
    },
    {
      "source_id": "omnia-data-center-pecem",
      "source_file": "omnia-data-center-pecem.json",
      "source_sha256": "6bb6c50587e24a5e27a2317f1f60adc82bb095190a681a2f1ea0296053362f9c",
      "source_name": "Omnia Data Center Pecém",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "BR",
        "admin1": "Ceará",
        "locality": "Pecém",
        "lat": -3.5467,
        "lon": -38.8314,
        "precision": "locality",
        "source_ids": [
          "s1"
        ],
        "note": "The source names the Pecém complex but no parcel. Coordinates are the Port of Pecém reference point (English Wikipedia infobox), in São Gonçalo do Amarante; the data centre's position within the industrial and port complex was not published, so the municipality is left blank."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-05-18",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://casadosventos.com.br/cases/case-omnia",
        "https://pt.wikipedia.org/wiki/Casa_dos_Ventos"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-99459620c3cd48c8a82f",
      "canonical_project_id": null,
      "related_project_ids": [
        "0fd5e6a4-6421-5a23-b51c-e490e4a79cd9"
      ],
      "related_site_ids": [
        "vcc-site-99459620c3cd48c8a82f"
      ],
      "reason": "Same OMNIA Data Center Pecem campus at the Pecem industrial complex. Source covers campus/PPA context; existing record selects initial construction supported by SEMACE project identity and June 2026 official observation. The port reference point is not the site.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "0fd5e6a4-6421-5a23-b51c-e490e4a79cd9",
          "project_stable_key": "curated:omnia-pecem-data-center-campus:initial-tiktok-bytedance-build",
          "site_id": "vcc-site-99459620c3cd48c8a82f",
          "physical_site_stable_key": "curated:omnia-pecem-data-center-campus",
          "name": "OMNIA Pecém Initial Data Center Construction",
          "status": "under_construction",
          "status_as_of": "2026-06-16",
          "latitude": -3.65423321723938,
          "longitude": -38.82234191894531,
          "status_source_url": "https://www.complexodopecem.com.br/no-ceara-iniciadas-obras-do-terminal-logistico-que-ligara-o-porto-do-pecem-a-transnordestina/",
          "geometry_source_url": "https://servicos.semace.ce.gov.br/SemaceMobileWS/webService/consultaProcesso/processos"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-99459620c3cd48c8a82f",
          "distance_km": 11.999,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "0fd5e6a4-6421-5a23-b51c-e490e4a79cd9",
          "source_status": "announced",
          "source_status_as_of": "2026-05-18",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-16",
          "flag": "source_status_predates_canonical_observation"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "openai-stargate-abilene",
      "source_file": "openai-stargate-abilene.json",
      "source_sha256": "3d5e26cae202f2c893720da67cbdf1d23c0fe50dbdafd1f787a8c1db57b23e76",
      "source_name": "Stargate Abilene (Crusoe campus on Lancium land)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "locality": "Abilene",
        "lat": 32.4465,
        "lon": -99.7476,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s7"
        ],
        "note": "Abilene city centroid from an OpenStreetMap Nominatim lookup. Cited sources name the city but give no street address or parcel, so the campus itself is not pinpointed."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture",
        "https://group.softbank/en/news/press/20250924",
        "https://w.media/crusoe-tops-off-final-ai-data-center-in-abilene-texas/",
        "https://www.industrialinfo.com/iirenergy/industry-news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568",
        "https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
        "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-abilene",
        "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene",
        "https://thetechcapital.com/abilene-stargate-data-centre-update/",
        "https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-85b3549bb55293336132",
      "canonical_project_id": null,
      "related_project_ids": [
        "938feeec-a323-56e0-b6ce-2590fe58e623"
      ],
      "related_site_ids": [
        "vcc-site-85b3549bb55293336132"
      ],
      "reason": "Same original eight-building Crusoe/Oracle/OpenAI campus on Lancium land. Source includes the first operating buildings and full 1.2 GW program; existing record selects the remaining six-building expansion. Adjacent Crusoe Microsoft campus is separate.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "938feeec-a323-56e0-b6ce-2590fe58e623",
          "project_stable_key": "curated:lancium-clean-campus-abilene-ai-data-center:remaining-six-building-expansion",
          "site_id": "vcc-site-85b3549bb55293336132",
          "physical_site_stable_key": "curated:lancium-clean-campus-abilene-ai-data-center",
          "name": "Lancium Clean Campus Abilene Remaining Six-Building Expansion",
          "status": "under_construction",
          "status_as_of": "2026-06-04",
          "latitude": 32.509551980071,
          "longitude": -99.774790370504,
          "status_source_url": "https://www.oracle.com/data-centers/",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-85b3549bb55293336132",
          "distance_km": 7.461,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "938feeec-a323-56e0-b6ce-2590fe58e623",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-10-05",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-04",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus.",
      "source_relations": [
        {
          "source_id": "crusoe-abilene-microsoft",
          "relationship": "separate_adjacent_campuses",
          "reason": "Source explicitly describes Microsoft campus as second and adjacent to original Oracle/OpenAI campus; distinct building programs and tenants."
        }
      ]
    },
    {
      "source_id": "openai-stargate-dona-ana-county",
      "source_file": "openai-stargate-dona-ana-county.json",
      "source_sha256": "156ac01301ce08972f66809a5a42cd4aa10ee42a2c854aab06a6d3c5a5d5f659",
      "source_name": "Project Jupiter (Stargate New Mexico, Doña Ana County)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "New Mexico",
        "admin2": "Doña Ana County",
        "lat": 32.3282,
        "lon": -106.8494,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s3",
          "s5"
        ],
        "note": "Doña Ana County centroid from OpenStreetMap Nominatim. Sources name only the county; a September 2026 community release about the project was datelined Santa Teresa and focused on Santa Teresa and Sunland Park, but no site address was found."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-03",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://group.softbank/en/news/press/20250924",
        "https://www.datacenterknowledge.com/data-center-site-selection/openai-expands-stargate-with-five-new-data-center-sites-across-us",
        "https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
        "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-jupiter",
        "https://www.bloomenergy.com/news/oracle-and-bloom-energy-announce-400000-in-support-for-roadrunner-food-bank-to-expand-food-access-in-santa-teresa-and-sunland-park/"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-f65d3c659a862ad07679",
      "canonical_project_id": "6f0acd88-cd04-5f3f-915c-48a71fd51f39",
      "related_project_ids": [
        "6f0acd88-cd04-5f3f-915c-48a71fd51f39"
      ],
      "related_site_ids": [
        "vcc-site-f65d3c659a862ad07679"
      ],
      "reason": "Same Project Jupiter four-building Oracle/STACK/BorderPlex campus in Dona Ana County. Explicit Project Jupiter alias and developer/tenant identities resolve the match despite the source county centroid being 59 km from the campus.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "6f0acd88-cd04-5f3f-915c-48a71fd51f39",
          "project_stable_key": "curated:oracle-project-jupiter-dona-ana-campus:current-campus-build",
          "site_id": "vcc-site-f65d3c659a862ad07679",
          "physical_site_stable_key": "curated:oracle-project-jupiter-dona-ana-campus",
          "name": "Oracle Project Jupiter Doña Ana County Current Campus Build",
          "status": "under_construction",
          "status_as_of": "2026-09-14",
          "latitude": 31.8182982,
          "longitude": -106.66530225,
          "status_source_url": "https://www.oracle.com/news/announcement/project-jupiter-statement-on-construction-permitting-2026-09-14/",
          "geometry_source_url": "https://www.openstreetmap.org/way/1476734418"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-f65d3c659a862ad07679",
          "distance_km": 59.293,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "6f0acd88-cd04-5f3f-915c-48a71fd51f39",
          "source_status": "under_construction",
          "source_status_as_of": "2026-09-03",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-09-14",
          "flag": "source_status_predates_canonical_observation"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "openai-stargate-milam-county",
      "source_file": "openai-stargate-milam-county.json",
      "source_sha256": "366e8c246622e5cb54e849a3461f6fdb15b03e69913acf0f37329bb5088f5e8b",
      "source_name": "Stargate Milam County (SB Energy campus)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Milam County",
        "lat": 30.7627,
        "lon": -96.9982,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "Milam County centroid from OpenStreetMap Nominatim. Sources name only the county, which Epoch AI places about 70 miles northeast of Austin; no site address was found."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-17",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://group.softbank/en/news/press/20250924",
        "https://www.datacenterknowledge.com/data-center-site-selection/openai-expands-stargate-with-five-new-data-center-sites-across-us",
        "https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Stargate Milam County (SB Energy campus) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "openai-stargate-saline-township",
      "source_file": "openai-stargate-saline-township.json",
      "source_sha256": "1858e480c5b3ec6bdd169c110b83a8b7178ba20600c04fcc8a3c101f999fe203",
      "source_name": "The Barn (Stargate Michigan, Saline Township)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Michigan",
        "admin2": "Washtenaw County",
        "locality": "Saline Township",
        "lat": 42.1248,
        "lon": -83.8587,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3",
          "s4"
        ],
        "note": "Sources place the site entrance off Michigan Avenue, and news photos show the campus from West Michigan Avenue and from Braun Road on its back side. The point lies on West Michigan Avenue in Saline Township near the line of Braun Road, derived from OpenStreetMap Nominatim road geometry; the county is named in the June 2026 release. It is not a surveyed parcel location."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-02",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site",
        "https://spectrumlocalnews.com/mi/michigan/news/2025/12/20/mpsc-approves-dte-contracts",
        "https://www.webwire.com/ViewPressRel.asp?aId=355624",
        "https://spectrumlocalnews.com/mi/michigan/news/2026/08/02/related-digital-saline-township-data-center-construction-progress",
        "https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-249f52c31025c0aa2ef2",
      "canonical_project_id": "7d936c4e-29f2-592f-984b-61f5d6367fc8",
      "related_project_ids": [
        "7d936c4e-29f2-592f-984b-61f5d6367fc8"
      ],
      "related_site_ids": [
        "vcc-site-249f52c31025c0aa2ef2"
      ],
      "reason": "Same The Barn three-building Stargate campus developed by Related Digital for Oracle/OpenAI in Saline Township. Name alias, parties and construction program agree.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "canonical_records": [
        {
          "project_id": "7d936c4e-29f2-592f-984b-61f5d6367fc8",
          "project_stable_key": "curated:related-openai-oracle-stargate-michigan-saline:current-build",
          "site_id": "vcc-site-249f52c31025c0aa2ef2",
          "physical_site_stable_key": "curated:related-openai-oracle-stargate-michigan-saline",
          "name": "The Barn Stargate Current Data Center Build",
          "status": "under_construction",
          "status_as_of": "2026-06-01",
          "latitude": 42.1239264,
          "longitude": -83.88208795,
          "status_source_url": "https://www.related.com/press-releases/2026-06-01/related-digital-blackstone-oracle-openai-walbridge-and-governor-whitmer",
          "geometry_source_url": "https://www.openstreetmap.org/way/1528327802"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-249f52c31025c0aa2ef2",
          "distance_km": 1.931,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "7d936c4e-29f2-592f-984b-61f5d6367fc8",
          "source_status": "under_construction",
          "source_status_as_of": "2026-08-02",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-01",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "openai-stargate-shackelford-county",
      "source_file": "openai-stargate-shackelford-county.json",
      "source_sha256": "130c9be9748b683d69c292d35b59ff95cfc5d1d56c2efa537f540f59faefa4c9",
      "source_name": "Vantage Frontier campus (Stargate Shackelford County)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Shackelford County",
        "lat": 32.7089,
        "lon": -99.3308,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s4",
          "s5",
          "s8"
        ],
        "note": "Shackelford County centroid from OpenStreetMap Nominatim. Texas TDLR filings give a site address on Private Road 1604 with an Abilene mailing address in Shackelford County, but the road was not found in OpenStreetMap. Epoch AI places the campus just across the county line from the Abilene site, so the true site is likely west of this point."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-17",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://rebusinessonline.com/vantage-data-centers-to-invest-25b-for-mega-campus-in-shackleford-county-texas/",
        "https://group.softbank/en/news/press/20250924",
        "https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas/",
        "https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026024068",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026024112",
        "https://vantage-dc.com/data-center-locations/north-america/",
        "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-frontier",
        "https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Vantage Frontier campus (Stargate Shackelford County) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "oracle-vantage-port-washington",
      "source_file": "oracle-vantage-port-washington.json",
      "source_sha256": "3400afe27b31a4168bd0917a9a6248131c913bb69139456f93d0092790bd71d9",
      "source_name": "Vantage Lighthouse campus (Stargate Port Washington)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wisconsin",
        "admin2": "Ozaukee County",
        "locality": "Port Washington",
        "lat": 43.3886,
        "lon": -87.8693,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s7",
          "s8"
        ],
        "note": "Port Washington city centroid from OpenStreetMap Nominatim. Sources place the campus on the city's north side, just west of Interstate 43, without giving an address or parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-11",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://ozaukeepress.com/content/vantage-chief-calls-complex-large-even-its-standards",
        "https://w.media/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
        "https://vantage-dc.com/data-center-locations/north-america/",
        "https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
        "https://www.wpr.org/news/oracle-sues-wisconsin-utility-regulators-psc-financial-requirements-data-centers",
        "https://ozaukeepress.com/node/113525",
        "https://fox11online.com/news/state/port-washington-data-center-project-lighthouse-construction-open-house-neighbor-concerns-companies-representatives-vantage-oracle-openai",
        "https://wisconsinwatch.org/2026/10/wisconsin-we-energies-deal-oracle-data-center-nuclear-energy-power-point-beach-plant/"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-d272a722ca415c1be654",
      "canonical_project_id": "3b636397-fbb2-5564-a352-fa1382a218b5",
      "related_project_ids": [
        "3b636397-fbb2-5564-a352-fa1382a218b5"
      ],
      "related_site_ids": [
        "vcc-site-d272a722ca415c1be654"
      ],
      "reason": "Same Vantage Lighthouse four-building Port Washington campus for Oracle/OpenAI. Lighthouse alias, developer, locality and Wisconsin DNR identity agree.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "3b636397-fbb2-5564-a352-fa1382a218b5",
          "project_stable_key": "curated:vantage-lighthouse-port-washington-campus:current-campus-build",
          "site_id": "vcc-site-d272a722ca415c1be654",
          "physical_site_stable_key": "curated:vantage-lighthouse-port-washington-campus",
          "name": "Vantage Lighthouse Port Washington Current Campus Build",
          "status": "under_construction",
          "status_as_of": "2026-06-12",
          "latitude": 43.430735,
          "longitude": -87.861494,
          "status_source_url": "https://dnr.wisconsin.gov/topic/EIA/Portwashington.html",
          "geometry_source_url": "https://dnr.wisconsin.gov/topic/EIA/Portwashington.html"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-d272a722ca415c1be654",
          "distance_km": 4.727,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "3b636397-fbb2-5564-a352-fa1382a218b5",
          "source_status": "under_construction",
          "source_status_as_of": "2026-09-11",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-12",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "pdg-jc3-bekasi",
      "source_file": "pdg-jc3-bekasi.json",
      "source_sha256": "b5a881b948f3ef9e8b8676da5680503c9f8c7d5b6901345b60f63d73fd208662",
      "source_name": "Princeton Digital Group JC3 Greater Jakarta",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ID",
        "admin1": "West Java",
        "admin2": "Bekasi Regency",
        "lat": -6.3836,
        "lon": 107.1911,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3"
        ],
        "note": "PDG places JC3 in the Greenland International Industrial Center (GIIC), Bekasi Regency, without a street address; coordinates are the OpenStreetMap Nominatim centroid of the GIIC industrial estate."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-05-07",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://princetondg.com/press-releases/princeton-digital-group-breaks-ground-on-milestone-usd-1-billion-120-mw-greater-jakarta-campus/",
        "https://princetondg.com/press-releases/pdg-raising-usd-856-million-debt-for-its-hyperscale-data-center-expansion-in-indonesia/",
        "https://princetondg.com/press-releases/pdg-acquires-240-mw-of-powered-land-in-jakarta-advancing-its-rapid-expansion-across-asia/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Princeton Digital Group JC3 Greater Jakarta as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "b2e4945f-3d75-5d9b-b2bb-d65deb74c405",
          "project_stable_key": "curated:digital-edge-cgk-campus-bekasi:cgk1",
          "site_id": "vcc-site-f42f9f22874b1766554e",
          "physical_site_stable_key": "curated:digital-edge-cgk-campus-bekasi",
          "name": "Digital Edge CGK1",
          "status": "shell",
          "status_as_of": "2026-06-08",
          "latitude": -6.386820103966021,
          "longitude": 107.18709493651593,
          "status_source_url": "https://id.digitaledgedc.com/news/digital-edge-tops-out-cgk1-secures-largest-indonesia-power-deal",
          "geometry_source_url": "https://api.openstreetmap.org/api/0.6/way/568349989/full.json",
          "reason": "PDG JC3 and Digital Edge CGK1 are distinct named operators/campuses within GIIC."
        },
        {
          "project_id": "aa93c84a-17d6-5092-bf57-686f7e1ab4a4",
          "project_stable_key": "curated:stt-jakarta-data-centre-campus:stt-jakarta-3",
          "site_id": "vcc-site-57a103a9de718a95ae14",
          "physical_site_stable_key": "curated:stt-jakarta-data-centre-campus",
          "name": "STT Jakarta 3",
          "status": "shell",
          "status_as_of": "2026-06-10",
          "latitude": -6.37400965,
          "longitude": 107.20106675,
          "status_source_url": "https://www.sttelemediagdc.com/newsroom/stt-gdc-accelerates-jakarta-campus-expansion-power-indonesia-ai-and-digital-ambitions",
          "geometry_source_url": "https://www.openstreetmap.org/way/1533569836",
          "reason": "PDG JC3 and STT Jakarta are distinct named campuses."
        }
      ],
      "source_relations": [
        {
          "source_id": "pdg-jc4-bekasi",
          "relationship": "separate_nearby_campuses",
          "reason": "PDG describes JC4 about 1.7 km from JC3; both use the GIIC estate centroid. Preserve independent campus identities."
        }
      ]
    },
    {
      "source_id": "pdg-jc4-bekasi",
      "source_file": "pdg-jc4-bekasi.json",
      "source_sha256": "8ac1105bbdbc397e79da7ed495d74773d3cde3f65c90633c398ba1b52807be6a",
      "source_name": "Princeton Digital Group JC4 Greater Jakarta",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ID",
        "admin1": "West Java",
        "admin2": "Bekasi Regency",
        "lat": -6.3836,
        "lon": 107.1911,
        "precision": "approximate_site",
        "source_ids": [
          "s1"
        ],
        "note": "PDG places JC4 in the Greenland International Industrial Center (GIIC), Bekasi Regency, without a street address; coordinates are the OpenStreetMap Nominatim centroid of the GIIC industrial estate and are shared with the nearby JC3 record."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-30",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://princetondg.com/press-releases/pdg-acquires-240-mw-of-powered-land-in-jakarta-advancing-its-rapid-expansion-across-asia/",
        "https://princetondg.com/press-releases/pdg-raising-usd-856-million-debt-for-its-hyperscale-data-center-expansion-in-indonesia/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Princeton Digital Group JC4 Greater Jakarta as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "b2e4945f-3d75-5d9b-b2bb-d65deb74c405",
          "project_stable_key": "curated:digital-edge-cgk-campus-bekasi:cgk1",
          "site_id": "vcc-site-f42f9f22874b1766554e",
          "physical_site_stable_key": "curated:digital-edge-cgk-campus-bekasi",
          "name": "Digital Edge CGK1",
          "status": "shell",
          "status_as_of": "2026-06-08",
          "latitude": -6.386820103966021,
          "longitude": 107.18709493651593,
          "status_source_url": "https://id.digitaledgedc.com/news/digital-edge-tops-out-cgk1-secures-largest-indonesia-power-deal",
          "geometry_source_url": "https://api.openstreetmap.org/api/0.6/way/568349989/full.json",
          "reason": "PDG JC4 and Digital Edge CGK1 are distinct named operators/campuses within GIIC."
        },
        {
          "project_id": "aa93c84a-17d6-5092-bf57-686f7e1ab4a4",
          "project_stable_key": "curated:stt-jakarta-data-centre-campus:stt-jakarta-3",
          "site_id": "vcc-site-57a103a9de718a95ae14",
          "physical_site_stable_key": "curated:stt-jakarta-data-centre-campus",
          "name": "STT Jakarta 3",
          "status": "shell",
          "status_as_of": "2026-06-10",
          "latitude": -6.37400965,
          "longitude": 107.20106675,
          "status_source_url": "https://www.sttelemediagdc.com/newsroom/stt-gdc-accelerates-jakarta-campus-expansion-power-indonesia-ai-and-digital-ambitions",
          "geometry_source_url": "https://www.openstreetmap.org/way/1533569836",
          "reason": "PDG JC4 and STT Jakarta are distinct named campuses."
        }
      ],
      "source_relations": [
        {
          "source_id": "pdg-jc3-bekasi",
          "relationship": "separate_nearby_campuses",
          "reason": "PDG describes JC4 about 1.7 km from JC3; both use the GIIC estate centroid. Preserve independent campus identities."
        }
      ]
    },
    {
      "source_id": "powerhouse-95-spotsylvania",
      "source_file": "powerhouse-95-spotsylvania.json",
      "source_sha256": "b7af86891ac1f351a9a3b7538e7808c52342d8f3c19f5ad1091aba8b2e211671",
      "source_name": "PowerHouse 95 data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Virginia",
        "admin2": "Spotsylvania County",
        "lat": 38.18,
        "lon": -77.65,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Sources say only that the campus is in Spotsylvania along the I-95 corridor near existing electrical infrastructure. The point is the Spotsylvania County coordinate from its Wikipedia article, not the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/",
        "https://www.lightwaveonline.com/data-center/article/14304356/powerhouse-data-centers-announces-purchase-of-145-acres-in-spotsylvania-va-for-powerhouse-95-campus",
        "https://powerhousedata.com/data-center/powerhouse-95",
        "https://en.wikipedia.org/wiki/Spotsylvania_County,_Virginia"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve PowerHouse 95 data center campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "powerhouse-big-watt-taylor",
      "source_file": "powerhouse-big-watt-taylor.json",
      "source_sha256": "b9ae36453c5bc2d5e7dbd46d36652e96b338fba97598638e5166d6b9de6f29b5",
      "source_name": "Taylor Technology Campus (Big Watt Digital and PowerHouse)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Williamson County",
        "locality": "Taylor",
        "lat": 30.5725,
        "lon": -97.4167,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4"
        ],
        "note": "Bisnow gives the address 3301 Farm to Market Road 112; KUT places the site just outside Taylor's city limits in unincorporated Williamson County, pending annexation. The point is the Taylor city coordinate from its Wikipedia article, not the site."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.bisnow.com/news/austin-san-antonio/data-center/taylor-deciding-annexation-zoning-data-center-campus-powerhouse",
        "https://www.kut.org/energy-environment/2026-10-02/taylor-annexing-data-center-development",
        "https://www.kut.org/energy-environment/2026-10-09/taylor-tx-annex-data-center-power-plant",
        "https://en.wikipedia.org/wiki/Taylor,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Taylor Technology Campus (Big Watt Digital and PowerHouse) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "powerhouse-pennsylvania-digital-i-carlisle",
      "source_file": "powerhouse-pennsylvania-digital-i-carlisle.json",
      "source_sha256": "2508d9e8e994b87fadbf70317086c9aa5eb855648aff9617fde30cc4cc393c54",
      "source_name": "Pennsylvania Digital I (PAX-1), Middlesex Township",
      "source_scope": "bounded_master_park",
      "source_location": {
        "country": "US",
        "admin1": "Pennsylvania",
        "admin2": "Cumberland County",
        "locality": "Middlesex Township",
        "lat": 40.2167,
        "lon": -77.1164,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Coordinates are the Wikipedia point for Middlesex Township (s4). Local reporting places the site off Country Club Road about five miles northeast of Carlisle; the parcel was not geocoded."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-03-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://powerhousedata.com/news/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania",
        "https://bob949.iheart.com/featured/whp580-newsroom/content/2026-01-09-plans-approved-for-18-building-data-center-in-pennsylvania/",
        "https://constructionreviewonline.com/450-mw-substation-approved-for-15b-pennsylvania-digital-i-pax-ai-data-center-in-carlisle/",
        "https://en.wikipedia.org/wiki/Middlesex_Township,_Cumberland_County,_Pennsylvania"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Pennsylvania Digital I (PAX-1), Middlesex Township as an independent source record; its locality locator does not itself establish a surveyed physical site. Source encompasses a single explicitly bounded master park with multiple development subcampuses; retain that park-level scope and do not count its internal projects as separately resolved sites.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry",
        "master_park_with_multiple_subcampuses_not_individual_facility"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "powerhouse-poe-louisville-camp-ground-road",
      "source_file": "powerhouse-poe-louisville-camp-ground-road.json",
      "source_sha256": "5471b111c6ac92c990b79489fd4ae91e75783ea10c7e4aef405795c3ffdb8b73",
      "source_name": "PowerHouse Louisville hyperscale campus (Camp Ground Road)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Kentucky",
        "admin2": "Jefferson County",
        "locality": "Louisville",
        "lat": 38.2561,
        "lon": -85.7514,
        "precision": "locality",
        "source_ids": [
          "s3",
          "s5",
          "s6",
          "s7"
        ],
        "note": "Local sources place the campus on Camp Ground Road in southern or southwest Louisville without coordinates. The point is the Louisville city coordinate from its Wikipedia article, not the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-13",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://news.pplweb.com/2025-01-16-LG-E-announces-first-major-data-center-electric-customer",
        "https://www.datacenterfrontier.com/site-selection/article/55263723/lets-go-build-some-data-centers-powerhouse-drives-hyperscale-and-ai-infrastructure-across-north-america",
        "https://www.wdrbwave.com/2025/01/17/louisville-welcome-kentuckys-first-hyperscale-data-center/",
        "https://powerhousedata.com/data-center/ph-louisville",
        "https://www.wdrbwave.com/2026/07/18/louisville-data-center-opponents-rally-metro-hall-push-stronger-regulations/",
        "https://www.lpm.org/news/2026-08-13/louisville-metro-council-approves-data-center-moratorium-as-new-proposal-sparks-controversy",
        "https://en.wikipedia.org/wiki/Louisville,_Kentucky"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve PowerHouse Louisville hyperscale campus (Camp Ground Road) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "project-blue-tucson",
      "source_file": "project-blue-tucson.json",
      "source_sha256": "9f1b32cb9ddbbf307e29039d7363f7d2cad9828ba5f410f8f04e197c9d4def92",
      "source_name": "Project Blue",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Arizona",
        "admin2": "Pima County",
        "locality": "Tucson",
        "lat": 32.2219,
        "lon": -110.9714,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s6"
        ],
        "note": "Wikipedia coordinates for Tucson. The site is in unincorporated Pima County immediately north of the Pima County Fairgrounds and west of Houghton Road in the Southeast Employment and Logistics Center, southeast of this point; no coordinates were found in a cited source."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.pima.gov/3552/Project-Blue-FAQ",
        "https://azluminaria.org/2025/08/27/project-blue-data-center-pima-county-beale-infrastructure-tep/",
        "https://www.azfamily.com/2025/08/09/tucson-rejects-amazon-linked-data-center-amid-water-energy-concerns/",
        "https://azcapitoltimes.com/news/2025/12/04/acc-greenlights-energy-agreement-for-tep-to-power-project-blue-data-center/",
        "https://www.kold.com/2025/12/16/pima-county-votes-move-forward-with-project-blue",
        "https://www.kold.com/2026/04/25/construction-begins-first-hyper-scale-data-center-pima-county/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Project Blue as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "project-sail-coweta-county",
      "source_file": "project-sail-coweta-county.json",
      "source_sha256": "cf11e23564534700cd813ca376c5c4d39eec80181d8ef3f5be83b26b71083b69",
      "source_name": "Project Sail (Prologis data center campus, Coweta County)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Georgia",
        "admin2": "Coweta County",
        "locality": "Sargent",
        "lat": 33.376,
        "lon": -84.788,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia centroid of Sargent (s5). The river group's fact sheet (s1) places the site in rural Sargent about 7 miles northwest of Newnan, with Wahoo Creek crossing the property; no parcel coordinates were found."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://chattahoochee.org/wp-content/uploads/2026/03/Project-Sail-Fact-Sheet-March-2026.pdf",
        "https://www.cowetaprojectsail.com/coweta-lp/",
        "https://www.telecomreviewamericas.com/articles/wholesale-and-capacity/a-massive-data-center-project-near-atlanta/",
        "https://propmodo.com/?p=179099",
        "https://en.wikipedia.org/wiki/Sargent,_Georgia"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Project Sail (Prologis data center campus, Coweta County) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "prometheus-hyperscale-evanston",
      "source_file": "prometheus-hyperscale-evanston.json",
      "source_sha256": "8a379e650d83c37fb15431359dd0c005f7c3d62830ef93407788400280adbed6",
      "source_name": "Prometheus Hyperscale Evanston campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Wyoming",
        "admin2": "Uinta County",
        "locality": "Evanston",
        "lat": 41.2683,
        "lon": -110.9632,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia centroid of Evanston (s5). Local reporting places the site about 12 miles east of Evanston on the south side of Interstate 80, so the campus lies some distance east of this point."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-22",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.kpcw.org/state-regional/2026-06-19/1-25gw-data-center-approved-on-ranchland-near-evanston-wyoming",
        "https://townlift.com/2026/06/proposed-ai-data-center-near-evanston-advances-as-prometheus-courts-major-tech-clients/",
        "https://baxtel.com/news/wyoming-approves-prometheus-hyperscale-s-gigawatt-data-center-campus",
        "https://cowboystatedaily.com/2026/02/14/data-center-near-evanston-is-talking-to-microsoft-meta/",
        "https://en.wikipedia.org/wiki/Evanston,_Wyoming"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Prometheus Hyperscale Evanston campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "provident-powerhouse-grand-prairie",
      "source_file": "provident-powerhouse-grand-prairie.json",
      "source_sha256": "0da6c2ea909b84af9206de837090ec74a234cf9464da32e68cd32a53764580db",
      "source_name": "PowerHouse Grand Prairie campus (PowerHouse and Provident)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Ellis County",
        "locality": "Midlothian",
        "lat": 32.5069,
        "lon": -97.0069,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia centroid of Midlothian (s5), the mailing city in the state filing for Building 1 at 881 Miller Road (s4). The developers describe the site as just outside Grand Prairie in northern Ellis County. The street address was not geocoded."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-04-02",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://powerhousedata.com/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus",
        "https://dallasinnovates.com/dallas-provident-data-centers-virginias-powerhouse-partner-on-hyperscale-north-texas-campus/",
        "https://powerhousedata.com/data-center/powerhouse-grand-prairie",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2026016734",
        "https://en.wikipedia.org/wiki/Midlothian,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve PowerHouse Grand Prairie campus (PowerHouse and Provident) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "pw-digital-gateway",
      "source_file": "pw-digital-gateway.json",
      "source_sha256": "55a39c19574c08418db086d6ad471b37fb588a9df92f2a145845d535b3596116",
      "source_name": "PW Digital Gateway",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Virginia",
        "admin2": "Prince William County",
        "locality": "Gainesville",
        "lat": 38.7947,
        "lon": -77.6206,
        "precision": "locality",
        "source_ids": [
          "s6",
          "s1"
        ],
        "note": "Wikipedia coordinates for Gainesville, Virginia. WTOP places the roughly 2,000-acre corridor along Pageland Lane near Gainesville, next to Manassas National Battlefield Park; the court describes three adjoining rezoning areas, so the site extends several kilometres from this point."
      },
      "source_status": "cancelled",
      "source_status_as_of": "2026-07-04",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.vacourts.gov/opinions/opncavwp/1592254.pdf",
        "https://www.bisnow.com/news/washington-dc/data-center/judge-throws-out-zoning-approval-for-2100-acre-northern-virginia-data-center-project-130496",
        "https://www.bisnow.com/news/washington-dc/data-center-development/officials-end-fight-2100-acre-data-center-rezoning-killing-one-of-worlds-largest-planned-projects-134136",
        "https://www.bisnow.com/news/national/data-center-development/developer-backs-out-of-17-gw-virginia-data-center-plan-134341",
        "https://www.bisnow.com/news/washington-dc/data-center-development/blackstones-qts-abandons-digital-gateway-project-ends-lawsuit-135295",
        "https://wtop.com/?p=29400462",
        "https://www.battlefields.org/news/victory-manassas-prince-william-digital-gateway-project-dead-after-developer-drops-appeal",
        "https://convergedigest.com/qts-drops-digital-gateway-data-center-campus-in-va/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve PW Digital Gateway as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "qscale-q01-levis",
      "source_file": "qscale-q01-levis.json",
      "source_sha256": "cc92eb90d7af016cc498a6233f3acd0d2a81a360c55904229d55fd6f73ffc170",
      "source_name": "QScale Q01 campus (Lévis)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Quebec",
        "locality": "Lévis",
        "lat": 46.6761,
        "lon": -71.3251,
        "precision": "site",
        "source_ids": [
          "s7"
        ],
        "note": "QScale's Q01 campus page gives the address 2280 Albert-Dion St, Lévis; coordinates were geocoded from that address to an OpenStreetMap building tagged QScale."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.qscale.com/news/from-data-processing-to-food-self-sufficiency-financing",
        "https://www.qscale.com/news/qscale-accelerates-its-expansion-and-growth",
        "https://www.qscale.com/news/hewlett-packard-enterprise-hpe-q01-campus",
        "https://www.qscale.com/news/320m-financing-growth",
        "https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale",
        "https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure",
        "https://www.qscale.com/q01-campus"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-0ecf05307f91c1e40479",
      "canonical_project_id": null,
      "related_project_ids": [
        "a848e771-2e45-55fb-8d43-db0885bb824f"
      ],
      "related_site_ids": [
        "vcc-site-0ecf05307f91c1e40479"
      ],
      "reason": "Same QScale Q01 campus at 2280 Albert-Dion Street; coordinates agree within about 7 metres and the Building B issuer source is shared. Source spans operating campus and expansion; existing record is only Building B.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "source_site_point_not_surveyed_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "a848e771-2e45-55fb-8d43-db0885bb824f",
          "project_stable_key": "curated:qscale-q01-levis-campus:building-b",
          "site_id": "vcc-site-0ecf05307f91c1e40479",
          "physical_site_stable_key": "curated:qscale-q01-levis-campus",
          "name": "QScale Q01 Building B",
          "status": "under_construction",
          "status_as_of": "2026-06-04",
          "latitude": 46.676157,
          "longitude": -71.32506265,
          "status_source_url": "https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure",
          "geometry_source_url": "https://www.openstreetmap.org/way/1171439340"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-0ecf05307f91c1e40479",
          "distance_km": 0.007,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure"
      ],
      "status_comparisons": [
        {
          "project_id": "a848e771-2e45-55fb-8d43-db0885bb824f",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-10-09",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-04",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "qts-cambois-blyth",
      "source_file": "qts-cambois-blyth.json",
      "source_sha256": "102e9f9c4b02ce10721d3e1dbe44c28f322f748aa97e3b9459eece88dc34d64c",
      "source_name": "QTS Cambois Data Centre Campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "GB",
        "admin1": "England",
        "admin2": "Northumberland",
        "locality": "Cambois",
        "lat": 55.1453,
        "lon": -1.5309,
        "precision": "locality",
        "source_ids": [
          "s6",
          "s8"
        ],
        "note": "Sources place the campus on the former Blyth Power Station site at Cambois. Nominatim did not return the power station site, so the Cambois village centroid is used."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-06",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.uktech.news/big-data/northumberland-council-approves-plans-for-10bn-data-centre-20250305",
        "https://www.acenet.co.uk/news/infrastructure-intelligence/new-milestone-reached-on-10bn-data-centre-project/",
        "https://www.gov.uk/government/news/us-uk-pact-will-boost-advances-in-drug-discovery-create-tens-of-thousands-of-jobs-and-transform-lives",
        "https://w.media/qts-gained-approval-for-data-center-project-in-northumbria/",
        "https://www.corgan.com/projects/qts-data-center-campus-cambois",
        "https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/",
        "https://datacentrereview.com/2026/04/qts-reaffirms-commitment-to-north-east-ai-growth-zone/",
        "https://www.keller.co.uk/news/keller-lays-foundations-huge-data-centre"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-ee33430200d597833ebe",
      "canonical_project_id": null,
      "related_project_ids": [
        "5b11c034-5a3b-5e5d-bc6a-b7122e21fbec"
      ],
      "related_site_ids": [
        "vcc-site-ee33430200d597833ebe"
      ],
      "reason": "Same QTS former Blyth Power Station campus. Source covers ten-building campus with initial two-building works; existing record selects 2026 earthworks. TBC Partners Factory Road proposal is explicitly nearby and separate.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "5b11c034-5a3b-5e5d-bc6a-b7122e21fbec",
          "project_stable_key": "curated:qts-cambois-data-centre-campus:2026-earthworks",
          "site_id": "vcc-site-ee33430200d597833ebe",
          "physical_site_stable_key": "curated:qts-cambois-data-centre-campus",
          "name": "QTS Cambois 2026 Earthworks",
          "status": "civil_works",
          "status_as_of": "2026-07-01",
          "latitude": 55.15092301981584,
          "longitude": -1.533627047468273,
          "status_source_url": "https://q.com/data-centers/cambois/",
          "geometry_source_url": "https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-ee33430200d597833ebe",
          "distance_km": 0.649,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "5b11c034-5a3b-5e5d-bc6a-b7122e21fbec",
          "source_status": "under_construction",
          "source_status_as_of": "2026-08-06",
          "canonical_status": "civil_works",
          "canonical_status_as_of": "2026-07-01",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus.",
      "source_relations": [
        {
          "source_id": "tbc-partners-cambois",
          "relationship": "separate_nearby_campuses",
          "reason": "TBC proposal on Factory Road is explicitly described as near the QTS former power-station campus; identical Cambois centroid is administrative only."
        }
      ]
    },
    {
      "source_id": "qts-eemshaven",
      "source_file": "qts-eemshaven.json",
      "source_sha256": "f1d272439a5b52de9b22758b3ece07e46367cfcdecd71345eb352a00a3887354",
      "source_name": "QTS Eemshaven data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "NL",
        "admin1": "Groningen",
        "locality": "Eemshaven",
        "lat": 53.437501,
        "lon": 6.858112,
        "precision": "site",
        "source_ids": [
          "s5"
        ],
        "note": "Point for the 'QTS Eemshaven Netherlands Data Center' building (OSM way 455499803, Huibertgatweg) from the local OpenStreetMap layer, matching the address on QTS's campus page. The layer also maps a QTS new build about 350 m to the north-west; the full 18-hectare campus boundary is not published."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://q.com/news/qts-expands-international-platform-with-the-strategic-acquisition-of-two-data-centers-in-the-netherlands/",
        "https://thetechcapital.com/qts-data-centers-invests-1-5-billion-in-dutch-hyperscale-expansion/",
        "https://www.structureresearch.net/?p=100674",
        "https://www.groningen-seaports.com/wp-content/uploads/Website_Ommelander_ADV_GSP_maart2025.pdf",
        "https://www.q.com/data-centers/netherlands-eemshaven"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve QTS Eemshaven data center campus as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "qts-fayetteville-georgia",
      "source_file": "qts-fayetteville-georgia.json",
      "source_sha256": "a95bb65756ade86f346463b6b7e1b7cffd3a93a4b94023dbc007e97c05631250",
      "source_name": "QTS Fayetteville campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Georgia",
        "admin2": "Fayette County",
        "locality": "Fayetteville",
        "lat": 33.4478,
        "lon": -84.4617,
        "precision": "locality",
        "source_ids": [
          "s4",
          "s3"
        ],
        "note": "Wikipedia coordinates for Fayetteville, Georgia. The campus is at 1435 Highway 54 West, bounded by Highway 54 West, Tyrone Road and Flat Creek Trail; no cited source gives site coordinates."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2025-11-21",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://rebusinessonline.com/?p=324851",
        "https://www.bisnow.com/atlanta/news/data-center/qts-project-excalibur-to-span-7m-sf-in-fayetteville-115472",
        "https://thecitizen.com/?p=104756",
        "https://thecitizen.com/?p=109827",
        "https://thecitizen.com/?p=234517",
        "https://www.ajc.com/business/2025/11/microsofts-newest-ai-superfactory-opens-at-sprawling-fayetteville-campus/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve QTS Fayetteville campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "microsoft-fairwater-atlanta",
          "relationship": "reported_same_campus_tenant_scope",
          "reason": "Both records cite the same AJC permitting investigation; tenant/campus linkage is reported but not company-confirmed. QTS remains the campus anchor; Fairwater record is held from independent site/project counts."
        }
      ]
    },
    {
      "source_id": "qts-vimercate",
      "source_file": "qts-vimercate.json",
      "source_sha256": "f4d79141779165657969abaac643332fe9136caee03246c72acbb244add3eb09",
      "source_name": "QTS Vimercate data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IT",
        "admin1": "Lombardia",
        "admin2": "Monza e Brianza",
        "locality": "Vimercate",
        "lat": 45.617,
        "lon": 9.367,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s7"
        ],
        "note": "Town coordinates from the Vimercate Wikipedia article. Sources place the site on the former IBM area at Velasca, a frazione of Vimercate, near the boundary with Burago; the site is not mapped in the local OpenStreetMap layer."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://q.com/data-centers/vimercate-en/",
        "https://primamonza.it/attualita/il-primo-data-center-della-citta-si-svela/",
        "https://www.ciai.it/wp-content/uploads/2026/07/Giornale-Vimercate-30-6-26.pdf",
        "https://www.ilgiorno.it/monza-brianza/cronaca/il-campus-data-center-fa-6bad3cb1",
        "https://cloudnews.tech/qts-prepares-a-220-mw-campus-near-milan-and-accelerates-its-expansion/",
        "https://en.wikipedia.org/wiki/Vimercate"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve QTS Vimercate data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "quantum-frederick",
      "source_file": "quantum-frederick.json",
      "source_sha256": "9aca781ae31db58f1a6986ccd5855d5e73741016fe013058dac666203171704d",
      "source_name": "Quantum Frederick data center park",
      "source_scope": "bounded_master_park",
      "source_location": {
        "country": "US",
        "admin1": "Maryland",
        "admin2": "Frederick County",
        "locality": "Frederick",
        "lat": 39.4311,
        "lon": -77.3972,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia centroid of the city of Frederick (s5). Baxtel's listing beside the 2021 article (s1) gives a Manor Woods Road, Frederick address for the former Eastalco site, which lies outside the city; the park was not geocoded."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-03-12",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://baxtel.com/news/tpg-teams-up-with-quantum-loophole-to-redevelop-old-alcoa-plant",
        "https://www.cablinginstall.com/data-center/article/14279126/quantum-loophole-begins-construction-on-massive-frederick-md-data-center-campus",
        "https://baxtel.com/news/tpg-real-estate-takes-full-control-of-quantum-frederick-project",
        "https://baxtel.com/news/aligned-tops-out-new-maryland-data-center",
        "https://en.wikipedia.org/wiki/Frederick,_Maryland"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Quantum Frederick data center park as an independent source record; its locality locator does not itself establish a surveyed physical site. Source encompasses a single explicitly bounded master park with multiple development subcampuses; retain that park-level scope and do not count its internal projects as separately resolved sites.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry",
        "master_park_with_multiple_subcampuses_not_individual_facility"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "red-admiral-rochfortbridge",
      "source_file": "red-admiral-rochfortbridge.json",
      "source_sha256": "3e8aeb3449a05e45e952439811a65d975deb5567ede7299604b1a43a492bda0d",
      "source_name": "Red Admiral data centre campus, Rochfortbridge",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IE",
        "admin1": "County Westmeath",
        "locality": "Rochfortbridge",
        "lat": 53.416,
        "lon": -7.296,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Rochfortbridge village centroid from its Wikipedia article. The application covers several townlands around Rochfortbridge (Gneevebane, Oldtown, Farthingstown, Castlelost and Kiltotan, and Collinstown), but no cited source gives site coordinates."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.pleanala.ie/en-ie/case/501596",
        "https://www.westmeathexaminer.ie/?p=128147",
        "https://en.wikipedia.org/wiki/Rochfortbridge"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Red Admiral data centre campus, Rochfortbridge as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "reliance-jamnagar-ai-data-center",
      "source_file": "reliance-jamnagar-ai-data-center.json",
      "source_sha256": "2a1bd57413bbf96d609c7d6ae3d95c3e5b0bf66dca12b87d235e350a9ba80fec",
      "source_name": "Reliance Jamnagar AI-enabled data centre for Meta",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Gujarat",
        "admin2": "Jamnagar",
        "locality": "Jamnagar",
        "lat": 22.4732,
        "lon": 70.0552,
        "precision": "locality",
        "source_ids": [
          "s1"
        ],
        "note": "The release names Jamnagar, Gujarat only. Coordinates are the OpenStreetMap Nominatim centroid of Jamnagar city, not the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.ril.com/sites/default/files/2026-06/10062026_MR_Reliance_and_Meta_to_Develop_AI-Enabled_Data_Centre_in_Jamnagar_Gujarat.pdf"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Reliance Jamnagar AI-enabled data centre for Meta as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "riot-corsicana",
      "source_file": "riot-corsicana.json",
      "source_sha256": "e9ca626950f6f54d42883240cce4b491a37594b6b30cc132b3eefbe58ef540a6",
      "source_name": "Riot Platforms Corsicana facility",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Navarro County",
        "lat": 32.05,
        "lon": -96.47,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s6"
        ],
        "note": "Riot's 10-K places the facility in Navarro County without naming a town or address. Coordinates are the Navarro County point from its Wikipedia article, not the site."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926022322/riot-20251231x10k.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810x8k.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d2.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926093448/riot-20260630x10q.htm",
        "https://en.wikipedia.org/wiki/Navarro_County,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Riot Platforms Corsicana facility as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "riot-rockdale",
      "source_file": "riot-rockdale.json",
      "source_sha256": "83ee46c3aeab921f2adb3ba21fb99add87cfd4743e9a3f06748fa76b26923754",
      "source_name": "Riot Platforms Rockdale data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Milam County",
        "locality": "Rockdale",
        "lat": 30.6547,
        "lon": -97.0075,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s6"
        ],
        "note": "Filings place the facility in Rockdale, Milam County, without an address. Coordinates are the Rockdale city point from its Wikipedia article."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-10",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926022322/riot-20251231x10k.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d1.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d2.htm",
        "https://www.sec.gov/Archives/edgar/data/1167419/000110465926093448/riot-20260630x10q.htm",
        "https://en.wikipedia.org/wiki/Rockdale,_Texas"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-3dedcd29014f493a2abb",
      "canonical_project_id": null,
      "related_project_ids": [
        "b4ff75a2-9d55-54ad-bf27-4c60b096eb0f"
      ],
      "related_site_ids": [
        "vcc-site-3dedcd29014f493a2abb"
      ],
      "reason": "Same Riot Rockdale mining-to-AI campus. Source spans operating AMD capacity and a separate 191 MW frontier-lab lease; existing record selects AMD expansion phases 3 and 4. Do not combine the tenants or capacity scopes.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "b4ff75a2-9d55-54ad-bf27-4c60b096eb0f",
          "project_stable_key": "curated:riot-rockdale-site:amd-expansion-phases-3-4",
          "site_id": "vcc-site-3dedcd29014f493a2abb",
          "physical_site_stable_key": "curated:riot-rockdale-site",
          "name": "Riot Rockdale AMD Expansion Phases 3 and 4",
          "status": "under_construction",
          "status_as_of": "2026-08-10",
          "latitude": 30.57589508119766,
          "longitude": -97.0788554968219,
          "status_source_url": "https://www.riotplatforms.com/riot-platforms-reports-second-quarter-2026-financial-results-and-strategic-highlights/",
          "geometry_source_url": "https://feature.geographic.texas.gov/arcgis/rest/services/Address_Points/stratmap_address_points_48_most_recent/MapServer/0/query?objectIds=8633415&outFields=objectid,full_addr,add_number,st_name,post_comm,post_code,county,source,date_acq&returnGeometry=true&outSR=3857&f=json"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-3dedcd29014f493a2abb",
          "distance_km": 11.109,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "b4ff75a2-9d55-54ad-bf27-4c60b096eb0f",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-08-10",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-10",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "rowan-project-temple",
      "source_file": "rowan-project-temple.json",
      "source_sha256": "8fe20c86e81b104d6a630add48c6cf11e1f38b5c3ceb80f08ee6bb5e035229a4",
      "source_name": "Rowan Project Temple",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "admin2": "Bell County",
        "locality": "Temple",
        "lat": 31.1056,
        "lon": -97.4208,
        "precision": "locality",
        "source_ids": [
          "s4",
          "s1",
          "s3"
        ],
        "note": "Wikipedia coordinates for Temple, Texas. Bisnow places the 707-acre campus near Bob White Road and Lorraine Avenue, and Rowan places it in east Temple, so the site lies east of this point."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-05-29",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://rowan.com/rowan-powers-texas-growth-as-construction-begins-on-300-mw-temple-data-center/",
        "https://rowan.com/rowan-closes-3b-green-financing-for-turnkey-hyperscale-campus-in-high-growth-texas-market/",
        "https://rowan.com/rowan-to-invest-38-million-in-temple-water-infrastructure-and-sammons-community-center/",
        "https://www.bisnow.com/news/austin-san-antonio/data-center/sustainable-developer-bringing-data-center-campus-to-temple-134759"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Rowan Project Temple as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "meta-temple-texas",
          "relationship": "separate_named_developments",
          "reason": "Meta operating Temple campus and Rowan Project Temple are separately named developments; both use the Temple city point."
        }
      ]
    },
    {
      "source_id": "samca-green-it-aragon-luceni",
      "source_file": "samca-green-it-aragon-luceni.json",
      "source_sha256": "0e19da99a19f19463b4d36af07c32e4b0861da3cfe5def7c3086482d0dda5a48",
      "source_name": "Green IT Aragón data center campus (SAMCA), Luceni",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragon",
        "admin2": "Zaragoza",
        "locality": "Luceni",
        "lat": 41.833,
        "lon": -1.233,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s6"
        ],
        "note": "Luceni municipal centroid from its Wikipedia article. The technical annex places all three data centers in Luceni municipality; associated grid and wind works extend into Rueda de Jalón, Plasencia de Jalón and Pedrola. No cited source gives site coordinates."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.aragon.es/-/piga-green-it",
        "https://www.aragon.es/documents/d/guest/vol_iv_anx_18_memoria_consumo_agua-1",
        "https://www.eldiario.es/aragon/economia/tres-centros-datos-aragon-samca-anuncia-inversion-2-627-millones-luceni_1_12252656.html",
        "https://www.elespanol.com/aragon/actualidad/20261005/cerca-millones-invertidos-centros-datos-aragon-esperan-rampa-salida-obras/1003744406849_0.html",
        "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
        "https://en.wikipedia.org/wiki/Luceni"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Green IT Aragón data center campus (SAMCA), Luceni as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "scala-ai-city-eldorado-do-sul",
      "source_file": "scala-ai-city-eldorado-do-sul.json",
      "source_sha256": "7c9051a8b3c2a79777dcfdf3020a9a420711a7c8d4cace9dd7cab6fae1492262",
      "source_name": "Scala AI City (Eldorado do Sul)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "BR",
        "admin1": "Rio Grande do Sul",
        "locality": "Eldorado do Sul",
        "lat": -30.0839,
        "lon": -51.6158,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Municipal reference point for Eldorado do Sul (Wikipedia infobox); the releases name the municipality but not the parcel."
      },
      "source_status": "announced",
      "source_status_as_of": "2025-05-14",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.prnewswire.com/news-releases/with-an-initial-investment-of-usd-500-million-scala-data-centers-and-rio-grande-do-sul-government-sign-agreement-for-largest-digital-infrastructure-project-in-the-state-of-southern-brazil-302245667.html",
        "https://www.prnewswire.com/news-releases/mayor-of-eldorado-do-sul-brazil-approves-law-enabling-the-construction-of-latin-americas-first-data-center-city-302335569.html",
        "https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Scala AI City (Eldorado do Sul) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "scala-tambore-barueri",
      "source_file": "scala-tambore-barueri.json",
      "source_sha256": "4fc2dddb08c0813609556dae262220485cc4e4b75d979daa0b082e0c2304bf72",
      "source_name": "Scala Data Centers Tamboré Campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "BR",
        "admin1": "São Paulo",
        "admin2": "Barueri",
        "locality": "Tamboré",
        "lat": -23.4656,
        "lon": -46.8419,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Releases place the campus in the Tamboré area of Barueri alongside the Rodoanel without a street address; coordinates are the Tamboré reference point (Portuguese Wikipedia), and Tamboré spans Barueri and neighbouring Santana de Parnaíba."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2025-10-30",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.prnewswire.com/news-releases/scala-data-centers-inaugurates-phase-2-of-tambore-campus-with-governor-tarcisio-de-freitas-present-committing-1-13-billion-302224370.html",
        "https://www.prnewswire.com/news-releases/scala-data-centers-celebrates-historic-milestone-with-approval-of-the-master-plan-for-its-tambore-campus-in-sao-paulo---the-largest-and-most-advanced-in-latin-america-with-600-mw-of-capacity-302599995.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Scala Data Centers Tamboré Campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "schwarz-digits-luebbenau",
      "source_file": "schwarz-digits-luebbenau.json",
      "source_sha256": "7442cfe4646dc7f890b689770f56fd5278cbc0c9d472f36a35f0c4f925e52e03",
      "source_name": "Schwarz Digits Lübbenau data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "DE",
        "admin1": "Brandenburg",
        "admin2": "Oberspreewald-Lausitz",
        "locality": "Lübbenau/Spreewald",
        "lat": 51.868,
        "lon": 13.9689,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Nominatim centroid of Lübbenau/Spreewald; sources describe a former power plant site in the town but give no address."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.esmmagazine.com/technology/schwarz-digits-invests-e11bn-in-new-data-centre-300560",
        "https://www.startbase.com/news/schwarz-digits-investiert-11-milliarden-euro-in-digitale-souveraenitaet/",
        "https://thetechcapital.com/lidl-and-kaufland-owner-advances-12-billion-data-centre-project-amid-eu-ai-infrastructure-talks/",
        "https://fr.euronews.com/my-europe/2026/08/24/un-des-plus-grands-centres-de-donnees-ia-deurope-a-11-milliards-deuros-ouvre-dans-le-brand"
      ],
      "relationship": "exact_project_match",
      "canonical_site_id": "vcc-site-8a73ede727ab01225667",
      "canonical_project_id": "8f5c2434-0b2d-547e-ac2c-e25ddeefe1b7",
      "related_project_ids": [
        "8f5c2434-0b2d-547e-ac2c-e25ddeefe1b7"
      ],
      "related_site_ids": [
        "vcc-site-8a73ede727ab01225667"
      ],
      "reason": "Same Schwarz Digits/STACKIT development on the former Luebbenau power-plant site. Both records describe construction of that named development; town centroid is not the site.",
      "integration_action": "enrich_existing_project",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "canonical_records": [
        {
          "project_id": "8f5c2434-0b2d-547e-ac2c-e25ddeefe1b7",
          "project_stable_key": "curated:schwarz-digits-luebbenau-campus:current-build",
          "site_id": "vcc-site-8a73ede727ab01225667",
          "physical_site_stable_key": "curated:schwarz-digits-luebbenau-campus",
          "name": "Lübbenau Data Center Current Build",
          "status": "under_construction",
          "status_as_of": "2026-08-18",
          "latitude": 51.84710977414326,
          "longitude": 13.960999567308617,
          "status_source_url": "https://www.convis.com/neues-von-der-baustelle-pressetermin-am-mega-rechenzentrum-in-luebbenau/",
          "geometry_source_url": "https://search.geobasis-bb.de/v2/search?query=Kraftwerkstra%C3%9Fe&limit=50&filter%5BassignMunicipality.keyword%5D=L%C3%BCbbenau%2FSpreewald%20%5BLubnjow%2FB%C5%82ota%5D"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-8a73ede727ab01225667",
          "distance_km": 2.385,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "8f5c2434-0b2d-547e-ac2c-e25ddeefe1b7",
          "source_status": "under_construction",
          "source_status_as_of": "2026-08-24",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-18",
          "flag": "same_status_label_different_evidence_dates_not_automatically_reverified"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "sdaia-hexagon-riyadh",
      "source_file": "sdaia-hexagon-riyadh.json",
      "source_sha256": "c76535396da4ab856da31ff6b384bcb216d08ef60a0c2c2784a500b93b51a445",
      "source_name": "Hexagon Data Center (Riyadh)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "SA",
        "admin1": "Riyadh Province",
        "locality": "Riyadh",
        "lat": 24.633,
        "lon": 46.717,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "City coordinates from the Riyadh Wikipedia page; the sources do not name a district."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-05-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://w.media/sdaia-lays-foundation-stone-for-480mw-hexagon-government-data-center-in-riyadh/",
        "https://en.sharikatmubasher.com/news/article/21526638/saudi-arabia-lays-cornerstone-for-hexagon-data-center-in-riyadh?lang=en",
        "https://ognnews.com/ArticleOGN/461988/sdaia-hexagon-data-centre",
        "https://en.wikipedia.org/wiki/Riyadh"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Hexagon Data Center (Riyadh) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "sify-chennai-02-siruseri",
      "source_file": "sify-chennai-02-siruseri.json",
      "source_sha256": "1c5b10951d644b597903819d7720293e0aaebd1c10ae4c460b60f4872b1692f7",
      "source_name": "Sify Chennai 02 data center campus, Siruseri",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Tamil Nadu",
        "admin2": "Chengalpattu district",
        "locality": "Siruseri",
        "lat": 12.835,
        "lon": 80.2,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s3",
          "s4"
        ],
        "note": "Sources name Siruseri, Chennai, without an address. The point is the Siruseri coordinate from its Wikipedia article (which also gives the district), so it marks the locality rather than the site."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2025-10-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sifytechnologies.com/europe/data-centre/",
        "https://w.media/sify-and-partners-to-invest-rs-10000-crores-in-chennai-dc-over-next-five-years-mp-vijaykumar/",
        "https://nsearchives.nseindia.com/corporate/Registration_17102025141743_DRHP_Fillingversion.pdf",
        "https://en.wikipedia.org/wiki/Siruseri"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Sify Chennai 02 data center campus, Siruseri as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "sify-noida-02",
      "source_file": "sify-noida-02.json",
      "source_sha256": "8ccf5eca5f59e0e0c7a4bcf1c073a3bc4ada69df67946582006fda41b699990d",
      "source_name": "Sify Noida 02 data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Uttar Pradesh",
        "admin2": "Gautam Buddha Nagar district",
        "locality": "Noida",
        "lat": 28.57,
        "lon": 77.32,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4",
          "s5"
        ],
        "note": "Sify says Noida 02 is within 1 km of Noida 01, whose address is Plot B7, Sector 132, Noida; no address is given for Noida 02 itself. The point is the Noida city coordinate from its Wikipedia article, so it marks the city rather than the site near Sector 132."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2025-10-16",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://indianinfrastructure.com/2025/03/11/sify-launches-north-indias-largest-ai-ready-data-centre-campus-in-noida/",
        "https://www.sifytechnologies.com/europe/data-centre/",
        "https://nsearchives.nseindia.com/corporate/Registration_17102025141743_DRHP_Fillingversion.pdf",
        "https://www.sifytechnologies.com/data-center/noida-data-center/",
        "https://en.wikipedia.org/wiki/Noida"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Sify Noida 02 data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "adaniconnex-noida",
          "relationship": "separate_named_developments",
          "reason": "Distinct AdaniConneX and Sify named developments; exactly shared coordinates are Noida city locators."
        }
      ]
    },
    {
      "source_id": "sify-rabale-navi-mumbai",
      "source_file": "sify-rabale-navi-mumbai.json",
      "source_sha256": "6347e247ca845b8953b09fc8ece3ee8b9f14d8b7b04671491f40153486848a0f",
      "source_name": "Sify Rabale data center campus (Mumbai 03), Navi Mumbai",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Maharashtra",
        "admin2": "Thane district",
        "locality": "Rabale, Navi Mumbai (TTC Industrial Area)",
        "lat": 19.14417,
        "lon": 73.00861,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s3",
          "s4"
        ],
        "note": "Sify gives the address as Plot R-847, TTC Industrial Area, Rabale, Navi Mumbai, and the prospectus places towers 11 and 12 on Plot R-978 in the same industrial area. The point is the Rabale coordinate from its Wikipedia article (which also gives Thane district), so it marks the neighbourhood rather than the plots."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sifytechnologies.com/europe/data-centre/",
        "https://www.sifytechnologies.com/data-center/mumbai-data-center/",
        "https://nsearchives.nseindia.com/corporate/Registration_17102025141743_DRHP_Fillingversion.pdf",
        "https://en.wikipedia.org/wiki/Rabale"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Sify Rabale data center campus (Mumbai 03), Navi Mumbai as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "sk-aws-ulsan-ai-data-center",
      "source_file": "sk-aws-ulsan-ai-data-center.json",
      "source_sha256": "67cb26b51f214198940925d2d1180fb872b9a7cedd0f5f66dc61cc031d24e5e7",
      "source_name": "SK AI Data Center Ulsan",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "KR",
        "admin1": "Ulsan",
        "locality": "Ulsan",
        "lat": 35.5392,
        "lon": 129.3119,
        "precision": "admin1",
        "source_ids": [
          "s1",
          "s2",
          "s6"
        ],
        "note": "Sources place the site in the Mipo National Industrial Complex in Ulsan without an address, and the complex could not be geocoded; coordinates are the OpenStreetMap Nominatim centroid of Ulsan Metropolitan City."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-09-14",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://amchamkorea.org/pp/latest_news/members_news/read/?idx=2451",
        "https://www.itnews.asia/news/sk-group-and-aws-to-build-south-koreas-largest-ai-data-centre-in-ulsan-617900",
        "https://www.koreajoongangdaily.com/business/sk-group-breaks-ground-on-ai-only-data-center-in-ulsan/12451117",
        "https://www.telecomtv.com/content/ai/under-the-hood-of-skt-s-ulsan-ai-datacentre-53720/",
        "https://www.lightreading.com/data-centers/sk-telecom-creates-sk-horizon-in-2-2b-data-center-spin-off-deal",
        "https://constructionreviewonline.com/sk-ai-data-center-ulsan-chairman-says-site-nearing-900-megawatts/",
        "https://news.sktelecom.com/en/3290"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve SK AI Data Center Ulsan as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "softbank-sakai",
      "source_file": "softbank-sakai.json",
      "source_sha256": "a2fc50cdfd93ac1ebb5425d3cee8f1a89a1f06616a43101e00d6b54978e3c043",
      "source_name": "SoftBank Osaka Sakai AI data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "JP",
        "admin1": "Osaka Prefecture",
        "admin2": "Sakai-ku",
        "locality": "Sakai",
        "lat": 34.596,
        "lon": 135.4333,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s3",
          "s7"
        ],
        "note": "SoftBank names Sharp's Sakai LCD plant in Sakai City; Sharp gives the plant address as 1 Takumi-cho, Sakai-ku. Coordinates are the OpenStreetMap Nominatim centroid of the Takumi-cho neighbourhood, so they approximate the plant complex rather than the exact SoftBank portion (about 60% of the plant land)."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-06-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.softbank.jp/en/corp/news/press/sbkk/2024/20240607_01",
        "https://www.softbank.jp/corp/news/press/sbkk/2024/20241220_03",
        "https://www.softbank.jp/corp/news/press/sbkk/2025/20250314_01",
        "https://techcrunch.com/2025/03/14/softbank-buys-676m-old-sharp-plant-for-its-openai-collab-in-japan",
        "https://www.softbank.jp/en/sbnews/entry/20260512_01",
        "https://www.softbank.jp/en/sbnews/entry/20260623_01",
        "https://global.sharp/corporate/news/090408_2.html"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve SoftBank Osaka Sakai AI data center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "softbank-sesterce-bosquel",
      "source_file": "softbank-sesterce-bosquel.json",
      "source_sha256": "87f6315aa67b2532e26f672b5172cf4c61921d629ae1c7cc9864f727d45400f5",
      "source_name": "SoftBank-Sesterce Bosquel AI data center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "FR",
        "admin1": "Hauts-de-France",
        "admin2": "Somme",
        "locality": "Bosquel",
        "lat": 49.7391,
        "lon": 2.2179,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2"
        ],
        "note": "Nominatim centroid of the commune of Bosquel (Somme); sources name the commune only."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://group.softbank/en/news/press/20260531",
        "https://www.sesterce.com/newsroom/softbank-group-sesterce-1gw-ai-data-center-bosquel-france",
        "https://group.softbank/en/news/press/20260531_0"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve SoftBank-Sesterce Bosquel AI data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "softbank-tomakomai",
      "source_file": "softbank-tomakomai.json",
      "source_sha256": "87f8282937aee10c7fce6886f9f2f9a117b38090f43f09ef236bae73fa629846",
      "source_name": "SoftBank Hokkaido Tomakomai AI Data Center",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "JP",
        "admin1": "Hokkaido",
        "locality": "Tomakomai",
        "lat": 42.6341,
        "lon": 141.6055,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "Sources name Tomakomai City only; coordinates are the OpenStreetMap Nominatim centroid of the city boundary."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-06-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/",
        "https://dempa-digital.com/?p=492112",
        "https://www.softbank.jp/business/service/platform/datacenter/tomakomai",
        "https://www.softbank.jp/en/sbnews/entry/20250501_01",
        "https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/",
        "https://www.softbank.jp/en/sbnews/entry/20260225_01",
        "https://www.softbank.jp/en/sbnews/entry/20260623_01"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve SoftBank Hokkaido Tomakomai AI Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "100cf064-1cae-5dba-a4d9-6c4ae35152ec",
          "project_stable_key": "curated:ai-tech-tomakomai-kashiwabara:phase1-foundations",
          "site_id": "vcc-site-f9661fed6650ccc21ce2",
          "physical_site_stable_key": "curated:ai-tech-tomakomai-kashiwabara",
          "name": "AI Tech Tomakomai Phase I Foundation Works",
          "status": "under_construction",
          "status_as_of": "2026-06-19",
          "latitude": 42.69518558066431,
          "longitude": 141.76624601705532,
          "status_source_url": "https://www.ef-hd.com/wp-content/uploads/2026/06/2026061901_1ef.pdf",
          "geometry_source_url": "https://gsic-opendata.s3.ap-northeast-1.amazonaws.com/aigid/aigid-moj/2026/01/aigid-moj-01213/01213_%E8%8B%AB%E5%B0%8F%E7%89%A7%E5%B8%82_%E5%85%AC%E5%85%B1%E5%BA%A7%E6%A8%9912%E7%B3%BB_%E7%AD%86R_2026.geojson",
          "reason": "SoftBank/IDC Frontier Tomakomai and AI Tech Tomakomai are different named developers/projects; municipality centroid proximity does not identify the same parcel."
        }
      ]
    },
    {
      "source_id": "stack-amazon-resilient-technology-park-shreveport",
      "source_file": "stack-amazon-resilient-technology-park-shreveport.json",
      "source_sha256": "a2d6a938a1e16b4c50604538a755ac96f45ce557bc73550adfa1a84017fe45c8",
      "source_name": "Amazon and STACK campus at Resilient Technology Park, Shreveport",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Louisiana",
        "admin2": "Caddo Parish",
        "locality": "Shreveport",
        "lat": 32.4639,
        "lon": -93.7944,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4",
          "s6"
        ],
        "note": "Local radio gives 7340 Greenwood Road, and the Shreveport-Bossier Journal places the park off Greenwood Road in west Shreveport next to I-20, but no coordinates are published. The point is the Shreveport city coordinate from its Wikipedia article, not the park."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://710keel.com/northwest-louisiana-data-centers/",
        "https://www.wafb.com/2026/02/23/more-data-centers-reportedly-coming-northwest-louisiana-major-announcement-coming-monday/",
        "https://shreveportbossierjournal.com/2026/04/09/court-hearing-set-april-20-in-challenge-to-shreveport-amazon-data-center/",
        "https://www.opportunitylouisiana.gov/news/amazon-grows-northwest-louisiana-planned-investment-to-18-billion-with-new-shreveport-campus",
        "https://irei.com/news/amazon-earmarks-6b-for-third-data-center-campus-in-northwest-louisiana/",
        "https://en.wikipedia.org/wiki/Shreveport,_Louisiana",
        "https://www.ksla.com/2026/02/24/campuses-newly-announced-amazon-data-center-spanning-bossier-caddo-parishes-confirmed/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Amazon and STACK campus at Resilient Technology Park, Shreveport as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "cbe074bd-68d8-59cb-aaf7-e21fa82b193f",
          "project_stable_key": "curated:stack-bossier-highway-3-technology-park-campus:current-campus-build",
          "site_id": "vcc-site-b414ed2a7f2e60f4b886",
          "physical_site_stable_key": "curated:stack-bossier-highway-3-technology-park-campus",
          "name": "STACK Bossier Highway 3 Technology Park Current Campus Build",
          "status": "under_construction",
          "status_as_of": "2026-06-10",
          "latitude": 32.75561,
          "longitude": -93.73567,
          "status_source_url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/",
          "geometry_source_url": "https://www.mvk.usace.army.mil/Portals/58/docs/regulatory/publicnotices/Public%20Notice%20MVK-2025-00855%20WP%20Signed.pdf?ver=D2NPrQzn2XfolicLUj62YA%3D%3D",
          "reason": "Resilient Technology Park at 7340 Greenwood Road is in Shreveport/Caddo Parish; existing Highway 3 Technology Park is in Bossier Parish, a separate regional Amazon/STACK campus."
        }
      ]
    },
    {
      "source_id": "stack-berry-hill-pittsylvania-county",
      "source_file": "stack-berry-hill-pittsylvania-county.json",
      "source_sha256": "1301e456484de774bba21590e6accbaca516c0d4928ada1480c52c54ea81f28d",
      "source_name": "STACK Infrastructure Berry Hill campus, Pittsylvania County",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Virginia",
        "admin2": "Pittsylvania County",
        "lat": 36.82,
        "lon": -79.4,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s2",
          "s4",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia point for Pittsylvania County (s5); precision is county level. Sources place the campus at the Berry Hill megasite in Pittsylvania County but give no address, and the parcel was not geocoded. The staged record used the Danville city centroid, which lies outside the county."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-07-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.wdbj7.com/2026/03/09/sale-approved-pittsylvania-county-land-data-center-developer/",
        "https://www.wdbj7.com/2026/04/30/new-details-massive-data-center-planned-pittsylvania-county/",
        "https://wset.com/news/local/pittsylvania-county-advances-100b-data-center-campus-proposal-despite-resident-concerns-berry-hill-july-2026",
        "https://wset.com/news/local/berry-hill-data-center-expected-to-be-operational-by-july-2027-stack-infrastructure-pittsylvania-county-virginia",
        "https://en.wikipedia.org/wiki/Pittsylvania_County,_Virginia"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve STACK Infrastructure Berry Hill campus, Pittsylvania County as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "balico-pittsylvania-county",
          "relationship": "separate_named_developments",
          "reason": "Rejected Balico Banister/Chatham plan and STACK Berry Hill megasite have distinct proponent and site descriptions; centroid proximity is not site overlap."
        }
      ]
    },
    {
      "source_id": "stargate-uae",
      "source_file": "stargate-uae.json",
      "source_sha256": "aa0d3a7f712edd89e4f9225b5b0666974a750dda28dcbec949f40f7bb5054607",
      "source_name": "Stargate UAE / UAE-US AI Campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "AE",
        "admin1": "Abu Dhabi",
        "lat": 24.3438,
        "lon": 55.1,
        "precision": "admin1",
        "source_ids": [
          "s1",
          "s4"
        ],
        "note": "Sources place the campus in Abu Dhabi without naming a district, and its exact site has not been published. Coordinates are the OpenStreetMap Nominatim centroid of the Abu Dhabi emirate, not the site."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-08-13",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae",
        "https://www.g42.ai/resources/news/g42-lead-consortium-us-partners-build-5gw-uae-us-ai-campus",
        "https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html",
        "https://www.thenationalnews.com/business/2025/12/05/stargate-uaes-first-phase-to-be-completed-in-third-quarter-of-2026",
        "https://www.thenationalnews.com/future/technology/2026/01/26/stargate-uae-data-centre-to-cost-more-than-30bn-ai-minister-says/",
        "https://www.khaleejtimes.com/uae/abu-dhabi-5gw-uae-us-ai-campus-on-track-regional-conflict",
        "https://www.uae-embassy.org/uae-us-cooperation/economic/forging-future-ai-together-uae-us-advanced-tech-cooperation"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Stargate UAE / UAE-US AI Campus as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "start-campus-sines",
      "source_file": "start-campus-sines.json",
      "source_sha256": "ddddec762a953d619f874a5e5e3a96597261bd1d6fe8e3807d19857a4e1ccd3a",
      "source_name": "Start Campus SINES data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "PT",
        "admin1": "Setúbal District",
        "admin2": "Sines",
        "locality": "Sines",
        "lat": 37.9349,
        "lon": -8.8132,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s5"
        ],
        "note": "Nominatim (OpenStreetMap) geocode of the industrial land-use area tagged Start Campus in Sines; sources name the campus in Sines but give no street address."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-03",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.startcampus.pt/",
        "https://datacenterfrontier.com/colocation/article/55133589/fresh-start-sines-dc-eyes-sustainable-12-gw-it-capacity-as-europes-largest-colocation-campus",
        "https://www.datacenterknowledge.com/deals/microsoft-to-rent-nscale-ai-data-center-capacity-in-portugal",
        "https://www.essential-business.pt/2026/03/02/start-campus-in-e2bn-deal-to-build-microsoft-centre-in-sines/",
        "https://capacityglobal.com/news/data-centre-of-the-month-start-campus-sines-portugal-interview/",
        "https://executivedigest.sapo.pt/?p=704935",
        "https://portalerp.com/pt/noticia/start-campus-reforca-posicao-de-portugal-na-infraestrutura-europeia-de-ia-com-expansao-em-sines"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-fdb92bb99c36b43e6162",
      "canonical_project_id": null,
      "related_project_ids": [
        "94c0f50d-843b-57cd-bfcd-4bd3b7b9d9f0"
      ],
      "related_site_ids": [
        "vcc-site-fdb92bb99c36b43e6162"
      ],
      "reason": "Same Start Campus Sines six-building campus. Source includes operational SIN01 and future full campus; existing record specifically selects SIN02 construction.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "approximate_locator_not_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "94c0f50d-843b-57cd-bfcd-4bd3b7b9d9f0",
          "project_stable_key": "curated:start-campus-sines-data-campus:sin02-current-facility-build",
          "site_id": "vcc-site-fdb92bb99c36b43e6162",
          "physical_site_stable_key": "epoch-ai:data-center:1fb39208-53bc-5714-80d2-881a5c944551",
          "name": "Start Campus SIN02 Current Facility Build",
          "status": "under_construction",
          "status_as_of": "2026-06-23",
          "latitude": 37.93843247395192,
          "longitude": -8.805549690439344,
          "status_source_url": "https://www.linkedin.com/feed/update/urn:li:activity:7475104761256718337",
          "geometry_source_url": "https://siaia.apambiente.pt/AIADOC/AIA3633/22045-ep-amb-des-001-01-a202382212930.pdf"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-fdb92bb99c36b43e6162",
          "distance_km": 0.777,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [],
      "status_comparisons": [
        {
          "project_id": "94c0f50d-843b-57cd-bfcd-4bd3b7b9d9f0",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-08-03",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-06-23",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "stt-gdc-fairview-quezon-city",
      "source_file": "stt-gdc-fairview-quezon-city.json",
      "source_sha256": "1017bee96f9c625520384df90fc72c7790f26218103f962eb7719f56dba49e2f",
      "source_name": "STT Fairview data center campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "PH",
        "admin1": "Metro Manila",
        "admin2": "Quezon City",
        "locality": "Fairview (Regalado Avenue)",
        "lat": 14.65,
        "lon": 121.0475,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s3",
          "s6"
        ],
        "note": "STT's factsheet gives the address as Regalado Avenue, Fairview, Quezon City. The point is the Quezon City coordinate from its Wikipedia article, so it marks the city centre, several kilometres south of the Fairview area; precision is therefore given at city level."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-04-20",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://w.media/stt-gdc-announces-plans-to-build-sustainable-carrier-neutral-data-center-in-the-philippines/",
        "https://w.media/sttgdc-awards-contract-for-stt-fairview-1-data-center-development-the-philippines/",
        "https://assets.sttelemediagdc.com/sttgdc/global_en/public/2024-11/STT_Fairview_1_Factsheet_vOct2024.pdf",
        "https://www.sttgdc.com/ph-en/newsroom/stt-gdc-philippines-advances-country-digital-readiness-welcomes-globe-radius-source-telecoms-connectivity-partners",
        "https://www.philstar.com/business/2026/04/20/2522112/ayala-led-data-center-builder-inks-supply-deal-meralco",
        "https://en.wikipedia.org/wiki/Quezon_City"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve STT Fairview data center campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "synapse-olds",
      "source_file": "synapse-olds.json",
      "source_sha256": "e7f226b1cc6f5ca84ee1dd889e237a8004d4a142986dcf1c4583e737194bb93d",
      "source_name": "Synapse Data Center (Olds)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "locality": "Olds (northeast corner of Highways 2A and 27)",
        "lat": 51.79278,
        "lon": -114.10667,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4"
        ],
        "note": "Town coordinates from the Olds Wikipedia page. The developer places the site in the town's industrial area at the northeast corner of Highways 2A and 27 (SW and NW quarters of Section 4-33-1-W5M)."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.olds.ca/media/y3cp0anv/synapse-data-center-project-information-package.pdf",
        "https://engage.olds.ca/data-centre-development",
        "https://thelogic.co/briefing/alberta-regulator-rejects-proposal-for-massive-data-centre-in-olds-over-deficient-application/",
        "https://en.wikipedia.org/wiki/Olds,_Alberta"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Synapse Data Center (Olds) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "tbc-partners-cambois",
      "source_file": "tbc-partners-cambois.json",
      "source_sha256": "58a9db58dfa3a70967ba84221d28332a6113a3722e182c6e330572c764f5e49e",
      "source_name": "TBC Partners Cambois data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "GB",
        "admin1": "England",
        "admin2": "Northumberland",
        "locality": "Cambois",
        "lat": 55.1453,
        "lon": -1.5309,
        "precision": "locality",
        "source_ids": [
          "s2"
        ],
        "note": "The site is on Factory Road, Cambois, beside the A189 just south of the River Wansbeck. Nominatim did not resolve Factory Road, so the Cambois village centroid is used."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-08-18",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.tbcpartners.co.uk/",
        "https://bebeez.eu/2026/08/18/application-filed-for-data-center-campus-near-qts-site-in-northumberland-uk/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve TBC Partners Cambois data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "5b11c034-5a3b-5e5d-bc6a-b7122e21fbec",
          "project_stable_key": "curated:qts-cambois-data-centre-campus:2026-earthworks",
          "site_id": "vcc-site-ee33430200d597833ebe",
          "physical_site_stable_key": "curated:qts-cambois-data-centre-campus",
          "name": "QTS Cambois 2026 Earthworks",
          "status": "civil_works",
          "status_as_of": "2026-07-01",
          "latitude": 55.15092301981584,
          "longitude": -1.533627047468273,
          "status_source_url": "https://q.com/data-centers/cambois/",
          "geometry_source_url": "https://consult.environment-agency.gov.uk/psc/ne22-7bl-rainton-construction-limited-a001/supporting_documents/application-bespoke-a001-gbr1-dczz-cdl-ste-xx-rp-b-0018_-essd-171125pdf",
          "reason": "Source explicitly places TBC Factory Road proposal near the QTS campus, not on the same identified campus."
        }
      ],
      "source_relations": [
        {
          "source_id": "qts-cambois-blyth",
          "relationship": "separate_nearby_campuses",
          "reason": "TBC proposal on Factory Road is explicitly described as near the QTS former power-station campus; identical Cambois centroid is administrative only."
        }
      ]
    },
    {
      "source_id": "tcs-hypervault-hyderabad",
      "source_file": "tcs-hypervault-hyderabad.json",
      "source_sha256": "cc82971333d2d52d504e8812317c8a7e9bbcbcc25371cfacf3567ff4f9b6b0a2",
      "source_name": "TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "IN",
        "admin1": "Telangana",
        "locality": "Hyderabad (Bharat Future City)",
        "lat": 17.3617,
        "lon": 78.4747,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4"
        ],
        "note": "Sources name Hyderabad and place the campus in Bharat Future City on the city's southern outskirts, without a district, address or coordinates; Bharat Future City's Wikipedia article has no coordinates. The point is the Hyderabad city coordinate from Wikipedia, so it marks the named city, and the site lies an unknown distance to its south."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-09-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://thearabianpost.com/tcs-commits-₹700-billion-to-hyderabad-ai-campus/",
        "https://startupfeed.in/?p=11607",
        "https://www.sahi.com/news/tcs-hypervault-to-set-up-70-000-crore-ai-data-center-in-telangana-2185-PE1_COR",
        "https://en.wikipedia.org/wiki/Hyderabad",
        "https://w.media/tcs-adds-anakapalli-and-pune-sites-to-fuel-its-data-center-push/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve TCS HyperVault AI data center campus, Bharat Future City (Hyderabad) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "terawulf-chesapeake-morgantown",
      "source_file": "terawulf-chesapeake-morgantown.json",
      "source_sha256": "2d88ba12560f6541cc29109fcc38a918b163081507876c2296aab985485d798f",
      "source_name": "TeraWulf Chesapeake Data Campus (Morgantown)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Maryland",
        "admin2": "Charles County",
        "locality": "Morgantown",
        "lat": 38.3453,
        "lon": -76.9711,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s5"
        ],
        "note": "Sources name the Morgantown Generating Station in Charles County without an address. Coordinates are the Morgantown community point from its Wikipedia article, which notes the plant's smokestacks; they are not the plant site itself."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-08-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.terawulf.com/news-events/press-releases/detail/129",
        "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
        "https://www.thebanner.com/economy/growth-development/charles-county-coal-data-center-ZHX6HMX5BNDS7HH6X42MKV7A4A/",
        "https://investors.terawulf.com/news-events/press-releases/detail/140/terawulf-reports-first-quarter-2026-results",
        "https://en.wikipedia.org/wiki/Morgantown,_Maryland"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve TeraWulf Chesapeake Data Campus (Morgantown) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "terawulf-fluidstack-abernathy",
      "source_file": "terawulf-fluidstack-abernathy.json",
      "source_sha256": "f237216344f2a9bdc1f81adb9e25380882befa51cfd73d5971cc152953f61607",
      "source_name": "Abernathy HPC campus (TeraWulf and Fluidstack joint venture)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Texas",
        "locality": "Abernathy",
        "lat": 33.8322,
        "lon": -101.8431,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s6"
        ],
        "note": "Town coordinates from Wikipedia; the sources name Abernathy but give no address. The town spans Hale and Lubbock counties, so no county is recorded."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-02-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.terawulf.com/news-events/press-releases/detail/121/terawulf-expands-strategic-partnership-with-fluidstack-through-new-168-mw-ai-compute-joint-venture",
        "https://investors.terawulf.com/news-events/press-releases/detail/128/terawulf-and-fluidstack-announce-successful-pricing-of-project-financing-for-168-mw-hpc-compute-joint-venture",
        "https://www.sec.gov/Archives/edgar/data/1083301/000108330126000031/wulf-20251231.htm",
        "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
        "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
        "https://en.wikipedia.org/wiki/Abernathy,_Texas"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Abernathy HPC campus (TeraWulf and Fluidstack joint venture) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "terawulf-justified-data-hawesville",
      "source_file": "terawulf-justified-data-hawesville.json",
      "source_sha256": "27278e58daf1a0c3569e9dbb95f6fd7bc301c50777ef215c520c7574637006a7",
      "source_name": "TeraWulf Justified Data campus (Hawesville)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Kentucky",
        "admin2": "Hancock County",
        "locality": "Hawesville",
        "lat": 37.9011,
        "lon": -86.7494,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5"
        ],
        "note": "City coordinates from Wikipedia. TeraWulf places the campus at the former Century Aluminum Hawesville facility in Hancock County, whose exact position is not given in the sources."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland",
        "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
        "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
        "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus",
        "https://en.wikipedia.org/wiki/Hawesville,_Kentucky"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve TeraWulf Justified Data campus (Hawesville) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "terawulf-lake-hawkeye",
      "source_file": "terawulf-lake-hawkeye.json",
      "source_sha256": "d49e03a278f72f749e6b38962c4bb8520e70e53b97dc38fbe371d4ed37598bab",
      "source_name": "TeraWulf Lake Hawkeye data campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "New York",
        "admin2": "Tompkins County",
        "locality": "Lansing",
        "lat": 42.5658,
        "lon": -76.5319,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s4",
          "s5",
          "s6"
        ],
        "note": "Sources place the site at the former Cayuga power plant in the town of Lansing without an address. Coordinates are the town point from the Lansing, New York Wikipedia article, not the plant site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.terawulf.com/news-events/press-releases/detail/113",
        "https://investors.terawulf.com/news-events/press-releases/detail/140/terawulf-reports-first-quarter-2026-results",
        "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
        "https://www.wbng.com/2026/01/28/tompkins-county-residents-oppose-ai-data-center-cayuga-lake/",
        "https://www.fingerlakes1.com/2026/07/22/whats-next-for-lansing-data-center-after-state-moratorium/",
        "https://en.wikipedia.org/wiki/Lansing,_New_York"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve TeraWulf Lake Hawkeye data campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "terawulf-lake-mariner",
      "source_file": "terawulf-lake-mariner.json",
      "source_sha256": "51a4f406e75d7fb19b3bff1df1781eb0ed72323aecb56d89a58a0a2fe34a4ebe",
      "source_name": "TeraWulf Lake Mariner data campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "New York",
        "admin2": "Niagara County",
        "locality": "Barker",
        "lat": 43.3275,
        "lon": -78.5536,
        "precision": "locality",
        "source_ids": [
          "s4",
          "s7"
        ],
        "note": "Village coordinates from Wikipedia. The 10-K places the campus on a retired coal-fired plant site in Barker, on about 157 leased acres in Niagara County, but the sources reviewed give no exact site position."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.terawulf.com/news-events/press-releases/detail/107/terawulf-reports-first-quarter-2025-results",
        "https://investors.terawulf.com/news-events/press-releases/detail/112/terawulf-signs-200-mw-10-year-ai-hosting-agreements-with-fluidstack",
        "https://investors.terawulf.com/news-events/press-releases/detail/114/terawulf-announces-fluidstack-expansion-with-160-mw-cb-5-lease-at-lake-mariner",
        "https://www.sec.gov/Archives/edgar/data/1083301/000108330126000031/wulf-20251231.htm",
        "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results",
        "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
        "https://en.wikipedia.org/wiki/Barker,_Niagara_County,_New_York"
      ],
      "relationship": "same_site_distinct_scope",
      "canonical_site_id": "vcc-site-88b1acf055e1ab6200e4",
      "canonical_project_id": null,
      "related_project_ids": [
        "6b11de63-a6b0-5513-87a1-b77ff3b71bfb"
      ],
      "related_site_ids": [
        "vcc-site-88b1acf055e1ab6200e4"
      ],
      "reason": "Same TeraWulf Barker Lake Mariner campus, confirmed by identical August 2026 issuer results source. Source includes operating mining/HPC, CB-4 and CB-5; existing record is only CB-5 current construction.",
      "integration_action": "add_distinct_scope_project_to_existing_site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "canonical_records": [
        {
          "project_id": "6b11de63-a6b0-5513-87a1-b77ff3b71bfb",
          "project_stable_key": "epoch-ai:data-center:dd4bfd7c-adf8-5312-9a4a-f2728f1fe791:cb-5-current-build",
          "site_id": "vcc-site-88b1acf055e1ab6200e4",
          "physical_site_stable_key": "epoch-ai:data-center:dd4bfd7c-adf8-5312-9a4a-f2728f1fe791",
          "name": "Lake Mariner CB-5 Current Build",
          "status": "under_construction",
          "status_as_of": "2026-08-05",
          "latitude": 43.348937013719,
          "longitude": -78.602908090738,
          "status_source_url": "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
          "geometry_source_url": "https://geocoding.geo.census.gov/geocoder/locations/onelineaddress?address=7725%20Lake%20Road%2C%20Barker%2C%20NY%2014012&benchmark=Public_AR_Current&format=json"
        }
      ],
      "location_comparisons": [
        {
          "site_id": "vcc-site-88b1acf055e1ab6200e4",
          "distance_km": 4.646,
          "interpretation": "Source representative location and canonical reviewed locator have different precision/scope; distance alone is not contradictory site evidence."
        }
      ],
      "shared_source_urls": [
        "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results"
      ],
      "status_comparisons": [
        {
          "project_id": "6b11de63-a6b0-5513-87a1-b77ff3b71bfb",
          "source_status": "partially_operational",
          "source_status_as_of": "2026-08-05",
          "canonical_status": "under_construction",
          "canonical_status_as_of": "2026-08-05",
          "flag": "different_scope_or_status_taxonomy_requires_no_automatic_overwrite"
        }
      ],
      "geometry_policy": "Retain canonical reviewed locator for the linked identity only, including its geometry scope and uncertainty; do not broaden a building/phase boundary to a whole campus."
    },
    {
      "source_id": "terawulf-muskie",
      "source_file": "terawulf-muskie.json",
      "source_sha256": "3aefa629da658522eb1e62d6f67bb8f586bf6818211dc51ba5f00635b9dfe4ed",
      "source_name": "TeraWulf Muskie Data Campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Kentucky",
        "admin2": "Boyd County",
        "lat": 38.36,
        "lon": -82.69,
        "precision": "admin2",
        "source_ids": [
          "s1",
          "s4",
          "s5",
          "s6",
          "s7"
        ],
        "note": "Local media place the site in EastPark near Ashland and Interstate 64, spanning the Boyd and Greenup county line; TeraWulf's Q2 2026 release describes it as Grayson, Eastern Kentucky. Coordinates are the Boyd County point from its Wikipedia article, not the site."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus",
        "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
        "https://investors.terawulf.com/news-events/press-releases/detail/146/terawulf-expands-contracted-power-capacity-at-its-muskie-data-campus-to-1-gw",
        "https://www.weku.org/text/the-commonwealth/2026-05-26/new-data-center-project-announced-in-northeastern-kentucky",
        "https://www.wsaz.com/2026/06/02/neighbors-ask-questions-address-concerns-data-center-town-hall/",
        "https://www.weku.org/the-commonwealth/2026-08-06/terawulf-tells-investors-it-could-double-the-size-of-one-of-its-ky-data-center-projects",
        "https://en.wikipedia.org/wiki/Boyd_County,_Kentucky"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve TeraWulf Muskie Data Campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "terranova-campinas",
      "source_file": "terranova-campinas.json",
      "source_sha256": "7b53fe541d6e6142c5b7ac2aab833a5e3b6031310cb6798b5dcf48054802e99d",
      "source_name": "Terranova Campinas data centre campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "BR",
        "admin1": "São Paulo",
        "admin2": "Campinas",
        "locality": "Barão Geraldo (Fazenda Pau D'Alho)",
        "lat": -22.82778,
        "lon": -47.07972,
        "precision": "locality",
        "source_ids": [
          "s3",
          "s4",
          "s5",
          "s6"
        ],
        "note": "Coordinates of the Barão Geraldo district from its Wikipedia page; the campus is on the Fazenda Pau D'Alho property within the PIDS innovation zone, whose exact boundary was not located."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-08-26",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://teletime.com.br/19/02/2026/terranova-tera-megaestruturas-e-estuda-expansao-de-data-centers-no-brasil/",
        "https://w.media/terranova-starts-construction-on-us-500-million-data-center-campus-in-brazil/",
        "https://constructionreviewonline.com/terranova-breaks-ground-on-216-mw-data-centre-in-campinas-sao-paulo/",
        "https://www.correiodamanha.com.br/nacional/sao-paulo/campinas/2026/08/312866-campinas-tera-data-center-de-rs-5-bilhoes-voltado-a-inteligencia-artificial.html",
        "https://www.correiodamanha.com.br/nacional/sao-paulo/campinas/2026/08/314378-data-center-de-rs-5-bi-em-campinas-conti-samia-petta-e-orlando-silva-pedem-suspensao-ao-mpf-e-ao-mp-sp.html",
        "https://en.wikipedia.org/wiki/Bar%C3%A3o_Geraldo"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Terranova Campinas data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "terranova-praia-grande",
      "source_file": "terranova-praia-grande.json",
      "source_sha256": "4a49ba855a28609628c4924f281da0039fc3288570f7a04d68137b93b0256be5",
      "source_name": "Terranova Praia Grande data center campus (proposed)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "BR",
        "admin1": "São Paulo",
        "locality": "Praia Grande",
        "lat": -24.00611,
        "lon": -46.40278,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Sources name the city of Praia Grande and say the site is near its submarine cable landing point, without an address. The point is the city coordinate from the Praia Grande Wikipedia article."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-08-25",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://teletime.com.br/19/02/2026/terranova-tera-megaestruturas-e-estuda-expansao-de-data-centers-no-brasil/",
        "https://constructionreviewonline.com/terranova-breaks-ground-on-216-mw-data-centre-in-campinas-sao-paulo/",
        "https://en.wikipedia.org/wiki/Praia_Grande"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Terranova Praia Grande data center campus (proposed) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "teton-digital-black-bear-swan-hills",
      "source_file": "teton-digital-black-bear-swan-hills.json",
      "source_sha256": "c2aca4c0fdd215dfd7a5856135bf9fcf51bdab2c75b6a0fc3163f68167ea252c",
      "source_name": "Teton Digital Black Bear power and data centre campus (Swan Hills)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "admin2": "Big Lakes County",
        "locality": "About 19 km south of Swan Hills",
        "lat": 54.532535,
        "lon": -115.57319,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Coordinates of the south end of the power plant project area as stated in the 2024 federal project description (SW and SE quarters of Section 15-64-11-W5M). The data centre land is described only as adjacent Crown land, so its centre may differ."
      },
      "source_status": "proposed",
      "source_status_as_of": "2026-09-23",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://iaac-aeic.gc.ca/050/documents/p88747/158276E.pdf",
        "https://iaac-aeic.gc.ca/050/evaluations/proj/88747",
        "https://tetondigital.io/black-bear",
        "https://dailyhive.com/edmonton/power-plant-data-centre-swan-hills",
        "https://www.desmog.com/2026/07/27/u-s-developer-tied-to-failed-bitcoin-venture-is-proposing-major-alberta-data-centre/"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Teton Digital Black Bear power and data centre campus (Swan Hills) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "tract-buckeye",
      "source_file": "tract-buckeye.json",
      "source_sha256": "15e7b23a4a095d2af1ec74da847cb844a14e1a0650280be7632a36cc14fbd191",
      "source_name": "Tract Buckeye data center park",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Arizona",
        "locality": "Buckeye",
        "lat": 33.3706,
        "lon": -112.5908,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s5"
        ],
        "note": "Coordinates are the Wikipedia centroid of Buckeye (s5). Local reporting places the park in southwest Buckeye, south of Interstate 10 on Johnson Road near Buckeye Municipal Airport; the parcel was not geocoded."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-06-15",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center",
        "https://ktar.com/arizona-news/20-billion-data-center-campus-gets-green-light-in-buckeye",
        "https://baxtel.com/news/tract-announces-new-gigawatt-scale-data-center-park-in-phoenix-arizona",
        "https://constructionreviewonline.com/tract-secures-approval-for-20-billion-data-center-in-buckeye/",
        "https://en.wikipedia.org/wiki/Buckeye,_Arizona",
        "https://www.kjzz.org/business/2026-09-02/aps-says-it-cant-commit-to-new-data-centers-because-of-electric-grid-constraints"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Tract Buckeye data center park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "tract-morris-technology-park",
      "source_file": "tract-morris-technology-park.json",
      "source_sha256": "51240dc2bc5887b2f3dd259dcb6f78db220061c3a732903a810818147bb404ec",
      "source_name": "Morris Technology Park",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Illinois",
        "admin2": "Grundy County",
        "locality": "Morris",
        "lat": 41.38,
        "lon": -88.4244,
        "precision": "locality",
        "source_ids": [
          "s1"
        ],
        "note": "Wikipedia coordinates for Morris. Bisnow places the parcel off Interstate 80 in Morris but gives no address."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-01-27",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.bisnow.com/news/chicago/data-center-capital-markets/data-center-infrastructure-developer-takes-343-acre-chicago-area-swing-132919"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Morris Technology Park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "vantage-jhb1-sedenak",
      "source_file": "vantage-jhb1-sedenak.json",
      "source_sha256": "bd46211bd673a78d63aa4e12630f7fc11b9ba465e0b30e2cf88b7e067b56a650",
      "source_name": "Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Kulai District",
        "locality": "Sedenak (Sedenak Tech Park)",
        "lat": 1.713667,
        "lon": 103.524778,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s4"
        ],
        "note": "Sources name Sedenak Tech Park in Johor without an address. The point is the Sedenak coordinate from its Wikipedia article (which also gives Kulai District), so it marks the locality rather than the parcel."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://vantage-dc.com/news/vantage-data-centers-secures-1-6b-investment-in-apac-platform-from-gic-and-adia/",
        "https://w.media/vantage-data-centers-completes-purchase-of-yondrs-300mw-data-center-in-johor-closes-us1-6b-investment-in-apac/",
        "https://vantage-dc.com/data-center-locations/apac/johor-malaysia",
        "https://en.wikipedia.org/wiki/Sedenak"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "bridge-my06-sedenak",
          "relationship": "separate_named_developments",
          "reason": "Bridge MY06 and Vantage JHB1 are separately named campuses in Sedenak Tech Park; identical park/locality coordinates are not evidence of co-location."
        }
      ]
    },
    {
      "source_id": "vantage-kul2-cyberjaya",
      "source_file": "vantage-kul2-cyberjaya.json",
      "source_sha256": "4ea59882a900006b0a3b49ebadc701ea7b5d03b2fc4c600ab783ce866f92c00c",
      "source_name": "Vantage Data Centers Cyberjaya II campus (KUL2)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Selangor",
        "admin2": "Sepang District",
        "locality": "Cyberjaya",
        "lat": 2.9225,
        "lon": 101.655,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4"
        ],
        "note": "Vantage places KUL2 next to its KUL1 campus in Cyberjaya without an address. The point is the Cyberjaya coordinate from its Wikipedia article (which also gives the district), so it marks the township rather than the parcel."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2024-08-06",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://vietnamnews.vn/media-outreach/1536601/vantage-data-centers-announces-second-campus-in-cyberjaya.html",
        "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-256mw-cyberjaya-campus/",
        "https://vantage-dc.com/data-center-locations/apac/cyberjaya-ii-malaysia/",
        "https://en.wikipedia.org/wiki/Cyberjaya"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Vantage Data Centers Cyberjaya II campus (KUL2) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "vantage-villanueva-de-gallego",
      "source_file": "vantage-villanueva-de-gallego.json",
      "source_sha256": "c78936918e73e197adf4b09e48719063801a700d4cc4e2226281758b9fdc36de",
      "source_name": "Vantage Data Centers Villanueva de Gállego campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "ES",
        "admin1": "Aragón",
        "admin2": "Zaragoza",
        "locality": "Villanueva de Gállego",
        "lat": 41.767,
        "lon": -0.817,
        "precision": "locality",
        "source_ids": [
          "s2",
          "s3",
          "s4"
        ],
        "note": "Town coordinates from the Villanueva de Gállego Wikipedia article. Sources place the site south of the town along the A-23 (Huesca motorway), opposite the San Miguel industrial estate and close to the Universidad San Jorge campus; no parcel boundary is published."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-03-20",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.eldiario.es/aragon/politica/gigante-data-centers-amigo-trump-desembarca-zaragoza-aliado-empresarios-aragoneses_1_12301095.html",
        "https://www.libertaddigital.com/espana/2025-09-12/azcon-anuncia-una-inversion-de-3-200-millones-para-un-centro-de-datos-de-vantage-en-aragon-7294927/",
        "https://www.elespanol.com/aragon/economia/20260320/sacara-vantage-metros-cubicos-agua-necesita-centros-datos-villanueva-gallego/1003744176774_0.html",
        "https://en.wikipedia.org/wiki/Villanueva_de_G%C3%A1llego"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Vantage Data Centers Villanueva de Gállego campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "vermaland-la-osa-pinal-county",
      "source_file": "vermaland-la-osa-pinal-county.json",
      "source_sha256": "ae70b28f7d056bde8ee79fdd5af396a435be31e1fb371df47be0e98399367463",
      "source_name": "La Osa Energy Center (Vermaland), Pinal County",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Arizona",
        "admin2": "Pinal County",
        "locality": "Eloy",
        "lat": 32.7636,
        "lon": -111.6,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s4",
          "s6"
        ],
        "note": "Coordinates are the Wikipedia centroid of Eloy (s6). Sources place the site south of Eloy along the Greene Canal (s1), off Picacho Highway (s2) and about 12 miles outside the city (s4), so the parcel lies some distance from this point."
      },
      "source_status": "cancelled",
      "source_status_as_of": "2026-08-26",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://baxtel.com/news/vermaland-plans-33bn-data-center-in-arizona",
        "https://constructionreporter.com/massive-proposed-southern-arizona-data-center-business-park-moving-forward/",
        "https://www.kjzz.org/fronteras-desk/2026-05-28/largest-proposed-data-center-in-arizona-to-be-scaled-back-80-after-opposition",
        "https://www.kjzz.org/politics/2026-08-25/pinal-county-will-vote-on-la-osa-which-could-become-one-of-arizonas-largest-data-center-projects",
        "https://www.kjzz.org/politics/2026-08-26/pinal-county-rejects-massive-la-osa-data-center-residents-want-more-rules-for-future-projects",
        "https://en.wikipedia.org/wiki/Eloy,_Arizona"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve La Osa Energy Center (Vermaland), Pinal County as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "virtus-wustermark",
      "source_file": "virtus-wustermark.json",
      "source_sha256": "91aa18b5ffa4d381faa2d0925636228f1d3da1e5e19cfb9c6ed32d0b2066c683",
      "source_name": "VIRTUS Wustermark campus",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "DE",
        "admin1": "Brandenburg",
        "admin2": "Havelland",
        "locality": "Wustermark",
        "lat": 52.5463,
        "lon": 12.9404,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Nominatim centroid of the municipality of Wustermark; sources name the municipality and the 50Hertz Wustermark substation but give no address."
      },
      "source_status": "under_construction",
      "source_status_as_of": "2026-06-01",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://virtusdatacentres.com/press-releases/virtus-unveils-3bn-300mw-wustermark-megacampus-project",
        "https://virtusdatacentres.com/press-releases/virtus-installs-two-of-europes-largest-super-grid-transformers-at-wustermark-campus-in-brandenburg",
        "https://virtusdatacentres.com/locations/germany/berlin-data-centres-wustermark-campus"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve VIRTUS Wustermark campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "rejected_candidate_matches": [
        {
          "project_id": "3941c42e-216d-52fa-b0d8-d7555b441a1a",
          "project_stable_key": "curated:maincubes-mainhub-nauen-campus:ber02",
          "site_id": "vcc-site-75fed87a1b38b8cd7280",
          "physical_site_stable_key": "curated:maincubes-mainhub-nauen-campus",
          "name": "maincubes BER02",
          "status": "under_construction",
          "status_as_of": "2026-07-19",
          "latitude": 52.5935,
          "longitude": 12.8929999,
          "status_source_url": "https://www.maincubes.com/en/data-centers/berlin-cloud-ai-provider-campus-ber02/",
          "geometry_source_url": "https://www.maincubes.com/wp-content/uploads/2026/02/maincubes_factsheet_ber02_en.pdf",
          "reason": "VIRTUS Wustermark and maincubes BER02 Nauen are distinct operators/developments."
        }
      ]
    },
    {
      "source_id": "wbs-power-baltic-data-center-campus",
      "source_file": "wbs-power-baltic-data-center-campus.json",
      "source_sha256": "73668d72a83acf18d14292b9f2f951611d56b56f3ec90e62acad02a856b4f551",
      "source_name": "WBS Power Baltic Data Center Campus, Lublewo",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "PL",
        "admin1": "Pomeranian Voivodeship",
        "admin2": "Wejherowo County",
        "locality": "Lublewo (Choczewo municipality)",
        "lat": 54.75972,
        "lon": 17.94528,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s3",
          "s4",
          "s5"
        ],
        "note": "The press release and Gramwzielone name the site as Lublewo in Choczewo municipality; neither uses the official name Lublewo Lęborskie. Wikipedia lists Lublewo Lęborskie as the only village called Lublewo in Gmina Choczewo (the other similar name is Lublewko), so its village coordinates are used, at locality precision. County is from Wikipedia. No cited source gives site coordinates."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-03-24",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://tools.prnewswire.com/en-us/live/20823/release/20260324EN14682",
        "https://wnn.world-nuclear.org/articles/data-centre-to-be-built-near-planned-polish-nuclear-power-plant",
        "https://www.gramwzielone.pl/?p=20353659",
        "https://en.wikipedia.org/wiki/Lublewo_L%C4%99borskie",
        "https://en.wikipedia.org/wiki/Gmina_Choczewo"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve WBS Power Baltic Data Center Campus, Lublewo as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "wonder-valley-alberta",
      "source_file": "wonder-valley-alberta.json",
      "source_sha256": "35d730bb27d84824a53aab3fece2704ebbe9fabd9ef69e02b4c6cd792cd24d9d",
      "source_name": "Wonder Valley AI data centre park (Alberta)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "CA",
        "admin1": "Alberta",
        "admin2": "Municipal District of Greenview No. 16",
        "locality": "Greenview Industrial Gateway (south of Grande Prairie)",
        "lat": 54.8119,
        "lon": -118.6834,
        "precision": "approximate_site",
        "source_ids": [
          "s3",
          "s1",
          "s8"
        ],
        "note": "Point taken from the Government of Alberta major projects inventory entry for Phase 1 and rounded; the developer's FAQ places the site in the Greenview Industrial Gateway about 42 km south of Grande Prairie. Parcel boundaries were not published."
      },
      "source_status": "announced",
      "source_status_as_of": "2026-10-09",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://calgary.tech/2024/12/09/kevin-oleary-leads-visionary-70-billion-ai-data-centre-project-in-alberta/",
        "https://www.naturalgasworld.com/vc-unveils-plan-for-7.5-gw-data-centre-in-alberta-118787",
        "https://majorprojects.alberta.ca/details/Wonder-Valley-AI-Data-Centre-Park/11477",
        "https://tools.prnewswire.com/en-us/live/20823/release/20260217EN90212",
        "https://www.geothermalcanada.org/news/2025/12/17/the-truth-about-wonder-valley",
        "https://www.eab.gov.ab.ca/media/r2slqi1d/eab-25-014-md-of-greenview-final.pdf",
        "https://waterportal.ca/water-news/wonder-valley-licence/",
        "https://www.olearydigital.ai/faq",
        "https://www.westernstandard.news/news/judge-rejects-kevin-oleary-backed-data-centre-bid-to-halt-first-nation-challenge/75984"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve Wonder Valley AI data centre park (Alberta) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "xai-colossus-2-memphis",
      "source_file": "xai-colossus-2-memphis.json",
      "source_sha256": "4cfe5b5baab4cd38ff3e09967cd3611e410e23f78f3009854145febbb02aef3b",
      "source_name": "xAI Colossus 2 (Memphis)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Tennessee",
        "locality": "Memphis",
        "lat": 34.998,
        "lon": -90.0349,
        "precision": "site",
        "source_ids": [
          "s2",
          "s9"
        ],
        "note": "Center of the OpenStreetMap building tagged 'xAI Macrohard Colossus 2' at 5420 Tulane Road, taken from this project's OpenStreetMap data center layer (no geocoder call); Cleanview gives the same address. MLGW describes the facility as on Tulane Road very near the Tennessee-Mississippi line."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.actionnews5.com/2025/03/07/xai-purchasing-1-million-square-feet-property-southwest-memphis-expansion",
        "https://www.mlgw.com/images/content/files/pdf/new/5-5-25%20xAI%20Update.pdf",
        "https://desotocountynews.com/desoto-county-news/xai-buys-southaven-property/",
        "https://www.mississippifreepress.org/mississippi-permit-board-grants-xais-request-for-41-southaven-gas-turbines-to-power-memphis-data-center/",
        "https://www.selc.org/press-release/groups-appeal-air-permit-for-xais-personal-power-plant/",
        "https://www.anthropic.com/news/series-h",
        "https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/",
        "https://epoch.ai/data/ai-data-centers/directory/colossus-2",
        "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve xAI Colossus 2 (Memphis) as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "xai-macrohardrr-southaven",
          "relationship": "separate_nearby_facilities",
          "reason": "Colossus 2 Memphis and MACROHARDRR Southaven are separately named facilities in Tennessee and Mississippi; nearby coordinates do not merge them."
        }
      ]
    },
    {
      "source_id": "xai-colossus-memphis",
      "source_file": "xai-colossus-memphis.json",
      "source_sha256": "48c95e4a44b8f4dbae5819de5f7056cdd6ee6aae1c540f087c3d07df103e6305",
      "source_name": "xAI Colossus 1 (Memphis)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Tennessee",
        "admin2": "Shelby County",
        "locality": "Memphis",
        "lat": 35.0599,
        "lon": -90.1563,
        "precision": "site",
        "source_ids": [
          "s1",
          "s2",
          "s3",
          "s7"
        ],
        "note": "Center of the OpenStreetMap building tagged 'xAI Colossus' at 3231 Paul R. Lowery Road, taken from this project's OpenStreetMap data center layer (no geocoder call). The address comes from Cleanview and from Memphis Business Journal reporting cited by WMC; MLGW places the facility in the former Electrolux plant in Frank C. Pidgeon Industrial Park. Shelby County is the jurisdiction of the health department that permitted the site's turbines."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-10-05",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.actionnews5.com/2024/06/05/elon-musk-build-multi-billion-dollar-ai-supercomputer-project-memphis/",
        "https://www.mlgw.com/images/content/files/pdf/new/5-5-25%20xAI%20Update.pdf",
        "https://www.actionnews5.com/2025/07/02/health-dept-grants-permit-xai-turbines/",
        "https://www.actionnews5.com/2026/01/07/xai-raises-billions-dollars-expansion-amid-rapid-growth-memphis-metro",
        "https://www.anthropic.com/news/higher-limits-spacex",
        "https://epoch.ai/data/ai-data-centers/directory/colossus-1",
        "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve xAI Colossus 1 (Memphis) as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    },
    {
      "source_id": "xai-macrohardrr-southaven",
      "source_file": "xai-macrohardrr-southaven.json",
      "source_sha256": "abf3551fad31d958a766d3a571a49c602f4511d97258795493fb0411254fead0",
      "source_name": "xAI MACROHARDRR data center (Southaven)",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "US",
        "admin1": "Mississippi",
        "admin2": "DeSoto County",
        "locality": "Southaven",
        "lat": 34.9935,
        "lon": -90.0342,
        "precision": "approximate_site",
        "source_ids": [
          "s1",
          "s2",
          "s5"
        ],
        "note": "Center of the OpenStreetMap building tagged 'xAI Macrohardrr' on Stateline Road West, taken from this project's OpenStreetMap data center layer (no geocoder call), about 0.5 km south of the Colossus 2 building. This matches Cleanview's address of 2400 Stateline Road, Southaven, and WREG's description of the warehouse as just south of Colossus 2."
      },
      "source_status": "operational",
      "source_status_as_of": "2026-07-31",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/",
        "https://www.yahoo.com/news/articles/ms-governor-confirms-major-announcement-173629625.html",
        "https://convergedigest.com/xai-commits-20b-to-2-gw-ai-data-center-in-mississippi/",
        "https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/",
        "https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve xAI MACROHARDRR data center (Southaven) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry.",
      "source_relations": [
        {
          "source_id": "xai-colossus-2-memphis",
          "relationship": "separate_nearby_facilities",
          "reason": "Colossus 2 Memphis and MACROHARDRR Southaven are separately named facilities in Tennessee and Mississippi; nearby coordinates do not merge them."
        }
      ]
    },
    {
      "source_id": "ytl-kulai-johor",
      "source_file": "ytl-kulai-johor.json",
      "source_sha256": "143f9a74590e5c248f1f6a1d7693813daba34dd5514d624d001912588729e7bb",
      "source_name": "YTL Green Data Center Park, Kulai",
      "source_scope": "source_record_scope",
      "source_location": {
        "country": "MY",
        "admin1": "Johor",
        "admin2": "Kulai District",
        "locality": "Kulai",
        "lat": 1.6569,
        "lon": 103.6059,
        "precision": "locality",
        "source_ids": [
          "s1",
          "s2",
          "s3"
        ],
        "note": "Sources place the park in Kulai, Johor, about 30 km from Johor Bahru, without an address; coordinates are the OpenStreetMap Nominatim point for Kulai town."
      },
      "source_status": "partially_operational",
      "source_status_as_of": "2026-08-20",
      "source_last_reviewed": "2026-10-09",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1526125/000110465922062648/tm2215932d2_ex99-1.htm",
        "https://www.ytlpowerinternational.com/press-releases/ytl-to-advance-ai-development-in-malaysia-in-collaboration-with-nvidia/",
        "https://api.edgeprop.my/content/1914263/ytl-power-completes-first-nvidia-powered-ai-data-centre-johor-ytl-ai-cloud-now-operational",
        "https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/",
        "https://www.edgeprop.my/content/1917178/ytl-power-develop-new-gigawatt-data-centre-campus-johor"
      ],
      "relationship": "unique_source_record",
      "canonical_site_id": null,
      "canonical_project_id": null,
      "related_project_ids": [],
      "related_site_ids": [],
      "reason": "No matching named development in the 201-project release. Preserve YTL Green Data Center Park, Kulai as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "integration_action": "add_source_project_and_site_with_original_precision",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "geometry_policy": "Preserve source location.precision and location.note. Administrative or approximate locations are locator-only and must be visibly distinguished from reviewed facility/campus geometry."
    }
  ],
  "format": "datacenter-atlas-consolidation-mapping-v1",
  "decisions": [
    {
      "source_record_id": "acs-la-puebla-de-alfinden",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve ACS DC La Puebla data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "adaniconnex-hyderabad",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AdaniConneX Hyderabad data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "adaniconnex-navi-mumbai",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AdaniConneX Navi Mumbai data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "adaniconnex-noida",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AdaniConneX Noida data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "sify-noida-02",
          "relationship": "separate_named_developments",
          "reason": "Distinct AdaniConneX and Sify named developments; exactly shared coordinates are Noida city locators."
        }
      ]
    },
    {
      "source_record_id": "adaniconnex-pune",
      "decision": "same_site_distinct_scope",
      "rationale": "Pune campus context includes operating first and second phases and 250 MW potential; existing record specifically selects PNQ04 current construction. Preserve campus metrics and operating status separately from PNQ04.",
      "target_physical_site_stable_key": "curated:adaniconnex-pune-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "airtrunk-hyd1-chandanvelly",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AirTrunk HYD1 Hyderabad as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "ctrls-chandanvelly-hyderabad",
          "relationship": "separate_named_developments",
          "reason": "Distinct AirTrunk HYD1 and CtrlS campus announcements share only the Chandanvelly locality locator."
        }
      ]
    },
    {
      "source_record_id": "airtrunk-jhb1-johor",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AirTrunk JHB1 as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "airtrunk-jhb2-iskandar-puteri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AirTrunk JHB2 as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "airtrunk-jhb3-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB3 physical identity."
        },
        {
          "source_id": "airtrunk-jhb4-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB4 physical identity."
        }
      ]
    },
    {
      "source_record_id": "airtrunk-jhb3-iskandar-puteri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AirTrunk JHB3 Johor Bahru as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "airtrunk-jhb4-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate JHB3 and JHB4 campuses, different site areas and 138/142 MW scopes; shared city centroid is not a shared site."
        },
        {
          "source_id": "airtrunk-jhb2-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB3 physical identity."
        }
      ]
    },
    {
      "source_record_id": "airtrunk-jhb4-iskandar-puteri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AirTrunk JHB4 Johor Bahru as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "airtrunk-jhb3-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate JHB3 and JHB4 campuses, different site areas and 138/142 MW scopes; shared city centroid is not a shared site."
        },
        {
          "source_id": "airtrunk-jhb2-iskandar-puteri",
          "relationship": "separate_nearby_campuses",
          "reason": "AirTrunk names separate campuses; shared JHB2 electrical supply does not merge JHB4 physical identity."
        }
      ]
    },
    {
      "source_record_id": "airtrunk-kurri-kurri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AirTrunk Kurri Kurri Data Centre as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "airtrunk-tok1-inzai",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AirTrunk TOK1 Tokyo East as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aker-nscale-korgen",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Aker Nscale Korgen AI data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "applied-digital-delta-forge-1",
      "decision": "exact_project",
      "rationale": "Same named Delta Forge 1 development in Boyce near Alexandria; source and release share the issuer July 2026 results URL. Existing current build and source initial two-facility development describe the same project.",
      "target_project_stable_key": "curated:applied-digital-delta-forge-1-alexandria:current-build",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "applied-digital-delta-forge-2",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Applied Digital Delta Forge 2 as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "applied-digital-polaris-forge-1",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Ellendale campus, confirmed by shared issuer results source. Source includes operating ELN buildings and planned total campus; existing record selects the remaining construction expansion.",
      "target_physical_site_stable_key": "epoch-ai:data-center:ae2c8749-c97f-5512-a0ad-a40ed8df37ce",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "applied-digital-polaris-forge-2",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Harwood campus, confirmed by shared issuer results source. Source includes 1 GW campus potential and first 200 MW leases; existing current construction is a narrower active-build scope.",
      "target_physical_site_stable_key": "curated:applied-digital-polaris-forge-2-harwood",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "applied-digital-polaris-forge-3",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Applied Digital Polaris Forge 3 as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "art-data-centres-ennis",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Art Data Centres Ennis campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "atnorth-haugaland-nor01",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve atNorth NOR01 Haugaland mega site as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "atnorth-salo-fin05",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve atNorth FIN05 Salo mega site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "atnorth-solleftea-swe04",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve atNorth SWE04 Sollefteå mega site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "atnorth-varde-den02",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve atNorth DEN02 Varde mega site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aws-clinton-hinds-county-mississippi",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AWS Clinton data center (former Delphi plant) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aws-douglas-county-georgia",
      "decision": "multi_site_program",
      "rationale": "Source describes undisclosed plural AWS campuses across Douglas County and a wider Douglas/Butts investment program. The county centroid is regional context; no exact physical site or one-campus scope can be inferred.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "related_project_stable_keys": [],
      "unmapped_components": [
        {
          "name": "Undisclosed AWS Douglas County campuses",
          "reason": "Source explicitly says exact sites were not disclosed; no supported individual site count or coordinates."
        }
      ]
    },
    {
      "source_record_id": "aws-fayette-county-ohio",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AWS Fayette County data center site as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aws-hobart-indiana",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Amazon Web Services Hobart data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aws-king-george-county-virginia",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Amazon Web Services King George County campus (Birchwood site) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aws-lake-anna-technology-campus-louisa-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AWS Lake Anna Technology Campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "aws-madison-county-mississippi",
      "decision": "multi_site_program",
      "rationale": "The source explicitly combines two separate AWS campuses: the Madison County Mega Site near Canton and Ridgeland near West County Line Road. Different completion states are reported. Preserve the program context without inventing a single physical site or assigning combined investment/capacity to either campus.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "related_project_stable_keys": [],
      "unmapped_components": [
        {
          "name": "AWS Madison County Mega Site near Canton",
          "reason": "Source identifies five completed buildings at Canton but provides only a county representative point for the program."
        },
        {
          "name": "AWS Ridgeland campus near West County Line Road",
          "reason": "Source explicitly names this as the second campus and says no buildings complete as of August 2026; needs its own locator and scoped facts."
        }
      ]
    },
    {
      "source_record_id": "aws-project-rainier-new-carlisle",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AWS New Carlisle data center campus (Project Rainier) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aws-richmond-county-north-carolina",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AWS Richmond County data center campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "aws-salem-township-pennsylvania",
      "decision": "same_site_distinct_scope",
      "rationale": "Same acquired Cumulus/AWS Salem Township campus beside Susquehanna, with shared Amazon campus URL. Source spans the operating campus and long-term buildout; existing record selects active campus construction.",
      "target_physical_site_stable_key": "curated:amazon-salem-township-innovation-campus",
      "flags": [
        "approximate_locator_not_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "aws-vicksburg-warren-county-mississippi",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve AWS Vicksburg data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "azora-tillion-villamayor-de-gallego",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Tillion Aragón data center campus (Azora), Villamayor de Gállego as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "microsoft-aragon-villamayor-de-gallego",
          "relationship": "separate_named_developments",
          "reason": "Distinct Azora/Tillion and Microsoft projects; shared Villamayor municipality point is not a parcel or alias."
        }
      ]
    },
    {
      "source_record_id": "balico-pittsylvania-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Balico gas-powered data center campus, Pittsylvania County as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "stack-berry-hill-pittsylvania-county",
          "relationship": "separate_named_developments",
          "reason": "Rejected Balico Banister/Chatham plan and STACK Berry Hill megasite have distinct proponent and site descriptions; centroid proximity is not site overlap."
        }
      ]
    },
    {
      "source_record_id": "beacon-ai-centers-heartland",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Beacon AI Centers Heartland campus (Sturgeon County) as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ]
    },
    {
      "source_record_id": "beacon-ai-centers-indus",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Beacon AI Centers Indus campus as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ]
    },
    {
      "source_record_id": "bell-ai-fabric-sherwood-saskatchewan",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bell AI Fabric Sherwood campus (Regina area) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "bitdeer-clarington-ohio",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bitdeer Clarington data center site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "bitdeer-fox-creek",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bitdeer Fox Creek energy and computing facility as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "bitdeer-shalersville-portage-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bitdeer and Geis Shalersville AI data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "bitdeer-weathersfield-ohio",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bitdeer Weathersfield (Niles) development site as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "blackstone-calatorao",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve QTS Calatorao data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "box2bit-epila",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Box2Bit Epilon data center campus (Épila) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "bridge-chonburi-khlong-tamru",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bridge Data Centres Chonburi hyperscale campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "bridge-my06-sedenak",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bridge Data Centres MY06, Sedenak Tech Park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "vantage-jhb1-sedenak",
          "relationship": "separate_named_developments",
          "reason": "Bridge MY06 and Vantage JHB1 are separately named campuses in Sedenak Tech Park; identical park/locality coordinates are not evidence of co-location."
        }
      ]
    },
    {
      "source_record_id": "bridge-my07-ulu-tiram",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Bridge Data Centres MY07, Ulu Tiram as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "brookfield-cambrai",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Data4 Cambrai E-Valley campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "brookfield-strangnas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Brookfield AI center, Strängnäs as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "cavour-trino",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Cavour Hyperscale Campus (Trino) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "cdc-marsden-park",
      "decision": "exact_project",
      "rationale": "Same CDC six-building Marsden Park development and early-construction scope. The source suburb centroid does not replace the reviewed campus locator.",
      "target_project_stable_key": "curated:cdc-marsden-park-campus:early-construction",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "cipher-barber-lake",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Cipher Barber Lake data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "cipher-black-pearl",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Cipher Black Pearl facility near Wink, with mining conversion, operating phase I and phase II. Existing record specifically selects AWS phase II current construction; campus partial operation does not complete phase II.",
      "target_physical_site_stable_key": "curated:cipher-digital-black-pearl-wink-texas-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "cloudhq-gru-paulinia",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve CloudHQ GRU Campus (Paulínia) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "cloudhq-queretaro",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve CloudHQ QRO Campus (Querétaro) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "compass-hoffman-estates",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Compass Datacenters Hoffman Estates campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "compass-meridian-mississippi",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Compass Datacenters Meridian campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "core-scientific-denton",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Core Scientific Denton data center (CoreWeave) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "core-scientific-hunt-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Core Scientific Hunt County data center site as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "core-scientific-muskogee",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Core Scientific Muskogee data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "core-scientific-pecos",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Core Scientific Cottonwood/Pecos campus on FM 2119, linked by the same operator facility URL. Source describes the whole mining-to-HDC campus and proposed 1.5 GW expansion; existing record selects initial HDC vertical construction.",
      "target_physical_site_stable_key": "curated:core-scientific-pecos-cottonwood-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "source_relations": [
        {
          "source_id": "microsoft-pecos-texas",
          "relationship": "separate_named_developments",
          "reason": "Core Scientific Cottonwood on FM 2119 and Microsoft/Chevron Project Kilby are distinct named developments; shared city coordinate does not imply identity."
        }
      ]
    },
    {
      "source_record_id": "coreweave-kenilworth-new-jersey",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve CoreWeave Kenilworth NEST 11 AI data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "coreweave-lancaster-pennsylvania",
      "decision": "multi_site_program",
      "rationale": "Source explicitly bundles Greenfield Road phase 1/phase 2 and a planned Harrisburg Pike site. Only the Greenfield Phase 1 adaptive-reuse project is in the current release; attach the broad source as program context, retain Harrisburg Pike as an unmapped component, and do not treat a Lancaster city centroid as either site.",
      "related_project_stable_keys": [
        "curated:coreweave-chirisa-lancaster-greenfield-road-campus:phase-1-adaptive-reuse"
      ],
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "unmapped_components": [
        {
          "name": "1375 Harrisburg Pike planned site",
          "reason": "Explicit separate address in source summary; not geocoded and no matching current release project."
        }
      ]
    },
    {
      "source_record_id": "crusoe-abilene-microsoft",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Crusoe Abilene AI factory campus for Microsoft as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "openai-stargate-abilene",
          "relationship": "separate_adjacent_campuses",
          "reason": "Source explicitly describes Microsoft campus as second and adjacent to original Oracle/OpenAI campus; distinct building programs and tenants."
        }
      ]
    },
    {
      "source_record_id": "crusoe-lancium-childress-texas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Crusoe and Lancium Childress AI data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "iren-childress",
          "relationship": "separate_named_developments",
          "reason": "Crusoe/Lancium newly announced campus and IREN mining/HPC conversion campus are separately described operators/developments, sharing only the Childress town centroid."
        }
      ]
    },
    {
      "source_record_id": "crusoe-tallgrass-cheyenne",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "ctrls-chandanvelly-hyderabad",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve CtrlS Chandanvelly AI-ready data center park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "airtrunk-hyd1-chandanvelly",
          "relationship": "separate_named_developments",
          "reason": "Distinct AirTrunk HYD1 and CtrlS campus announcements share only the Chandanvelly locality locator."
        }
      ]
    },
    {
      "source_record_id": "cyrusone-bosque-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve CyrusOne Bosque County data center campus (Thad Hill) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "cyrusone-freestone-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve CyrusOne Freestone County data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "data4-escaudain",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Data4 Escaudain campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "data4-hanau",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Data4 Hanau campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "datavita-lanarkshire-ai-growth-zone",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve DataVita Lanarkshire AI Growth Zone campus (Chapelhall) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "datavolt-oxagon",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve DataVolt Oxagon AI data centre campus (NEOM) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "dayone-chonburi-tech-park",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve DayOne Chonburi Tech Park (CTP) data center campus as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "deutsche-telekom-nvidia-munich",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Deutsche Telekom Industrial AI Cloud, Munich Tucherpark as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "ecodatacenter-borlange",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve EcoDataCenter 2 Borlänge campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "edgeconnex-kyotanabe-greater-osaka",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve EdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "edgecore-louisa-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve EdgeCore Louisa County campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "edgecore-mesa",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve EdgeCore Mesa data center campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "elea-rio-ai-city",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Rio AI City (Elea Data Centers) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "eni-khazna-ferrera-erbognone",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Eni and Khazna AI data center campus, Ferrera Erbognone as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "fermi-america-hypergrid-amarillo",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Fermi America Project Matador campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "galaxy-helios",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Galaxy Helios campus in Dickens County. Source includes operating phase I and three-phase CoreWeave leases; existing record selects phase II 260 MW critical-IT construction.",
      "target_physical_site_stable_key": "curated:galaxy-helios-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "google-armstrong-county-texas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Armstrong County data center campus (Crusoe Goodnight) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "google-cedar-rapids-iowa",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Cedar Rapids data center campus (Big Cedar Industrial Center) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "google-elmina-selangor",
      "decision": "exact_project",
      "rationale": "Same first Google Malaysia data-center campus in Elmina Business Park developed by Sime Darby Property; both records describe the current campus development.",
      "target_project_stable_key": "curated:google-elmina-business-park-data-center:current-campus-build",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "google-fort-wayne-indiana",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Fort Wayne data center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "google-franklin-township-indianapolis",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Franklin Township data center proposal (Project Flo) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "google-journey-haskell-county-texas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Journey data center campus (Haskell County) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "google-kansas-city-north-missouri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Kansas City data center campus (Hunt Midwest Business Center) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "google-meitner-energy-center-texas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Meitner Energy Center data center (Gray and Roberts counties) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "google-owasso-project-clydesdale",
      "decision": "exact_project",
      "rationale": "Project Clydesdale alias, Beale developer, Google operator and Tulsa County west-of-Owasso location identify the same campus development. Source town centroid is not the campus.",
      "target_project_stable_key": "curated:beale-tulsa-county-project-clydesdale-campus:current-campus-build",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "google-stillwater-oklahoma",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Stillwater data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "google-visakhapatnam-ai-hub",
      "decision": "multi_site_program",
      "rationale": "Source explicitly describes a three-campus AI hub at Tarluvada, Adavivaram and Rambilli with combined 1 GW capacity. The supplied Tarluvada locality point cannot locate the whole regional program; retain the hub as program context pending individual campus records.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "related_project_stable_keys": [],
      "unmapped_components": [
        {
          "name": "Tarluvada campus",
          "reason": "Explicitly named campus component of the combined Visakhapatnam hub; source does not provide independently scoped site coordinates, capacity or status."
        },
        {
          "name": "Adavivaram campus",
          "reason": "Explicitly named campus component of the combined Visakhapatnam hub; source does not provide independently scoped site coordinates, capacity or status."
        },
        {
          "name": "Rambilli campus",
          "reason": "Explicitly named campus component of the combined Visakhapatnam hub; source does not provide independently scoped site coordinates, capacity or status."
        }
      ]
    },
    {
      "source_record_id": "google-waltham-cross-uk",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google Waltham Cross data centre as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "google-west-memphis-arkansas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Google West Memphis data center campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "herbata-naas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Herbata data centre campus (Naas) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "homer-city-redevelopment",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Homer City Energy Campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "humain-al-saad-riyadh",
      "decision": "unique_site",
      "rationale": "Named 6 GW Al-Saad campus in east Riyadh has no matching development in the current release. Preserve it as the source campus anchor; the earlier undifferentiated HUMAIN Riyadh 100 MW record is held because its relationship to Al-Saad is unproven. Do not sum both as independent projects.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "source_anchor_with_unresolved_possible_earlier_phase"
      ],
      "source_relations": [
        {
          "source_id": "humain-riyadh",
          "relationship": "unresolved_possible_same_campus",
          "reason": "Same developer and Riyadh centroid, but no source links the initial 100 MW site to the 6 GW Al-Saad proposal."
        }
      ]
    },
    {
      "source_record_id": "humain-dammam",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve HUMAIN Dammam AI data centre as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "khazna-dammam",
          "relationship": "separate_named_developments",
          "reason": "Distinct HUMAIN initial Dammam build and Khazna first Saudi campus announcement; shared Dammam city coordinates do not establish the same physical site."
        }
      ]
    },
    {
      "source_record_id": "humain-riyadh",
      "decision": "unresolved",
      "rationale": "The 2025 initial 100 MW Riyadh site has no district or address. The 2026 6 GW Al-Saad campus may be a later umbrella or a separate location; identical Riyadh centroid and same developer do not resolve the relationship.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "possible_source_internal_duplicate_hold"
      ],
      "source_relations": [
        {
          "source_id": "humain-al-saad-riyadh",
          "relationship": "unresolved_possible_same_campus",
          "reason": "Same developer and Riyadh centroid, but no source links the initial 100 MW site to the 6 GW Al-Saad proposal."
        }
      ]
    },
    {
      "source_record_id": "huntley-page-arizona",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Page, Arizona data center site (Huntley LLC) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "hut8-beacon-point",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Hut 8 Beacon Point campus and shared issuer quarterly source. Source includes both 352 MW phases and 1 GW utility capacity; existing project is explicitly the first 352 MW critical-IT lease build.",
      "target_physical_site_stable_key": "curated:hut8-beacon-point-ai-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "hut8-river-bend-louisiana",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Hut 8 River Bend campus in West Feliciana Parish and shared issuer quarterly source. Source combines phase I 245 MW critical IT with potential 1 GW campus growth; existing record is the scoped 245 MW current build.",
      "target_physical_site_stable_key": "curated:hut8-river-bend-ai-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "igoudar-dakhla",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Igoudar Dakhla green data centre complex as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "iozera-tetouan",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Iozera Tetouan AI data center and hub as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "iren-childress",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve IREN Childress data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "crusoe-lancium-childress-texas",
          "relationship": "separate_named_developments",
          "reason": "Crusoe/Lancium newly announced campus and IREN mining/HPC conversion campus are separately described operators/developments, sharing only the Childress town centroid."
        }
      ]
    },
    {
      "source_record_id": "iren-kiowa-oklahoma",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve IREN Kiowa data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "iren-sweetwater",
      "decision": "multi_site_program",
      "rationale": "Source explicitly describes a two-site hub: 1,400 MW Sweetwater 1 on 1,700 acres and 600 MW Sweetwater 2 on 500 acres, with separate ERCOT connections and energization schedules. One Sweetwater town point must not be treated as either physical site or a single campus.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ],
      "related_project_stable_keys": [],
      "unmapped_components": [
        {
          "name": "IREN Sweetwater 1",
          "reason": "Named 1,400 MW/1,700-acre site with separate grid connection; no individually scoped site locator in the source record."
        },
        {
          "name": "IREN Sweetwater 2",
          "reason": "Named 600 MW/500-acre site with separate grid connection; no individually scoped site locator in the source record."
        }
      ]
    },
    {
      "source_record_id": "joliet-technology-center",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Joliet Technology Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "k2-zibido-san-giacomo-lacchiarella",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "kasi-cloud-lekki",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Kasi Cloud LOS campus (Lekki, Lagos) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "kenya-olkaria-geothermal-campus",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve G42 and Microsoft Olkaria geothermal data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "khazna-ajman",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Khazna QAJ1 AI data center (Ajman) as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "khazna-dammam",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Khazna Data Centers Dammam campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "humain-dammam",
          "relationship": "separate_named_developments",
          "reason": "Distinct HUMAIN initial Dammam build and Khazna first Saudi campus announcement; shared Dammam city coordinates do not establish the same physical site."
        }
      ]
    },
    {
      "source_record_id": "kio-qro3-queretaro",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve KIO Data Centers QRO3, Querétaro as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "koacc-national-ai-computing-center-haenam",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve National AI Computing Center, Solaseado (Haenam) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "lambda-kansas-city",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Lambda Kansas City AI factory as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "meta-kansas-city",
          "relationship": "separate_named_developments",
          "reason": "Separate Lambda AI factory and Meta campus; coordinates are the same Kansas City civic location, not facility evidence."
        }
      ]
    },
    {
      "source_record_id": "lancium-qts-hall-county-texas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve QTS and Lancium Hall County data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-beaver-dam",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Beaver Dam data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-bowling-green",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Bowling Green data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-cheyenne",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Cheyenne data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-dekalb-illinois",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta DeKalb Data Center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "meta-el-paso",
      "decision": "exact_project",
      "rationale": "Same Meta northeast El Paso campus development, operator and 2028 delivery program. Retain all sourced campus capacity definitions without assigning them to an individual building.",
      "target_project_stable_key": "curated:meta-el-paso-texas-data-center:current-development",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "meta-gallatin-tennessee",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Gallatin Data Center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "meta-hyperion-richland-parish",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Meta Franklin Farm/Richland Parish Hyperion campus. Source includes the 5 GW long-term campus expansion; release evidence explicitly delimits observed phase 1/phase 2 construction, so preserve a broader campus scope.",
      "target_physical_site_stable_key": "curated:meta-richland-parish-data-center",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "meta-kansas-city",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Kansas City data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "lambda-kansas-city",
          "relationship": "separate_named_developments",
          "reason": "Separate Lambda AI factory and Meta campus; coordinates are the same Kansas City civic location, not facility evidence."
        }
      ]
    },
    {
      "source_record_id": "meta-kuna-idaho",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Kuna Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-lebanon-indiana",
      "decision": "exact_project",
      "rationale": "Same Meta LEAP district Lebanon campus with February 2026 groundbreaking and phased current development. No competing Meta Lebanon site is present in the release.",
      "target_project_stable_key": "curated:meta-lebanon-indiana-data-center:current-development",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-mesa-arizona",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Mesa Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-montgomery",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Montgomery data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-prometheus-new-albany",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta New Albany data center campus (Prometheus) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-sturgeon-county",
      "decision": "exact_project",
      "rationale": "Same Meta first Canadian campus in Sturgeon County; the exact Meta groundbreaking URL is shared. The source county centroid is not the permit-located site. Nearby Beacon Heartland is a separate project.",
      "target_project_stable_key": "curated:meta-sturgeon-county-alberta-data-center:current-campus-build",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-talavera-de-la-reina",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Talavera de la Reina data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "meta-temple-texas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Temple Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "rowan-project-temple",
          "relationship": "separate_named_developments",
          "reason": "Meta operating Temple campus and Rowan Project Temple are separately named developments; both use the Temple city point."
        }
      ]
    },
    {
      "source_record_id": "meta-tulsa",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Meta Tulsa data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "mgx-bpifrance-mistral-nvidia-campus",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Campus AI Fouju as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "microsoft-aragon-la-muela",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft La Muela datacenter campus (Aragón) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "microsoft-aragon-villamayor-de-gallego",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Villamayor de Gállego datacenter campus (Aragón) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "azora-tillion-villamayor-de-gallego",
          "relationship": "separate_named_developments",
          "reason": "Distinct Azora/Tillion and Microsoft projects; shared Villamayor municipality point is not a parcel or alias."
        }
      ]
    },
    {
      "source_record_id": "microsoft-aragon-zaragoza-puerto-venecia",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Zaragoza (Puerto Venecia) datacenter campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "microsoft-fairwater-atlanta",
      "decision": "unresolved",
      "rationale": "AJC permitting research and Epoch link Microsoft Fairwater Atlanta to the QTS Fayetteville campus, but the source explicitly says the companies have not confirmed it. Hold the tenant-labelled record from independent counts; preserve its claims and reported relation to the separately documented QTS campus.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "possible_source_internal_duplicate_hold"
      ],
      "source_relations": [
        {
          "source_id": "qts-fayetteville-georgia",
          "relationship": "reported_same_campus_tenant_scope",
          "reason": "Both records cite the same AJC permitting investigation; tenant/campus linkage is reported but not company-confirmed. QTS remains the campus anchor; Fairwater record is held from independent site/project counts."
        }
      ]
    },
    {
      "source_record_id": "microsoft-fairwater-mount-pleasant",
      "decision": "same_site_distinct_scope",
      "rationale": "Source explicitly covers completed phase 1 plus adjacent phase 2 at County Road KR; existing record is specifically the second facility. Durand Avenue and International Drive are separate later locations and remain separate records.",
      "target_physical_site_stable_key": "curated:microsoft-mount-pleasant-datacenter-campus",
      "flags": [
        "source_site_point_not_surveyed_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "source_relations": [
        {
          "source_id": "microsoft-mount-pleasant-durand-avenue",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and Durand/Hewitt Memorial Phase 3 occupy separately described development parcels."
        },
        {
          "source_id": "microsoft-mount-pleasant-international-drive",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and International Drive six-building campus occupy separately described development parcels."
        }
      ]
    },
    {
      "source_record_id": "microsoft-licking-county-ohio",
      "decision": "multi_site_program",
      "rationale": "Source explicitly describes separate Microsoft campuses in Heath, Hebron and New Albany. Each already has its own release identity and site locator; attach regional context to all three without merging their statuses or capacities. Source statement that no New Albany update was found differs from the release's July 2026 official New Albany observation.",
      "related_project_stable_keys": [
        "curated:microsoft-heath-oh-datacenter:initial-site-preparation",
        "curated:microsoft-hebron-oh-datacenter:initial-site-preparation",
        "curated:microsoft-new-albany-oh-datacenter:initial-site-preparation"
      ],
      "flags": [
        "administrative_locator_not_project_geometry",
        "multiple_sites_no_single_map_point"
      ]
    },
    {
      "source_record_id": "microsoft-middenmeer-campus-west",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Middenmeer Campus West expansion (Agriport Plot B) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "microsoft-mount-pleasant-durand-avenue",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Mount Pleasant Durand Avenue datacenter campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "source_relations": [
        {
          "source_id": "microsoft-fairwater-mount-pleasant",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and Durand/Hewitt Memorial Phase 3 occupy separately described development parcels."
        },
        {
          "source_id": "microsoft-mount-pleasant-international-drive",
          "relationship": "separate_campus_parcels",
          "reason": "Distinct 791-acre nine-building Durand campus and 530-acre six-building International Drive campus."
        }
      ]
    },
    {
      "source_record_id": "microsoft-mount-pleasant-international-drive",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Mount Pleasant International Drive datacenter campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "source_relations": [
        {
          "source_id": "microsoft-fairwater-mount-pleasant",
          "relationship": "separate_campus_parcels",
          "reason": "County Road KR phases 1/2 and International Drive six-building campus occupy separately described development parcels."
        },
        {
          "source_id": "microsoft-mount-pleasant-durand-avenue",
          "relationship": "separate_campus_parcels",
          "reason": "Distinct 791-acre nine-building Durand campus and 530-acre six-building International Drive campus."
        }
      ]
    },
    {
      "source_record_id": "microsoft-pecos-texas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Pecos datacenter campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "core-scientific-pecos",
          "relationship": "separate_named_developments",
          "reason": "Core Scientific Cottonwood on FM 2119 and Microsoft/Chevron Project Kilby are distinct named developments; shared city coordinate does not imply identity."
        }
      ]
    },
    {
      "source_record_id": "microsoft-skelton-grange-leeds",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Skelton Grange datacentre campus, Leeds as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "microsoft-union-city-georgia",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Microsoft Union City data center campus (EdgeConneX) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "mihta-askiy-data-centre-peace-river",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Mihta Askiy Data Centre as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "natelli-new-hill-digital-campus",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve New Hill Digital Campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "nebius-birmingham-alabama",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Nebius Birmingham AI factory (Lakeshore Parkway) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "nebius-independence-missouri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Nebius Independence AI factory as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "nebius-vineland-new-jersey",
      "decision": "same_site_distinct_scope",
      "rationale": "Same DataOne-owned Vineland campus with Nebius as tenant; canonical evidence includes the exact Nebius project page. Source is campus-wide while existing record selects Phase 2 expansion. A tenant label is not a separate physical site.",
      "target_physical_site_stable_key": "curated:dataone-vineland-ai-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "nextdc-m4-port-melbourne",
      "decision": "same_site_distinct_scope",
      "rationale": "Same NEXTDC M4 campus at 127 Todd Road, Port Melbourne. Source retains the approved full campus while existing record selects June 2026 initial early works; its older announced status must not replace the observed site preparation.",
      "target_physical_site_stable_key": "curated:nextdc-m4-melbourne",
      "flags": [
        "approximate_locator_not_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "nextdc-s7-eastern-creek",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve NEXTDC S7 Sydney as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "nightpeak-old-ocean",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Old Ocean Data Center (Nightpeak Energy) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "nscale-kvandal-narvik",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Kvandal/Bjerkvik Nscale campus, with exact shared Nordscale issuer source. Source encompasses Stargate Norway and three-building/100 MW development; existing record is the initial 25 MW EPC build. Its municipality centroid is 38 km away from the reviewed parcel locator.",
      "target_physical_site_stable_key": "curated:nscale-kvandal-narvik-ai-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "ntt-gdc-tokyo-tky12-shiroi",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve NTT Global Data Centers Tokyo TKY12 campus, Shiroi as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "omnia-data-center-pecem",
      "decision": "same_site_distinct_scope",
      "rationale": "Same OMNIA Data Center Pecem campus at the Pecem industrial complex. Source covers campus/PPA context; existing record selects initial construction supported by SEMACE project identity and June 2026 official observation. The port reference point is not the site.",
      "target_physical_site_stable_key": "curated:omnia-pecem-data-center-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "openai-stargate-abilene",
      "decision": "same_site_distinct_scope",
      "rationale": "Same original eight-building Crusoe/Oracle/OpenAI campus on Lancium land. Source includes the first operating buildings and full 1.2 GW program; existing record selects the remaining six-building expansion. Adjacent Crusoe Microsoft campus is separate.",
      "target_physical_site_stable_key": "curated:lancium-clean-campus-abilene-ai-data-center",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "source_relations": [
        {
          "source_id": "crusoe-abilene-microsoft",
          "relationship": "separate_adjacent_campuses",
          "reason": "Source explicitly describes Microsoft campus as second and adjacent to original Oracle/OpenAI campus; distinct building programs and tenants."
        }
      ]
    },
    {
      "source_record_id": "openai-stargate-dona-ana-county",
      "decision": "exact_project",
      "rationale": "Same Project Jupiter four-building Oracle/STACK/BorderPlex campus in Dona Ana County. Explicit Project Jupiter alias and developer/tenant identities resolve the match despite the source county centroid being 59 km from the campus.",
      "target_project_stable_key": "curated:oracle-project-jupiter-dona-ana-campus:current-campus-build",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "openai-stargate-milam-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Stargate Milam County (SB Energy campus) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "openai-stargate-saline-township",
      "decision": "exact_project",
      "rationale": "Same The Barn three-building Stargate campus developed by Related Digital for Oracle/OpenAI in Saline Township. Name alias, parties and construction program agree.",
      "target_project_stable_key": "curated:related-openai-oracle-stargate-michigan-saline:current-build",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "openai-stargate-shackelford-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Vantage Frontier campus (Stargate Shackelford County) as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "oracle-vantage-port-washington",
      "decision": "exact_project",
      "rationale": "Same Vantage Lighthouse four-building Port Washington campus for Oracle/OpenAI. Lighthouse alias, developer, locality and Wisconsin DNR identity agree.",
      "target_project_stable_key": "curated:vantage-lighthouse-port-washington-campus:current-campus-build",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "pdg-jc3-bekasi",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Princeton Digital Group JC3 Greater Jakarta as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "source_relations": [
        {
          "source_id": "pdg-jc4-bekasi",
          "relationship": "separate_nearby_campuses",
          "reason": "PDG describes JC4 about 1.7 km from JC3; both use the GIIC estate centroid. Preserve independent campus identities."
        }
      ]
    },
    {
      "source_record_id": "pdg-jc4-bekasi",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Princeton Digital Group JC4 Greater Jakarta as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "source_relations": [
        {
          "source_id": "pdg-jc3-bekasi",
          "relationship": "separate_nearby_campuses",
          "reason": "PDG describes JC4 about 1.7 km from JC3; both use the GIIC estate centroid. Preserve independent campus identities."
        }
      ]
    },
    {
      "source_record_id": "powerhouse-95-spotsylvania",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve PowerHouse 95 data center campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "powerhouse-big-watt-taylor",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Taylor Technology Campus (Big Watt Digital and PowerHouse) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "powerhouse-pennsylvania-digital-i-carlisle",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Pennsylvania Digital I (PAX-1), Middlesex Township as an independent source record; its locality locator does not itself establish a surveyed physical site. Source encompasses a single explicitly bounded master park with multiple development subcampuses; retain that park-level scope.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "master_park_with_multiple_subcampuses_not_individual_facility"
      ]
    },
    {
      "source_record_id": "powerhouse-poe-louisville-camp-ground-road",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve PowerHouse Louisville hyperscale campus (Camp Ground Road) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "project-blue-tucson",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Project Blue as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "project-sail-coweta-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Project Sail (Prologis data center campus, Coweta County) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "prometheus-hyperscale-evanston",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Prometheus Hyperscale Evanston campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "provident-powerhouse-grand-prairie",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve PowerHouse Grand Prairie campus (PowerHouse and Provident) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "pw-digital-gateway",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve PW Digital Gateway as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "qscale-q01-levis",
      "decision": "same_site_distinct_scope",
      "rationale": "Same QScale Q01 campus at 2280 Albert-Dion Street; coordinates agree within about 7 metres and the Building B issuer source is shared. Source spans operating campus and expansion; existing record is only Building B.",
      "target_physical_site_stable_key": "curated:qscale-q01-levis-campus",
      "flags": [
        "source_site_point_not_surveyed_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "qts-cambois-blyth",
      "decision": "same_site_distinct_scope",
      "rationale": "Same QTS former Blyth Power Station campus. Source covers ten-building campus with initial two-building works; existing record selects 2026 earthworks. TBC Partners Factory Road proposal is explicitly nearby and separate.",
      "target_physical_site_stable_key": "curated:qts-cambois-data-centre-campus",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ],
      "source_relations": [
        {
          "source_id": "tbc-partners-cambois",
          "relationship": "separate_nearby_campuses",
          "reason": "TBC proposal on Factory Road is explicitly described as near the QTS former power-station campus; identical Cambois centroid is administrative only."
        }
      ]
    },
    {
      "source_record_id": "qts-eemshaven",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve QTS Eemshaven data center campus as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ]
    },
    {
      "source_record_id": "qts-fayetteville-georgia",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve QTS Fayetteville campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "microsoft-fairwater-atlanta",
          "relationship": "reported_same_campus_tenant_scope",
          "reason": "Both records cite the same AJC permitting investigation; tenant/campus linkage is reported but not company-confirmed. QTS remains the campus anchor; Fairwater record is held from independent site/project counts."
        }
      ]
    },
    {
      "source_record_id": "qts-vimercate",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve QTS Vimercate data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "quantum-frederick",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Quantum Frederick data center park as an independent source record; its locality locator does not itself establish a surveyed physical site. Source encompasses a single explicitly bounded master park with multiple development subcampuses; retain that park-level scope.",
      "flags": [
        "administrative_locator_not_project_geometry",
        "master_park_with_multiple_subcampuses_not_individual_facility"
      ]
    },
    {
      "source_record_id": "red-admiral-rochfortbridge",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Red Admiral data centre campus, Rochfortbridge as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "reliance-jamnagar-ai-data-center",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Reliance Jamnagar AI-enabled data centre for Meta as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "riot-corsicana",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Riot Platforms Corsicana facility as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "riot-rockdale",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Riot Rockdale mining-to-AI campus. Source spans operating AMD capacity and a separate 191 MW frontier-lab lease; existing record selects AMD expansion phases 3 and 4. Do not combine the tenants or capacity scopes.",
      "target_physical_site_stable_key": "curated:riot-rockdale-site",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "rowan-project-temple",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Rowan Project Temple as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "meta-temple-texas",
          "relationship": "separate_named_developments",
          "reason": "Meta operating Temple campus and Rowan Project Temple are separately named developments; both use the Temple city point."
        }
      ]
    },
    {
      "source_record_id": "samca-green-it-aragon-luceni",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Green IT Aragón data center campus (SAMCA), Luceni as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "scala-ai-city-eldorado-do-sul",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Scala AI City (Eldorado do Sul) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "scala-tambore-barueri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Scala Data Centers Tamboré Campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "schwarz-digits-luebbenau",
      "decision": "exact_project",
      "rationale": "Same Schwarz Digits/STACKIT development on the former Luebbenau power-plant site. Both records describe construction of that named development; town centroid is not the site.",
      "target_project_stable_key": "curated:schwarz-digits-luebbenau-campus:current-build",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "sdaia-hexagon-riyadh",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Hexagon Data Center (Riyadh) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "sify-chennai-02-siruseri",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Sify Chennai 02 data center campus, Siruseri as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "sify-noida-02",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Sify Noida 02 data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "adaniconnex-noida",
          "relationship": "separate_named_developments",
          "reason": "Distinct AdaniConneX and Sify named developments; exactly shared coordinates are Noida city locators."
        }
      ]
    },
    {
      "source_record_id": "sify-rabale-navi-mumbai",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Sify Rabale data center campus (Mumbai 03), Navi Mumbai as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "sk-aws-ulsan-ai-data-center",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve SK AI Data Center Ulsan as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "softbank-sakai",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve SoftBank Osaka Sakai AI data center as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "softbank-sesterce-bosquel",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve SoftBank-Sesterce Bosquel AI data center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "softbank-tomakomai",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve SoftBank Hokkaido Tomakomai AI Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "stack-amazon-resilient-technology-park-shreveport",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Amazon and STACK campus at Resilient Technology Park, Shreveport as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "stack-berry-hill-pittsylvania-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve STACK Infrastructure Berry Hill campus, Pittsylvania County as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "balico-pittsylvania-county",
          "relationship": "separate_named_developments",
          "reason": "Rejected Balico Banister/Chatham plan and STACK Berry Hill megasite have distinct proponent and site descriptions; centroid proximity is not site overlap."
        }
      ]
    },
    {
      "source_record_id": "stargate-uae",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Stargate UAE / UAE-US AI Campus as an independent source record; its admin1 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "start-campus-sines",
      "decision": "same_site_distinct_scope",
      "rationale": "Same Start Campus Sines six-building campus. Source includes operational SIN01 and future full campus; existing record specifically selects SIN02 construction.",
      "target_physical_site_stable_key": "epoch-ai:data-center:1fb39208-53bc-5714-80d2-881a5c944551",
      "flags": [
        "approximate_locator_not_boundary",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "stt-gdc-fairview-quezon-city",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve STT Fairview data center campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "synapse-olds",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Synapse Data Center (Olds) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "tbc-partners-cambois",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve TBC Partners Cambois data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "qts-cambois-blyth",
          "relationship": "separate_nearby_campuses",
          "reason": "TBC proposal on Factory Road is explicitly described as near the QTS former power-station campus; identical Cambois centroid is administrative only."
        }
      ]
    },
    {
      "source_record_id": "tcs-hypervault-hyderabad",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve TCS HyperVault AI data center campus, Bharat Future City (Hyderabad) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "terawulf-chesapeake-morgantown",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve TeraWulf Chesapeake Data Campus (Morgantown) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "terawulf-fluidstack-abernathy",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Abernathy HPC campus (TeraWulf and Fluidstack joint venture) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "terawulf-justified-data-hawesville",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve TeraWulf Justified Data campus (Hawesville) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "terawulf-lake-hawkeye",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve TeraWulf Lake Hawkeye data campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "terawulf-lake-mariner",
      "decision": "same_site_distinct_scope",
      "rationale": "Same TeraWulf Barker Lake Mariner campus, confirmed by identical August 2026 issuer results source. Source includes operating mining/HPC, CB-4 and CB-5; existing record is only CB-5 current construction.",
      "target_physical_site_stable_key": "epoch-ai:data-center:dd4bfd7c-adf8-5312-9a4a-f2728f1fe791",
      "flags": [
        "administrative_locator_not_project_geometry",
        "campus_and_phase_scopes_must_remain_separate"
      ]
    },
    {
      "source_record_id": "terawulf-muskie",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve TeraWulf Muskie Data Campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "terranova-campinas",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Terranova Campinas data centre campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "terranova-praia-grande",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Terranova Praia Grande data center campus (proposed) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "teton-digital-black-bear-swan-hills",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Teton Digital Black Bear power and data centre campus (Swan Hills) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "tract-buckeye",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Tract Buckeye data center park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "tract-morris-technology-park",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Morris Technology Park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "vantage-jhb1-sedenak",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ],
      "source_relations": [
        {
          "source_id": "bridge-my06-sedenak",
          "relationship": "separate_named_developments",
          "reason": "Bridge MY06 and Vantage JHB1 are separately named campuses in Sedenak Tech Park; identical park/locality coordinates are not evidence of co-location."
        }
      ]
    },
    {
      "source_record_id": "vantage-kul2-cyberjaya",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Vantage Data Centers Cyberjaya II campus (KUL2) as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "vantage-villanueva-de-gallego",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Vantage Data Centers Villanueva de Gállego campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "vermaland-la-osa-pinal-county",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve La Osa Energy Center (Vermaland), Pinal County as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "virtus-wustermark",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve VIRTUS Wustermark campus as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "wbs-power-baltic-data-center-campus",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve WBS Power Baltic Data Center Campus, Lublewo as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    },
    {
      "source_record_id": "wonder-valley-alberta",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve Wonder Valley AI data centre park (Alberta) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ]
    },
    {
      "source_record_id": "xai-colossus-2-memphis",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve xAI Colossus 2 (Memphis) as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ],
      "source_relations": [
        {
          "source_id": "xai-macrohardrr-southaven",
          "relationship": "separate_nearby_facilities",
          "reason": "Colossus 2 Memphis and MACROHARDRR Southaven are separately named facilities in Tennessee and Mississippi; nearby coordinates do not merge them."
        }
      ]
    },
    {
      "source_record_id": "xai-colossus-memphis",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve xAI Colossus 1 (Memphis) as an independent source record; its site locator does not itself establish a surveyed physical site.",
      "flags": [
        "source_site_point_not_surveyed_boundary"
      ]
    },
    {
      "source_record_id": "xai-macrohardrr-southaven",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve xAI MACROHARDRR data center (Southaven) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.",
      "flags": [
        "approximate_locator_not_boundary"
      ],
      "source_relations": [
        {
          "source_id": "xai-colossus-2-memphis",
          "relationship": "separate_nearby_facilities",
          "reason": "Colossus 2 Memphis and MACROHARDRR Southaven are separately named facilities in Tennessee and Mississippi; nearby coordinates do not merge them."
        }
      ]
    },
    {
      "source_record_id": "ytl-kulai-johor",
      "decision": "unique_site",
      "rationale": "No matching named development in the 201-project release. Preserve YTL Green Data Center Park, Kulai as an independent source record; its locality locator does not itself establish a surveyed physical site.",
      "flags": [
        "administrative_locator_not_project_geometry"
      ]
    }
  ]
}