{
  "input_sha256": "b4a6e8d278faadd906105ee62ca76d441cd9300a2905a0c24476d99e172527b5",
  "source_projections": {
    "cn-next-beijing-campus-osm": {
      "attribution": "OpenStreetMap contributors",
      "attribution_url": "https://www.openstreetmap.org/copyright",
      "content_hash": "9bb7017cb47f731e937e1fab1a81378eaed5536ac72cf426ad5f96f200efcb0c",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "coordinate_crs": "WGS84 longitude/latitude as provided by OpenStreetMap API",
      "date_semantics": "OSM version timestamp is a mapping edit date, not a construction or operation observation. Retrieval does not refresh physical status.",
      "id": "cn-next-beijing-campus-osm",
      "kind": "openstreetmap",
      "license": "ODbL-1.0",
      "license_url": "https://opendatacommons.org/licenses/odbl/1-0/",
      "osm_last_edited_at": "2022-05-21T04:12:15Z",
      "osm_way_id": 768393624,
      "osm_way_version": 3,
      "published_at": null,
      "publisher": "OpenStreetMap contributors",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-next/beijing-osm-phase3.json",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:41:43.384598+00:00",
      "source_family": "cn-beijing-information-port-no6",
      "source_url": "https://api.openstreetmap.org/api/0.6/way/768393624/full.json",
      "summary": "Named community-mapped Phase3 polygon supplies a representative point within the wider China Mobile International Information Port campus. The locator is not No6/C18 geometry.",
      "title": "OpenStreetMap named China Mobile International Information Port Phase3 area, way 768393624"
    },
    "cn-next-beijing-no6-design": {
      "attribution": "Beijing Public Resources Trading Service",
      "content_hash": "a6fc536dce1c02067d19b41098bdd77ead8f81670a4edfb1248d284f1cf709d8",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Earlier design procurement notice. Retained to expose the unresolved cardinal-direction conflict; it is not a status refresh.",
      "id": "cn-next-beijing-no6-design",
      "kind": "government_record",
      "license": "all-rights-reserved",
      "published_at": "2026-05-26",
      "publisher": "Beijing Public Resources Trading Service",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-next/beijing-no6-design.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:41:47.668763+00:00",
      "source_family": "cn-beijing-information-port-no6",
      "source_url": "https://ggzyfw.beijing.gov.cn/jyxxgcjszbjh/20260526/5546321.html",
      "summary": "Earlier official design notice places C18 southeast within Information Port; July and September notices place it northeast. Both identify No6/C18 at the same named Changping campus.",
      "title": "Beijing No6 design procurement plan correction"
    },
    "cn-next-beijing-no6-registration": {
      "attribution": "Beijing Public Resources Trading Service",
      "content_hash": "69873d7ebd80fa3527529c6b934917d4b921e2dcbf5808c5454548ac091158c1",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "July 9 project registration is historical identity and planned-scope context. Company internal project approvals do not establish government planning or construction permission.",
      "id": "cn-next-beijing-no6-registration",
      "kind": "government_record",
      "license": "all-rights-reserved",
      "published_at": "2026-07-09",
      "publisher": "Beijing Public Resources Trading Service",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-next/beijing-no6-registration.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:41:46.133391+00:00",
      "source_family": "cn-beijing-information-port-no6",
      "source_url": "https://ggzyfw.beijing.gov.cn/jylcgcjs/20260709/5616948.html",
      "summary": "Registration identifies No6/C18 within International Information Port, two data-center buildings, two power-center buildings and basement, with total planned floor area about 99,300 sqm.",
      "title": "Beijing China Mobile International Information Port No6 project registration"
    },
    "cn-next-beijing-no6-tender": {
      "attribution": "Beijing Public Resources Trading Service",
      "content_hash": "82a0dac5c1c39d762ae324bded3b3147f4309caac85ccbb7c528822f293f296f",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "September 1 is the explicit start of candidate public notice, following August 28 bid evaluation. Future service schedule September 1, 2026 to July 23, 2028 is not an observation of physical construction.",
      "id": "cn-next-beijing-no6-tender",
      "kind": "government_record",
      "license": "all-rights-reserved",
      "published_at": "2026-09-01",
      "publisher": "Beijing Public Resources Trading Service",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-next/beijing-no6-tender.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:41:44.973418+00:00",
      "source_family": "cn-beijing-information-port-no6",
      "source_observation_date": "2026-09-01",
      "source_url": "https://ggzyfw.beijing.gov.cn/jyxxzbhxrgs/20260901/5692101.html",
      "summary": "Official supervision procurement candidate notice confirms a live No6/C18 data-center development proposal inside China Mobile International Information Port. Procurement supports announced status.",
      "title": "Beijing International Information Port No6 supervision procurement candidates"
    },
    "cn-next-beijing-operator-address": {
      "attribution": "China Mobile",
      "content_hash": "820171a5561bbb3ccf1a3ad1236ab6355cb201631e23a6e4afb7cdaa727af366",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Undated contact address used for campus identity only; it establishes no No6 building or lifecycle stage.",
      "id": "cn-next-beijing-operator-address",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "China Mobile",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-next/beijing-operator-contact.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:43:29.810030+00:00",
      "source_family": "cn-beijing-information-port-no6",
      "source_url": "https://b2bjoy.10086.cn/cms/help/goods/zw/lxwm/index.jsp",
      "summary": "Operator contact page names International Information Port Phase3, G32 building, Manbai Road, Shahe, Changping, Beijing, independently corroborating the named mapped campus sector.",
      "title": "China Mobile JOY contact address at International Information Port Phase3"
    },
    "de-muc2-next-campus-location": {
      "attribution": "NTT DATA",
      "content_hash": "4d20ab3ef93f46c70d0125280b6264a90accb59ae7d56a585e348765e4ffae2d",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "address": "Landshuter Straße 7, 85716 Unterschleißheim, Germany",
        "buildings": [
          "A",
          "B"
        ],
        "campus_critical_it_capacity_mw": 14,
        "campus_server_space_m2": {
          "qualifier": "more_than",
          "value": 6300
        },
        "capacity_basis": "operator-published campus specification; not measured draw or AI deployment capacity",
        "connectivity": "carrier neutral; DE-CIX and cloud connectivity",
        "cooling": "chiller systems with free cooling and weather-dependent energy management",
        "observation_date": "undated current page accessed October 13; not used as status date",
        "on_site_substation_capacity_mva": 30,
        "substation_unit": "MVA; no MW conversion"
      },
      "id": "de-muc2-next-campus-location",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "NTT DATA",
      "raw_capture_file": "local_data/country-research-2026-10-13-de-muc2-next/ntt-munich2-location.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:46:33.161523+00:00",
      "source_family": "ntt_official",
      "source_url": "https://www.nttdata.com/en-us/services/global-data-centers/global-locations/emea/munich-data-centers/munich-2-data-center",
      "summary": "Operator identifies Munich 2 at Landshuter Straße 7, 85716 Unterschleißheim. It describes 6,300-plus square metres of server space across buildings A and B and 14 MW critical IT load. Figures apply to the campus, not the AI Factory deployment.",
      "title": "NTT Munich 2 campus address and specifications"
    },
    "de-muc2-next-live-20261007": {
      "attribution": "NTT DATA",
      "content_hash": "e908856309ea73331278cb0f805bd13c0065dec21c8372d36a83029b44316188",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "ai_factory_capacity_mw": null,
        "ai_factory_opened": "2026-10-07",
        "campus_operation_observation_date": "2026-10-07",
        "campus_status": "operational",
        "gpu_count": null,
        "not_established": [
          "campus originally opened in 2026",
          "new campus building construction",
          "all campus power allocated to AI",
          "exact deployment quantity"
        ],
        "physical_scope": "hosted AI validation environment inside existing Munich 2 Data Center",
        "precise_hall_or_building": null,
        "reported_platforms": [
          "NVIDIA Blackwell GPUs",
          "NVIDIA Spectrum-X Ethernet",
          "NVIDIA AI Enterprise",
          "Dell AI Factory with NVIDIA"
        ],
        "reported_workload": "enterprise/public-sector AI validation and use-case testing"
      },
      "id": "de-muc2-next-live-20261007",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-10-07",
      "publisher": "NTT DATA",
      "raw_capture_file": "local_data/country-research-2026-10-13-de-muc2-next/ntt-munich2-live-20261007.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:46:32.185979+00:00",
      "source_family": "ntt_official",
      "source_url": "https://www.nttdata.com/en-us/news/2026/ntt-data-opens-ai-factory-munich",
      "summary": "NTT announces its AI Factory opened on October 7 inside the live Munich 2 Data Center. This directly confirms current data-centre operation. The new opening concerns a hosted AI validation environment, not a newly built campus or all 14 MW of newly deployed AI capacity.",
      "title": "NTT DATA opens AI Factory in the live Munich 2 Data Center"
    },
    "de-muc2-next-opening-20170518": {
      "attribution": "NTT Communications",
      "content_hash": "d5f5640f328864f0646fbb8ee7ebf762e1780a0cac703daec5c25d213e5e283f",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "historical_initial_racks": 1100,
        "historical_initial_server_space_m2": 2800,
        "historical_operator": "e-shelter, an NTT Communications company",
        "historical_values_not_current_capacity": true,
        "original_campus_opening": "2017-05-18"
      },
      "id": "de-muc2-next-opening-20170518",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2017-05-18",
      "publisher": "NTT Communications",
      "raw_capture_file": "local_data/country-research-2026-10-13-de-muc2-next/ntt-munich2-opening-20170518.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:46:33.035587+00:00",
      "source_family": "ntt_official",
      "source_url": "https://www.ntt.com/en/about-us/press-releases/news/article/2017/0518.html",
      "summary": "NTT states Munich 2 opened effective immediately on May 18, 2017 in Unterschleißheim under e-shelter management. This historical milestone keeps the 2026 hosted AI Factory opening separate from the campus opening.",
      "title": "NTT Communications announces original Munich 2 opening"
    },
    "de-muc2-next-osm-address": {
      "attribution": "OpenStreetMap contributors; Nominatim",
      "content_hash": "94a3747313b29c48d176c5e0492dddd2047ac3e6f5a9ef3002e58862409827f3",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "address": {
          "country_code": "de",
          "house_number": "7",
          "postcode": "85716",
          "road": "Landshuter Straße",
          "town": "Unterschleißheim"
        },
        "operator_tag": "absent; identity is exact-address bridge, not inferred OSM operator label",
        "osm_copyright_url": "https://www.openstreetmap.org/copyright",
        "osm_id": 452201257,
        "osm_type": "way",
        "scope": "constituent address-tagged building reference used as campus locator",
        "source_point": [
          11.5739274,
          48.2927153
        ]
      },
      "id": "de-muc2-next-osm-address",
      "kind": "map",
      "license": "ODbL-1.0",
      "published_at": null,
      "publisher": "OpenStreetMap contributors; Nominatim",
      "raw_capture_file": "local_data/country-research-2026-10-13-de-muc2-next/osm-address-search.json",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:46:55.595632+00:00",
      "source_family": "openstreetmap",
      "source_url": "https://nominatim.openstreetmap.org/search?q=Landshuter+Stra%C3%9Fe+7%2C+85716+Unterschlei%C3%9Fheim%2C+Germany&format=jsonv2&addressdetails=1&polygon_geojson=1&limit=5",
      "summary": "Address query returns industrial building way 452201257 with street, number, postcode and town matching NTT’s primary campus address. The supplied point is retained only as a campus address locator, not an AI Factory room or legal campus boundary.",
      "title": "OpenStreetMap exact-address building locator for Landshuter Straße 7"
    },
    "de-muc2-next-osm-way": {
      "attribution": "OpenStreetMap contributors",
      "content_hash": "bd4c0393ff9c4f3ab0d5e070b8b5e9c8f79f98f157ba041178edc08ba778e32b",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "feature_updated_at": "2025-12-15T22:38:37Z",
        "osm_id": 452201257,
        "osm_type": "way",
        "status_inference_from_osm": false,
        "tags": {
          "addr:city": "Unterschleißheim",
          "addr:country": "DE",
          "addr:housenumber": "7",
          "addr:postcode": "85716",
          "addr:street": "Landshuter Straße",
          "building": "industrial"
        },
        "version": 5
      },
      "id": "de-muc2-next-osm-way",
      "kind": "map",
      "license": "ODbL-1.0",
      "published_at": null,
      "publisher": "OpenStreetMap contributors",
      "raw_capture_file": "local_data/country-research-2026-10-13-de-muc2-next/osm-way-452201257-full.xml",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:47:26.872638+00:00",
      "source_family": "openstreetmap",
      "source_url": "https://api.openstreetmap.org/api/0.6/way/452201257/full",
      "summary": "Raw OSM API independently returns way 452201257 with industrial-building tag and exact NTT campus address. Community feature version 5 dates to December 15, 2025; edit time is not an operation or construction observation.",
      "title": "OpenStreetMap way 452201257 raw address tags and members"
    },
    "europe-next-datum-campus": {
      "attribution": "Datum Datacentres",
      "content_hash": "f2c0a6628a62f6c52ecd35923d0b85c0c4feeec7d9b82bd75e96c81372aae1b5",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "address": "Cody Technology Park, Farnborough, Hampshire GU14 0LX, United Kingdom",
        "construction_start": "2025-12",
        "construction_start_precision": "month",
        "hall_count_conflict": "overview says two new halls; technical specification says four. No hall-count assertion selected.",
        "planned_floors": 2,
        "planned_racks": 1200
      },
      "id": "europe-next-datum-campus",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Datum Datacentres",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/datum-farnborough.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:39:41.478872+00:00",
      "source_family": "datum_official",
      "source_url": "https://www.datum.co.uk/data-centres/london-south-east/",
      "summary": "Operator locates its Farnborough facilities in Cody Technology Park and explicitly describes FRN2 as linked adjacent to FRN1. Its footer publishes the exact Google Maps campus link selected for the locator.",
      "title": "Datum London and South East campus: FRN1 and adjacent FRN2"
    },
    "europe-next-datum-frn2-20260904": {
      "attribution": "Datum Datacentres",
      "content_hash": "d9a5ded48f44df1a838d6b4fe88ed4c7ad475a01c4aee70ef6d20b4c42e5f00a",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "planned_go_live": "2027",
        "reported_stage": "under_construction",
        "roof": "construction beginning; shell completion not established"
      },
      "id": "europe-next-datum-frn2-20260904",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-04",
      "publisher": "Datum Datacentres",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/datum-frn2-20260904.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:39:20.474070+00:00",
      "source_family": "datum_official",
      "source_url": "https://www.datum.co.uk/insights/news/frn2-construction-update/",
      "summary": "Operator reports FRN2 steel frame erected, stair steelwork and precast units nearly in place, architectural metalwork fitted and roof construction beginning. September 4 is a present-tense progress observation, not an invented groundbreak date.",
      "title": "Datum FRN2 construction progress"
    },
    "europe-next-datum-map": {
      "attribution": "Google Maps; campus link selected by Datum",
      "content_hash": "d6aeeeb159033d17c74cac26093a8c14d22c5ee6237867f3060ee221ec2f3140",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "coordinate_pointer": "redirect URL !8m2!3d51.2803199!4d-0.7967507; raw Maps response also gives feature coordinate pair",
        "feature_id": "0x48742b75438fb84b:0xdf9f3eac758036d3",
        "feature_label": "Datum Datacentres",
        "latitude": 51.2803199,
        "longitude": -0.7967507,
        "operator_link": "https://maps.app.goo.gl/EFidiMnMxGXZZE2j9",
        "rejected_viewport_longitude": -0.7993256,
        "source_authority": "secondary mapping selected by primary operator"
      },
      "id": "europe-next-datum-map",
      "kind": "map",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Google Maps; campus link selected by Datum",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/datum-campus-map.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:40:10.749652+00:00",
      "source_family": "google_maps_operator_selected_locator",
      "source_url": "https://maps.app.goo.gl/EFidiMnMxGXZZE2j9",
      "summary": "The exact Maps link published by Datum resolves to its named Datum Datacentres feature at -0.7967507,51.2803199. Feature coordinates are used, not the different viewport longitude. This is a parent-campus marker, not an FRN2 footprint.",
      "title": "Datum-selected Google Maps campus feature"
    },
    "europe-next-datum-specifications": {
      "attribution": "Datum Datacentres",
      "content_hash": "ede127fbec06976d39ed8a96d64b89324c37515ea35df4a77e60a7a6091c31c8",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "certification_scope": "design/marketing claims on planned FRN2; achieved certification not independently verified",
        "planned_average_density_kw_per_rack": 3.5,
        "planned_density_up_to_kw_per_rack": 30,
        "planned_racks": 1200,
        "planned_technical_space_sq_ft": 22000,
        "total_mw": "not supplied and not derived from racks times density"
      },
      "id": "europe-next-datum-specifications",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Datum Datacentres",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/datum-frn-specifications.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:40:10.250539+00:00",
      "source_family": "datum_official",
      "source_url": "https://www.datum.co.uk/data-centres/london-south-east/technical-specifications/",
      "summary": "FRN2 is described as the next Farnborough development linked adjacent to FRN1, with 1,200 footprints across two floors and planned 22,000 square feet of technical space. The four-hall bullet conflicts with the overview’s two halls; retain the conflict and no inferred total MW.",
      "title": "Datum FRN2 planned technical specification"
    },
    "europe-next-datum-visit-20260925": {
      "attribution": "Datum Datacentres",
      "content_hash": "9de513f6b908855b6b35c9fa7cb32e06f1eb862af8405e70616f83111753e2ad",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "publication_is_visit_date": false,
        "visit_date_precision": "relative week; exact day unknown"
      },
      "id": "europe-next-datum-visit-20260925",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-25",
      "publisher": "Datum Datacentres",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/datum-mp-visit-20260925.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:40:10.250476+00:00",
      "source_family": "datum_official",
      "source_url": "https://www.datum.co.uk/insights/news/alex-baker-mp-farnborough-tour/",
      "summary": "The September 25 report says the MP visited the ongoing FRN2 construction last week and identifies FRN2 as the second facility on its Farnborough campus. The visit lacks an exact day; use September 4 for the precise physical observation rather than relabelling publication as visit date.",
      "title": "Datum reports MP visit to ongoing FRN2 construction"
    },
    "europe-next-kao-esg-manchester": {
      "attribution": "Kao Data",
      "content_hash": "d0356acba5a4bd1c0c8cc6468dfa2d4896fd3f9ec54e249a91c7a4dccfdc8522",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "physical_stage": "unspecified development",
        "publication_not_physical_observation": true,
        "release_date_source_id": "europe-next-kao-esg-publication",
        "report_period": "financial year 2025–26"
      },
      "id": "europe-next-kao-esg-manchester",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Kao Data",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/kao-esg-page7.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:39:21.030410+00:00",
      "source_family": "kao_data_official",
      "source_url": "https://kao-data.paperturn-view.com/kao-data-esg-report-25-26-sp?p=7&pid=ODk8964505",
      "summary": "Report overview describes the Manchester facility as being developed, without a specific construction milestone or dated physical observation. It does not resolve the admission freshness hold.",
      "title": "Kao Data ESG report page 7 portfolio overview"
    },
    "europe-next-kao-esg-publication": {
      "attribution": "Kao Data",
      "content_hash": "16aa0bf838937e9fc570350b7e0f18858606ca981d85e3a229836964185a7aad",
      "content_hash_scope": "sha256_exact_response_bytes",
      "id": "europe-next-kao-esg-publication",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-10-06",
      "publisher": "Kao Data",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/kao-esg-release-20261006.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:39:20.589134+00:00",
      "source_family": "kao_data_official",
      "source_url": "https://kaodata.com/building-a-sustainable-future-introducing-our-2025-26-esg-report/",
      "summary": "Dated announcement publishes the new ESG report. Report availability is new evidence, but publication alone does not establish a new physical construction observation at Manchester.",
      "title": "Kao Data releases 2025–26 ESG report"
    },
    "europe-next-pure-lon01b2-20260902": {
      "attribution": "Glencar Construction",
      "content_hash": "9d7d67cdbfb4146f255e27cab626c923a51fd1a867dc3650a7a3659befa6a406",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "cooling_design": "closed-loop liquid cooling",
        "current_operational_scope": "existing campus; does not establish B2 completion or operation",
        "delivery_scope": [
          "piling and foundations",
          "underground services",
          "structural frame",
          "connections to East Cold Shell",
          "slabs",
          "stair cores",
          "envelope and roofing"
        ],
        "planned_completion": "2029-Q2",
        "planned_extension_area_m2": {
          "qualifier": "more_than",
          "value": 23000
        },
        "planned_facility_power_mw": 70,
        "planned_total_campus_power_mw": 90,
        "power_scope": "source says facility/campus capacity; IT-versus-utility not explicit in this report; not additive",
        "project": "LON01B2 West Cold Shell",
        "workload_design": [
          "AI inference",
          "cloud"
        ]
      },
      "id": "europe-next-pure-lon01b2-20260902",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-02",
      "publisher": "Glencar Construction",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/pure-lon01b2-glencar-20260902.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:39:20.940585+00:00",
      "source_family": "glencar_official",
      "source_url": "https://www.glencar.com/news-articles/glencar-starts-piling-on-final-build-phase-of-pure-dcs-1bn-brent-cross-data-centre-campus/",
      "summary": "Contractor reports piling underway for B2 West Cold Shell, with concurrent construction and fit-out across the live Brent Cross campus. The exact commencement day is not supplied; September 2 is the dated contemporary work report.",
      "title": "Glencar begins piling for Pure DC LON01B2 West Cold Shell"
    },
    "europe-next-wustermark-grid-20261007": {
      "attribution": "50Hertz Transmission GmbH",
      "content_hash": "cdda7a5f90076e5c1f176d080377fd5f812efa1ff854f91c283b08a5aaa0f615",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "energized_connection_confirmed": false,
        "exact_start_date": "not stated; construction commenced as reported October 7",
        "physical_scope": "50Hertz Wustermark substation expansion",
        "planned_completion": "2028",
        "planned_grid_connection_mw": 300,
        "planned_grid_voltage_kv": 380,
        "planned_new_switchgear_bays": 2,
        "planned_reliability": "N-1 secure",
        "planned_second_bus_coupler": true,
        "planned_spare_bays": 1
      },
      "id": "europe-next-wustermark-grid-20261007",
      "kind": "utility_record",
      "license": "all-rights-reserved",
      "published_at": "2026-10-07",
      "publisher": "50Hertz Transmission GmbH",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/wustermark-50hertz-20261007.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:39:20.294056+00:00",
      "source_family": "50hertz_official",
      "source_url": "https://www.50hertz.com/Portals/1/Dokumente/Medien/Pressemitteilungen/2026/20261007_Pressemitteilung_Baustart_UW_Wustermark_EN.pdf",
      "summary": "Utility reports current construction of the existing Wustermark grid substation expansion, explicitly supporting VIRTUS. This is upstream power-infrastructure work and does not establish a new physical stage at the data-centre buildings.",
      "title": "50Hertz begins Wustermark substation expansion"
    },
    "europe-next-wustermark-grid-project": {
      "attribution": "50Hertz Transmission GmbH",
      "content_hash": "9d4fcab23baac3e0de83a0448056fbdf49fbee6b24a7d8d4d8ff62e463e9b9d6",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "conflict": "October 7 PDF gives 300 MW; this undated page says 300 MVA",
        "current_page_stage": "page still describes planned start after approval; dated October 7 PDF supplies later actual upstream works",
        "planned_connected_apparent_power_mva": 300
      },
      "id": "europe-next-wustermark-grid-project",
      "kind": "utility_record",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "50Hertz Transmission GmbH",
      "raw_capture_file": "local_data/country-research-2026-10-13-europe-next/wustermark-50hertz-project.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:39:22.590882+00:00",
      "source_family": "50hertz_official",
      "source_url": "https://www.50hertz.com/de/Netz/Netzausbau/ProjekteanLand/UmspannwerkWustermark/",
      "summary": "Utility identifies the connected customer as VIRTUS Germany Holdco GmbH. Its undated project page gives 300 MVA, while the October 7 press release gives 300 MW. Retain both units without conversion or forced reconciliation.",
      "title": "50Hertz Wustermark project page"
    },
    "jp-next-ishikari-bbt-oct": {
      "attribution": "BroadBand Tower / Tokyu Land / GMO Internet",
      "content_hash": "2450ee26be0c226bfcb07b937fd463e2a910da5f2d2435c8ccc68bd61e8f8adb",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "October 7 publication explicitly repeats August 1 host opening. Planned 2026 GMO service remains a target.",
      "id": "jp-next-ishikari-bbt-oct",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-10-07",
      "publisher": "BroadBand Tower / Tokyu Land / GMO Internet",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/ishikari-bbt-oct.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:42:53.154467+00:00",
      "source_family": "broadband_tower_official",
      "source_url": "https://www.bbtower.co.jp/ir/pr/2026/1007_004558/",
      "summary": "Confirms host facility began service August 1. GMO plans to use part of BroadBand Tower Ishikari Shinko floor with operation targeted within 2026; future tenant deployment is not a second physical site or achieved GPU commissioning.",
      "title": "GMO, Tokyu and BroadBand Tower plan GPU deployment inside operating Ishikari DC"
    },
    "jp-next-ishikari-moj-parcel": {
      "attribution": "Japan Ministry of Justice registry map data; AIGID GeoJSON conversion. Catalog license CC BY: http://www.opendefinition.org/licenses/cc-by/",
      "content_hash": "d9b69bf72568ce9dbbf7d4ab8d379c05dca3073ce4b61ea80f4eac5ee33f2545",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "2026 dataset release, catalog resource created August10. Individual parcel survey/validity day unknown; publication date left null. Geometry is not a status observation.",
      "geometry_facts_file": "sources/research-countries-2026-10-13-jp-next-geometry-facts.json",
      "geometry_facts_sha256": "f34a1402d3c5ddf366ae8a780adb3488db5bea331eebeea28da2f18f7bd85fb7",
      "id": "jp-next-ishikari-moj-parcel",
      "kind": "map",
      "license": "CC-BY",
      "published_at": null,
      "publisher": "AIGID; source registry map data by Japan Ministry of Justice",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/ishikari-moj-2026.geojson",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:44:52.845037+00:00",
      "source_family": "moj_aigid_cadastral",
      "source_url": "https://gsic-opendata.s3.ap-northeast-1.amazonaws.com/aigid/aigid-moj/2026/01/aigid-moj-01235/01235_%E7%9F%B3%E7%8B%A9%E5%B8%82_%E5%85%AC%E5%85%B1%E5%BA%A7%E6%A8%9912%E7%B3%BB_%E7%AD%86R_2026.geojson",
      "summary": "Unique exact-address parcel matches Tokyu published site. Selected feature H000000005, map01235_2022_1; interior centroid141.298122,43.178556 locates campus only.",
      "title": "MOJ / AIGID 2026 Ishikari cadastral geometry: Shinko Chuo 1-chome 722-1"
    },
    "jp-next-ishikari-opening": {
      "attribution": "Ishikari Renewable Energy Data Center No.1 LLC / Flower Communications via PR TIMES",
      "content_hash": "ce6e1d177c8d356af81cb07e53ecd1d46fba5af753dbf24c2a8c11c463939f44",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Published August 5; explicit achieved service commencement August 1 is the status observation date. March 27 is earlier building completion, not the operational date.",
      "id": "jp-next-ishikari-opening",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-08-05",
      "publisher": "Ishikari Renewable Energy Data Center No.1 LLC / Flower Communications via PR TIMES",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/ishikari-opening.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:43:28.505959+00:00",
      "source_family": "ishikari_dc_project_primary",
      "source_url": "https://prtimes.jp/main/html/rd/p/000000015.000119810.html",
      "summary": "Owner announcement confirms fit-out completion and services to data halls started August 1; IOWN connection to Tokyo also completed. Facility has six halls. Operational does not mean all tenant equipment is installed or fully occupied.",
      "title": "Ishikari Renewable Energy Data Center No.1 begins service on August 1"
    },
    "jp-next-ishikari-tokyu-april-pdf": {
      "attribution": "Tokyu Land Corporation",
      "content_hash": "998fa5ec57f2af4c615bb14c0957930122232f8b94e52074abf3079a6d4a29a0",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "April 22 announcement describes March 27 completion; used for location identity and context, not recent operational status. Page 4 visually reviewed.",
      "id": "jp-next-ishikari-tokyu-april-pdf",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-04-22",
      "publisher": "Tokyu Land Corporation",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/ishikari-tokyu-april-pdf.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:42:32.934215+00:00",
      "source_family": "tokyu_land_official",
      "source_url": "https://www.tokyu-land.co.jp/news/uploads/cb0f63570376678edc4208c8f11328240a89118a.pdf",
      "summary": "PDF page 4 gives Ishikari Shinko Chuo 1-chome 722-1 parcel address, six halls and March 27 completion. This address supplies the identity bridge to the cadastral parcel.",
      "title": "Tokyu announces completion of Ishikari Renewable Energy Data Center No.1; exact site parcel"
    },
    "jp-next-ishikari-tokyu-site": {
      "attribution": "Tokyu Land Corporation",
      "content_hash": "f063e27d4a9efbe89732aee88493ba401822d4548131fc41dd57f9042aa204c1",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Undated marketing page, retrieved October 13. Do not use retrieval date as status date.",
      "id": "jp-next-ishikari-tokyu-site",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Tokyu Land Corporation",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/ishikari-tokyu-site.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:42:49.665418+00:00",
      "source_family": "tokyu_dc_official",
      "source_url": "https://www.tokyu-dc.com/dc_ishikari.html",
      "summary": "Undated facility page gives site area 14,215 square metres, six halls and indicative electrical specifications. It still displays a March 2026 completion forecast; later dated releases establish achieved milestones.",
      "title": "Ishikari Renewable Energy Data Center No.1 property specification"
    },
    "jp-next-kobe-tunnel-announcement": {
      "attribution": "Getworks / Mitsui Fudosan / Kumagai Gumi",
      "content_hash": "5e6616dc48db85d24b051e17873a3471d84f949d328d313d12b2487134990c12",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "October 6 announcement; September 4 lease-award decision. No achieved physical construction or commissioning date selected.",
      "id": "jp-next-kobe-tunnel-announcement",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-10-06",
      "publisher": "Getworks / Mitsui Fudosan / Kumagai Gumi",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/kobe-tunnel-announcement.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:46:50.817939+00:00",
      "source_family": "getworks_official",
      "source_url": "https://www.getworks.co.jp/news/attachments/kobe-underground-data-center/release-20261006-5e6616dc48db.pdf",
      "summary": "Named Kobe project uses about 3 km of former conveyor tunnel leased following September 4 award. Initial service planned end-2027 and eventual receiving capacity up to 20 MW. Development announcement does not establish physical installation.",
      "title": "Mitsui Fudosan, Kumagai Gumi and Getworks announce Kobe underground DC"
    },
    "jp-next-miyagi-bbix": {
      "attribution": "BBIX / BBSakura Networks / Getworks",
      "content_hash": "762a735288d07d5d2067801c2e78a9019831545bd72ea76c99fb347f2fed9706",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Publication September 30; explicit achieved network-node opening September 1. No publication-to-observation substitution.",
      "id": "jp-next-miyagi-bbix",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-30",
      "publisher": "BBIX / BBSakura Networks / Getworks",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/miyagi-bbix.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:45:37.225624+00:00",
      "source_family": "bbix_official",
      "source_url": "https://www.bbix.net/information/press/2026-09-30-2/",
      "summary": "September 30 release confirms OCX node opened September 1 at named Miyagi AI Data Center. This supports an operating network service at the facility, without proving every GPU container commissioned. Location remains municipality-only.",
      "title": "BBIX and Getworks opened Miyagi AI DC OCX node September 1"
    },
    "jp-next-miyagi-completion": {
      "attribution": "Getworks via PR TIMES",
      "content_hash": "5e943c9a980b6beae0de228278ee6c9f98638c2814b8f6058cacbbf9fe6824e7",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "July 24 is explicit completion date. July 31 service plan is not alone proof of achieved operations.",
      "id": "jp-next-miyagi-completion",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-07-24",
      "publisher": "Getworks via PR TIMES",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/miyagi-completion.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:45:34.262761+00:00",
      "source_family": "getworks_official",
      "source_url": "https://prtimes.jp/main/html/rd/p/000000036.000141706.html",
      "summary": "Joint development with Tohoku Electric on unused company land in Shichigahama. Explicit completion today; July 31 service commencement was still prospective on this publication date. Exact address is absent.",
      "title": "Miyagi AI Data Center completed July 24; housing services planned July 31"
    },
    "jp-next-miyagi-tohoku-summary": {
      "attribution": "Tohoku Electric Power / Getworks",
      "content_hash": "b0e9b91d135d081bc9d85a152379482b57ead984fe6b1c13725d83fc34b79795",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Deck dated July 24 and gives same-day facility completion. Future cooling and network upgrades remain planned.",
      "id": "jp-next-miyagi-tohoku-summary",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-07-24",
      "publisher": "Tohoku Electric Power / Getworks",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-next/miyagi-tohoku-summary.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T17:45:42.817177+00:00",
      "source_family": "tohoku_epco_official",
      "source_url": "https://www.tohoku-epco.co.jp/news/normal/__icsFiles/afieldfile/2026/07/24/a_1248900.pdf",
      "summary": "Primary four-page deck confirms July 24 completion but lists location only as Shichigahama, Miyagi. Receiving capacity is 50 kW per container and augmentable; it does not establish whole-site IT capacity.",
      "title": "Miyagi AI Data Center housing service and facility specifications"
    }
  },
  "update": {
    "additions": [
      {
        "context_source_ids": [
          "cn-next-beijing-no6-registration",
          "cn-next-beijing-no6-design",
          "cn-next-beijing-operator-address"
        ],
        "country": "China",
        "country_iso_a2": "CN",
        "distinctness_review": "Reviewed 419 projects, 395 sites and all 231 original imported records. No Beijing/Changping/International Information Port project or source alias occurs. Existing CN records are Haidong Phase2, Shaotang Shaoguan and Guizhou B5/B6. Nearest existing site is LG Uplus Paju AIDC, 945.43km away. No6/C18 is one development within one campus; phases mapped in OSM are not extra projects or sites.",
        "locator": {
          "authority": "community_mapped",
          "geometry": {
            "coordinates": [
              116.2297028,
              40.14536515
            ],
            "type": "Point"
          },
          "identity_review": "Official No6/C18 notices identify China Mobile International Information Port in Changping at the North Sixth Ring / Badaling Expressway junction. OSM way768393624 is explicitly named China Mobile International Information Port Phase3; the operator contact page corroborates Phase3 at Manbai Road, Shahe, Changping. Point is the arithmetic bounding-box center of that polygon and is verified inside it. The May26 official design notice says southeast C18 whereas July9/September1 official notices say northeast; neither direction is resolved by this marker. OSM Phase6 is not asserted to be No6 parcel.",
          "method": "openstreetmap_named_phase3_polygon_bbox_center_verified_inside_polygon",
          "precision": "Representative marker inside the existing mapped Phase3 sector of China Mobile International Information Port. Locates the wider named campus only; it does not locate No6/C18, a new data-center building, a parcel boundary, or the full-campus centroid.",
          "scope": "campus_locator",
          "scope_class": "community_mapped_named_existing_campus_sector_representative_point",
          "source_id": "cn-next-beijing-campus-osm",
          "uncertainty_reason": "Community mapping gives no measured positional accuracy. Offset from the existing Phase3 marker to No6/C18 is unknown; numeric precision is arithmetic/source precision, not survey accuracy."
        },
        "name": "China Mobile Beijing International Information Port No6 / C18 Data Center Development",
        "physical_site_stable_key": "curated:china-mobile-beijing-international-information-port",
        "project_stable_key": "curated:china-mobile-beijing-international-information-port:no6-c18-data-center-development",
        "roles": [
          {
            "party": "China Mobile",
            "relationship_scope": "intended",
            "role": "operator",
            "source_id": "cn-next-beijing-no6-registration"
          }
        ],
        "scoped_project_details": {
          "IT_power_MW": null,
          "No6_exact_parcel_geometry_established": false,
          "aliases": [
            "中国移动京津冀（北京）国际信息港6号地数据中心项目",
            "No6 land / C18 data center"
          ],
          "design_notice_total_floor_area_sqm": 99270,
          "floor_area_rounding_note": "May design notice 99,270sqm differs from rounded July registration 99,300sqm; no actual completed area inferred.",
          "planned_above_ground_floor_area_sqm_approx": 84900,
          "planned_below_ground_floor_area_sqm_approx": 14400,
          "planned_building_scope": "Two data-center buildings, two power-center buildings and basement; outdoor works included.",
          "planned_outdoor_works_area_sqm_approx": 30000,
          "planned_total_floor_area_sqm_approx": 99300,
          "project_registration_number": "S110000A001044405",
          "status_date_scope": "Dated procurement public notice; not first announcement or construction observation.",
          "supervision_engineering_number": "F0JL202600111",
          "supervision_transaction_number": "S110000A001044405002"
        },
        "site_name": "China Mobile International Information Port, Beijing",
        "status": {
          "as_of": "2026-09-01",
          "source_id": "cn-next-beijing-no6-tender",
          "summary": "Official supervision procurement candidate notice dated September 1 confirms the No6/C18 development. Two planned data-center buildings plus associated power buildings are one project at the existing campus. Procurement and scheduled service dates do not establish physical works or a government construction permission.",
          "value": "announced"
        },
        "successor_review": "Reviewed official September1 procurement notice and project registration on October13. A later September9 supervision award is indexed in secondary mirrors but its primary page was not recovered; it would remain procurement evidence. No verified later physical start, completion, operation, cancellation or granted development/building permit found. OSM commercial/construction tags and version dates are not lifecycle evidence."
      },
      {
        "context_source_ids": [
          "europe-next-datum-campus",
          "europe-next-datum-visit-20260925",
          "europe-next-datum-specifications"
        ],
        "country": "United Kingdom",
        "country_iso_a2": "GB",
        "distinctness_review": "No Datum, FRN1, FRN2, Cody Technology Park or Farnborough named project occurs in the 419-project base. Nearest recorded project is Iron Mountain LON-3 about 29.36 km away. FRN2 is one new project at one previously uncatalogued Datum campus; existing FRN1 is locator context, not another addition.",
        "locator": {
          "authority": "compiled_reference",
          "geometry": {
            "coordinates": [
              -0.7967507,
              51.2803199
            ],
            "type": "Point"
          },
          "horizontal_uncertainty_metres": null,
          "identity_review": "Datum states FRN2 is linked adjacent to FRN1 at its Farnborough campus and publishes the exact Maps link in the footer. That link resolves to the named Datum Datacentres feature. Source -0.7967507,51.2803199 is distinct from viewport longitude -0.7993256.",
          "method": "operator_selected_google_maps_feature_coordinates",
          "precision": "Google Maps feature for Datum Datacentres selected by the operator. Parent campus marker only; not a surveyed FRN2 point, new-building centroid, footprint or legal boundary.",
          "scope": "campus_locator",
          "scope_class": "operator_selected_existing_facility_marker_as_parent_campus_locator",
          "source_id": "europe-next-datum-map",
          "uncertainty_reason": "No measured positional accuracy or FRN2 boundary is published. Source decimal digits are retained without an accuracy claim."
        },
        "name": "Datum FRN2 Data Centre Building",
        "physical_site_stable_key": "curated:datum-farnborough-campus",
        "project_stable_key": "curated:datum-farnborough-campus:frn2-building",
        "roles": [],
        "site_name": "Datum Farnborough Campus",
        "status": {
          "as_of": "2026-09-04",
          "source_id": "europe-next-datum-frn2-20260904",
          "summary": "Operator reports frame erected, stair/precast and architectural metalwork installation, and roof construction beginning. This is a dated current work report; completed shell, fit-out, commissioning and operation are not established.",
          "value": "under_construction"
        },
        "successor_review": "September 25 report still calls FRN2 construction ongoing but dates the visit only as last week. Retain exact September 4 progress observation. Current operator site targets 2027 go-live, not achieved operation."
      },
      {
        "context_source_ids": [
          "de-muc2-next-campus-location",
          "de-muc2-next-opening-20170518",
          "de-muc2-next-osm-way"
        ],
        "country": "Germany",
        "country_iso_a2": "DE",
        "distinctness_review": "No NTT Munich 2/Unterschleissheim/Landshuter named campus occurs in the 419-project baseline. Existing Portus MUC2 is a different operator in Kirchheim at Marsstraße 5, about 20.76 km away; it is not an alias. Nearest existing site is Deutsche Telekom Industrial AI Cloud, Munich Tucherpark about 15.68 km away. Add one campus and one campus project; AI Factory is a hosted use, not another physical site.",
        "locator": {
          "authority": "community_mapped",
          "geometry": {
            "coordinates": [
              11.5739274,
              48.2927153
            ],
            "type": "Point"
          },
          "horizontal_uncertainty_metres": null,
          "identity_review": "NTT official campus page names Landshuter Straße 7, 85716 Unterschleißheim. Nominatim and raw OSM way 452201257 match all address components. OSM has no operator/name tag, so identity rests on the explicit exact-address match; community edits do not establish status.",
          "method": "nominatim_osm_way_address_point_matched_to_operator_campus_address",
          "precision": "Source-supplied reference point for OSM industrial building way 452201257, whose street, house number, postcode and town match the operator’s Munich 2 address. Campus locator only; not a verified AI Factory hall, building A/B allocation, entrance, legal parcel or campus boundary.",
          "scope": "campus_locator",
          "scope_class": "exact_address_matched_community_building_point_as_campus_locator",
          "source_id": "de-muc2-next-osm-address",
          "uncertainty_reason": "No measured horizontal accuracy, current imagery inspection or exact AI deployment footprint. Numerical precision does not imply surveyed accuracy."
        },
        "name": "NTT Munich 2 Operating Campus",
        "physical_site_stable_key": "curated:ntt-munich2-unterschleissheim-campus",
        "project_stable_key": "curated:ntt-munich2-unterschleissheim-campus:operating-campus",
        "roles": [
          {
            "party": "NTT Global Data Centers",
            "relationship_scope": "current",
            "role": "operator",
            "source_id": "de-muc2-next-live-20261007"
          }
        ],
        "site_name": "NTT Munich 2 Data Center (MUC2)",
        "status": {
          "as_of": "2026-10-07",
          "source_id": "de-muc2-next-live-20261007",
          "summary": "NTT’s October 7 announcement explicitly places the newly opened AI Factory inside its live Munich 2 Data Center. Confirms current operation of the existing campus; original campus opening was May 18, 2017. No claim that a new campus or all campus capacity opened in October 2026.",
          "value": "operational"
        },
        "successor_review": "October 7 primary announcement describes live production data-center operation and an achieved AI Factory opening that day. Current operator facility page corroborates campus address and operating service offering. Historical 2017 campus opening is preserved independently."
      },
      {
        "context_source_ids": [
          "jp-next-ishikari-tokyu-april-pdf",
          "jp-next-ishikari-bbt-oct",
          "jp-next-ishikari-tokyu-site"
        ],
        "country": "Japan",
        "country_iso_a2": "JP",
        "distinctness_review": "No Ishikari, Tokyu, ISRD or Flower facility occurs among395baseline sites/419projects or231original records. Nearest baseline site is SoftBank Tomakomai about65.5km away. One physical facility; BroadBand Tower tenant floor and prospective GMO deployment are nested uses, not extra sites.",
        "locator": {
          "authority": "compiled_reference",
          "geometry": {
            "coordinates": [
              141.298122,
              43.178556
            ],
            "type": "Point"
          },
          "identity_review": "Tokyu April22 PDF page4 specifies Ishikari Shinko Chuo1-chome722-1.2026 MOJ/AIGID collection has exactly one feature for municipality01235 +大字新港中央 +丁目１丁目 +地番722-1. Other722-1 parcels in Shinko Nishi/Minami and other districts were excluded. FeatureH000000005 on map01235_2022_1 has consistent site area.",
          "method": "moj_aigid_exact_address_parcel_interior_centroid",
          "precision": "Interior centroid of uniquely matched published campus parcel. Six decimal coordinates do not imply equivalent horizontal accuracy; no building or tenant footprint.",
          "scope": "campus_locator",
          "scope_class": "exact_operator_parcel_cadastral_bridge",
          "source_id": "jp-next-ishikari-moj-parcel",
          "uncertainty_reason": "No quantified positional accuracy established; source parcel classification is retained. Six decimal places describe calculation, not surveyed accuracy."
        },
        "name": "Ishikari Renewable Energy Data Center No.1",
        "physical_site_stable_key": "curated:ishikari-renewable-energy-dc-1",
        "project_stable_key": "curated:ishikari-renewable-energy-dc-1:facility",
        "role_scope_notes": [
          {
            "party": "Ishikari Renewable Energy Data Center No.1 LLC",
            "role": "operator",
            "scope_note": "Operates the host facility; data halls can be occupied by separate DC operators. Do not assign this role to every tenant workload."
          },
          {
            "party": "BroadBand Tower",
            "role": "tenant",
            "scope_note": "Uses part of the host facility as Ishikari Shinko site; its floor is not a separate physical campus."
          }
        ],
        "roles": [
          {
            "party": "Ishikari Renewable Energy Data Center No.1 LLC",
            "relationship_scope": "current",
            "role": "operator",
            "source_id": "jp-next-ishikari-opening"
          },
          {
            "party": "BroadBand Tower",
            "relationship_scope": "current",
            "role": "tenant",
            "source_id": "jp-next-ishikari-bbt-oct"
          }
        ],
        "site_name": "Ishikari Renewable Energy Data Center No.1",
        "status": {
          "as_of": "2026-08-01",
          "source_id": "jp-next-ishikari-opening",
          "summary": "Owner confirms fit-out completion and commencement of services to data halls on August1. Operational host facility; no claim that every hall is occupied or that the later GMO GPU deployment is live.",
          "value": "operational"
        },
        "successor_review": "August1 achieved opening is73days before October13. October7 joint release confirms host service commencement and gives future2026GMO deployment target. Undated marketing forecast is stale and does not undo achieved opening. No later closure/cancellation found."
      }
    ],
    "base_dataset": "verified_construction_core/2026-10-13-research-asia",
    "base_manifest_sha256": "8a5c2b129e7347b90fce646fcbe77c20552636d2d54cd11355c5833fb38494e8",
    "context_updates": [
      {
        "action": "append_power_readiness_context_only",
        "context_kind": "power_readiness",
        "identity_review": "50Hertz names VIRTUS as the customer served by the Wustermark substation expansion. This is the existing Wustermark campus power-readiness context, not a new data-centre building observation or location.",
        "preserve_geometry": true,
        "preserve_status_as_of": "2026-06-01",
        "project_stable_key": "imported:semiconductor-atlas:virtus-wustermark",
        "source_ids": [
          "europe-next-wustermark-grid-20261007",
          "europe-next-wustermark-grid-project"
        ],
        "summary": "Upstream 50Hertz substation expansion has commenced as of October 7; planned 300 MW N-1 connection, completion 2028. No energized capacity or new data-centre physical observation. Preserve 300 MVA undated-page inconsistency."
      }
    ],
    "format": "datacenter-atlas-update-input-v1",
    "integration_review": {
      "campus_markers": "User confirmed clearly labelled campus and parent-property markers. Beijing locates the existing named campus sector; Datum locates the operator-selected existing facility. Neither supplies a new-building footprint.",
      "japan_role_scopes": "Ishikari roles use schema value current; detailed facility-versus-tenant qualifiers are retained in role_scope_notes.",
      "munich_locator_authority": "The exact-address bridge comes from NTT; the underlying OSM geometry is classified community_mapped in the final definition. No operator label is inferred from the mapping record.",
      "source_preservation": "Prior published datasets remain immutable. Imported source-records and identity-mapping remain byte-identical.",
      "wustermark": "Associate utility records as grid context only. Preserve project row, status date, geometry and power fields; no 300 MW to 300 MVA conversion."
    },
    "output": "verified_construction_core/2026-10-13-research-followup",
    "source_files": [
      {
        "path": "sources/atlas-research-2026-10-13-de-muc2-next-primary-sources.json",
        "sha256": "9932632a2aa55889d111fe648bf817d3ab11eaa5b6794129f42859f8c5f6fc13"
      },
      {
        "path": "sources/atlas-research-2026-10-13-europe-next-primary-sources.json",
        "sha256": "cca5b1d82d53641f491b5e060f6d5f8d9ed05aaa66d1717f999d0f25b12d29b6"
      },
      {
        "path": "sources/research-countries-2026-10-13-cn-next-primary-sources.json",
        "sha256": "9f219492e1ecb0d5367c22379801e078cbe33a3eb2171991a5c5acd01f43b0cb"
      },
      {
        "path": "sources/research-countries-2026-10-13-jp-next-primary-sources.json",
        "sha256": "9a6124bf88f66318bb02adddb811a6aed5f748ff7607dbbfb4b0a1e677180d0d"
      }
    ],
    "status_updates": [
      {
        "identity_review": "Same LON01B2/Brent Cross named project as the existing May 28 B2 composite record. West Shell is one component of the existing project; preserve project/site keys and geometry, with no extra phase/site count.",
        "project_stable_key": "curated:pure-dc-brent-cross-lon01-campus:b2-composite-build",
        "status": {
          "as_of": "2026-09-02",
          "source_id": "europe-next-pure-lon01b2-20260902",
          "summary": "Glencar reports B2 West Cold Shell piling underway, with simultaneous construction and fit-out elsewhere in the live LON01 campus. Updates the existing composite B2 project; does not treat the entire B2 as completed shell or operational.",
          "value": "under_construction"
        },
        "successor_review": "September 2 is a dated present-tense work report. Planned B2 completion Q2 2029 remains a forecast; existing operational campus does not mean B2 is operational."
      }
    ],
    "updated_at": "2026-10-13"
  }
}
