{
  "input_sha256": "24540a2dee607df5ff420c7dacbdcf7fff27aa2d0e484626b69592497fe2410d",
  "source_projections": {
    "cn-third-tianjin-campus-osm": {
      "attribution": "OpenStreetMap contributors",
      "attribution_url": "https://www.openstreetmap.org/copyright",
      "content_hash": "0d7d80a20e1a3c6f21be042e96bbde43d4447c0568121e9d18f1848ea3f0e3f6",
      "content_hash_scope": "sha256_exact_response_body_bytes",
      "coordinate_crs": "WGS84 longitude/latitude supplied by OpenStreetMap API",
      "date_semantics": "Mapping timestamp March 17, 2024 is an edit date, not a physical-status observation.",
      "id": "cn-third-tianjin-campus-osm",
      "kind": "openstreetmap",
      "license": "ODbL-1.0",
      "license_url": "https://opendatacommons.org/licenses/odbl/1-0/",
      "osm_last_edited_at": "2024-03-17T07:52:01Z",
      "osm_way_id": 1263404569,
      "osm_way_version": 1,
      "published_at": null,
      "publisher": "OpenStreetMap contributors",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-third/tianjin-osm.json",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:07:08.917485+00:00",
      "source_family": "openstreetmap",
      "source_url": "https://api.openstreetmap.org/api/0.6/way/1263404569/full.json",
      "summary": "Named mapped data-center Phase1 area supplies a representative campus marker; its tag is not lifecycle evidence.",
      "title": "Named China Unicom Jing-Jin-Ji digital technology park area, OSM way 1263404569"
    },
    "cn-third-tianjin-south-civil": {
      "attribution": "China State Construction Engineering Corporation / China Construction Third Engineering Bureau",
      "content_hash": "f14b36eb704b1f22f370c568aba9aacafd775cc323e0f3054711617dc35d1287",
      "content_hash_scope": "sha256_exact_response_body_bytes",
      "date_semantics": "Article reports March 29, 2024 civil completion; historical identity/context only, not the fresh status anchor.",
      "id": "cn-third-tianjin-south-civil",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2024-04-10",
      "publisher": "China State Construction Engineering Corporation / China Construction Third Engineering Bureau",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-third/tianjin-cscec-south.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:11:02.040483+00:00",
      "source_family": "cscec_official",
      "source_url": "https://www.cscec.com/xwzx_new/zqydt_new/202404/3773453.html",
      "summary": "Contractor identifies the south-zone project at Gaocun Technology Innovation Park, Wuqing, Tianjin, with about 104,000 sqm and six structures including data-center, power-center and substation buildings.",
      "title": "CSCEC reports Jing-Jin-Ji park south-zone construction completion"
    },
    "cn-third-tianjin-south-operating": {
      "attribution": "Beijing TravelSky Birun Technology Co., Ltd.",
      "content_hash": "b74804bfbe52a2ee4d5bb2c9925e92f18af1b4dc87f917bb91230111ce2b20c9",
      "content_hash_scope": "sha256_exact_response_body_bytes",
      "date_semantics": "September 9 is the explicit ceremony and company-declared article date; used as contemporaneous confirmation of an operating south-zone project, not first opening, certification grant date or completion date. Image storage paths contain September 17; original publication availability is not independently established. Badge expiry is June 16, 2028 and does not establish award day.",
      "human_readable_url": "https://www.travelskybirun.com/detail.html?id=181&type=1",
      "id": "cn-third-tianjin-south-operating",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "primary_source_scope": "Direct participant report on its own certification consulting engagement.",
      "public_api_discovery": "Article HTML directly calls /index.php/news_list/findById with its public id=181; raw API includes full dated article. Company is a named direct project participant, not the operator.",
      "published_at": "2026-09-09",
      "publisher": "Beijing TravelSky Birun Technology Co., Ltd.",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-third/tianjin-consultant-article-data.json",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:11:23.798201+00:00",
      "source_family": "travelsky_birun",
      "source_observation_date": "2026-09-09",
      "source_observation_date_precision": "day",
      "source_url": "https://www.travelskybirun.com/index.php/news_list/findById?id=181",
      "summary": "Participating certification consultant reports the September 9 south-zone DC1/DC2 ceremony and completed management/operations assessment of the operating facilities.",
      "title": "China Unicom Jing-Jin-Ji south-zone DC1 and DC2 M&O report"
    },
    "cn-third-tianjin-uptime-registry": {
      "attribution": "Uptime Institute",
      "content_hash": "0f6bdf72643fff52d3b7602784666e87f33a65e9ce149a23b5b2b1dc60de04da",
      "content_hash_scope": "sha256_exact_response_body_bytes",
      "date_semantics": "Undated live registry corroborates certification and facility identity; retrieval is not an operating observation or award date.",
      "id": "cn-third-tianjin-uptime-registry",
      "kind": "certification_registry",
      "license": "all-rights-reserved",
      "license_url": "https://uptimeinstitute.com/terms-of-use",
      "published_at": null,
      "publisher": "Uptime Institute",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-third/tianjin-uptime.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:10:29.872025+00:00",
      "source_family": "uptime_institute",
      "source_url": "https://uptimeinstitute.com/uptime-institute-awards/country/id/CN",
      "summary": "Certifier independently lists China Unicom Smart Technology Industry Co., Ltd. DC1 and DC2 in Tianjin, each holding M&O Stamp of Approval.",
      "title": "Uptime Institute China awards registry: Jing-Jin-Ji DC1 and DC2"
    },
    "cn-third-tianjin-zone-identity": {
      "attribution": "Tianjin Unicom, published by People.cn",
      "content_hash": "c68d57f7918898e07f66fdacad7db46e01336d5798c63d03731df9463befea66",
      "content_hash_scope": "sha256_exact_response_body_bytes",
      "date_semantics": "January 20 is report date; north civil completion described only as recent. Neither an exact completion day nor current north operating status is inferred.",
      "id": "cn-third-tianjin-zone-identity",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-01-20",
      "publisher": "Tianjin Unicom, published by People.cn",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-13-cn-third/tianjin-january-http.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:07:46.067787+00:00",
      "source_family": "china_unicom_official",
      "source_url": "http://tj.people.com.cn/n2/2026/0120/c408648-41477688.html",
      "summary": "Operator-authored report distinguishes the previously operating south zone from north-zone construction and later MEP. North planned IT load 108MW is out of scope for the south-zone addition.",
      "title": "Tianjin Unicom reports north-zone civil works completion"
    },
    "jp-third-gsi-tile-specification": {
      "attribution": "Geospatial Information Authority of Japan",
      "content_hash": "1d9fa2729a17803aa3dc34ba0c5e144f183ce4f614885f3c44ac6802abe38aaa",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Undated technical reference, retrieved October 13. Geometry reference only.",
      "id": "jp-third-gsi-tile-specification",
      "kind": "map",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Geospatial Information Authority of Japan",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/gsi-tile-specification.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:15:00.215391+00:00",
      "source_family": "gsi_official",
      "source_url": "https://maps.gsi.go.jp/development/siyou.html",
      "summary": "Defines 256-pixel XYZ map tiles in Web Mercator; numeric tile addresses anchor the georeference to longitude and latitude.",
      "title": "GSI standard tile specification"
    },
    "jp-third-kobe-announcement": {
      "attribution": "Mitsui Fudosan / Kumagai Gumi / Getworks",
      "content_hash": "c9727da7b1409a9e916bb134b684cc4a42fe4ec2124069b96f1e8a12b0822e75",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "October 6 announcement supports announced lifecycle. September 4 is lease-award decision. Existing historical tunnel and development-start language do not prove physical DC construction.",
      "id": "jp-third-kobe-announcement",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-10-06",
      "publisher": "Mitsui Fudosan / Kumagai Gumi / Getworks",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/kobe-mitsui-announcement.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:02:29.581079+00:00",
      "source_family": "mitsui_fudosan_official",
      "source_url": "https://www.mitsuifudosan.co.jp/corporate/news/2026/1006/",
      "summary": "Named development uses the awarded 3-km section of the municipal former conveyor tunnel. First service is targeted for end-2027; eventual maximum 20 MW receiving capacity is a plan, not live IT power. Roles table identifies Mitsui and Kumagai as site developers, Getworks as container-DC operator, and Kumagai as intended works contractor.",
      "title": "Mitsui Fudosan, Kumagai Gumi and Getworks announce Kobe host-tunnel data center"
    },
    "jp-third-kobe-city-award": {
      "attribution": "Kobe City",
      "content_hash": "d9605e4a46eb4d92b9d8e542f6366cb00ec3263d3ff89a6142563966da86fe87",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "October 6 press release reports September 4 bid opening/award. No achieved construction date stated.",
      "id": "jp-third-kobe-city-award",
      "kind": "government_notice",
      "license": "all-rights-reserved",
      "published_at": "2026-10-06",
      "publisher": "Kobe City",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/kobe-city-press.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:05:29.703884+00:00",
      "source_family": "kobe_city_official",
      "source_url": "https://www.city.kobe.lg.jp/a26136/546798440636.html",
      "summary": "City identifies the Komi-to-Mitsugaoka section in Nishi Ward, approximately 3 km and 17000 square metres, with Mitsui Fudosan as lead and Kumagai Gumi as consortium member. City links its location map and the developer announcement.",
      "title": "Kobe city announces conveyor-tunnel lease award and identifies the selected section"
    },
    "jp-third-kobe-gsi-registration": {
      "attribution": "Geospatial Information Authority of Japan (GSI) standard map tiles; analyst-derived georeference",
      "content_hash": "ac1f4236845972804ee10e6d5e60dbf58d874e8b925c2dabaf5b7899012fa0f1",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Tile retrieval date is not map-observation or physical project-status date.",
      "geometry_facts_file": "sources/research-countries-2026-10-13-jp-third-geometry-facts.json",
      "geometry_facts_sha256": "93c5300424e744aedf012a43dae158cc1b4548ed63af8c165829a711994ce86e",
      "id": "jp-third-kobe-gsi-registration",
      "kind": "map",
      "license": "GSI-content-use-terms",
      "published_at": null,
      "publisher": "Geospatial Information Authority of Japan",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/gsi-std-15-28680-13008.png",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:07:25.575329+00:00",
      "source_family": "gsi_official",
      "source_url": "https://cyberjapandata.gsi.go.jp/xyz/std/15/28680/13008.png",
      "summary": "Official standard map tile containing the selected D4 marker. Geometry facts list all used control-point tile hashes and URLs. Nineteen spatially distributed tie points register the municipal diagram; residual does not measure total ground accuracy.",
      "title": "GSI standard map tiles supporting Kobe D4 host-tunnel georeference"
    },
    "jp-third-kobe-lease-map": {
      "attribution": "Kobe City",
      "content_hash": "3c66831dab7484f5f0eb04c0ebb154794ba6017d78a7f58c3747e34c29de93e5",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Undated attachment linked by October 6 award release. PDF metadata June 2026 is not claimed as publication date; used for geometry only.",
      "geometry_facts_file": "sources/research-countries-2026-10-13-jp-third-geometry-facts.json",
      "geometry_facts_sha256": "93c5300424e744aedf012a43dae158cc1b4548ed63af8c165829a711994ce86e",
      "id": "jp-third-kobe-lease-map",
      "kind": "map",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Kobe City",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/kobe-city-award-map.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:02:38.619612+00:00",
      "source_family": "kobe_city_official",
      "source_url": "https://www.city.kobe.lg.jp/documents/85318/ichizu.pdf",
      "summary": "One-page lease map explicitly highlights D4 machine room through D4 tunnel to D3 machine room and a short D3 section. Its D4 symbol has been registered to official GSI map tiles and selected only as an approximate host-facility marker.",
      "title": "Official lease map: D4 machine room, D4 tunnel and D3 machine room corridor"
    },
    "jp-third-miyagi-bbix": {
      "attribution": "BBIX / BBSakura Networks / Getworks",
      "content_hash": "762a735288d07d5d2067801c2e78a9019831545bd72ea76c99fb347f2fed9706",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "September 30 publication reports September 1 achieved network-node opening. Not proof every GPU container is commissioned.",
      "id": "jp-third-miyagi-bbix",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-30",
      "publisher": "BBIX / BBSakura Networks / Getworks",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/miyagi-bbix.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:14:55.526572+00:00",
      "source_family": "bbix_official",
      "source_url": "https://www.bbix.net/information/press/2026-09-30-2/",
      "summary": "Named Miyagi AI DC OCX node opened September 1. Supports achieved network service at the host; gives only Shichigahama municipality and cannot resolve a physical map point.",
      "title": "OCX network node opened September 1 at Miyagi AI Data Center"
    },
    "jp-third-miyagi-completion": {
      "attribution": "Getworks via PR TIMES",
      "content_hash": "5e943c9a980b6beae0de228278ee6c9f98638c2814b8f6058cacbbf9fe6824e7",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Explicit same-day completion; planned service date is not an achieved date.",
      "id": "jp-third-miyagi-completion",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-07-24",
      "publisher": "Getworks via PR TIMES",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/miyagi-completion.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:14:56.428157+00:00",
      "source_family": "getworks_official",
      "source_url": "https://prtimes.jp/main/html/rd/p/000000036.000141706.html",
      "summary": "Named container facility on unused Tohoku Electric land in Shichigahama completed July 24. July 31 service launch is prospective in this release. Exact property identity remains undisclosed in the release.",
      "title": "Miyagi AI Data Center completed July 24"
    },
    "jp-third-miyagi-ocx-sites": {
      "attribution": "BBIX / BBSakura Networks",
      "content_hash": "d65d39f8cddf92774d6fddcdb285848edb1833134945f0c225258e0b5e588447",
      "content_hash_scope": "sha256_exact_content_decoded_response_bytes",
      "date_semantics": "Undated site list retrieved October 13; not a new physical status observation.",
      "id": "jp-third-miyagi-ocx-sites",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "BBIX / BBSakura Networks",
      "raw_capture_file": "local_data/country-research-2026-10-13-jp-third/miyagi-ocx-sites.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:14:57.269151+00:00",
      "source_family": "ocx_official",
      "source_url": "https://docs.ocx-cloud.net/docs/physical-port/sites",
      "summary": "Lists Miyagi AI Data Center as JP-East-0034 in Shichigahama, Miyagi; location remains municipality-level.",
      "title": "OCX physical connection site list"
    },
    "us-third-phoenix-address": {
      "attribution": "Aligned Data Centers",
      "content_hash": "94526a8d62b7ab75a3acd336d7636f355f72580e659ada1e602546e99cb7762a",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "address_note": "Operator postcode differs from state filing 15077; exact text retained, not used to infer another site.",
        "operator_address_as_published": "100 Church Lane, Shippingport, PA 15001"
      },
      "id": "us-third-phoenix-address",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Aligned Data Centers",
      "raw_capture_file": "local_data/country-research-2026-10-13-us-third/phoenix-project.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:04:01.444843+00:00",
      "source_family": "aligned_official",
      "source_url": "https://aligneddc.com/pennsylvania-data-centers/",
      "summary": "Operator names its Shippingport campus PIT-01 at 100 Church Lane, Shippingport, PA 15001. Undated service specifications do not establish operation.",
      "title": "Aligned Pennsylvania campus and PIT-01 address"
    },
    "us-third-phoenix-announcement": {
      "attribution": "Aligned Data Centers",
      "content_hash": "260e397df39b70ff8ec0f1cea845f7ccaa5e07f19ceb0c3c64a7969e9ef7866f",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "announced_campus_capacity": {
          "basis": "planned",
          "it_or_facility_basis": "unspecified",
          "scope": "campus",
          "unit": "GW",
          "value": 2
        },
        "dedicated_power": "planned onsite source; adjacent former coal power station redeveloped for natural gas",
        "groundbreaking_event_date": "2026-09-10",
        "planned_facilities": 3
      },
      "id": "us-third-phoenix-announcement",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-10",
      "publisher": "Aligned Data Centers",
      "raw_capture_file": "local_data/country-research-2026-10-13-us-third/phoenix-release.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:04:01.639306+00:00",
      "source_family": "aligned_official",
      "source_url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/",
      "summary": "September 10 release names a proposed three-facility, 2 GW campus at Shippingport Industrial Park, adjacent to the separate power-station redevelopment. Announces a groundbreaking event; it does not describe a specific achieved physical work stage. The power figure is planned campus capacity with IT/facility basis unstated.",
      "title": "Aligned announces Project Phoenix at Shippingport"
    },
    "us-third-phoenix-blast-plan": {
      "attribution": "Aligned Data Centers; Google Earth basemap",
      "content_hash": "539dd5708348be203e06f65a07988dc5fab190aab647cc8d187756768060f40f",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "pages": 1,
        "project_footprint": false,
        "source_date": null,
        "visual_review": "Full page rendered and inspected October 13"
      },
      "id": "us-third-phoenix-blast-plan",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Aligned Data Centers; Google Earth basemap",
      "raw_capture_file": "local_data/country-research-2026-10-13-us-third/phoenix-blasting-radius.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:12:14.380240+00:00",
      "source_family": "aligned_official",
      "source_url": "https://aligneddc.com/wp-content/uploads/2026/09/Project-Phoenix_Blasting-Radius.pdf",
      "summary": "One-page undated traffic plan marks an 800-foot radius at Gate 17 and future rolling roadblocks. Visually inspected. It is a safety/traffic illustration for planned activity, not a survey or evidence that blasting occurred.",
      "title": "Project Phoenix Gate 17 planned blasting traffic map"
    },
    "us-third-phoenix-community": {
      "attribution": "Aligned Data Centers",
      "content_hash": "5ea897b8136af44d4ec9bfde98926c9533e9bda24a425404d5fa5fc467e788fe",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "observation_day": null,
        "schedule_is_actual_completion_evidence": false,
        "scheduled_first_blast_month_day": "09-28",
        "scheduled_last_blast_month_day": "10-16"
      },
      "id": "us-third-phoenix-community",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Aligned Data Centers",
      "raw_capture_file": "local_data/country-research-2026-10-13-us-third/phoenix-community.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:11:44.178453+00:00",
      "source_family": "aligned_official",
      "source_url": "https://aligneddc.com/shippingport-pa-data-center/",
      "summary": "Undated page describes adjusting site operations and rescheduling blasting to Monday September 28, with planned dates through October 16. This supports construction preparation context but does not prove any scheduled blast occurred or supply an exact observation date for physical works.",
      "title": "Aligned Shippingport community construction schedule"
    },
    "us-third-phoenix-state-notice": {
      "attribution": "Pennsylvania Department of General Services; filing by Aligned Data Centers LLC",
      "content_hash": "e773cff22d68008e968e6c36d32c1c60d2b27a8e706e0ecc9a3b5bc16a2b4fce",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "address": "Steel Curtain Dr, Shippingport, PA 15077",
        "contractor": "Kokosing Industrial, Inc",
        "notice_filed_date": "2026-10-08",
        "notice_id": "SCCM00016473",
        "notice_type": "Notice of Commencement",
        "pdf_retrieval": "Timed out; only the project-detail HTML was captured and relied upon.",
        "permit_grant_dates": null,
        "property_owner": "Aligned Data Centers, LLC",
        "reported_building_permits": [
          "SHI 26-138",
          "SHI 26-137",
          "SHI 26-136"
        ]
      },
      "id": "us-third-phoenix-state-notice",
      "kind": "government_record",
      "license": "source-specific-terms",
      "published_at": "2026-10-08",
      "publisher": "Pennsylvania Department of General Services; filing by Aligned Data Centers LLC",
      "raw_capture_file": "local_data/country-research-2026-10-13-us-third/pa-phoenix-detail.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:04:28.156220+00:00",
      "source_family": "pennsylvania_dgs",
      "source_url": "https://www.pa.gov/dgs/state-construction-notices-directory/Wizard/ProjectDetail/2832",
      "summary": "October 8 Notice of Commencement entry identifies Project Phoenix, Aligned as property owner, Kokosing Industrial as contractor, Steel Curtain Drive address, 20 parcel references, and reported building-permit identifiers. The directory filing date is not an observation of physical works or a recovered permit-grant date.",
      "title": "Pennsylvania construction directory Project Phoenix SCCM00016473"
    },
    "us-third-shippingport-entrance-map": {
      "attribution": "Shippingport Industrial Park / Frontier Group of Companies via Google My Maps",
      "content_hash": "82bdec50c85e6ec755eb8e5b02414a8ec025148f0b7270a8f0ccd71a13c92560",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "altitude_ignored": 0,
        "coordinate_system": "KML longitude/latitude in WGS84",
        "coordinates_lon_lat": [
          -80.414552,
          40.632068
        ],
        "document_name": "Shippingport Industrial Park",
        "selected_feature_name": "Main Site Entrance",
        "selected_feature_type": "Point",
        "source_map_date": null
      },
      "id": "us-third-shippingport-entrance-map",
      "kind": "map",
      "license": "source-specific-terms",
      "published_at": null,
      "publisher": "Shippingport Industrial Park / Frontier Group of Companies via Google My Maps",
      "raw_capture_file": "local_data/country-research-2026-10-13-us-third/shippingport-operator-map.kml",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:10:33.461993+00:00",
      "source_family": "shippingport_frontier_official",
      "source_url": "https://www.google.com/maps/d/kml?mid=186x-3dU4x2AdQmqnlojErXVzwPcSooE&forcekml=1",
      "summary": "Public KML for the exact map embedded on the property site contains a unique Main Site Entrance point. It locates the parent industrial property only. No planned data-center building footprint, surveyed campus boundary or present entrance-access claim is inferred.",
      "title": "Property-selected Shippingport Industrial Park map: Main Site Entrance"
    },
    "us-third-shippingport-map-bridge": {
      "attribution": "Shippingport Industrial Park / Frontier Group of Companies",
      "content_hash": "c6000ace79eab38195cdb959371dfa317767a014703549fb1dde79435e5a8cd9",
      "content_hash_scope": "sha256_exact_response_bytes",
      "facts": {
        "address_relation": "Differs from Aligned PIT-01 marketing address 100 Church Lane; no exact-address identity claim. The named property, not address equality, supplies the bridge.",
        "embedded_map_id": "186x-3dU4x2AdQmqnlojErXVzwPcSooE",
        "map_address": "128 Ferry Hill Road, Shippingport, PA 15077"
      },
      "id": "us-third-shippingport-map-bridge",
      "kind": "company_disclosure",
      "license": "source-specific-terms",
      "published_at": null,
      "publisher": "Shippingport Industrial Park / Frontier Group of Companies",
      "raw_capture_file": "local_data/country-research-2026-10-13-us-third/shippingport-site-map.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-13T18:10:06.761586+00:00",
      "source_family": "shippingport_frontier_official",
      "source_url": "https://shippingportindustrialpark.com/site-map/",
      "summary": "Property website identifies Shippingport Industrial Park and directly embeds My Maps document 186x-3dU4x2AdQmqnlojErXVzwPcSooE. Aligned explicitly names this park as the host of Project Phoenix. This is a named-parent-property bridge, not an exact address match or an Aligned building plan.",
      "title": "Shippingport Industrial Park site-map page"
    }
  },
  "update": {
    "additions": [
      {
        "context_source_ids": [
          "cn-third-tianjin-south-civil",
          "cn-third-tianjin-uptime-registry",
          "cn-third-tianjin-zone-identity"
        ],
        "country": "China",
        "country_iso_a2": "CN",
        "distinctness_review": "Reviewed all 423 base projects, 399 sites and 231 complete imported records for Unicom, Tianjin, Wuqing, Jing-Jin-Ji and Chinese aliases; no match. Nearest existing marker is China Mobile International Information Port Beijing, 78.163 km away. DC1 and DC2 are retained as one south-zone project at one physical campus. The north zone is distinct scope and receives no additional counted record in this packet.",
        "locator": {
          "authority": "community_mapped",
          "geometry": {
            "coordinates": [
              116.8344899,
              39.61740245
            ],
            "type": "Point"
          },
          "identity_review": "OSM way1263404569 is explicitly named 中国联通京津冀数字科技产业园项目数据中心一期. Contractor CSCEC places the identically named south-zone project at Gaocun Technology Innovation Park, Wuqing, Tianjin; the direct consultant identifies DC1/DC2 as the south-zone facilities, and the operator report distinguishes north and south at this campus. The arithmetic bounding-box center is checked inside the mapped polygon. OSM phase name does not establish a legal phase boundary or lifecycle state.",
          "method": "openstreetmap_named_campus_polygon_bbox_center_verified_inside_polygon",
          "precision": "Representative point within a named mapped China Unicom Jing-Jin-Ji park area. Campus locator only; does not identify a DC1/DC2 building footprint, the south-zone boundary or a surveyed full-campus centroid.",
          "scope": "campus_locator",
          "scope_class": "community_mapped_named_data_center_campus_representative_point",
          "source_id": "cn-third-tianjin-campus-osm",
          "uncertainty_reason": "Community mapping has no measured positional accuracy. Exact DC1/DC2 building positions and distance from this campus marker are unknown; coordinate decimals reflect calculation, not survey accuracy."
        },
        "name": "China Unicom Tianjin Jing-Jin-Ji Park South Zone DC1 / DC2",
        "physical_site_stable_key": "curated:china-unicom-tianjin-jingjinji-digital-technology-park",
        "project_stable_key": "curated:china-unicom-tianjin-jingjinji-digital-technology-park:south-zone-dc1-dc2",
        "roles": [
          {
            "party": "China Unicom Smart Technology Industry Co., Ltd.",
            "relationship_scope": "current",
            "role": "operator",
            "source_id": "cn-third-tianjin-south-operating"
          }
        ],
        "scoped_project_details": {
          "IT_power_MW": null,
          "aliases": [
            "中国联通京津冀数字科技产业园南区",
            "Beijing-Tianjin-Hebei Digital Technology Industrial Park DC1",
            "Beijing-Tianjin-Hebei Digital Technology Industrial Park DC2"
          ],
          "badge_expiry_date": "2028-06-16",
          "certification_event_date": "2026-09-09",
          "certification_grant_date": null,
          "certification_type": "Uptime M&O Stamp of Approval",
          "facility_scope": "Existing south-zone DC1 and DC2 grouped as one development; no separate north-zone admission.",
          "opening_date": null,
          "power_exclusion": "108MW reported by Tianjin Unicom belongs to planned north-zone IT load and is not assigned to this south-zone project.",
          "south_civil_scope_floor_area_sqm_approx": 104000,
          "south_civil_scope_source_id": "cn-third-tianjin-south-civil",
          "status_date_scope": "Dated operating confirmation in direct participant report; no claim of physical opening on that day."
        },
        "site_name": "China Unicom Jing-Jin-Ji Digital Technology Industrial Park, Tianjin",
        "status": {
          "as_of": "2026-09-09",
          "source_id": "cn-third-tianjin-south-operating",
          "summary": "The participating consultant’s September 9 report confirms the south-zone DC1/DC2 operating-management certification and service context. This is dated confirmation of an existing operating project, not a new opening or the original certification award day. It does not characterize the north-zone fit-out.",
          "value": "operational"
        },
        "successor_review": "Checked primary consultant report and live certifier registry on October 13. No subsequent closure or cancellation found. September 30 press coverage concerns north-zone MEP installation, and is not a reversal of south-zone operation. No north/DC3 project is inferred or counted."
      },
      {
        "context_source_ids": [
          "jp-third-kobe-city-award",
          "jp-third-kobe-gsi-registration",
          "jp-third-gsi-tile-specification"
        ],
        "country": "Japan",
        "country_iso_a2": "JP",
        "distinctness_review": "All 399 baseline sites, 423 projects and source records checked for Kobe, conveyor and Getworks; no existing project/site match. Nearest mapped site is SoftBank Osaka Sakai AI data center about 35.20 km away. One awarded host-tunnel section and one initial-development project; D3/D4 rooms and eventual containers are not separately counted.",
        "locator": {
          "authority": "compiled_reference",
          "derivation": "georeferenced_source_map",
          "geometry": {
            "coordinates": [
              135.0901,
              34.7393
            ],
            "type": "Point"
          },
          "horizontal_uncertainty_metres": null,
          "identity_review": "Kobe city award identifies approximately 3 km from Komi to Mitsugaoka and directly links the map highlighting D4 machine room, D4 tunnel and D3 machine room. The selected D4 circle lies within that exact map scope. Nineteen distributed controls register the official diagram to GSI tiles. The coastal locator for the full 14.5-km conveyor system is explicitly excluded.",
          "method": "official_lease_map_d4_symbol_registered_to_gsi_xyz_tiles",
          "precision": "Approximate D4 machine-room symbol centre within the named leased host-tunnel section. It locates the parent underground facility only; no surveyed portal, tunnel footprint, container installation point or building boundary is established.",
          "scope": "campus_locator",
          "scope_class": "official_lease_map_d4_host_tunnel_symbol_georeferenced_to_gsi",
          "source_id": "jp-third-kobe-lease-map",
          "uncertainty_reason": "The municipal diagram does not state geodetic or surveyed accuracy and uses a large symbolic room marker. A low registration residual does not establish ground accuracy. Rounded four-decimal coordinates identify the host-tunnel area only."
        },
        "name": "Kobe Former Conveyor Tunnel Data Center Initial Development",
        "physical_site_stable_key": "curated:kobe-conveyor-tunnel-dc",
        "project_stable_key": "curated:kobe-conveyor-tunnel-dc:initial-development",
        "roles": [
          {
            "party": "Getworks",
            "relationship_scope": "intended",
            "role": "operator",
            "source_id": "jp-third-kobe-announcement"
          }
        ],
        "scoped_project_details": {
          "capacity_scope": "Future maximum receiving capacity only; no selected live IT load or delivered capacity.",
          "eventual_maximum_receiving_capacity_MW": 20,
          "leased_section_area_m2_approx": 17000,
          "leased_section_length_km_approx": 3,
          "locator_scope": "Approximate D4 host-tunnel symbol, not an installation or portal survey",
          "physical_work_status_exact_day_established": false,
          "reported_additional_roles": [
            {
              "party": "Mitsui Fudosan",
              "relationship_scope": "current",
              "role": "developer",
              "source_id": "jp-third-kobe-announcement"
            },
            {
              "party": "Kumagai Gumi",
              "relationship_scope": "current",
              "role": "developer",
              "source_id": "jp-third-kobe-announcement"
            },
            {
              "party": "Kumagai Gumi",
              "relationship_scope": "intended",
              "role": "contractor",
              "source_id": "jp-third-kobe-announcement"
            }
          ],
          "service_target": "end-2027"
        },
        "site_name": "Kobe Former Conveyor Tunnel Data Center",
        "status": {
          "as_of": "2026-10-06",
          "source_id": "jp-third-kobe-announcement",
          "summary": "Joint developer announcement identifies a commercial data center in the awarded former conveyor tunnel section, with initial service targeted for end-2027. Existing tunnel, September 4 award and announced development do not establish achieved physical DC construction.",
          "value": "announced"
        },
        "successor_review": "Primary city and developer pages reviewed October 13; October 6 remains the latest dated named-project announcement established in this bounded pass. End-2027 service and eventual maximum 20 MW receiving capacity remain prospective. No later achieved physical works or operation observation established."
      },
      {
        "context_source_ids": [
          "us-third-phoenix-address",
          "us-third-shippingport-map-bridge",
          "us-third-phoenix-state-notice",
          "us-third-phoenix-community",
          "us-third-phoenix-blast-plan"
        ],
        "country": "United States",
        "country_iso_a2": "US",
        "distinctness_review": "Checked all 423 project rows, 399 sites and 231 preserved source records for Shippingport, Bruce Mansfield, Project Phoenix, PIT-01 and Steel Curtain. No match. Nearest existing site is Bitdeer Weathersfield (Niles), 67.24 km away. One campus project and one physical site; the three facilities are not counted separately, and the adjacent power station is not a DC project.",
        "locator": {
          "authority": "compiled_reference",
          "geometry": {
            "coordinates": [
              -80.414552,
              40.632068
            ],
            "type": "Point"
          },
          "horizontal_uncertainty_metres": null,
          "identity_review": "Aligned explicitly identifies Project Phoenix inside Shippingport Industrial Park. The named property website embeds the exact map whose unique Main Site Entrance point is selected. Its 128 Ferry Hill Road address differs from Aligned PIT-01 address 100 Church Lane; no exact address match is claimed. State filing independently links the named Aligned project to Shippingport parcels. Adjacent power-station equipment is not selected as the DC location.",
          "method": "direct_unique_named_point_from_property_embedded_google_mymaps_kml",
          "precision": "Main entrance marker for the parent Shippingport Industrial Park property. It does not locate an individual Aligned building, the three-facility campus centroid, construction work limits or a legal parcel boundary.",
          "scope": "campus_locator",
          "scope_class": "property_selected_parent_industrial_property_entrance_marker",
          "source_id": "us-third-shippingport-entrance-map",
          "uncertainty_reason": "Source gives no measured positional accuracy. Offset from the parent entrance to individual proposed DC buildings is unknown; decimal precision is not survey accuracy."
        },
        "name": "Aligned Project Phoenix / PIT-01 Campus Development",
        "physical_site_stable_key": "curated:aligned-shippingport-project-phoenix",
        "project_stable_key": "curated:aligned-shippingport-project-phoenix:campus-development",
        "roles": [
          {
            "party": "Aligned Data Centers, LLC",
            "relationship_scope": "current",
            "role": "owner",
            "source_id": "us-third-phoenix-state-notice"
          },
          {
            "party": "Aligned Data Centers",
            "relationship_scope": "intended",
            "role": "operator",
            "source_id": "us-third-phoenix-announcement"
          }
        ],
        "scoped_project_details": {
          "capacity_scope": "Developer headline; IT-versus-facility power unspecified, planned not delivered",
          "commencement_notice_date": "2026-10-08",
          "individual_building_footprint_established": false,
          "notice_does_not_refresh_status": true,
          "physical_work_status_exact_day_established": false,
          "planned_campus_capacity_GW": 2,
          "planned_facilities": 3
        },
        "site_name": "Aligned Project Phoenix, Shippingport",
        "status": {
          "as_of": "2026-09-10",
          "source_id": "us-third-phoenix-announcement",
          "summary": "Operator announces the named three-facility campus and September 10 groundbreaking. Retain announced as the latest exact-day supported lifecycle classification: undated site-operations and planned-blasting text has no exact achieved work observation, and the October 8 legal commencement filing is not such an observation.",
          "value": "announced"
        },
        "successor_review": "As of October 13: reviewed operator announcement, facility and community pages and October 8 state filing. Later undated community schedule gives proposed blasting dates, not achieved works; filing reports permit numbers without grant dates or approved scope. No newer exact-day physical construction/completion/operation observation established. Announced is a conservative evidence classification, not a claim that no site work has occurred."
      }
    ],
    "base_dataset": "verified_construction_core/2026-10-13-research-followup",
    "base_manifest_sha256": "6bf459ac00b1e8bd950289a6d934bafced7c52367b344b3053038e66dffcd4a3",
    "context_updates": [],
    "format": "datacenter-atlas-update-input-v1",
    "integration_review": {
      "campus_markers": "User reconfirmed clearly labelled campus and parent-property markers. Each admission must distinguish its host locator from building footprints and legal boundaries.",
      "date_semantics": "Separate current-operation confirmation from original opening dates. Announced status does not establish construction, and procurement/ceremonies/planned work dates do not supply an achieved physical work observation.",
      "source_preservation": "Earlier published datasets remain immutable; imported source-records and identity-mapping must remain byte-identical."
    },
    "output": "verified_construction_core/2026-10-13-research-third",
    "source_files": [
      {
        "path": "sources/research-countries-2026-10-13-cn-third-primary-sources.json",
        "sha256": "b034cfe41bbc4524ea5eccaf96ad4335c92e39d8a2531a3f0639aab0eaa8405f"
      },
      {
        "path": "sources/research-countries-2026-10-13-jp-third-primary-sources.json",
        "sha256": "b2a708bed7439e0bc7f213871f3a29475cd42de2e1097af8219b752ad906ccc5"
      },
      {
        "path": "sources/research-countries-2026-10-13-us-third-primary-sources.json",
        "sha256": "dd90c39d5210af142ed8e9644a9950161da0fd6a7d4dcfd5aae03dde8fff2b8e"
      }
    ],
    "status_updates": [],
    "updated_at": "2026-10-13"
  }
}
