  "input_sha256": "052dce7f4af717e89084994b5970d7376b14d7c1bf38f3f2508ef28150e17354",
  "source_projections": {
    "epcc-0": {
      "attribution": "EPCC, University of Edinburgh",
      "content_hash": "fb3d2282e3ee60641f43bc548607e8661204551f73743717ca5c91c170f70d6a",
      "id": "epcc-0",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-22",
      "publisher": "EPCC, University of Edinburgh",
      "retrieved_at": "2026-10-13T09:53:17.649297+00:00",
      "source_family": "university_edinburgh_acf",
      "source_url": "https://www.epcc.ed.ac.uk/whats-happening/articles/ai-minister-marks-milestone-supercomputer-build",
      "summary": "University reports the final structural beam and completed steel frame for the Next National Supercomputer building; external construction is nearing completion. Opening is expected early2028.",
      "title": "ACF supercomputer building steel-frame milestone"
    },
    "epcc-1": {
      "attribution": "Robertson",
      "content_hash": "fa186c6386b82247375c8f4172ca38e8ed7c6395316c2dcb555e533960e56bda",
      "id": "epcc-1",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-22",
      "publisher": "Robertson",
      "retrieved_at": "2026-10-13T09:55:59.063142+00:00",
      "source_family": "university_edinburgh_acf",
      "source_url": "https://www.robertson.co.uk/news/ai-minister-marks-milestone-edinburgh-supercomputer-build",
      "summary": "Principal contractor independently carries the same dated construction milestone and identifies Robertson Construction Central East as builder.",
      "title": "ACF construction milestone: principal contractor"
    },
    "epcc-2": {
      "attribution": "University of Edinburgh Estates",
      "content_hash": "41a13c364e590a1b8abd7c75d1f67e270359a2906668650c1d65c4e625338012",
      "id": "epcc-2",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-07-13",
      "publisher": "University of Edinburgh Estates",
      "retrieved_at": "2026-10-13T09:53:18.039056+00:00",
      "source_family": "university_edinburgh_acf",
      "source_url": "https://estates.ed.ac.uk/campus-development/easter-bush/cr4-supercomputer-preparation-project",
      "summary": "University estates identifies the project as an extension to CR4 at the Advanced Computing Facility on the Technopole site next to Easter Bush, plus a new plant room. The existing30MVA power supply was installed with CR4 in2020.",
      "title": "CR4 supercomputer preparation project"
    },
    "epcc-3": {
      "attribution": "University of Edinburgh via Public Contracts Scotland",
      "content_hash": "891f53787d3e02cdd090c5e83cf87df253708b0db600d1715a7545270f489709",
      "id": "epcc-3",
      "kind": "government_record",
      "license": "all-rights-reserved",
      "published_at": "2020-10-21",
      "publisher": "University of Edinburgh via Public Contracts Scotland",
      "retrieved_at": "2026-10-13T09:55:47.880405+00:00",
      "source_family": "university_edinburgh_acf",
      "source_url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT397510",
      "summary": "University procurement record gives the ACF performance address as Bush Estate, Penicuik EH26 0QA. Used for location only.",
      "title": "ACF Bush Estate address: university procurement"
    },
    "epcc-4": {
      "attribution": "OpenStreetMap contributors",
      "content_hash": "b09f740dfc88bc74c500d5cdc2264771104f64436167f596c0431e5e7f658930",
      "id": "epcc-4",
      "kind": "open_map",
      "license": "ODbL-1.0",
      "published_at": "2024-01-29",
      "publisher": "OpenStreetMap contributors",
      "retrieved_at": "2026-10-13T09:56:57.735746+00:00",
      "source_family": "openstreetmap",
      "source_url": "https://www.openstreetmap.org/api/0.6/way/59574224/full.json",
      "summary": "Direct OSM API object named ACF Building, with EH26 0QA and Edinburgh University address tags. Existing building bounds are lon[-3.2004260,-3.1985693],lat[55.8552576,55.8560677]; the proposed locator is their centre.",
      "title": "ACF Building: OpenStreetMap way59574224"
    },
    "oracle-jupiter-september": {
      "attribution": "Oracle",
      "content_hash": "d0df3007f3e0c14d128c5d296e7bb47df62e00f9d0411683f77a40b3d7d4642d",
      "id": "oracle-jupiter-september",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-09-14",
      "publisher": "Oracle",
      "retrieved_at": "2026-10-13T09:54:20.636452+00:00",
      "source_family": "oracle_news",
      "source_url": "https://www.oracle.com/news/announcement/project-jupiter-statement-on-construction-permitting-2026-09-14/",
      "summary": "Oracle states that work to date is on the data center campus and buildings are being constructed under county permits. Its statement distinguishes those works from the adjacent microgrid air-permit proceeding.",
      "title": "Project Jupiter statement on construction permitting"
    },
    "scala-archived-portfolio-ssclhb01": {
      "attribution": "Scala Data Centers",
      "base_evidence_id": "d4f91e87-3ea2-5833-b19d-fd5a3ca7b591",
      "content_hash": "8a78e94b27e3cc375549845cf680b76eb678b19605de0c1411dbc6aafc84972b",
      "id": "scala-archived-portfolio-ssclhb01",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "",
      "publisher": "Scala Data Centers",
      "retrieved_at": "2026-07-21T07:52:27Z",
      "source_family": "scala_data_center_portfolio_pages",
      "source_url": "https://scaladatacenters.com/en/data-centers-en/",
      "summary": "Archived undated operator portfolio label underlying the prior July21 claim. July21 was retrieval, not an observed physical-work date. No recent dated exact-HB01 physical-work source was found. Newer campus references can describe the HB02 expansion. The selected July 21 status is only a retrieval of the undated portfolio. Do not change it to completed or cancelled without a matching source.",
      "title": "Scala Data Centers Portfolio"
    },
    "scala-archived-portfolio-sscllp01": {
      "attribution": "Scala Data Centers",
      "base_evidence_id": "97007edb-ddfc-5984-884a-8222ded41e29",
      "content_hash": "8a78e94b27e3cc375549845cf680b76eb678b19605de0c1411dbc6aafc84972b",
      "id": "scala-archived-portfolio-sscllp01",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "",
      "publisher": "Scala Data Centers",
      "retrieved_at": "2026-07-21T07:52:27Z",
      "source_family": "scala_data_center_portfolio_pages",
      "source_url": "https://scaladatacenters.com/en/data-centers-en/",
      "summary": "Archived undated operator portfolio label underlying the prior July21 claim. July21 was retrieval, not an observed physical-work date. Government-hosted applicant report supports campus construction during first half 2026, replacing the unsupported July 21 date. It does not isolate LP01 or establish that all phases remained in construction after June 30.",
      "title": "Scala Data Centers Portfolio"
    },
    "scala-fortaleza-prospectus": {
      "attribution": "AZ Quest Panorama Data Centers",
      "content_hash": "0287ec94b2a93744e73b5b723c1a98bb65d20dc738d2ccf49721102bae171925",
      "id": "scala-fortaleza-prospectus",
      "kind": "regulatory_filing",
      "license": "all-rights-reserved",
      "published_at": "2026-08-04",
      "publisher": "AZ Quest Panorama Data Centers",
      "retrieved_at": "2026-10-13T10:10:03.364995+00:00",
      "source_family": "az_quest_prospectus",
      "source_url": "https://filemanager-cdn.mziq.com/published/eacf948d-b138-408b-a8b7-1d6db21f3e84/6352b3fe-1887-43c5-be82-dbf4c54255d3_67224342000166-OPD07082026V01-001280434.pdf",
      "summary": "Prospectus dated August4. PDF page13 identifies the PF01 data centre and substation in Fortaleza. PDF page242 separately lists Fortaleza PhaseI at Praia do Futuro in final construction; it distinguishes completed Tambore substation from this unfinished asset. Planned acquisition is not a statement of operational status.",
      "title": "AZ Quest Panorama Data Centers definitive prospectus, 4 August2026"
    }
  },
  "update": {
    "additions": [
      {
        "context_source_ids": [
          "epcc-1",
          "epcc-2",
          "epcc-3"
        ],
        "country": "United Kingdom",
        "country_iso_a2": "GB",
        "distinctness_review": "No Edinburgh, Penicuik, EPCC or Advanced Computing Facility campus exists among the five GB baseline sites. CR4 is an extension at the existing ACF campus; use one campus record, not separate records for the supercomputer, plant room and extension.",
        "locator": {
          "authority": "community_source",
          "geometry": {
            "coordinates": [
              -3.19949765,
              55.85566265
            ],
            "type": "Point"
          },
          "identity_review": "The named ACF Building has the same campus name and EH26 0QA postcode as university procurement. The university identifies CR4 as an extension on this campus.",
          "method": "bbox_center_of_named_osm_building",
          "precision": "Campus locator derived from the bounding-box centre of the existing named ACF building. OSM object address and name agree with the university procurement address. It does not delineate the CR4 extension, construction footprint, parcel or legal campus boundary.",
          "scope": "campus_locator",
          "scope_class": "community_mapped_existing_campus_building_reference_point",
          "source_id": "epcc-4",
          "uncertainty_reason": "OSM object states no positional accuracy"
        },
        "name": "ACF CR4 extension",
        "physical_site_stable_key": "curated:university-edinburgh-acf",
        "project_stable_key": "curated:university-edinburgh-acf:cr4-extension",
        "roles": [
          {
            "party": "University of Edinburgh",
            "relationship_scope": "current",
            "role": "owner",
            "source_id": "epcc-2"
          },
          {
            "party": "EPCC, University of Edinburgh",
            "relationship_scope": "current",
            "role": "operator",
            "source_id": "epcc-0"
          }
        ],
        "site_name": "University of Edinburgh Advanced Computing Facility",
        "status": {
          "as_of": "2026-09-22",
          "source_id": "epcc-0",
          "summary": "CR4 extension for the Next National Supercomputer. Steel frame complete; external construction still nearing completion. This is not completion of the data centre or commissioning of the supercomputer.",
          "value": "shell"
        },
        "successor_review": "Latest targeted university and contractor results remain the September22 steel-frame milestone with early2028 supercomputer opening target. Contractor news listing is current through October7. No later authoritative opening, halt or cancellation located."
      }
    ],
    "base_dataset": "verified_construction_core/2026-08-20-v0.18-draft-thirty-seventh-reviewed",
    "base_manifest_sha256": "7a383263ac1007a2577dd3e51a9b1fa6c6c7175528c75b20a71ba6f70139b0a2",
    "format": "datacenter-atlas-update-input-v1",
    "source_files": [
      {
        "path": "sources/atlas-update-2026-10-13-primary-sources.json",
        "sha256": "8e195f6e126d1194c6ea574950c6109ab67c22be6255d46dbaf08294d07c0d17"
      }
    ],
    "status_corrections": [
      {
        "identity_review": "Prospectus p13 identifies PF01; p242 identifies Fortaleza PhaseI at Praia do Futuro. Both match the existing SFORPF01 site, distinct from the separately listed PF01 substation.",
        "project_stable_key": "curated:scala-praia-do-futuro-campus:sforpf01",
        "reason": "Replace July21 retrieval-derived status with a dated prospective-acquirer document identifying PF01 and its final construction stage.",
        "replaces_status_evidence_id": "62b2a499-44a6-59c1-b956-78abbbc1b8d5",
        "status": {
          "as_of": "2026-08-04",
          "source_id": "scala-fortaleza-prospectus",
          "summary": "Fortaleza PhaseI at Praia do Futuro is reported in final construction in the August4 prospectus.",
          "value": "under_construction"
        },
        "successor_review": "Checked October13. Later fund acquisition and fundraising reports do not establish completed construction. No subsequent dated authoritative opening or cancellation found."
      }
    ],
    "status_updates": [
      {
        "identity_review": "Oracle identifies Project Jupiter in Dona Ana County; source explicitly distinguishes campus building works from adjacent microgrid permits.",
        "project_stable_key": "curated:oracle-project-jupiter-dona-ana-campus:current-campus-build",
        "status": {
          "as_of": "2026-09-14",
          "source_id": "oracle-jupiter-september",
          "summary": "Oracle states that work to date is on the data center campus and buildings are being constructed under county permits. Its statement distinguishes those works from the adjacent microgrid air-permit proceeding.",
          "value": "under_construction"
        },
        "successor_review": "Latest reviewed operator statement explicitly says buildings are being constructed. Microgrid air-permit stay does not establish that data center building works stopped. No subsequent operator completion/cancellation found."
      }
    ],
    "updated_at": "2026-10-13",
    "withdrawals": [
      {
        "physical_status_claim": "unknown; withdrawal does not imply cancellation",
        "project_stable_key": "curated:scala-huechuraba-campus:ssclhb01",
        "reason": "No recent dated exact-HB01 physical-work source was found. Newer campus references can describe the HB02 expansion. The selected July 21 status is only a retrieval of the undated portfolio. Do not change it to completed or cancelled without a matching source.",
        "replaces_status_evidence_id": "d4f91e87-3ea2-5833-b19d-fd5a3ca7b591",
        "source_ids": [
          "scala-archived-portfolio-ssclhb01"
        ]
      },
      {
        "physical_status_claim": "unknown; withdrawal does not imply cancellation",
        "project_stable_key": "curated:scala-lampa-campus:sscllp01",
        "reason": "Government-hosted applicant report supports campus construction during first half 2026, replacing the unsupported July 21 date. It does not isolate LP01 or establish that all phases remained in construction after June 30. The campus-wide first-half2026 report cannot replace a status for the specific LP01 building.",
        "replaces_status_evidence_id": "97007edb-ddfc-5984-884a-8222ded41e29",
        "source_ids": [
          "scala-archived-portfolio-sscllp01"
        ]
      }
    ]
  }
}