{
  "input_sha256": "5df892b786422c42797d2c64f2f520a16515fa48417665ebd445a7f45ed3dc49",
  "source_projections": {
    "cn-boda-fifth-qianhai-fubon-operation": {
      "attribution": "Boda Data",
      "content_hash": "6d36794da038e4fdd1723f1f542020ab9bac8c6542178b811598279671b284bc",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "August 26 is the dated operator confirmation of current service. Exact branch-opening, tenant go-live and data-centre opening days are not established.",
      "facts": {
        "capacity_scope": "100MW+ is a campus capability statement, not installed, energized or occupied IT capacity; no typed power update.",
        "exact_customer_go_live_date": null,
        "exact_data_center_opening_date": null,
        "named_campus": "博大数据前海一号智算基地",
        "named_customer": "富邦银行（香港）有限公司深圳分行"
      },
      "id": "cn-boda-fifth-qianhai-fubon-operation",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-08-26",
      "publisher": "Boda Data",
      "raw_capture_file": "local_data/country-research-2026-10-14-cn-fifth/boda-912.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T12:20:29.442413+00:00",
      "source_family": "cn-boda-operator",
      "source_url": "https://www.bodadata.com/xwzx/912.html",
      "summary": "Operator confirms its Qianhai No. 1 campus supports the core systems of the now-open Fubon Bank (Hong Kong) Shenzhen branch and forms a dual-active architecture with Humeng Wulian. Confirmation concerns active infrastructure service, not a new data-centre opening or full-campus occupancy.",
      "title": "Boda confirms Qianhai No. 1 support for Fubon Bank Shenzhen operating services"
    },
    "uk-fifth-gla-api-docs": {
      "attribution": "Greater London Authority",
      "content_hash": "e5a56d0aefa004a8ce50b33d6fd1a585a696c73abd62644301a178381c076a26",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "Source record or retrieval timing does not establish achieved physical work.",
      "id": "uk-fifth-gla-api-docs",
      "kind": "other",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Greater London Authority",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fifth/gla-api-documentation.bin",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T12:19:19.182174+00:00",
      "source_family": "uk-fifth-gla",
      "source_url": "https://www.london.gov.uk/sites/default/files/planninglondondatahub_api_connection_technical_documentation_v1.pdf",
      "summary": "Official documentation supplies the public read-only guest API, applications index and request-header semantics used to retrieve the named records.",
      "title": "GLA Planning London Datahub API connection documentation"
    },
    "uk-fifth-gla-dataset": {
      "attribution": "Greater London Authority",
      "content_hash": "31b44c2b7ddb66f310caeefa651ec64736c5e523503fb250d8ffc39387c42be3",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "Source record or retrieval timing does not establish achieved physical work.",
      "id": "uk-fifth-gla-dataset",
      "kind": "other",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Greater London Authority",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fifth/gla-datahub-dataset.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T12:21:36.002963+00:00",
      "source_family": "uk-fifth-gla",
      "source_url": "https://data.london.gov.uk/dataset/planning-london-datahub-applications-236qk",
      "summary": "Official catalog attributes the dataset to GLA Planning and states daily update frequency. No dataset-specific licence value is populated; no Open Government Licence is assumed. Only attributed factual projections are redistributed.",
      "title": "London Datastore Planning London Datahub applications catalog"
    },
    "uk-fifth-gla-demolition-context": {
      "attribution": "Greater London Authority / Ealing Council",
      "content_hash": "39b42e4a2fc13e35174c971fb09740a4b0409e474f22d6b1bcc6d511d055b445",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "Source record or retrieval timing does not establish achieved physical work.",
      "id": "uk-fifth-gla-demolition-context",
      "kind": "government_record",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Greater London Authority / Ealing Council",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fifth/Ealing-262644OPDCOB.json",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T12:20:49.932668+00:00",
      "source_family": "uk-fifth-gla",
      "source_url": "https://planningdata.london.gov.uk/api-guest/applications/_source/Ealing-262644OPDCOB",
      "summary": "Same named property and same centroid. August 3 NOOBJ consultation response concerns proposed demolition; it does not establish demolition occurred or the revised data-centre design was permitted.",
      "title": "GLA Datahub Ealing-262644OPDCOB: demolition consultation context"
    },
    "uk-fifth-gla-property-point": {
      "attribution": "Greater London Authority / Ealing Council",
      "content_hash": "478f31957578b8b9913c97febbc67fcec1c6921660541a46205b65ed74649593",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "Source record or retrieval timing does not establish achieved physical work.",
      "id": "uk-fifth-gla-property-point",
      "kind": "government_record",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Greater London Authority / Ealing Council",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fifth/Ealing-263070OPDCOB.json",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T12:20:49.816435+00:00",
      "source_family": "uk-fifth-gla",
      "source_url": "https://planningdata.london.gov.uk/api-guest/applications/_source/Ealing-263070OPDCOB",
      "summary": "Official named Frogmore Industrial Estate / Acton Lane record publishes centroid longitude -0.264505, latitude 51.530912. Tiny wgs84_polygon around the point is not treated as a property boundary. September 1 NOOBJ is a consultation response to enabling works, not OPDC consent or achieved works.",
      "title": "GLA Datahub Ealing-263070OPDCOB: named Frogmore property locator"
    },
    "uk-fifth-kao-boards": {
      "attribution": "Kao Data",
      "content_hash": "e695ceee050b186c470b6e9234b3f27f041a74090cd1f86c2fc2c1b108decb72",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "Source record or retrieval timing does not establish achieved physical work.",
      "id": "uk-fifth-kao-boards",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Kao Data",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fourth/kao-park-boards.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T11:58:08.933445+00:00",
      "source_family": "uk-fifth-kao",
      "source_url": "https://kaodataparkroyal.co.uk/wp-content/uploads/sites/451/2026/09/Kao-Data-Park-Royal-Public-Consultation-Boards-September-2026.pdf",
      "summary": "Page 4 supplies the exact parent-property outline with Acton Lane, Harold Road, Wesley Avenue and Newark Crescent context. The revised data-centre design requires separate planning approval. Boards identify Kao as intended owner and operator. September is a publication month, not an exact achieved construction date.",
      "title": "Kao Data September 2026 public consultation boards"
    },
    "uk-fifth-kao-letter": {
      "attribution": "Kao Data",
      "content_hash": "438fecd851b648d32a036930ada6fdd48f0a77d5951eb7043c80edd64250901c",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "July 21 is exact signed proposal confirmation; July 27 is forecast demolition.",
      "id": "uk-fifth-kao-letter",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": "2026-07-21",
      "publisher": "Kao Data",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fourth/kao-park-demolition-notice.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T11:58:06.902080+00:00",
      "source_family": "uk-fifth-kao",
      "source_url": "https://kaodataparkroyal.co.uk/wp-content/uploads/sites/451/2026/07/01-Kao-Data-Park-Royal-Construction-Commencement-Notification-July-2026.pdf",
      "summary": "Signed Programme Director letter names the former Frogmore site on Acton Lane. July 27 demolition is future planned work; the proposed data centre remains a separate planning application. July 21 supports announced status only.",
      "title": "Kao Data July 21 resident letter confirms Park Royal proposal"
    },
    "uk-fifth-kao-proposals": {
      "attribution": "Kao Data",
      "content_hash": "95412a508e8cc109a42d9a49090a0edb280fd6883d323ea184bec4a537c8630e",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "Source record or retrieval timing does not establish achieved physical work.",
      "id": "uk-fifth-kao-proposals",
      "kind": "company_disclosure",
      "license": "all-rights-reserved",
      "published_at": null,
      "publisher": "Kao Data",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fourth/kao-park-proposals.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T11:58:09.184194+00:00",
      "source_family": "uk-fifth-kao",
      "source_url": "https://kaodataparkroyal.co.uk/our-proposals/",
      "summary": "Current operator consultation page links the revised proposal to the former Frogmore Industrial Site. Undated page does not refresh the exact-day July 21 status.",
      "title": "Kao Data Park Royal current proposals page"
    },
    "uk-fifth-osm-estate-check": {
      "attribution": "© OpenStreetMap contributors, ODbL 1.0",
      "content_hash": "23c2aa0937e1eb02bd386969618158d1af8e369605980cd22cdcdb31f9113dee",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "Source record or retrieval timing does not establish achieved physical work.",
      "id": "uk-fifth-osm-estate-check",
      "kind": "openstreetmap",
      "license": "ODbL-1.0",
      "published_at": null,
      "publisher": "OpenStreetMap contributors",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-uk-fifth/osm-frogmore-estate.bin",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T12:19:19.521323+00:00",
      "source_family": "uk-fifth-osm",
      "source_url": "https://www.openstreetmap.org/api/0.6/way/1542072469/full",
      "summary": "Named-address parent estate polygon provides an independent spatial consistency check for the official property point. No OSM lifecycle tag is used as authoritative status. OSM geometry is not selected as the published location or an official boundary.",
      "title": "OpenStreetMap Frogmore Industrial Estate polygon way1542072469"
    }
  },
  "update": {
    "additions": [
      {
        "context_source_ids": [
          "uk-fifth-kao-boards",
          "uk-fifth-kao-proposals",
          "uk-fifth-gla-demolition-context",
          "uk-fifth-gla-api-docs",
          "uk-fifth-osm-estate-check",
          "uk-fifth-gla-dataset"
        ],
        "country": "United Kingdom",
        "country_iso_a2": "GB",
        "distinctness_review": "Checked all 405 base sites, 429 projects and 231 preserved source records for Frogmore, Park Royal and Acton Lane; no matches. Nearest existing site is Pure DC Brent Cross LON01 Campus, 4.803 km away. Current revised proposal is one project at one parent property; historic outline permission and separate demolition/enabling applications are not additional data centres.",
        "locator": {
          "authority": "official_source",
          "derivation": "direct_geometry",
          "geometry": {
            "coordinates": [
              -0.264505,
              51.530912
            ],
            "type": "Point"
          },
          "horizontal_uncertainty_metres": null,
          "identity_review": "Operator July 21 letter names the former Frogmore Industrial Site on Acton Lane, Park Royal. Its September plan shows the parent property bounded by Acton Lane, Harold Road and Newark Crescent, with Wesley Avenue to the north. The GLA record identifies Frogmore Industrial Estate, Acton Lane, NW10 7NQ and a property-specific centroid. The exact numeric point lies inside OSM way1542072469, whose address is Frogmore Industrial Estate and outline matches the operator site-plan shape. No postcode mean, unrelated Frogmore site, generic viewport or neighbouring data centre is selected.",
          "method": "direct_gla_planning_datahub_named_property_centroid",
          "precision": "Authority-published application centroid for the named Frogmore Industrial Estate parent property. It is not the revised data-centre building position, a surveyed campus centroid, work extent or legal boundary.",
          "scope": "campus_locator",
          "scope_class": "official_named_parent_property_application_marker",
          "source_id": "uk-fifth-gla-property-point",
          "uncertainty_reason": "The authority provides no measured positional accuracy for its application centroid; offset to the revised building is unknown. Source decimal places and the small accompanying wgs84_polygon are not survey accuracy or a property boundary."
        },
        "name": "Kao Data Park Royal Revised Data Centre Development",
        "physical_site_stable_key": "curated:kao-data-park-royal-frogmore",
        "project_stable_key": "curated:kao-data-park-royal-frogmore:revised-data-centre-development",
        "roles": [
          {
            "party": "Kao Data",
            "relationship_scope": "intended",
            "role": "owner",
            "source_id": "uk-fifth-kao-boards"
          },
          {
            "party": "Kao Data",
            "relationship_scope": "intended",
            "role": "operator",
            "source_id": "uk-fifth-kao-boards"
          }
        ],
        "scoped_project_details": {
          "IT_power_MW": null,
          "achieved_demolition_date": null,
          "capacity_note": "No typed power claim in this packet. Historical outline floor areas are not transferred to the revised design.",
          "historical_outline_reference": "21/0182/OUTOPDC",
          "parent_property": "Former Frogmore Industrial Estate, Acton Lane, Park Royal, NW10 7NQ",
          "parent_property_point_only": true,
          "planned_demolition_completion": "2027-01",
          "planned_demolition_start": "2026-07-27",
          "property_locator_record_id": "Ealing-263070OPDCOB",
          "property_locator_record_scope": "Out-of-borough enabling-works consultation, not the revised DC building permission",
          "revised_data_centre_permission_established": false,
          "status_date_scope": "Exact signed proposal confirmation; not a demolition commencement observation"
        },
        "site_name": "Kao Data Park Royal, Frogmore Industrial Estate",
        "status": {
          "as_of": "2026-07-21",
          "source_id": "uk-fifth-kao-letter",
          "summary": "Signed operator letter confirms development of a proposed data centre at the named Frogmore property. It forecasts demolition from July 27 and explicitly separates demolition from the data-centre design/construction application. September consultation retains a revised proposal requiring further planning approval. No dated achieved demolition, construction or revised-project consent is established.",
          "value": "announced"
        },
        "successor_review": "Reviewed September operator consultation boards, current proposals and official GLA records on October 14. Ealing NOOBJ responses concern demolition/enabling proposals and are not OPDC permission decisions or achieved-work observations. July 27 demolition was planned; the operator boards expect a separate detailed application in late autumn/early winter 2026 and a 2027 committee decision. No status upgrade inferred from these documents."
      }
    ],
    "base_dataset": "verified_construction_core/2026-10-14-research-fourth",
    "base_manifest_sha256": "ed72986c114ac429342657abbc615958d7c012de5eb139b3bb1323f9023905c2",
    "context_updates": [],
    "format": "datacenter-atlas-update-input-v1",
    "output": "verified_construction_core/2026-10-14-research-fifth",
    "source_files": [
      {
        "path": "sources/research-countries-2026-10-14-cn-boda-fifth-primary-sources.json",
        "sha256": "5e5e9717d3208de527a9b1549fb7fda1407ac0ecc37fb01089ecfe99c9f04d70"
      },
      {
        "path": "sources/research-countries-2026-10-14-uk-fifth-primary-sources.json",
        "sha256": "5dd9e05e3076db4b8e5af8a4b526fc9a6459c3fa157136431d7bb20557748554"
      }
    ],
    "status_updates": [
      {
        "identity_review": "The report explicitly names 博大数据前海一号智算基地 in Shenzhen Nanshan Qianhai and describes its dual-active infrastructure. This is the same campus already admitted, not the bank branch building or the separately named Humeng Wulian site.",
        "project_stable_key": "curated:boda-shenzhen-qianhai-no1-intelligent-computing-campus:operating-campus",
        "status": {
          "as_of": "2026-08-26",
          "source_id": "cn-boda-fifth-qianhai-fubon-operation",
          "summary": "Dated operator report confirms Qianhai No. 1 providing infrastructure for the active core systems of Fubon Bank (Hong Kong) Shenzhen branch, with ongoing operations support. August 26 is a current-service confirmation; exact facility-opening and customer go-live dates remain unknown. No full-campus occupancy or energized capacity is inferred.",
          "value": "operational"
        },
        "successor_review": "Reviewed five successfully captured later operator articles dated September 3-17; linked article 920 was unavailable (HTTP 404). Later general industry and resource-layout discussions do not supply a newer Qianhai-specific operating observation. Preserve site geometry and all previous evidence."
      }
    ],
    "updated_at": "2026-10-14"
  }
}
