{
  "input_sha256": "248f6e6bc76d2916b8a15d4d34c7f90dfe2d6e0b48c186fb8422c39cf08877ac",
  "source_projections": {
    "cn-fourteenth-wuqing-cs-participant-report": {
      "attribution": "中国证券报·中证网; reporter 杨洁; named project-participant statement by 贾晋宁",
      "content_hash": "d5d85f9cbef926463c3421bfbc4e61175f01c6aa0354ebb90e5642535ae03c8c",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "September 14 is the original China Securities Journal publication confirming the reported present state. The exact visit/interview date is not supplied. The article explicitly places initial resource-pool construction in 2024; that historical year is not the selected confirmation date or a precise opening date.",
      "firsthand_status_statement": {
        "basis": "attributed_project_participant_statement",
        "date_semantics": "September 14 is the original China Securities Journal publication confirming the reported present state. The exact visit/interview date is not supplied. The article explicitly places initial resource-pool construction in 2024; that historical year is not the selected confirmation date or a precise opening date.",
        "observed_on": "2026-09-14",
        "project_identity": "中国电信京津冀智能算力中心 in Tianjin Wuqing",
        "review": "Accept only existing operational facilities at the named campus. The named centre representative describes serving customers in the Beijing-surrounding region and current demand exceeding available intelligent-compute supply. This participant statement is distinct from the reporter observation of a control screen displaying power/card use, which corroborates actual operation. Neither statement identifies all operating buildings, proves completion of the whole campus, or completes Phase 4. The 2024 construction sentence alone would be insufficient for current status.",
        "speaker": "贾晋宁",
        "speaker_role": "中国电信京津冀智能算力中心相关负责人 (a representative responsible for the named centre; exact job title unspecified)",
        "statement": "The named centre representative describes the existing deployment as serving customers around Beijing and says intelligent-compute demand currently exceeds supply. This supports current operation of existing facilities, without assigning all campus buildings an operational state.",
        "supported_status": "operational"
      },
      "id": "cn-fourteenth-wuqing-cs-participant-report",
      "kind": "news",
      "license": "all-rights-reserved",
      "personal_author": "杨洁",
      "published_at": "2026-09-14",
      "published_time_as_displayed": "2026-09-14 08:16",
      "publisher": "中国证券报·中证网 (China Securities Journal)",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-15-cn-fourteenth-wuqing/cs-sept14-field-interview.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-15T06:37:49.490165+00:00",
      "source_family": "中国证券报·中证网 (China Securities Journal)",
      "source_url": "https://www.cs.com.cn/ssgs/cj2020/2026/09/14/detail_2026091410038909.html",
      "summary": "Original field report by 杨洁 attributes current regional customer service and intelligent-compute supply/demand to centre representative 贾晋宁. Reporter observation of power/card-use monitoring is separate corroboration of existing operation.",
      "title": "China Securities Journal: named Wuqing centre representative describes current compute service; reporter visits operations control centre"
    },
    "cn-fourteenth-wuqing-iitime-field-report": {
      "attribution": "工联网; reporter 王禹蓉; attributed project-participant account by 贾晋宁",
      "content_hash": "97b76f538b72129061c51735b435f882519b24e9cf9f5823e08ad3e88019b6c0",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "September 4 is publication; the field visit is described only as recent. No exact visit, acceptance or operation-start day is supplied.",
      "id": "cn-fourteenth-wuqing-iitime-field-report",
      "kind": "news",
      "license": "all-rights-reserved",
      "published_at": "2026-09-04",
      "publisher": "工联网 (IITime)",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-15-cn-fourteenth-wuqing/iitime-participant-site-visit.html",
      "raw_capture_redistributed": false,
      "raw_response_character_encoding": "gb18030",
      "retrieved_at": "2026-10-15T06:39:21.689961+00:00",
      "selected_capacity": false,
      "source_family": "工联网 (IITime)",
      "source_url": "https://www.iitime.com.cn/html/10207/16343342.htm",
      "summary": "Original field reporting by 王禹蓉 places the named centre in 武清高村数智创新园 and attributes eight data-centre buildings and three power buildings standing to 贾晋宁. Used as identity and existing-facility context; not proof all eleven buildings operate.",
      "title": "IITime field visit places the China Telecom Jing-Jin-Ji intelligent computing centre in Wuqing Gaocun and attributes existing buildings to 贾晋宁"
    },
    "cn-fourteenth-wuqing-osm-road-context": {
      "attribution": "OpenStreetMap contributors",
      "attribution_url": "https://www.openstreetmap.org/copyright",
      "content_hash": "50949aa577768af2f94a7011c8470a181d13b21cca00f952c5505ae74a22fe80",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "API capture date is not an observation of campus status.",
      "id": "cn-fourteenth-wuqing-osm-road-context",
      "kind": "openstreetmap",
      "license": "ODbL-1.0",
      "license_url": "https://opendatacommons.org/licenses/odbl/1-0/",
      "published_at": null,
      "publisher": "OpenStreetMap contributors",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-15-cn-fourteenth-wuqing/osm-campus-road-context.xml",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-15T06:40:00.372896+00:00",
      "source_family": "OpenStreetMap contributors",
      "source_url": "https://api.openstreetmap.org/api/0.6/map?bbox=116.838,39.612,116.846,39.619",
      "summary": "Mapped 汇旺路 ways 961236719/961236720 run immediately north of the named campus; 海宁路 is to the west/south. Context only, not an exact address geocode. CQC spells the address 汇旺道 while OSM spells the road 汇旺路.",
      "title": "OpenStreetMap adjacent road context for China Telecom Wuqing campus"
    },
    "cn-fourteenth-wuqing-park-june-project-context": {
      "attribution": "天津武清经济技术开发区; credited source 美丽武清",
      "content_hash": "4fb881dc3d0f891fa7563f2f93065fb416c1e8b951df008e9a5a93c4c004bb36",
      "content_hash_scope": "sha256_exact_response_bytes",
      "date_semantics": "June 22 is publication. Statements about planned year-end and 2027 completion remain forecasts; no later completion is inferred.",
      "id": "cn-fourteenth-wuqing-park-june-project-context",
      "kind": "government_record",
      "license": "all-rights-reserved",
      "published_at": "2026-06-22",
      "publisher": "天津武清经济技术开发区",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-15-cn-fourteenth-wuqing/park-june22.html",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-15T06:35:52.280125+00:00",
      "source_family": "天津武清经济技术开发区",
      "source_url": "https://www.tjuda.com/chanjingdongtai/18218.html",
      "summary": "Official development-zone publication credited to 美丽武清 identifies the same named China Telecom centre in Gaocun and distinguishes continuing Phase 4 construction. Older than the 90-day admission window; identity and scope context only.",
      "title": "Wuqing development-zone report: China Telecom Jing-Jin-Ji intelligent computing centre and separate Phase 4 works"
    },
    "cn-fourteenth-wuqing-telecom-osm": {
      "attribution": "OpenStreetMap contributors",
      "attribution_url": "https://www.openstreetmap.org/copyright",
      "content_hash": "3d96d2b93595c89662568e1c5050be7dcd089d69aa49fbad8cff9ffa3ecbbbb3",
      "content_hash_scope": "sha256_exact_response_bytes",
      "coordinate_crs": "WGS84 longitude/latitude supplied by OpenStreetMap API",
      "date_semantics": "March 17, 2024 is an OSM edit date, not a project event or status confirmation.",
      "id": "cn-fourteenth-wuqing-telecom-osm",
      "kind": "openstreetmap",
      "license": "ODbL-1.0",
      "license_url": "https://opendatacommons.org/licenses/odbl/1-0/",
      "osm_last_edit_timestamp": "2024-03-17T07:52:01Z",
      "osm_way_id": 961236748,
      "osm_way_version": 2,
      "published_at": null,
      "publisher": "OpenStreetMap contributors",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-cn-fourteenth-wuqing/osm-way-961236748.json",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T17:07:23.872917+00:00",
      "source_family": "OpenStreetMap contributors",
      "source_url": "https://api.openstreetmap.org/api/0.6/way/961236748/full.json",
      "summary": "Uniquely named community-mapped China Telecom parent-campus polygon supplies auditable WGS84 geometry. Its landuse tag and edit date do not establish physical operating status.",
      "title": "Named China Telecom Jing-Jin-Ji Data Industry Park branch campus, OSM way 961236748"
    },
    "cn-seventh-haoyang-certified-address": {
      "attribution": "China Quality Certification Centre",
      "content_hash": "0bae81d179e9636c29f27512b321d2120491f6e469995dd0c014996c76940155",
      "content_hash_scope": "sha256_exact_content_decoded_http_response_body_bytes",
      "document_page_1_based": 16,
      "id": "cn-seventh-haoyang-certified-address",
      "kind": "other",
      "license": "all-rights-reserved",
      "published_at": "2025-12-25",
      "publisher": "China Quality Certification Centre",
      "raw_capture_file": "/Users/kian/Developer/datacenter_atlas/local_data/country-research-2026-10-14-cn-next-haoyang/cqc-address-register.pdf",
      "raw_capture_redistributed": false,
      "retrieved_at": "2026-10-14T13:07:24.517010+00:00",
      "source_family": "cqc-certifier",
      "source_url": "https://www.cqc.com.cn/www/upload/file/2025-12/1766987522009.pdf",
      "summary": "Page 16 row 46 names Haoyang Langfang No. 1 at No. 27 Dongfang Street, Guan County, Langfang, Hebei. Certificate CQC250920355034. Address evidence only; certificate validity is not a current operating observation.",
      "title": "CQC data center certification register updated December 25, 2025"
    }
  },
  "update": {
    "additions": [
      {
        "context_source_ids": [
          "cn-seventh-haoyang-certified-address",
          "cn-fourteenth-wuqing-iitime-field-report",
          "cn-fourteenth-wuqing-park-june-project-context",
          "cn-fourteenth-wuqing-osm-road-context"
        ],
        "country": "China",
        "country_iso_a2": "CN",
        "distinctness_review": "All 417 site and 443 project rows in the fourteenth baseline screened across serialized fields for Wuqing, Gaocun, JingJinJi, 京津冀, 高村, 武清, 汇旺, way id and coordinate stem. No same-candidate match. The nearest recorded site is China Unicom Jing-Jin-Ji Digital Technology Industrial Park, 655.0 m between representative points, a separately named operator and campus.",
        "locator": {
          "authority": "community_mapped",
          "derivation": "direct_geometry",
          "geometry": {
            "coordinates": [
              116.8418499,
              39.61580515
            ],
            "type": "Point"
          },
          "horizontal_uncertainty_metres": null,
          "identity_review": "The CQC original register identifies 中国电信股份有限公司京津冀大数据产业园数据中心 at 武清高村科技创新园汇旺道6号. IITime original field reporting locates 中国电信京津冀智能算力中心 at 武清高村数智创新园; the original CS report names the same centre and its representative 贾晋宁. OSM way 961236748 is named 中国电信股份有限公司京津冀大数据产业园分公司 and lies immediately south of mapped 汇旺路. This is a reviewed same-operator/same-locality/named-property triangulation, not an explicit source alias declaration, cadastral match or exact address geocode. The 道/路 road-label difference is retained. The much larger Gaocun park is not used as geometry.",
          "method": "osm_named_campus_vector_polygon_bounding_box_midpoint_verified_inside",
          "precision": "Representative point inside the community-mapped named China Telecom Wuqing parent campus. It does not locate particular operating buildings, Phase 4 work, an entrance, a survey point or an official boundary.",
          "scope": "campus_locator",
          "scope_class": "community_mapped_named_parent_campus_point",
          "source_id": "cn-fourteenth-wuqing-telecom-osm",
          "uncertainty_reason": "The OSM source gives no measured horizontal accuracy. Offsets to individual operating facilities and the completeness of the current campus boundary are unknown."
        },
        "name": "China Telecom Wuqing Jing-Jin-Ji — Existing Operational Facilities",
        "physical_site_stable_key": "curated:china-telecom-wuqing-jingjinji",
        "project_stable_key": "curated:china-telecom-wuqing-jingjinji:existing-operational-facilities",
        "roles": [],
        "scoped_project_details": {
          "IT_power_MW": null,
          "alias_review": "Reviewed identity triangulation across sources; sources do not explicitly declare these names interchangeable.",
          "aliases": [
            "中国电信京津冀智能算力中心",
            "中国电信股份有限公司京津冀大数据产业园数据中心",
            "中国电信股份有限公司京津冀大数据产业园分公司"
          ],
          "all_campus_complete_claimed": false,
          "building_geometry_established": false,
          "capacity_exclusion": "No selected power, rack count, compute capacity or PUE. 3.76 EFLOPS is not MW; eight data-centre and three power buildings are standing-building context and not asserted all operational.",
          "certifier_identity_observation": {
            "certificate_level": "增强级 (L3)",
            "certificate_number": "CQC240920355029",
            "certificate_valid_from": "2024-11-27",
            "certificate_valid_to": "2027-11-26",
            "certified_address": "天津市武清区高村科技创新园汇旺道6号",
            "certified_name": "中国电信股份有限公司京津冀大数据产业园数据中心",
            "date_semantics": "December 25, 2025 is the update date printed in the register. Certificate validity November 27, 2024 through November 26, 2027 is not a construction or opening interval.",
            "source_id": "cn-seventh-haoyang-certified-address",
            "source_pages": [
              1,
              14
            ]
          },
          "construction_end_date": null,
          "construction_start_date": null,
          "exact_interview_date": null,
          "exact_site_visit_date": null,
          "facility_scope": "Existing operational facilities at the named Wuqing campus; no specific building set or Phase 4 scope assigned.",
          "historical_resource_pool_construction_year": 2024,
          "historical_year_not_selected_status_date": true,
          "operation_start_date": null,
          "operator": null,
          "owner": null,
          "phase_4_excluded": true,
          "status_date_scope": "Original field-report publication confirming present operation through named project-participant account"
        },
        "site_name": "China Telecom Jing-Jin-Ji Intelligent Computing Center, Wuqing",
        "status": {
          "as_of": "2026-09-14",
          "source_id": "cn-fourteenth-wuqing-cs-participant-report",
          "summary": "The original CS field report attributes current regional customer service and unmet intelligent-compute demand to named centre representative 贾晋宁; the reporter separately observes power/card-use monitoring. Supports existing operational facilities only. Publication confirmation date; exact interview and opening dates are unknown.",
          "value": "operational"
        },
        "successor_review": "September 14 original named-participant field report is the selected current confirmation of existing operation. June 22 original official park material separately describes Phase 4 works. September 14 Phase 4 relay material was not admitted as primary status; no whole-campus completion, Phase 4 completion or later phase transition is inferred."
      }
    ],
    "base_dataset": "verified_construction_core/2026-10-15-research-fourteenth",
    "base_manifest_sha256": "975e0e8ccf811222e659d21631bf3440ecc1ffa65964a18d9507ec1e25c3fd04",
    "context_updates": [],
    "format": "datacenter-atlas-update-input-v1",
    "output": "verified_construction_core/2026-10-15-research-fifteenth",
    "source_files": [
      {
        "path": "sources/research-countries-2026-10-15-cn-fifteenth-wuqing-primary-sources.json",
        "sha256": "6c92534b9d1eff9f18162779fbf55fc3537a0a0e674d36c29b7774186d88a77b"
      }
    ],
    "status_updates": [],
    "updated_at": "2026-10-15"
  }
}
