Microsoft Middenmeer Campus West expansion (Agriport Plot B)
Announced
Netherlands · 1 project · Last reported
Summary
Proposed expansion of Microsoft's datacenters at the Agriport A7 business park in Middenmeer, Hollands Kroon, North Holland. Announced in September 2025, it would add six double-storey datacenter buildings on Plot B, a site of about 53 hectares west of the A7 next to Microsoft's AMS13-14 datacenters, plus a 10-hectare public nature area, forming one eight-building campus. Microsoft has published no capacity figure; in March 2026 the national EIA commission put the planned emergency generator capacity at about 535 MWe and used it as a proxy for electrical demand. Microsoft's indicative timeline targets a permit application in September 2026 and construction from late 2027.
Source record as of 2026-03-25 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 52.78304, 5.02536 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Approximate site reference; the exact facility position is unverified.
Projects (1)
Microsoft Middenmeer Campus West expansion (Agriport Plot B)
Announced last observed as of · Reported status
Location: Middenmeer, Hollands Kroon, Noord-Holland, NL. Point of OSM way 1428523639 in the local OpenStreetMap layer, a Microsoft area tagged as a proposed datacenter expansion west of Microsoft's existing Agriport buildings; it is consistent with Microsoft's description of Plot B west of the A7 but is not confirmed by Microsoft. Microsoft; Microsoft; Commissie voor de milieueffectrapportage
Use: Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | about 535 MW | Planned · Campus · Onsite generation | 2026-03-25 | Commission estimate derived from backup generator capacity, not planned datacenter demand published by Microsoft: the Commissie m.e.r. read the scoping document as planning 160 emergency generators of 3.3 MWe and six of about 1.1 MWe, and, assuming the power needed equals that installed generator capacity, put continuous electrical demand at about 535 MWe. It is not a permitted or contracted capacity. | Commissie voor de milieueffectrapportage |
| Land area | about 53 hectares | Planned · Campus | 2025-12 | Size of Plot B; the plan includes a 10-hectare publicly accessible nature area. | Microsoft |
| Buildings | 6 count | Planned · Campus | 2026-03-25 | New double-storey datacenter buildings, joining the two existing AMS13-14 buildings to form an eight-building campus. | Microsoft; Commissie voor de milieueffectrapportage |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Microsoft | Developer | Microsoft; Microsoft; Commissie voor de milieueffectrapportage | |
| Provincie Noord-Holland (Gedeputeerde Staten) | Government | Competent authority for the environmental permit; the Omgevingsdienst Noordzeekanaalgebied runs the EIA procedure on its behalf. | Commissie voor de milieueffectrapportage |
| Gemeente Hollands Kroon | Government | Described by Microsoft as a cooperation partner for the new phase. | Microsoft |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-09-10 | Announced | Actual | Microsoft | |
| 2025-12-03 | Other | Actual | Public information market in Middenmeer; Microsoft's indicative timeline put the start of the EIA process in December 2025. | Microsoft; Microsoft |
| 2026-03-25 | Other | Actual | Commissie m.e.r. issued its scoping advice on the environmental impact report, which is required because the emergency generators exceed 300 MW thermal. | Commissie voor de milieueffectrapportage |
| 2026-09 | Other | Planned | Indicative date for submitting the permit application. | Microsoft |
| 2027 | Construction started | Planned | Indicative start at the end of 2027, dependent on permitting. | Microsoft |
Power supply
| Type | Description | Sources |
|---|---|---|
| Other | Emergency generators (120 to 150 in the commission's background text, 160 of 3.3 MWe plus six smaller units in its reading of the scoping document) and two substations; fuel is not stated, and Microsoft says it aims to stop using diesel for backup power by 2030. | Microsoft; Commissie voor de milieueffectrapportage |
Covers only the new six-building phase and its link to AMS13-14 (Westlanderweg 50); the EIA commission says Microsoft already has nine datacenters in Middenmeer, not recorded here. The only power figure is the commission's 535 MWe estimate, which assumes continuous demand equals the planned emergency generator capacity; its background text mentions 120 to 150 generators. Microsoft's living campus page has no entry newer than 17 February 2026 (first trees planted on Plot B), so status rests on the March 2026 advice. No evidence of the planned September 2026 permit application was found; a July 2026 report of a further land purchase was not opened.
Sources for these details
- Microsoft bouwt aan toekomstbestendige datacentercampus in Middenmeer — Microsoft; publication date not stated
- Information market 3 December 2025: new datacentre development in Middenmeer — Microsoft; 2025-12
- Uitbreiding Campus West Microsoft, provincie Noord-Holland: advies over reikwijdte en detailniveau van het milieueffectrapport — Commissie voor de milieueffectrapportage; 2026-03-25
- Companies
Source and location review
- Status source
- Microsoft bouwt aan toekomstbestendige datacentercampus in Middenmeer evidence row
Microsoft · publication date not stated · Company disclosure - Locator
- Approximate site reference · Compiled location reference · approximate_site evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 216 days before the data update on 2026-10-27
Location details
- Coordinates
- 52.78304, 5.02536
- Geometry licence
- source-terms-not-recorded
- Use scope
- Approximate site reference
- Scope class
- approximate_site
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Point of OSM way 1428523639 in the local OpenStreetMap layer, a Microsoft area tagged as a proposed datacenter expansion west of Microsoft's existing Agriport buildings; it is consistent with Microsoft's description of Plot B west of the A7 but is not confirmed by Microsoft.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- d781093d
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Information market 3 December 2025: new datacentre development in Middenmeer Archived copy | Microsoft Company disclosure | Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Milestone: Construction Started, Milestone: Other, Power Source: Other, Role: Developer | source-terms-not-recorded | Microsoft | 9913c80dc544a6dfd41d3b9f59f6f6ffacd86a3554e47c51ae73082461657a5bFactual source record; not the publisher page | ||
| Microsoft bouwt aan toekomstbestendige datacentercampus in Middenmeer Archived copy | Microsoft Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Milestone: Announced, Milestone: Other, Role: Developer, Role: Government | not stated | source-terms-not-recorded | Microsoft | cc5d5db7ef446a2ec817cb81e6e29e55375246086642bc19e937cd030a413c4fFactual source record; not the publisher page | |
| Uitbreiding Campus West Microsoft, provincie Noord-Holland: advies over reikwijdte en detailniveau van het milieueffectrapport Archived copy | Commissie voor de milieueffectrapportage Government record | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Power Capacity, Milestone: Other, Power Source: Other, Role: Developer, Role: Government | source-terms-not-recorded | Commissie voor de milieueffectrapportage | f757efb0f7fdeecb7dc2bf7f206d8252233b8519ba76da02ed3773ca21b06a9aFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Microsoft Middenmeer Campus West expansion (Agriport Plot B) [site vcc-site-04be359939cf11193024]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-04be359939cf11193024/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction