Microsoft Middenmeer Campus West expansion (Agriport Plot B)

Announced

Netherlands · 1 project · Last reported

Summary

Proposed expansion of Microsoft's datacenters at the Agriport A7 business park in Middenmeer, Hollands Kroon, North Holland. Announced in September 2025, it would add six double-storey datacenter buildings on Plot B, a site of about 53 hectares west of the A7 next to Microsoft's AMS13-14 datacenters, plus a 10-hectare public nature area, forming one eight-building campus. Microsoft has published no capacity figure; in March 2026 the national EIA commission put the planned emergency generator capacity at about 535 MWe and used it as a proxy for electrical demand. Microsoft's indicative timeline targets a permit application in September 2026 and construction from late 2027.

Source record as of 2026-03-25 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 52.78304, 5.02536 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Microsoft Middenmeer Campus West expansion (Agriport Plot B)

Announced last observed as of · Reported status

Location: Middenmeer, Hollands Kroon, Noord-Holland, NL. Point of OSM way 1428523639 in the local OpenStreetMap layer, a Microsoft area tagged as a proposed datacenter expansion west of Microsoft's existing Agriport buildings; it is consistent with Microsoft's description of Plot B west of the A7 but is not confirmed by Microsoft. Microsoft; Microsoft; Commissie voor de milieueffectrapportage

Use: Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 535 MWPlanned · Campus · Onsite generation2026-03-25Commission estimate derived from backup generator capacity, not planned datacenter demand published by Microsoft: the Commissie m.e.r. read the scoping document as planning 160 emergency generators of 3.3 MWe and six of about 1.1 MWe, and, assuming the power needed equals that installed generator capacity, put continuous electrical demand at about 535 MWe. It is not a permitted or contracted capacity.Commissie voor de milieueffectrapportage
Land areaabout 53 hectaresPlanned · Campus2025-12Size of Plot B; the plan includes a 10-hectare publicly accessible nature area.Microsoft
Buildings6 countPlanned · Campus2026-03-25New double-storey datacenter buildings, joining the two existing AMS13-14 buildings to form an eight-building campus.Microsoft; Commissie voor de milieueffectrapportage

Companies and organizations

NameRoleNotesSources
MicrosoftDeveloperMicrosoft; Microsoft; Commissie voor de milieueffectrapportage
Provincie Noord-Holland (Gedeputeerde Staten)GovernmentCompetent authority for the environmental permit; the Omgevingsdienst Noordzeekanaalgebied runs the EIA procedure on its behalf.Commissie voor de milieueffectrapportage
Gemeente Hollands KroonGovernmentDescribed by Microsoft as a cooperation partner for the new phase.Microsoft

Timeline

DateEventActual or plannedNotesSources
2025-09-10AnnouncedActualMicrosoft
2025-12-03OtherActualPublic information market in Middenmeer; Microsoft's indicative timeline put the start of the EIA process in December 2025.Microsoft; Microsoft
2026-03-25OtherActualCommissie m.e.r. issued its scoping advice on the environmental impact report, which is required because the emergency generators exceed 300 MW thermal.Commissie voor de milieueffectrapportage
2026-09OtherPlannedIndicative date for submitting the permit application.Microsoft
2027Construction startedPlannedIndicative start at the end of 2027, dependent on permitting.Microsoft

Power supply

TypeDescriptionSources
OtherEmergency generators (120 to 150 in the commission's background text, 160 of 3.3 MWe plus six smaller units in its reading of the scoping document) and two substations; fuel is not stated, and Microsoft says it aims to stop using diesel for backup power by 2030.Microsoft; Commissie voor de milieueffectrapportage

Covers only the new six-building phase and its link to AMS13-14 (Westlanderweg 50); the EIA commission says Microsoft already has nine datacenters in Middenmeer, not recorded here. The only power figure is the commission's 535 MWe estimate, which assumes continuous demand equals the planned emergency generator capacity; its background text mentions 120 to 150 generators. Microsoft's living campus page has no entry newer than 17 February 2026 (first trees planted on Plot B), so status rests on the March 2026 advice. No evidence of the planned September 2026 permit application was found; a July 2026 report of a further land purchase was not opened.

Sources for these details
Companies
  • Developer: Microsoft (unknown scope) evidence
  • Developer: Microsoft (unknown scope) evidence
  • Developer: Microsoft (unknown scope) evidence
  • Government: Provincie Noord-Holland (Gedeputeerde Staten) (unknown scope) evidence
  • Government: Gemeente Hollands Kroon (unknown scope) evidence
Source and location review
Status source
Microsoft bouwt aan toekomstbestendige datacentercampus in Middenmeer evidence row
Microsoft · publication date not stated · Company disclosure
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 216 days before the data update on 2026-10-27

Location details
Coordinates
52.78304, 5.02536
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Point of OSM way 1428523639 in the local OpenStreetMap layer, a Microsoft area tagged as a proposed datacenter expansion west of Microsoft's existing Agriport buildings; it is consistent with Microsoft's description of Plot B west of the A7 but is not confirmed by Microsoft.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
d781093d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Microsoft Middenmeer Campus West expansion (Agriport Plot B)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Information market 3 December 2025: new datacentre development in Middenmeer
Archived copy
Microsoft
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Milestone: Construction Started, Milestone: Other, Power Source: Other, Role: Developersource-terms-not-recordedMicrosoft9913c80dc544a6dfd41d3b9f59f6f6ffacd86a3554e47c51ae73082461657a5b
Factual source record; not the publisher page
Microsoft bouwt aan toekomstbestendige datacentercampus in Middenmeer
Archived copy
Microsoft
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Milestone: Announced, Milestone: Other, Role: Developer, Role: Governmentnot statedsource-terms-not-recordedMicrosoftcc5d5db7ef446a2ec817cb81e6e29e55375246086642bc19e937cd030a413c4f
Factual source record; not the publisher page
Uitbreiding Campus West Microsoft, provincie Noord-Holland: advies over reikwijdte en detailniveau van het milieueffectrapport
Archived copy
Commissie voor de milieueffectrapportage
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Power Capacity, Milestone: Other, Power Source: Other, Role: Developer, Role: Governmentsource-terms-not-recordedCommissie voor de milieueffectrapportagef757efb0f7fdeecb7dc2bf7f206d8252233b8519ba76da02ed3773ca21b06a9a
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Microsoft Middenmeer Campus West expansion (Agriport Plot B) [site vcc-site-04be359939cf11193024]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-04be359939cf11193024/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction