Google Waltham Cross data centre

Operational

United Kingdom · 1 project · Last reported

Summary

Google data centre on a 33-acre site in Waltham Cross, Hertfordshire, England. Google announced a $1 billion investment in the new facility in January 2024, describing air-based cooling with provision for off-site heat recovery to nearby homes and businesses. Chancellor Rachel Reeves opened the data centre in September 2025, when Google also announced a two-year GBP 5 billion UK investment covering capital spending, R&D and engineering. Google says the site supports AI services, Google Cloud, Search and Maps. Power capacity has not been disclosed.

Source record as of 2025-09-16 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 51.68580, -0.03300 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Google Waltham Cross data centre

Operational last observed as of · Reported status

Location: Waltham Cross, Hertfordshire, England, GB. Town centroid of Waltham Cross via Nominatim; Google's sources name the town but not the street address. Google; Google; Google

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Investment1,000,000,000 USDAnnounced · Campus2024-01-18Google
Land area33 acresReported · Campus2024-01-18Google

Companies and organizations

NameRoleNotesSources
GoogleDeveloperGoogle
GoogleOperatorGoogle; Google

Timeline

DateEventActual or plannedNotesSources
2024-01-18AnnouncedActualGoogle
2025-09-16First operationalActualOpening by the Chancellor reported in Google's post of this date.Google; Google

Power supply

TypeDescriptionSources
WindGoogle's 2022 offshore wind PPA with ENGIE for the Moray West farm in Scotland, adding 100 MW to the grid, covers its UK operations rather than this site alone.Google
Battery storageShell manages Google's UK carbon-free energy portfolio and is to deploy battery technology that stores surplus clean energy for the grid; the arrangement is UK-wide, not specific to this site.Google

The GBP 5 billion figure announced at the opening is a two-year UK-wide programme covering capital spending, R&D and engineering, including Google DeepMind research, so it is not recorded as a campus investment. Google's location page says the facility uses air cooling that limits water use to domestic needs.

Sources for these details
Companies
  • Developer: Google (unknown scope) evidence
  • Operator: Google (unknown scope) evidence
  • Operator: Google (unknown scope) evidence
Source and location review
Status source
Our new Waltham Cross data center is part of our two-year, £5 billion investment to help power the UK's AI economy evidence row
Google · published 2025-09-16 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 406 days before the data update on 2026-10-27

Location details
Coordinates
51.68580, -0.03300
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Town centroid of Waltham Cross via Nominatim; Google's sources name the town but not the street address.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
99547e51

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Google Waltham Cross data centre
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Our $1 billion investment in a new UK data centre
Archived copy
Google
Company disclosure
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Land Area, Milestone: Announced, Power Source: Wind, Role: Developersource-terms-not-recordedGoogle80fd8f1a8310d706a6177fbfe1cbef5e137b911f9cee0b77369829b77411ab98
Factual source record; not the publisher page
Our new Waltham Cross data center is part of our two-year, £5 billion investment to help power the UK's AI economy
Archived copy
Google
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Milestone: First Operational, Power Source: Battery Storage, Operator claimsource-terms-not-recordedGoogleafdb12348c055c23b3ae941834b6432f3321ca6ba3ef98e452612432e9bb6046
Factual source record; not the publisher page
Waltham Cross, United Kingdom - Google Data Center Location
Archived copy
Google
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Milestone: First Operational, Operator claimnot statedsource-terms-not-recordedGoogle77084937c1c001dd93891f4f4ad1d2627605c24bc7ed71405fc2d2a354b7c3e3
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Google Waltham Cross data centre [site vcc-site-078fc4166e995b536458]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-078fc4166e995b536458/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction