Bell AI Fabric Sherwood campus (Regina area)

Under construction

Canada · 1 project · Last reported

Summary

Bell Canada is building a 300 MW Bell AI Fabric data centre campus in the Rural Municipality of Sherwood, which surrounds Regina, Saskatchewan. In October 2026 Bell reported structural steel rising on all four first-phase buildings, more than 500 workers on site and the first data hall on track to operate in the first half of 2027. In September 2026 Bell and the Government of Saskatchewan signed a non-binding memorandum for up to 900 MW more, which would make the Sherwood campus the first phase of a potential 1.2 GW provincial AI hub.

Source record as of 2026-10-01 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 50.47300, -104.62700 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

County or district reference only; the facility position is not established.

Projects (1)

Bell AI Fabric Sherwood campus (Regina area)

Under construction last observed as of · Reported status

Location: Regina area, Rural Municipality of Sherwood No. 159, Saskatchewan, CA. Bell names only the rural municipality. Coordinates are the RM's published reference point (Wikipedia infobox); because the RM surrounds Regina, this point is near the city and is not the campus site. BCE Inc.

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity300 MWUnder construction · Campus · Unspecified2026-10-01Bell describes this campus as the first phase of a potential 1.2 GW hub; the additional up to 900 MW under the September 2026 memorandum is not tied to a named site.BCE Inc.; Government of Saskatchewan
Buildings4 countUnder construction · Phase · First phase2026-10-01BCE Inc.
Jobs constructionmore than 500 countReported · Campus2026-10-01Workers on site at the time of the update.BCE Inc.

Companies and organizations

NameRoleNotesSources
Bell CanadaDeveloperDevelops the campus under its Bell AI Fabric program.BCE Inc.; BCE Inc.
Government of SaskatchewanGovernmentSigned a non-binding memorandum with Bell and says it approved the expansion under its Data Centre Framework.BCE Inc.; BCE Inc.; Government of Saskatchewan
Dynamo ElectricBuilderBuilding the high-voltage substation that connects the campus to the provincial grid.BCE Inc.

Timeline

DateEventActual or plannedNotesSources
2026-09-14Expansion announcedActualNon-binding memorandum with the Government of Saskatchewan for phased development of up to 900 MW of additional capacity, which the province says it approved under its Data Centre Framework; contingent on customers, agreements and approvals.BCE Inc.; Government of Saskatchewan
2027-H1First operationalPlannedFirst data hall expected to begin operating.BCE Inc.

Power supply

TypeDescriptionSources
GridThe province says the original 300 MW comes from the provincial grid; a new high-voltage substation will connect the campus.BCE Inc.; Government of Saskatchewan
OtherExpansion of up to 900 MW would use Bell-arranged generation under the province's bring-your-own-power approach; Bell describes it as partner-developed natural gas generation. Siting relative to the campus was not stated.BCE Inc.; Government of Saskatchewan

Bell says total capital investment across its Saskatchewan presence, including data centre infrastructure, customer compute and power generation, could exceed 50 billion dollars if fully realized; this is province-wide and not recorded as a campus metric.

Sources for these details

The federal Impact Assessment Agency's registry identifies Bell Canada's 300 MW AI data centre on a 65-hectare agricultural site in the Rural Municipality of Sherwood. On June 5, 2026, the agency declined designation requests because the physical activity had substantially begun. This adds federal identity and site-size context; the status remains the October 1 construction observation, and the registry's approximate map marker is not used as a location. evidence

Impact Assessment Agency of Canada · published 2026-06-05

Companies
  • Developer: Bell Canada (unknown scope) evidence
  • Developer: Bell Canada (unknown scope) evidence
  • Government: Government of Saskatchewan (unknown scope) evidence
  • Government: Government of Saskatchewan (unknown scope) evidence
  • Government: Government of Saskatchewan (unknown scope) evidence
  • Builder: Dynamo Electric (unknown scope) evidence
Source and location review
Status source
Bell AI Fabric provides construction update in Saskatchewan, announces $1 million mental health commitment evidence row
BCE Inc. · published 2026-10-01 · Company disclosure
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 26 days before the data update on 2026-10-27

Location details
Coordinates
50.47300, -104.62700
Geometry licence
source-terms-not-recorded
Use scope
County or district reference only
Scope class
admin2
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Bell names only the rural municipality. Coordinates are the RM's published reference point (Wikipedia infobox); because the RM surrounds Regina, this point is near the city and is not the campus site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
34f860f9

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Bell AI Fabric Sherwood campus (Regina area)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Bell AI Fabric provides construction update in Saskatchewan, announces $1 million mental health commitment
Archived copy
BCE Inc.
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Jobs Construction, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Builder, Role: Developer, Role: Governmentsource-terms-not-recordedBCE Inc.7c2c6720e34101b3d39a54537c1a816432b2eab6bcd2507edf681ad0c2df5277
Factual source record; not the publisher page
Bell AI Fabric to expand nation-building project in Saskatchewan with up to 900 MW of additional power
Archived copy
BCE Inc.
Company disclosure
Imported: Record, Milestone: Expansion Announced, Power Source: Other, Role: Developer, Role: Governmentsource-terms-not-recordedBCE Inc.426fb43b5ba2695cb86b9ce9aae2d94a4559d57bf33564740ad7e6045de628d6
Factual source record; not the publisher page
Canadian Impact Assessment Registry: Bell AI Fabric Data Centre Project (reference 90514)
Archived copy
Impact Assessment Agency of Canada
Government record
Site and project identityCrown copyright; Canada.ca terms and conditionsImpact Assessment Agency of Canada70b08db724b1c14fb11d1bc83c0caf0346f62c9b573c8739a033c42f807bc067
Retained source material; see source provenance
Single Largest Private Sector Capital Investment in History of Canada Through Bell AI's Saskatchewan Expansion
Archived copy
Government of Saskatchewan
Government record
Imported: Record, Metric: Power Capacity, Milestone: Expansion Announced, Power Source: Grid, Power Source: Other, Role: Governmentsource-terms-not-recordedGovernment of Saskatchewan5725e317da98c74a7f75af6b3526d3241bb7f4c51468489663ac76cdd483a596
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Bell AI Fabric Sherwood campus (Regina area) [site vcc-site-0834945607ed54e349ce]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0834945607ed54e349ce/