Bell AI Fabric Sherwood campus (Regina area)
Under construction
Canada · 1 project · Last reported
Summary
Bell Canada is building a 300 MW Bell AI Fabric data centre campus in the Rural Municipality of Sherwood, which surrounds Regina, Saskatchewan. In October 2026 Bell reported structural steel rising on all four first-phase buildings, more than 500 workers on site and the first data hall on track to operate in the first half of 2027. In September 2026 Bell and the Government of Saskatchewan signed a non-binding memorandum for up to 900 MW more, which would make the Sherwood campus the first phase of a potential 1.2 GW provincial AI hub.
Source record as of 2026-10-01 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 50.47300, -104.62700 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
County or district reference only; the facility position is not established.
Projects (1)
Bell AI Fabric Sherwood campus (Regina area)
Under construction last observed as of · Reported status
Location: Regina area, Rural Municipality of Sherwood No. 159, Saskatchewan, CA. Bell names only the rural municipality. Coordinates are the RM's published reference point (Wikipedia infobox); because the RM surrounds Regina, this point is near the city and is not the campus site. BCE Inc.
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 300 MW | Under construction · Campus · Unspecified | 2026-10-01 | Bell describes this campus as the first phase of a potential 1.2 GW hub; the additional up to 900 MW under the September 2026 memorandum is not tied to a named site. | BCE Inc.; Government of Saskatchewan |
| Buildings | 4 count | Under construction · Phase · First phase | 2026-10-01 | BCE Inc. | |
| Jobs construction | more than 500 count | Reported · Campus | 2026-10-01 | Workers on site at the time of the update. | BCE Inc. |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Bell Canada | Developer | Develops the campus under its Bell AI Fabric program. | BCE Inc.; BCE Inc. |
| Government of Saskatchewan | Government | Signed a non-binding memorandum with Bell and says it approved the expansion under its Data Centre Framework. | BCE Inc.; BCE Inc.; Government of Saskatchewan |
| Dynamo Electric | Builder | Building the high-voltage substation that connects the campus to the provincial grid. | BCE Inc. |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-09-14 | Expansion announced | Actual | Non-binding memorandum with the Government of Saskatchewan for phased development of up to 900 MW of additional capacity, which the province says it approved under its Data Centre Framework; contingent on customers, agreements and approvals. | BCE Inc.; Government of Saskatchewan |
| 2027-H1 | First operational | Planned | First data hall expected to begin operating. | BCE Inc. |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | The province says the original 300 MW comes from the provincial grid; a new high-voltage substation will connect the campus. | BCE Inc.; Government of Saskatchewan |
| Other | Expansion of up to 900 MW would use Bell-arranged generation under the province's bring-your-own-power approach; Bell describes it as partner-developed natural gas generation. Siting relative to the campus was not stated. | BCE Inc.; Government of Saskatchewan |
Bell says total capital investment across its Saskatchewan presence, including data centre infrastructure, customer compute and power generation, could exceed 50 billion dollars if fully realized; this is province-wide and not recorded as a campus metric.
Sources for these details
- Bell AI Fabric to expand nation-building project in Saskatchewan with up to 900 MW of additional power — BCE Inc.; 2026-09-14
- Bell AI Fabric provides construction update in Saskatchewan, announces $1 million mental health commitment — BCE Inc.; 2026-10-01
- Single Largest Private Sector Capital Investment in History of Canada Through Bell AI's Saskatchewan Expansion — Government of Saskatchewan; 2026-09-14
The federal Impact Assessment Agency's registry identifies Bell Canada's 300 MW AI data centre on a 65-hectare agricultural site in the Rural Municipality of Sherwood. On June 5, 2026, the agency declined designation requests because the physical activity had substantially begun. This adds federal identity and site-size context; the status remains the October 1 construction observation, and the registry's approximate map marker is not used as a location. evidence
Impact Assessment Agency of Canada · published 2026-06-05
- Companies
- Developer: Bell Canada (unknown scope) evidence
- Developer: Bell Canada (unknown scope) evidence
- Government: Government of Saskatchewan (unknown scope) evidence
- Government: Government of Saskatchewan (unknown scope) evidence
- Government: Government of Saskatchewan (unknown scope) evidence
- Builder: Dynamo Electric (unknown scope) evidence
Source and location review
- Status source
- Bell AI Fabric provides construction update in Saskatchewan, announces $1 million mental health commitment evidence row
BCE Inc. · published 2026-10-01 · Company disclosure - Locator
- County or district reference only · Compiled location reference · admin2 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 26 days before the data update on 2026-10-27
Location details
- Coordinates
- 50.47300, -104.62700
- Geometry licence
- source-terms-not-recorded
- Use scope
- County or district reference only
- Scope class
- admin2
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Bell names only the rural municipality. Coordinates are the RM's published reference point (Wikipedia infobox); because the RM surrounds Regina, this point is near the city and is not the campus site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 34f860f9
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Bell AI Fabric provides construction update in Saskatchewan, announces $1 million mental health commitment Archived copy | BCE Inc. Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Jobs Construction, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Builder, Role: Developer, Role: Government | source-terms-not-recorded | BCE Inc. | 7c2c6720e34101b3d39a54537c1a816432b2eab6bcd2507edf681ad0c2df5277Factual source record; not the publisher page | ||
| Bell AI Fabric to expand nation-building project in Saskatchewan with up to 900 MW of additional power Archived copy | BCE Inc. Company disclosure | Imported: Record, Milestone: Expansion Announced, Power Source: Other, Role: Developer, Role: Government | source-terms-not-recorded | BCE Inc. | 426fb43b5ba2695cb86b9ce9aae2d94a4559d57bf33564740ad7e6045de628d6Factual source record; not the publisher page | ||
| Canadian Impact Assessment Registry: Bell AI Fabric Data Centre Project (reference 90514) Archived copy | Impact Assessment Agency of Canada Government record | Site and project identity | Crown copyright; Canada.ca terms and conditions | Impact Assessment Agency of Canada | 70b08db724b1c14fb11d1bc83c0caf0346f62c9b573c8739a033c42f807bc067Retained source material; see source provenance | ||
| Single Largest Private Sector Capital Investment in History of Canada Through Bell AI's Saskatchewan Expansion Archived copy | Government of Saskatchewan Government record | Imported: Record, Metric: Power Capacity, Milestone: Expansion Announced, Power Source: Grid, Power Source: Other, Role: Government | source-terms-not-recorded | Government of Saskatchewan | 5725e317da98c74a7f75af6b3526d3241bb7f4c51468489663ac76cdd483a596Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Bell AI Fabric Sherwood campus (Regina area) [site vcc-site-0834945607ed54e349ce]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0834945607ed54e349ce/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction