DayOne Nusajaya Tech Park (NTP) Data Center Campus

Operational

Malaysia · 1 project · Last reported

Summary

DayOne's NTP campus at Nusajaya Tech Park, Iskandar Puteri, Johor is a commercial hyperscale data-centre campus. Its F-1 registration statement, filed October 5, 2026, reports NTP's share of Capacity In Service as of September 20, 2026: 47.8% of the 962 MW total. The filing defines that capacity as ready for service and fully fitted out. The campus opened in 2023. Johor's separate 616 MW of capacity under construction is not allocated between NTP and KTP and is not attributed to this record. evidence

DayOne Data Centers Limited via SEC EDGAR · published 2026-10-05

Location

The interactive map needs JavaScript. Display anchor: 1.43437, 103.59966 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

DayOne NTP Data Center Campus — in-service capacity

Operational last observed as of · Authoritative status update

DayOne's official Johor page says it operates across two Johor campuses, Nusajaya Tech Park (NTP) and Kempas Tech Park (KTP). It says NTP has operated since 2023 and lists LEED certifications for buildings NTP1 to NTP7, NTP9 and NTP12. The page's undated capacity figures (390 MW in service; over 478 MW operational) disagree and are not used. evidence

DayOne Data Centers · publication date not stated

DayOne opened its Nusajaya Tech Park data-centre campus, also called the DayOne NTP Data Center Campus, on August 10, 2023. Phase 1 comprised NTP1, NTP2 and NTP3, with a 69.5 MW total IT power capacity. evidence

DayOne Data Centers · published 2023-08-10

Companies
  • Operator: DayOne Data Centers Limited (current) evidence
Source and location review
Status source
DayOne Data Centers Limited Form F-1 registration statement, filed October 5, 2026 (Internet Archive copy of the EDGAR document) evidence row
DayOne Data Centers Limited via SEC EDGAR · published 2026-10-05 · Regulatory filing
Locator
Campus locator · Compiled location reference · operator_listed_named_campus_feature evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 37 days before the data update on 2026-10-27

Location details
Coordinates
1.43437, 103.59966
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
operator_listed_named_campus_feature
Authority
Compiled location reference
Source entity
Campus
Method
direct_google_maps_named_facility_response_coordinates
Derivation
direct_geometry
Precision scope
Google named DayOne Nusajaya Tech Park (NTP) data-centre campus feature at No.3 Lingkaran, Jalan Teknologi Perintis 1, Taman Teknologi Nusajaya, used to locate the campus. It is not a surveyed footprint, campus boundary, parcel boundary, entrance or individual-building location.
Horizontal uncertainty
Not reported

The map feature does not publish a surveyed horizontal accuracy.

Geometry evidence
eb83c423

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for DayOne Nusajaya Tech Park (NTP) Data Center Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
DayOne Data Centers launches Nusajaya Tech Park data center campus in Johor, Malaysia
Archived copy
DayOne Data Centers
Company disclosure
Site and project identityall-rights-reservedDayOne Data Centers2f373ebf08b2ca6ab24d42fc888e3544182b8173d4307f949b9371e8ea8b4eac
Retained source material; see source provenance
DayOne Data Centers Limited Form F-1 registration statement, filed October 5, 2026 (Internet Archive copy of the EDGAR document)
Archived copy
DayOne Data Centers Limited via SEC EDGAR
Regulatory filing
Physical status, Operator claim, Owner claimsource-terms-not-recordedDayOne Data Centers Limited; U.S. Securities and Exchange Commission EDGAR; archived by the Internet Archive Wayback Machineef2d8312d6f912c7480d5e7a5e54b11c47918e85c16c4ae5a436871445aab2f0
Retained source material; see source provenance
DayOne: Johor, Malaysia data center market page (NTP and KTP campuses)
Archived copy
DayOne Data Centers
Company disclosure
Site and project identitynot statedall-rights-reservedDayOne Data Centersaf7834a6c497550a35d05f5385296939d2854828a2639bbf4ee0a3bc4c1c01a1
Retained source material; see source provenance
Google Maps named feature: DayOne Nusajaya Tech Park (NTP) Data Center
Archived copy
Google Maps
Map feature
Geometrynot statedall-rights-reservedGoogle Maps50899bd35dc5e18098f47aa943ce47730f2e58d49edbb315072babbc55996486
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). DayOne Nusajaya Tech Park (NTP) Data Center Campus [site vcc-site-163f6ec5acc49b77191a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-163f6ec5acc49b77191a/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction