DayOne Nusajaya Tech Park (NTP) Data Center Campus
Operational
Malaysia · 1 project · Last reported
Summary
DayOne's NTP campus at Nusajaya Tech Park, Iskandar Puteri, Johor is a commercial hyperscale data-centre campus. Its F-1 registration statement, filed October 5, 2026, reports NTP's share of Capacity In Service as of September 20, 2026: 47.8% of the 962 MW total. The filing defines that capacity as ready for service and fully fitted out. The campus opened in 2023. Johor's separate 616 MW of capacity under construction is not allocated between NTP and KTP and is not attributed to this record. evidence
DayOne Data Centers Limited via SEC EDGAR · published 2026-10-05
Location
The interactive map needs JavaScript. Display anchor: 1.43437, 103.59966 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
DayOne NTP Data Center Campus — in-service capacity
Operational last observed as of · Authoritative status update
DayOne's official Johor page says it operates across two Johor campuses, Nusajaya Tech Park (NTP) and Kempas Tech Park (KTP). It says NTP has operated since 2023 and lists LEED certifications for buildings NTP1 to NTP7, NTP9 and NTP12. The page's undated capacity figures (390 MW in service; over 478 MW operational) disagree and are not used. evidence
DayOne Data Centers · publication date not stated
DayOne opened its Nusajaya Tech Park data-centre campus, also called the DayOne NTP Data Center Campus, on August 10, 2023. Phase 1 comprised NTP1, NTP2 and NTP3, with a 69.5 MW total IT power capacity. evidence
DayOne Data Centers · published 2023-08-10
- Companies
- Operator: DayOne Data Centers Limited (current) evidence
Source and location review
- Status source
- DayOne Data Centers Limited Form F-1 registration statement, filed October 5, 2026 (Internet Archive copy of the EDGAR document) evidence row
DayOne Data Centers Limited via SEC EDGAR · published 2026-10-05 · Regulatory filing - Locator
- Campus locator · Compiled location reference · operator_listed_named_campus_feature evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 37 days before the data update on 2026-10-27
Location details
- Coordinates
- 1.43437, 103.59966
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- operator_listed_named_campus_feature
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- direct_google_maps_named_facility_response_coordinates
- Derivation
- direct_geometry
- Precision scope
- Google named DayOne Nusajaya Tech Park (NTP) data-centre campus feature at No.3 Lingkaran, Jalan Teknologi Perintis 1, Taman Teknologi Nusajaya, used to locate the campus. It is not a surveyed footprint, campus boundary, parcel boundary, entrance or individual-building location.
- Horizontal uncertainty
Not reported
The map feature does not publish a surveyed horizontal accuracy.
- Geometry evidence
- eb83c423
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| DayOne Data Centers launches Nusajaya Tech Park data center campus in Johor, Malaysia Archived copy | DayOne Data Centers Company disclosure | Site and project identity | all-rights-reserved | DayOne Data Centers | 2f373ebf08b2ca6ab24d42fc888e3544182b8173d4307f949b9371e8ea8b4eacRetained source material; see source provenance | ||
| DayOne Data Centers Limited Form F-1 registration statement, filed October 5, 2026 (Internet Archive copy of the EDGAR document) Archived copy | DayOne Data Centers Limited via SEC EDGAR Regulatory filing | Physical status, Operator claim, Owner claim | source-terms-not-recorded | DayOne Data Centers Limited; U.S. Securities and Exchange Commission EDGAR; archived by the Internet Archive Wayback Machine | ef2d8312d6f912c7480d5e7a5e54b11c47918e85c16c4ae5a436871445aab2f0Retained source material; see source provenance | ||
| DayOne: Johor, Malaysia data center market page (NTP and KTP campuses) Archived copy | DayOne Data Centers Company disclosure | Site and project identity | not stated | all-rights-reserved | DayOne Data Centers | af7834a6c497550a35d05f5385296939d2854828a2639bbf4ee0a3bc4c1c01a1Retained source material; see source provenance | |
| Google Maps named feature: DayOne Nusajaya Tech Park (NTP) Data Center Archived copy | Google Maps Map feature | Geometry | not stated | all-rights-reserved | Google Maps | 50899bd35dc5e18098f47aa943ce47730f2e58d49edbb315072babbc55996486Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). DayOne Nusajaya Tech Park (NTP) Data Center Campus [site vcc-site-163f6ec5acc49b77191a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-163f6ec5acc49b77191a/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction