Bridge Data Centres MY06, Sedenak Tech Park

Operational

Malaysia · 1 project · Last reported

Summary

Bridge Data Centres' MY06 hyperscale campus sits in Kidex Sedenak, part of the Sedenak Tech Park in Kulai District, Johor. Announced in December 2021 as a three-building, 100 MW IT campus on about 40 acres with RM2.5 billion of investment over five years, its first 20 MW building was built with prefabricated modules and opened in November 2022, with ByteDance as anchor tenant. Bridge now lists MY06 at 508 MW of IT capacity across 15 buildings, and in September 2026 described the Sedenak campus as a fully operating hyperscale site.

Source record as of 2026-09-15 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 1.71370, 103.52480 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Bridge Data Centres MY06, Sedenak Tech Park

Operational last observed as of · Reported status

Location: Sedenak (Sedenak Tech Park), Kulai District, Johor, MY. Sources place the campus in Kidex Sedenak, within the Sedenak Technology Valley (Sedenak Tech Park), without an address; the point is the Sedenak coordinate from its Wikipedia article, so it marks the locality rather than the parcel. Malaysian Investment Development Authority (MIDA); The Iskandarian; W.Media; Bridge Data Centres; Wikipedia

Use: Colocation, Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity100 MWPlanned · Campus · It load2021-12-02Original plan for three buildings; the 2022 opening coverage gave 110 MW for the same three-building project.Malaysian Investment Development Authority (MIDA)
Power capacity110 MWPlanned · Campus · It load2022-11-21W.Media gives 110 MW of IT power; The Iskandarian gives 110 MW without a scope.The Iskandarian; W.Media
Power capacity20 MWOperational · Phase · Unspecified · Phase 1 (first building)2022-11-21W.Media
Power capacity508 MWPlanned · Campus · It load2026-10-09Total IT capacity listed for MY06 on Bridge's undated Malaysia locations page; the page does not say how much of it is built.Bridge Data Centres
Investmentabout 2,500,000,000 MYRAnnounced · Campus2021-12-02Estimated investment over five years for the original 100 MW plan.Malaysian Investment Development Authority (MIDA)
Buildings3 countPlanned · Campus2021-12-02Original plan.Malaysian Investment Development Authority (MIDA); The Iskandarian
Buildings15 countPlanned · Campus2026-10-09Campus building count listed on Bridge's locations page; construction status of each building is not given.Bridge Data Centres
Land areaabout 40 acresReported · Campus2021-12-02The Iskandarian gave 38 acres at the 2022 opening.Malaysian Investment Development Authority (MIDA)

Companies and organizations

NameRoleNotesSources
Bridge Data CentresDeveloperDescribed as a subsidiary of Chindata Group at announcement; later coverage says it is backed by Bain Capital.Malaysian Investment Development Authority (MIDA); The Iskandarian; W.Media
Bridge Data CentresOperatorBridge Data Centres; Bridge Data Centres
ByteDance System Sdn. Bhd.TenantNamed as anchor tenant at the phase 1 opening.The Iskandarian
Bain CapitalInvestorBacker of Bridge's Southeast Asian hyperscale expansion.The Iskandarian
Tenaga Nasional BerhadUtilityListed among the agencies and utilities supporting the opening.The Iskandarian

Timeline

DateEventActual or plannedNotesSources
2021-12-02AnnouncedActualMalaysian Investment Development Authority (MIDA)
2021-11Construction startedActualThe Iskandarian dates the groundbreaking to November 2021, with phase 1 finished about 314 days later.The Iskandarian
2022-11First operationalActualGrand opening of the first building, handed over to the anchor tenant.The Iskandarian; W.Media

Power supply

TypeDescriptionSources
GridBridge lists a 275 kV power intake for MY06; Tenaga Nasional Berhad was among the supporting parties at the opening.The Iskandarian; Bridge Data Centres

Status rests on a September 2026 Bridge staff profile describing the Sedenak campus as fully operating; it does not say whether all 15 buildings and 508 MW now listed for MY06 are complete, so the larger figure is recorded as planned. Wikipedia is cited only for the locality coordinate.

Sources for these details
Companies
  • Developer: Bridge Data Centres (unknown scope) evidence
  • Developer: Bridge Data Centres (unknown scope) evidence
  • Developer: Bridge Data Centres (unknown scope) evidence
  • Operator: Bridge Data Centres (unknown scope) evidence
  • Operator: Bridge Data Centres (unknown scope) evidence
  • Tenant: ByteDance System Sdn. Bhd. (unknown scope) evidence
  • Investor: Bain Capital (unknown scope) evidence
  • Utility: Tenaga Nasional Berhad (unknown scope) evidence
Source and location review
Status source
Powering Malaysia's Digital Future evidence row
Bridge Data Centres · published 2026-09-15 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 42 days before the data update on 2026-10-27

Location details
Coordinates
1.71370, 103.52480
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources place the campus in Kidex Sedenak, within the Sedenak Technology Valley (Sedenak Tech Park), without an address; the point is the Sedenak coordinate from its Wikipedia article, so it marks the locality rather than the parcel.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
6b6e6695

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Bridge Data Centres MY06, Sedenak Tech Park
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Bridge Data Centres announces construction of its fourth hyperscale data centre campus in Johor, Malaysia
Archived copy
Malaysian Investment Development Authority (MIDA)
Government record
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Role: Developersource-terms-not-recordedMalaysian Investment Development Authority (MIDA)37de0dfd28bd2a6147303369e592d8a8c27e8eb76902eb4e3d1b80fec929a693
Factual source record; not the publisher page
Building Malaysia's Digital Future
Archived copy
Bridge Data Centres
Company disclosure
Imported: Geometry, Imported: Record, Operator claimsource-terms-not-recordedBridge Data Centres963a363724b8cad389c6a89b7c68ff4182b6d63724ab58286df9d131d8007b40
Factual source record; not the publisher page
How Bridge's MY06 is Rewriting the Rules of Data Centre Construction
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: First Operational, Role: Developersource-terms-not-recordedW.Media7b85e7c0823986f465d20c235461512f29959f968d29d88073f41f8388dfa6cf
Factual source record; not the publisher page
Malaysia locations
Archived copy
Bridge Data Centres
Company disclosure
Imported: Record, Metric: Buildings, Metric: Power Capacity, Power Source: Gridnot statedsource-terms-not-recordedBridge Data Centres122bf011a6215cb8a005cd21e8e54c24602b076fda4ceff45ac9a809e3f16800
Factual source record; not the publisher page
Powering Malaysia's Digital Future
Archived copy
Bridge Data Centres
Company disclosure
Imported: Record, Imported: Status, Operator claimsource-terms-not-recordedBridge Data Centresacd40876114aa8e1fa1fc98f164243693635dc92b9417465019833141ed72018
Factual source record; not the publisher page
Sedenak
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia124597bda6af796585893f9d1829efe4c01402f8756c92534458ce676ca082da
Factual source record; not the publisher page
The First Phase Hyperscale Data Centre in Johor Malaysia Commenced
Archived copy
The Iskandarian
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Power Capacity, Milestone: Construction Started, Milestone: First Operational, Power Source: Grid, Role: Developer, Role: Investor, Tenant claim, Role: Utilitysource-terms-not-recordedThe Iskandarian9fedcb33a477ed57e1bee75fd9c824a5f95c1f8f80e99e3e41700d5a955f5bb9
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Bridge Data Centres MY06, Sedenak Tech Park [site vcc-site-18b5f6f9e4309fa610af]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-18b5f6f9e4309fa610af/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction