SDC-EN Meath I data storage campus, Bracetown and Gunnocks, north of Clonee, Co. Meath

Announced

Ireland · 1 project · Last reported

Summary

In a letter dated 17 September 2026 (posted to the EPA's LEAP site on 18 September) An Coimisiún Pleanála answered the EPA's 4 September consultation on industrial emissions licence application P1239-01, identifying its case ABP-307546-20 (Meath County Council RA191593) as the construction of four two-storey data storage buildings, a single-storey storage centre, a single-storey MV operations building and a two-storey office building at Bracetown & Gunnocks, to the north of Clonee, and referring the Agency to the Commission Order. This dated government record identifies the project and supports announced status as of 17 September 2026. The Board Order signed on 5 July 2021 granted permission for 10 years and the applicant states that legal challenges were dismissed, but the in-window letter does not itself restate the grant or its current effect, so permitted status is not asserted. The applicant's May 2026 filings describe the site as greenfield agricultural land and estimate Phase 1 (DC1 and DC3) ready for operation in Q3/Q4 2028, a forecast that is not used. No site works, construction, completion or operation is claimed. evidence

An Coimisiún Pleanála, published by the Environmental Protection Agency (Ireland) · published 2026-09-17

Location

The interactive map needs JavaScript. Display anchor: 53.42855, -6.45270 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

SDC-EN Meath I — four two-storey data storage buildings DC1-DC4 (An Bord Pleanála ABP-307546-20 / Meath RA191593; EPA IE licence application P1239-01)

Announced last observed as of · Project announcement

The Agency finds the application (received 29 June 2026) not yet compliant and requests updated air dispersion modelling with representative background concentrations, a demonstration that the BAT-associated emission levels can be met by all generators in Phase 1, Phase 2 and Phase 3, noise assessment using standard limits for continuous back-up generator operation, climate information per phase, and details of any national grid connection or offer and of the grid supply per phase. evidence

Environmental Protection Agency (Ireland) · published 2026-10-05

On behalf of the applicant, the agent explains that site notices at the Sdc-En Meath I Limited site at Bracetown & Gunnocks, to the north of Clonee (Irish Grid Reference E 302899, N 243140), erected on 16 June 2026, were removed early on 21 July 2026 and re-erected on 11 August 2026; the reproduced notices state that SDC-EN Meath I Limited (company no. 650645) applies for an industrial emissions licence for the installation at that grid reference, class 2.1. evidence

Sdc-En Meath I Limited (agent AWN Consulting Ltd), published by the Environmental Protection Agency (Ireland) · published 2026-08-11

SDC-EN Meath I Limited applies for an IE licence for its data storage facility at Bracetown & Gunnocks, to the north of Clonee (licence area c. 22.8 ha), replacing an application of 11 November 2025 withdrawn after changes to the phasing. Phase 1 would operate data centres DC1 and DC3 before grid connection, powered by 36 continuous-rated temporary power generation (TPG) generators at the DC2 and DC4 locations, with 18 back-up generators at each data centre; Phase 2 connects DC1 and DC3 to the grid; Phase 3 builds DC2 and DC4, giving four data centres and 72 back-up generators (combined thermal input 543.64 MWth in Phases 1-2 and 577.84 MWth in Phase 3). It states that the development of four data centres received final grant from Meath County Council (RA/191593, 17 June 2020) and An Bord Pleanála (ABP-307546, stated as 24 June 2021), that legal challenges have been dismissed, and that Meath County Council declared the temporary TPG use exempt in September 2025 and June 2026. Its timeline estimates Phase 1 'ready for operational commencement' in Q3/Q4 2028. evidence

SDC-EN Meath I Limited (prepared by AWN Consulting Ltd), published by the Environmental Protection Agency (Ireland) · published 2026-07-07

The operational report describes the site at Bracetown & Gunnocks, to the north of Clonee, as currently agricultural land zoned for development and a large greenfield area, with the existing Meta ICT facility nearby; it repeats the three-phase description, the RA/191593 planning description (four two-storey data storage buildings to be constructed in a minimum of four phases) and the Q3/Q4 2028 Phase 1 estimate. evidence

SDC-EN Meath I Limited (prepared by AWN Consulting Ltd), published by the Environmental Protection Agency (Ireland) · published 2026-07-07

The Order decides appeals by An Taisce, EngineNode Limited and others against Meath County Council's decision of 17 June 2020 to grant permission to EngineNode Limited for development to be constructed in a minimum of four phases: four two-storey data storage buildings with a combined gross floor area of c. 92,172 sq m, a single-storey energy centre of c. 8,906 sq m, a one-storey MV operations building and EngineNode two-storey offices, each data storage building with 18 back-up generator flues 21.5 m high. The Board granted permission subject to conditions; condition 2 states that the permission shall be for a period of 10 years from the date of the Order. evidence

An Bord Pleanála (now An Coimisiún Pleanála) · published 2021-07-05

The case page describes the appeal as construction of four two-storey data storage buildings, a single-storey storage centre, a single-storey MV operations building and a two-storey office building at Bracetown & Gunnocks, to the north of Clonee, Co. Meath (EIAR and NIS), with decision 'Grant permission with conditions', date signed 5 July 2021, lodged 13 July 2020, and links to the Inspector's Report, Order and Direction. No later decision is shown. evidence

An Coimisiún Pleanála · publication date not stated

Portal record 2019205 (Meath County Council RA191593, application received 26 November 2019) describes four two-storey data storage buildings with an energy centre, an MV operations building and EngineNode offices at Bracetown and Gunnocks, to the north of Clonee, and its location text prints 'Grid Ref E = 702827.6389 N= 743165.09' (ITM), which transforms to a point 0.6 m from the EPA site-centre point. The same listing includes portal record 2020208 for the Wicklow 20/1285 data centre complex at Avoca River Park, Arklow. evidence

Department of Housing, Local Government and Heritage (EIA Portal) · publication date not stated

Licence metadata: Sdc-En Meath I Limited, Bracetown & Gunnocks, to the North of Clonee, Bracetown, Meath; new application received 29 June 2026 (EIAR the same day); licence status Applied; assessment status 'Under Assessment RFI Outstanding'; no proposed determination or licence issued; one submission; NACE 6311. evidence

Environmental Protection Agency (Ireland) · publication date not stated

The document list (88 items) runs from the application documents of 7 July 2026 through the EPA's site-notice request of 10 August, the applicant's reply of 11 August, the EPA consultations of 4 September with the planning bodies, the Commission's reply of 17 September (posted 18 September) and the EPA's further-information request of 5 October 2026; it contains no proposed determination, inspection report or later filing. Third-party submitter names in file titles are not copied. evidence

Environmental Protection Agency (Ireland) · publication date not stated

Companies
  • Operator: SDC-EN Meath I Limited (intended) evidence
Source and location review
Status source
An Coimisiún Pleanála letter of 17 September 2026 to the EPA on IE licence application P1239-01 (Commission case ABP-307546-20; Meath County Council RA191593), Bracetown & Gunnocks, to the north of Clonee evidence row
An Coimisiún Pleanála, published by the Environmental Protection Agency (Ireland) · published 2026-09-17 · Government record
Locator
Campus locator · Compiled location reference · official_regulator_register_installation_site_centre_grid_reference evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 40 days before the data update on 2026-10-27

Location details
Coordinates
53.42855, -6.45270
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_regulator_register_installation_site_centre_grid_reference
Authority
Compiled location reference
Source entity
Campus
Method
epa_register_national_grid_reference_irish_grid_tm75_to_wgs84_pyproj_3_7_1
Derivation
coordinate_transform
Precision scope
Site-centre point of the EPA licence-application installation P1239-01 (four data storage buildings DC1-DC4 with their generator areas, licence area c. 22.8 ha) at Bracetown and Gunnocks north of Clonee, from the register's National Grid Reference N243140 E302899 (the same values as the application form and the applicant's 11 August 2026 letter), read as TM75 / Irish Grid and transformed to WGS84. It locates the planned campus as a whole, not an individual building, a footprint, an entrance or the boundary; the substation within the wider planning boundary is outside the licence area.
Horizontal uncertainty
Not reported

The register gives a single site-centre grid reference at 1 m resolution with no stated survey accuracy for a c. 22.8 ha licence area; the offset to any building is unknown. The TM75-to-WGS84 operation is rated at 1 m; the alternative operation moves the point 2.2 m. The independent ITM coordinate agrees to 0.6 m but derives from the same application. Decimal places are arithmetic precision.

Geometry evidence
07f7d6ee

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for SDC-EN Meath I data storage campus, Bracetown and Gunnocks, north of Clonee, Co. Meath
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
An Bord Pleanála Board Order ABP-307546-20 (Meath County Council RA/191593), Bracetown and Gunnocks, north of Clonee
Archived copy
An Bord Pleanála (now An Coimisiún Pleanála)
Government record
Site and project identityall-rights-reservedAn Coimisiún Pleanála491341f1c095226b46876fa568e24f361c496312191a8d1add814fb7c8c76285
Retained source material; see source provenance
An Coimisiún Pleanála case page 307546 (PL17.307546; Meath County Council RA191593)
Archived copy
An Coimisiún Pleanála
Government record
Site and project identitynot statedall-rights-reservedAn Coimisiún Pleanálad9e9a0e704029c28734f1e49163539147e905939e209380b24994780fad2ae04
Retained source material; see source provenance
An Coimisiún Pleanála letter of 17 September 2026 to the EPA on IE licence application P1239-01 (Commission case ABP-307546-20; Meath County Council RA191593), Bracetown & Gunnocks, to the north of Clonee
Archived copy
An Coimisiún Pleanála, published by the Environmental Protection Agency (Ireland)
Government record
Project announcementall-rights-reservedAn Coimisiún Pleanála via EPA LEAP9b6475bcb14c6dd3b3abb51636bfd3609064f096c5028b96b45808e27b652d34
Retained source material; see source provenance
Applicant's reply of 11 August 2026 to the EPA request of 10 August 2026 on site notices, IE licence application P1239-01 (Sdc-En Meath I Limited, Bracetown & Gunnocks)
Archived copy
Sdc-En Meath I Limited (agent AWN Consulting Ltd), published by the Environmental Protection Agency (Ireland)
Regulatory filing
Site and project identityall-rights-reservedSdc-En Meath I Limited via EPA LEAPede329d9e3ce0ec5932812815faae61aedd3b22ac33929518cf08bab17b89730
Retained source material; see source provenance
Attachment 1-2 Non-Technical Summary, EPA Industrial Emissions Licence Application, SDC-EN Meath I Limited (P1239-01, 25 May 2026)
Archived copy
SDC-EN Meath I Limited (prepared by AWN Consulting Ltd), published by the Environmental Protection Agency (Ireland)
Regulatory filing
Site and project identityall-rights-reservedSDC-EN Meath I Limited via EPA LEAP8e8a3dc74122387910f5f4e0cf9b223759984225d37a8075e4b13e1b69304fa4
Retained source material; see source provenance
Attachment 4-8-1 Operational Report, EPA IE licence application P1239-01, SDC-EN Meath I Limited (May 2026)
Archived copy
SDC-EN Meath I Limited (prepared by AWN Consulting Ltd), published by the Environmental Protection Agency (Ireland)
Regulatory filing
Site and project identityall-rights-reservedSDC-EN Meath I Limited via EPA LEAPdad859fcda4bec1574385c8c1d4a91da3367cb7d4995ed9ec7dd08227875ce95
Retained source material; see source provenance
Department of Housing EIA Portal feature service (EIA_Location_Point): data-centre entries, including portal record 2019205 for Meath County Council RA191593
Archived copy
Department of Housing, Local Government and Heritage (EIA Portal)
Government record
Site and project identitynot statedCC-BY-4.0Department of Housing, Local Government and Heritage1a5b68e387cd74b31d67bc7de7f256e227b7a5a2c82b05ebae91e4a0bbb19720
Retained source material; see source provenance
EPA IE licence application form LA020360 (P1239-01), Sdc-En Meath I Limited: organisation (section 2) and site geographical location (section 3.2)
Archived copy
Sdc-En Meath I Limited, published by the Environmental Protection Agency (Ireland)
Regulatory filing
Operator claimall-rights-reservedSdc-En Meath I Limited via EPA LEAPa5372cf37f66b485e889003386ec89b1eced57dea94f8b50a351b240cc7b9f3a
Retained source material; see source provenance
EPA LEAP document list for IE licence application P1239-01 (data.epa.ie LEAP API, Document/listbylicenceidfullfiltered)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Site and project identitynot statedall-rights-reservedEnvironmental Protection Agency (Ireland), LEAP27c204984980ec359f572cb88742ffbbc662a14507eb9ab44fdd2442a00ebeb7
Retained source material; see source provenance
EPA LEAP licence record P1239-01 (data.epa.ie LEAP API, Licence/fulllbyid)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Site and project identitynot statedall-rights-reservedEnvironmental Protection Agency (Ireland), LEAPbe523942a06038c4c8489667fc4dc1e9ccc048a26fa5c1967d6fe0d6e3b046cc
Retained source material; see source provenance
EPA Register of IE Licence Application No. P1239-01 (Sdc-En Meath I Limited, Bracetown & Gunnocks, to the north of Clonee)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Geometryall-rights-reservedEnvironmental Protection Agency (Ireland), LEAPa23fedcf2f36c3c5b9795bf0879de3a445d40e0f7a1a1a7a9ffc655e910b2973
Retained source material; see source provenance
EPA request for further information of 5 October 2026 (Regulation 10(2)(b)(ii)) on the licence application from Sdc-En Meath I Limited for an installation at Bracetown & Gunnocks, to the north of Clonee (P1239-01)
Archived copy
Environmental Protection Agency (Ireland)
Government record
Site and project identityall-rights-reservedEnvironmental Protection Agency (Ireland), LEAP3d37fe1db2ee5638e374bd32944e8da3abb50de2e714464a6da0aeeec5d961bf
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). SDC-EN Meath I data storage campus, Bracetown and Gunnocks, north of Clonee, Co. Meath [site vcc-site-1a7a99925cc9fdd0d013]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1a7a99925cc9fdd0d013/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction