Envision Ulanqab Zero-Carbon AI Computing Industrial Park (Yiwutang)
Under construction
China · 1 project · Last reported
Summary
On 24 October 2026 CSCEC reported that Phase 1 of the Envision Ulanqab Zero-Carbon AI Computing Industrial Park (远景乌兰察布零碳人工智能算力产业园(一期)项目) in the Chahar High-Tech Development Zone, built by its subsidiary China Construction Third Engineering Bureau, is advancing and currently in its construction-finishing stage, with the remaining finishing and commissioning work still to be completed. Completion, commissioning completion and operation are not established; no capacity is asserted. Phase 2 (planned) and the separately reported Phase 3 are not part of this project. evidence
China State Construction Engineering Corporation · published 2026-10-24
Location
The interactive map needs JavaScript. Display anchor: 40.94879, 113.24847 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Envision Ulanqab Zero-Carbon AI Computing Industrial Park — Phase 1
Under construction last observed as of · Authoritative status update
Approval decision 内环表〔2026〕15号, dated 2 February 2026 and published with the approval-result publicity of 10 February 2026 (local nmg-envision-p1-220kv-approval-0210.html), addressed to Envision (Ulanqab) Technology Development Co., Ltd. It approves in principle a new 220 kV substation (2 x 160 MVA, three 220 kV bays) located in the Envision Ulanqab Zero-Carbon AI Computing Industrial Park Phase 1 supporting works at Yiwutang Industrial Park, Chahar High-Tech Development Zone, Ulanqab, and delegates construction-period supervision to the Ulanqab Ecology and Environment Bureau. It is an approval of ancillary grid works, not consent for the data-centre buildings. evidence
Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2026-02-10
- Companies
- Owner: Envision (Ulanqab) Technology Development Co., Ltd. (远景(乌兰察布)科技开发有限公司) (current) evidence
Source and location review
- Status source
- CSCEC reports current data-centre construction in Ulanqab evidence row
China State Construction Engineering Corporation · published 2026-10-24 · Company disclosure - Locator
- Campus locator · Official source · official_eia_on_campus_substation_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 3 days before the data update on 2026-10-27
Location details
- Coordinates
- 40.94879, 113.24847
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_substation_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- official_eia_geographic_dms_point_transcription
- Derivation
- direct_geometry
- Precision scope
- EIA centre point of the Phase 1 park's own 220 kV substation, which the report places inside the Phase 1 plant area on its north side, just south of the east-west road (Pingzan Street). Locates the Phase 1 park through on-campus support infrastructure; not a data-centre building footprint, parcel centroid, entrance or construction extent. On the report's map the park extends up to about 600 m south and 400 m east of the point.
- Horizontal uncertainty
Not reported
No datum or positional accuracy is stated. The CGCS2000/WGS84 reading is supported by the report's internally consistent enclosure corners and by agreement of its figure-4 graticule with independent Esri imagery within about 10 m at two ground features (manual pixel picks against imagery of unstated accuracy and date). The point marks the planned on-campus substation, not the Phase 1 data-centre buildings, which may lie several hundred metres south or east. Decimal places are transcription precision, not accuracy.
- Geometry evidence
- 0a0c06c2
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| CSCEC reports current data-centre construction in Ulanqab Archived copy | China State Construction Engineering Corporation Company disclosure | Physical status, Operator claim | all-rights-reserved | China State Construction Engineering Corporation | cd0b51c24b1c8cd1c5c9405ff80593523844efcc497f07c37035d1ec5c8fd0f8Retained source material; see source provenance | ||
| Environmental impact report form: Envision Ulanqab Zero-Carbon AI Computing Industrial Park Phase 1 supporting 220 kV substation (Inner Mongolia Department of Ecology and Environment approval-result publicity, 10 February 2026) Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Environmental assessment document | Geometry, Owner claim | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 远景(乌兰察布)科技开发有限公司 | 5100d30779477cf25e5dfe475dace015c20630492bc3866b2a0673e906a3bb56Retained source material; see source provenance | ||
| Esri World Imagery EPSG:4326 export around the Envision Ulanqab Phase 1 park, Yiwutang (113.238-113.262E, 40.938-40.956N) Archived copy | Esri Map feature | Site and project identity | not stated | all-rights-reserved | Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery) | 54fefffbc0c3226d81471b5cc1da323295f4a56e19f878755a766bebc7a82031Retained source material; see source provenance | |
| Inner Mongolia Department of Ecology and Environment approval of the EIA report form for the Envision Ulanqab Zero-Carbon AI Computing Industrial Park Phase 1 supporting 220 kV substation (内环表〔2026〕15号) Archived copy | Inner Mongolia Autonomous Region Department of Ecology and Environment Government record | Site and project identity | all-rights-reserved | Inner Mongolia Autonomous Region Department of Ecology and Environment | 1b54faa2d8f545db7549a61817db1e7e6ee7595df68f64c0e0a231576c201d6fRetained source material; see source provenance |
Cite this site
Kyars, K. (2026). Envision Ulanqab Zero-Carbon AI Computing Industrial Park (Yiwutang) [site vcc-site-1ca63216bf79dbfaf507]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1ca63216bf79dbfaf507/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction