Envision Ulanqab Zero-Carbon AI Computing Industrial Park (Yiwutang)

Under construction

China · 1 project · Last reported

Summary

On 24 October 2026 CSCEC reported that Phase 1 of the Envision Ulanqab Zero-Carbon AI Computing Industrial Park (远景乌兰察布零碳人工智能算力产业园(一期)项目) in the Chahar High-Tech Development Zone, built by its subsidiary China Construction Third Engineering Bureau, is advancing and currently in its construction-finishing stage, with the remaining finishing and commissioning work still to be completed. Completion, commissioning completion and operation are not established; no capacity is asserted. Phase 2 (planned) and the separately reported Phase 3 are not part of this project. evidence

China State Construction Engineering Corporation · published 2026-10-24

Location

The interactive map needs JavaScript. Display anchor: 40.94879, 113.24847 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Envision Ulanqab Zero-Carbon AI Computing Industrial Park — Phase 1

Under construction last observed as of · Authoritative status update

Approval decision 内环表〔2026〕15号, dated 2 February 2026 and published with the approval-result publicity of 10 February 2026 (local nmg-envision-p1-220kv-approval-0210.html), addressed to Envision (Ulanqab) Technology Development Co., Ltd. It approves in principle a new 220 kV substation (2 x 160 MVA, three 220 kV bays) located in the Envision Ulanqab Zero-Carbon AI Computing Industrial Park Phase 1 supporting works at Yiwutang Industrial Park, Chahar High-Tech Development Zone, Ulanqab, and delegates construction-period supervision to the Ulanqab Ecology and Environment Bureau. It is an approval of ancillary grid works, not consent for the data-centre buildings. evidence

Inner Mongolia Autonomous Region Department of Ecology and Environment · published 2026-02-10

Companies
  • Owner: Envision (Ulanqab) Technology Development Co., Ltd. (远景(乌兰察布)科技开发有限公司) (current) evidence
Source and location review
Status source
CSCEC reports current data-centre construction in Ulanqab evidence row
China State Construction Engineering Corporation · published 2026-10-24 · Company disclosure
Locator
Campus locator · Official source · official_eia_on_campus_substation_locator evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 3 days before the data update on 2026-10-27

Location details
Coordinates
40.94879, 113.24847
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_eia_on_campus_substation_locator
Authority
Official source
Source entity
Campus
Method
official_eia_geographic_dms_point_transcription
Derivation
direct_geometry
Precision scope
EIA centre point of the Phase 1 park's own 220 kV substation, which the report places inside the Phase 1 plant area on its north side, just south of the east-west road (Pingzan Street). Locates the Phase 1 park through on-campus support infrastructure; not a data-centre building footprint, parcel centroid, entrance or construction extent. On the report's map the park extends up to about 600 m south and 400 m east of the point.
Horizontal uncertainty
Not reported

No datum or positional accuracy is stated. The CGCS2000/WGS84 reading is supported by the report's internally consistent enclosure corners and by agreement of its figure-4 graticule with independent Esri imagery within about 10 m at two ground features (manual pixel picks against imagery of unstated accuracy and date). The point marks the planned on-campus substation, not the Phase 1 data-centre buildings, which may lie several hundred metres south or east. Decimal places are transcription precision, not accuracy.

Geometry evidence
0a0c06c2

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Envision Ulanqab Zero-Carbon AI Computing Industrial Park (Yiwutang)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
CSCEC reports current data-centre construction in Ulanqab
Archived copy
China State Construction Engineering Corporation
Company disclosure
Physical status, Operator claimall-rights-reservedChina State Construction Engineering Corporationcd0b51c24b1c8cd1c5c9405ff80593523844efcc497f07c37035d1ec5c8fd0f8
Retained source material; see source provenance
Environmental impact report form: Envision Ulanqab Zero-Carbon AI Computing Industrial Park Phase 1 supporting 220 kV substation (Inner Mongolia Department of Ecology and Environment approval-result publicity, 10 February 2026)
Archived copy
Inner Mongolia Autonomous Region Department of Ecology and Environment
Environmental assessment document
Geometry, Owner claimall-rights-reservedInner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 远景(乌兰察布)科技开发有限公司5100d30779477cf25e5dfe475dace015c20630492bc3866b2a0673e906a3bb56
Retained source material; see source provenance
Esri World Imagery EPSG:4326 export around the Envision Ulanqab Phase 1 park, Yiwutang (113.238-113.262E, 40.938-40.956N)
Archived copy
Esri
Map feature
Site and project identitynot statedall-rights-reservedEsri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)54fefffbc0c3226d81471b5cc1da323295f4a56e19f878755a766bebc7a82031
Retained source material; see source provenance
Inner Mongolia Department of Ecology and Environment approval of the EIA report form for the Envision Ulanqab Zero-Carbon AI Computing Industrial Park Phase 1 supporting 220 kV substation (内环表〔2026〕15号)
Archived copy
Inner Mongolia Autonomous Region Department of Ecology and Environment
Government record
Site and project identityall-rights-reservedInner Mongolia Autonomous Region Department of Ecology and Environment1b54faa2d8f545db7549a61817db1e7e6ee7595df68f64c0e0a231576c201d6f
Retained source material; see source provenance