TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)
Announced
India · 1 project · Last reported
Summary
HyperVault AI Data Center Limited, the data center subsidiary of Tata Consultancy Services, announced on 5 September 2026 that it had secured 264 acres in Hyderabad, Telangana, for an AI campus of up to 1 GW, with HyperVault and its partners expected to invest up to Rs 70,000 crore over the build-out. The site is in Bharat Future City on Hyderabad's southern outskirts. Construction will be phased to customer demand, and Telangana's chief minister asked for the campus to open by 2 June 2028. TPG agreed in November 2025 to take a 27.5 to 49 percent stake in HyperVault.
Source record as of 2026-09-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 17.36170, 78.47470 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)
Announced last observed as of · Reported status
Location: Hyderabad (Bharat Future City), Telangana, IN. Sources name Hyderabad and place the campus in Bharat Future City on the city's southern outskirts, without a district, address or coordinates; Bharat Future City's Wikipedia article has no coordinates. The point is the Hyderabad city coordinate from Wikipedia, so it marks the named city, and the site lies an unknown distance to its south. The Arabian Post; StartupFeed; Sahi; Wikipedia
Use: Ai training, Ai inference
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | up to 1,000 MW | Planned · Campus · Unspecified | 2026-09-05 | Sources say up to 1 GW without stating IT or facility power; build-out will be phased to demand. | The Arabian Post; StartupFeed; Sahi |
| Investment | up to 700,000,000,000 INR | Announced · Campus | 2026-09-05 | Rs 70,000 crore expected from HyperVault and its partners for development and operation over several years. | The Arabian Post; StartupFeed; Sahi |
| Land area | 264 acres | Reported · Campus | 2026-09-05 | Described as land HyperVault has secured; the sources do not say whether it was bought or allotted. | The Arabian Post; StartupFeed; Sahi |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| HyperVault AI Data Center Limited | Developer | Subsidiary of Tata Consultancy Services. | The Arabian Post; StartupFeed; Sahi |
| Tata Consultancy Services | Investor | Parent of HyperVault; keeps board control under the TPG deal. | The Arabian Post; StartupFeed |
| TPG | Investor | Agreed in November 2025 to invest up to Rs 8,820 crore in HyperVault for a 27.5 to 49 percent stake; this is an investment in the company, not specifically in this site. | The Arabian Post; StartupFeed; Sahi; W.Media |
| Government of Telangana | Government | The chief minister announced the project and assured HyperVault of the required sanctions. | The Arabian Post; StartupFeed |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-09-05 | Announced | Actual | The Arabian Post; StartupFeed; Sahi | |
| 2028-06-02 | First operational | Planned | Opening date requested by Telangana's chief minister, tied to the state's formation day; not stated as a company target. | StartupFeed |
StartupFeed says HyperVault disclosed the plan in a regulatory filing but does not name the exchange; the filing itself is not cited, so the record relies on news coverage. Telangana's chief minister estimated about 7,000 jobs without saying whether they are direct or permanent, so no job metric is recorded. W.Media reports that OpenAI was announced in February 2026 as HyperVault's first customer at 100 MW, but no source ties OpenAI to this site. HyperVault's land in Anakapalli and in Bopkhel, Pune, are separate projects. Wikipedia is cited only for the city coordinate.
Sources for these details
- TCS commits ₹700 billion to Hyderabad AI campus — The Arabian Post; 2026-09-05 · Archived source
- TCS HyperVault to Build Rs 70,000 Cr AI Data Centre in Hyderabad — StartupFeed; 2026-09-09
- TCS HyperVault to set up ₹70,000 crore AI data center in Telangana — Sahi; 2026-09-05
- Hyderabad — Wikipedia; publication date not stated
- TCS adds Anakapalli and Pune sites to fuel its data center push — W.Media; 2026-07-21
- Companies
- Developer: HyperVault AI Data Center Limited (unknown scope) evidence
- Developer: HyperVault AI Data Center Limited (unknown scope) evidence
- Developer: HyperVault AI Data Center Limited (unknown scope) evidence
- Investor: Tata Consultancy Services (unknown scope) evidence
- Investor: Tata Consultancy Services (unknown scope) evidence
- Investor: TPG (unknown scope) evidence
- Investor: TPG (unknown scope) evidence
- Investor: TPG (unknown scope) evidence
- Investor: TPG (unknown scope) evidence
- Government: Government of Telangana (unknown scope) evidence
- Government: Government of Telangana (unknown scope) evidence
Source and location review
- Status source
- TCS commits ₹700 billion to Hyderabad AI campus evidence row
The Arabian Post · published 2026-09-05 · News - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 48 days before the data update on 2026-10-27
Location details
- Coordinates
- 17.36170, 78.47470
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources name Hyderabad and place the campus in Bharat Future City on the city's southern outskirts, without a district, address or coordinates; Bharat Future City's Wikipedia article has no coordinates. The point is the Hyderabad city coordinate from Wikipedia, so it marks the named city, and the site lies an unknown distance to its south.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 68467274
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Hyderabad Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 14d97298755aa77c98cf491f41e2763b9afec6363df255498387db41c7a84905Factual source record; not the publisher page | |
| TCS adds Anakapalli and Pune sites to fuel its data center push Archived copy | W.Media Trade publication | Imported: Record, Role: Investor | source-terms-not-recorded | W.Media | ba18f325bec62656c1f0879aa688ea52d58202014fb7a99ce901033519c5cf11Factual source record; not the publisher page | ||
| TCS commits ₹700 billion to Hyderabad AI campus Archived copy | The Arabian Post News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Role: Developer, Role: Government, Role: Investor | source-terms-not-recorded | The Arabian Post | b45805e84183a964b52c114905cfc675bf665a47abf66f9a9a9724fe7f8712b9Factual source record; not the publisher page | ||
| TCS HyperVault to Build Rs 70,000 Cr AI Data Centre in Hyderabad Archived copy | StartupFeed News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developer, Role: Government, Role: Investor | source-terms-not-recorded | StartupFeed | 55dc7251d9b40eadd9c0d9f200ea7191c1073e8a9da9c7a75d649dbb71ca3ce1Factual source record; not the publisher page | ||
| TCS HyperVault to set up ₹70,000 crore AI data center in Telangana Archived copy | Sahi News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Role: Developer, Role: Investor | source-terms-not-recorded | Sahi | 878f26e13aeaf44ea4f079fbd92fdddbee251f73b7a3728b7c17f34aa6393423Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). TCS HyperVault AI data center campus, Bharat Future City (Hyderabad) [site vcc-site-23fd4beb18c498caa043]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23fd4beb18c498caa043/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction