Keli Xinneng Cloud Computing IDC Data Center, Guangzhou Knowledge City

Announced

China · 1 project · Last reported

Summary

On 21 August 2026 the Guangzhou Municipal Development and Reform Commission issued and published its energy-review opinion on Guangzhou Keli Big Data Industry Co., Ltd.'s Keli Xinneng efficient low-carbon intelligent computing centre, to be built on floors 1-3 of self-numbered Building 2# of the Keli park at No. 27 Bohua Third Road, Sino-Singapore Guangzhou Knowledge City: 200 racks (about 2,998 standard racks, about 3,000 PFLOPS FP16), production expected in December 2027. This dated government record identifies the project and supports announced status. An energy review is not development consent; no fit-out work, completion or operation of the intelligent computing centre is established. evidence

Guangzhou Municipal Development and Reform Commission · published 2026-08-21

Location

The interactive map needs JavaScript. Display anchor: 23.29815, 113.54259 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Keli Xinneng Efficient Low-Carbon Intelligent Computing Centre — Data-Centre Building 2#, floors 1-3

Announced last observed as of · Project announcement

Post-approval publication page for case 2026060000012703 (category 建设工程规划条件核实合格证核发): Keli Xinneng cloud-computing IDC data centre and high-end manufacturing project, buildings 1#-3# data-centre machine rooms, office 4#, factory 5# and basement; builder Guangzhou Keli Big Data Industry Co., Ltd.; location parcel ZSCXN-C4-1 bounded by the Yongjiu Expressway, Kelian West Road and Bohua Third Road; published 2026-04-20. evidence

Guangzhou Planning and Natural Resources Bureau · published 2026-04-20

Stamped A3 publication sheet (scanned PDF, read as an image) of verification 穗规划资源核实〔2026〕812号, approved 2026-04-13 (related documents 穗知识城规建证〔2021〕79号, 穗规划资源业务函〔2022〕635号 and 〔2022〕16319号): data-centre machine-room buildings 1#, 2# and 3# each 8 storeys above ground and 1 below (about 33,500 m2 each), office 4# and factory 5# of 14 storeys, total GFA 165,300 m2; site plan places the three data-centre buildings on the west of the parcel, Bohua Third Road to the south and the Yongjiu Expressway to the east. Supports that Building 2# exists as a completed data-centre machine-room building. evidence

Guangzhou Planning and Natural Resources Bureau · published 2026-04-20

Static JavaScript of the bureau's official planning-publicity map page (ghzyj.gz.gov.cn/JGG/xcweb/#/bmap). It builds the map in spatialReference wkid 4326 on Tianditu 'vec_c'/'cva_c' tiles and the Guangzhou Tianditu node, splits each publicity record's lnglat field into longitude and latitude, and plots it as a geographic point with wkid 4326; the map carries the Tianditu review number GS(2024)0568. This documents that register lnglat values are geographic CGCS2000 coordinates (WGS84-equivalent at sub-metre level), not GCJ-02 or BD-09 web-map coordinates. Coordinate semantics only; the embedded basemap service key was neither used nor copied. evidence

Guangzhou Planning and Natural Resources Bureau · publication date not stated

Web Mercator imagery tile containing the register marker for ZSCXN-C4-1, used with neighbouring z16/z17 tiles (listed in the geometry facts) only to check that the marker read directly as WGS84 falls on the middle of three large rectangular halls on the west of the Keli campus, matching the verification sheet layout, while the GCJ-02 alternative (about 611 m west-north-west) falls in wooded land between the expressway corridors with no campus buildings. Qualitative registration check; not a measured accuracy. evidence

Esri · publication date not stated

Companies
  • Owner: Guangzhou Keli Big Data Industry Co., Ltd. (广州科利大数据产业有限公司) (current) evidence
Source and location review
Status source
Guangzhou DRC energy-review opinion on the Keli Xinneng efficient low-carbon intelligent computing centre project evidence row
Guangzhou Municipal Development and Reform Commission · published 2026-08-21 · Government record
Locator
Campus locator · Official source · official_planning_publicity_register_marker evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 67 days before the data update on 2026-10-27

Location details
Coordinates
23.29815, 113.54259
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_planning_publicity_register_marker
Authority
Official source
Source entity
Campus
Method
official_planning_register_lnglat_transcription
Derivation
direct_geometry
Precision scope
Official Guangzhou planning-publicity register marker of the April 2026 as-built verification (穗规划资源核实〔2026〕812号) covering data-centre machine-room buildings 1#-3#, office 4#, factory 5# and basement on parcel ZSCXN-C4-1. Locates the Keli campus; not the Building 2# footprint, a parcel centroid, entrance or construction extent.
Horizontal uncertainty
Not reported

No datum or positional accuracy is stated in the record; the page plots it as geographic wkid 4326 on Tianditu CGCS2000 tiles, and the WGS84 reading is supported only by a qualitative check against Esri World Imagery (the GCJ-02 alternative falls about 610-630 m away on land without the described buildings). Placement rules for register markers are undocumented; markers of other records for the same parcel lie up to 86 m apart, so the point locates the parcel, not a building. Decimal places are publication precision, not accuracy.

Geometry evidence
a9598541

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Keli Xinneng Cloud Computing IDC Data Center, Guangzhou Knowledge City
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Esri World Imagery tile z17/56809/106875 (Keli park, Knowledge City)
Archived copy
Esri
Other
Site and project identitynot statedEsri World Imagery terms of use; not redistributedEsri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)c043353e236f8fcc51902d2a71c3bdee4bdb3cb034e1d210626db14f14b3b28e
Retained source material; see source provenance
Guangzhou DRC energy-review opinion on the Keli Xinneng efficient low-carbon intelligent computing centre project
Archived copy
Guangzhou Municipal Development and Reform Commission
Government record
Project announcement, Owner claimall-rights-reservedGuangzhou Municipal Development and Reform Commissiondea271d28b28e435e11d698aa3603d4c602a6da7d2219fd9d9cea2e26533a34c
Retained source material; see source provenance
Guangzhou planning post-approval publication page: ZSCXN-C4-1 Keli Xinneng cloud-computing IDC data centre, planning-condition verification
Archived copy
Guangzhou Planning and Natural Resources Bureau
Government record
Site and project identityall-rights-reservedGuangzhou Planning and Natural Resources Bureaud96671325614cb9c24797165764aa92b7f961591832d33addd50741a199b1485
Retained source material; see source provenance
Guangzhou planning-publicity electronic map (规划公示电子地图) application code: map and marker set-up
Archived copy
Guangzhou Planning and Natural Resources Bureau
Other
Site and project identitynot statedall-rights-reservedGuangzhou Planning and Natural Resources Bureau19bc1e366b37ce62d2cd562b5ac29da6d180c54165bbc8960d23be49452e095f
Retained source material; see source provenance
Guangzhou planning-publicity register record 10778498: ZSCXN-C4-1 Keli Xinneng cloud-computing IDC data centre buildings, planning-condition verification 穗规划资源核实〔2026〕812号
Archived copy
Guangzhou Planning and Natural Resources Bureau
Government record
Geometryall-rights-reservedGuangzhou Planning and Natural Resources Bureau9239b42246a723c447d732102280cf78b2adbfe82ea9819fcbbd023c9b0f4bba
Retained source material; see source provenance
Stamped post-approval sheet: planning-condition verification 穗规划资源核实〔2026〕812号, Keli Xinneng cloud-computing IDC data centre (ZSCXN-C4-1)
Archived copy
Guangzhou Planning and Natural Resources Bureau
Government record
Site and project identityall-rights-reservedGuangzhou Planning and Natural Resources Bureau113a28fe6d16bff344f740e4d4adfec3dad98d85448ea7626272f98dd0e20a26
Retained source material; see source provenance