Campus AI Fouju
Under construction
France · 1 project · Last reported
Summary
Campus AI, a joint venture of the UAE fund MGX, French public bank Bpifrance, Mistral AI and NVIDIA, is developing a 1.4 GW AI data center campus at Fouju in Seine-et-Marne, about 40 km southeast of Paris. Plans call for roughly eleven data center buildings plus a training building on about 89 hectares, fed by a dedicated 400 kV substation. Environmental authorizations and the phase-one building permit were granted in summer 2026, phase-one works were scheduled from September 2026, and the first three data centers are targeted for early 2028. Local opponents have said they will appeal.
Source record as of 2026-09-01 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 48.58640, 2.77850 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Campus AI Fouju
Under construction last observed as of · Reported status
Location: Fouju, Seine-et-Marne, Île-de-France, FR. Nominatim centroid of the commune of Fouju; sources name the commune but not a parcel. Eiffage; Communauté de communes Brie des Rivières et Châteaux; Next
Use: Ai training, Ai inference, Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 1,400 MW | Planned · Campus · Unspecified | 2026-08-13 | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage; Next | |
| Power capacity | 1,400 MW | Planned · Campus · Grid connection | 2026-06-02 | Final output rating of the 400/33 kV substation Eiffage is building; same headline figure as the campus capacity, not additional. | Eiffage |
| Investment | 50,000,000,000 EUR | Reported · Campus | 2026-08-13 | News report attributing the sum to MGX, NVIDIA, Mistral AI and Bpifrance; no company source opened for this figure. | Next |
| Land area | 89 hectares | Planned · Campus | 2026-08-13 | Of which 73 hectares to be built on. | Next |
| Buildings | 11 count | Planned · Campus | 2026-08-13 | Data center buildings; a training center is additional. | Next |
| Buildings | 3 count | Planned · Phase · Phase 1 | 2026-09-01 | First three data centers, plus a reception and training building and the substation, due early 2028. | Communauté de communes Brie des Rivières et Châteaux |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Campus AI | Developer | Joint venture that acquires land, builds high-voltage and shared infrastructure, and co-invests with data center developers; site companies Campus AI SPV1, SPV2 and SPV4 are authorized to operate DC1, DC2 and DC4. | Eiffage; Communauté de communes Brie des Rivières et Châteaux |
| MGX | Investor | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage | |
| Bpifrance | Investor | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage | |
| Mistral AI | Investor | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage | |
| NVIDIA | Investor | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage | |
| Mistral AI | Tenant | Described as the founding client, securing up to 200 MW of compute capacity with Campus AI (announced 2026-06-01; the source does not say all of it is at Fouju). | Communauté de communes Brie des Rivières et Châteaux |
| Eiffage | Builder | General contractor (consortium led by Eiffage Énergie Systèmes) for the 400/33 kV substation and shared infrastructure, contract above EUR 120 million. | Eiffage |
| RTE | Utility | Signed a fast-track grid connection agreement with Campus AI on 2026-01-26 and was authorized to build a substation at the site. | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Communauté de communes Brie des Rivières et Châteaux |
| Préfecture de Seine-et-Marne | Government | Issued the environmental authorizations on 2026-07-29. | Communauté de communes Brie des Rivières et Châteaux; Next |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-05-19 | Announced | Actual | Joint venture announced at the Choose France summit for an Île-de-France campus. | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Communauté de communes Brie des Rivières et Châteaux |
| 2025-10-13 | Other | Actual | Start of the voluntary public pre-consultation under the CNDP framework (ran to 2025-11-23). | Communauté de communes Brie des Rivières et Châteaux |
| 2026-01-26 | Other | Actual | Fast-track grid connection agreement signed with RTE. | Communauté de communes Brie des Rivières et Châteaux |
| 2026-04-30 | Other | Actual | Single public inquiry opened (to 2026-05-30) covering environmental authorizations, local plan change and building permit. | Communauté de communes Brie des Rivières et Châteaux |
| 2026-06 | Other | Actual | At Choose France 2026 the joint venture said it plans up to 3 GW in France through a second, not yet named site that will complement the Fouju campus. | Mac4Ever |
| 2026-06-02 | Other | Actual | Eiffage named general contractor for the substation and shared infrastructure. | Eiffage |
| 2026-07-23 | Zoning approved | Actual | Approval of the Fouju local plan (PLU) amendment. | Communauté de communes Brie des Rivières et Châteaux |
| 2026-07-29 | Permit approved | Actual | Prefectoral environmental authorizations for data centers and an RTE substation. | Communauté de communes Brie des Rivières et Châteaux; Next |
| 2026-08-28 | Permit approved | Actual | Building permit for phase 1. | Communauté de communes Brie des Rivières et Châteaux |
| 2026-09 | Construction started | Actual | Start of phase-1 works as listed in the local authority's project timeline; archaeological excavations on 15 hectares were also under way from May 2026. | Communauté de communes Brie des Rivières et Châteaux |
| 2028 | First operational | Planned | Early 2028 delivery of the first phase per the local timeline; the 2025 announcement targeted service by 2028. | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Communauté de communes Brie des Rivières et Châteaux |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Fast-track connection to the RTE transmission grid through a new 400/33 kV substation rated for 1.4 GW at full build-out. | Eiffage; Communauté de communes Brie des Rivières et Châteaux |
Investment figures for the campus vary widely in public reporting; only the EUR 50 billion figure from an opened news source is recorded. A June 2026 announcement raised the joint venture's national target to up to 3 GW with an unnamed second site, which is not part of this record. Opponents (collective Stop IA à Fouju) said they would file an appeal against the authorizations.
Sources for these details
- MGX, Bpifrance, Mistral AI et NVIDIA annoncent la création d'une joint-venture pour développer en France le plus grand campus IA d'Europe — MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); 2025-05-19 · Archived source
- Campus AI enters the implementation phase: Eiffage selected for deployment of shared infrastructure on the Fouju Campus — Eiffage; 2026-06-02
- Calendrier du projet Campus IA — Communauté de communes Brie des Rivières et Châteaux; 2026-09-01
- La préfecture de Seine-et-Marne autorise l'installation de Campus IA à Fouju — Next; 2026-08-13
- Campus AI : Mistral, Bpifrance et MGX prévoient jusqu'à 3 GW de puissance IA en France — Mac4Ever; 2026-06-02 · Archived source
- Companies
- Developer: Campus AI (unknown scope) evidence
- Developer: Campus AI (unknown scope) evidence
- Investor: MGX (unknown scope) evidence
- Investor: MGX (unknown scope) evidence
- Investor: Bpifrance (unknown scope) evidence
- Investor: Bpifrance (unknown scope) evidence
- Investor: Mistral AI (unknown scope) evidence
- Investor: Mistral AI (unknown scope) evidence
- Investor: NVIDIA (unknown scope) evidence
- Investor: NVIDIA (unknown scope) evidence
- Tenant: Mistral AI (unknown scope) evidence
- Builder: Eiffage (unknown scope) evidence
- Utility: RTE (unknown scope) evidence
- Utility: RTE (unknown scope) evidence
- Government: Préfecture de Seine-et-Marne (unknown scope) evidence
- Government: Préfecture de Seine-et-Marne (unknown scope) evidence
Source and location review
- Status source
- Calendrier du projet Campus IA evidence row
Communauté de communes Brie des Rivières et Châteaux · published 2026-09-01 · Government record - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 56 days before the data update on 2026-10-27
Location details
- Coordinates
- 48.58640, 2.77850
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Nominatim centroid of the commune of Fouju; sources name the commune but not a parcel.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- a82abc73
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Calendrier du projet Campus IA Archived copy | Communauté de communes Brie des Rivières et Châteaux Government record | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Milestone: Announced, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Milestone: Permit Approved, Milestone: Zoning Approved, Power Source: Grid, Role: Developer, Role: Government, Tenant claim, Role: Utility | source-terms-not-recorded | Communauté de communes Brie des Rivières et Châteaux | 8728810bbe736c6ec1711771f9d4a697a33b0400d11ccb7ac7800f0fb8763040Factual source record; not the publisher page | ||
| Campus AI : Mistral, Bpifrance et MGX prévoient jusqu'à 3 GW de puissance IA en France Archived copy | Mac4Ever News | Imported: Record, Imported: Status, Milestone: Other | source-terms-not-recorded | Mac4Ever | 2733c039e5b074d28ab5762aa964c2cf4440cb0699f3746d52697bd5bee6a55eFactual source record; not the publisher page | ||
| Campus AI enters the implementation phase: Eiffage selected for deployment of shared infrastructure on the Fouju Campus Archived copy | Eiffage Company disclosure | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Builder, Role: Developer, Role: Investor | source-terms-not-recorded | Eiffage | b2748b12ab698c5b35ce778ff717e35b88920ce323ad3482fc54f52d8a6e8604Factual source record; not the publisher page | ||
| La préfecture de Seine-et-Marne autorise l'installation de Campus IA à Fouju Archived copy | Next News | Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Permit Approved, Role: Government | source-terms-not-recorded | Next | ce1506ba0cfea309ba1229078f795a389f0b1053121b1598b1f51979155373b7Factual source record; not the publisher page | ||
| MGX, Bpifrance, Mistral AI et NVIDIA annoncent la création d'une joint-venture pour développer en France le plus grand campus IA d'Europe Archived copy | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique) Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Investor, Role: Utility | source-terms-not-recorded | MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique) | 24793500d4358be16ee28da6d42320482bfe1f450a6f6bfb5c707dddd9d48e68Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Campus AI Fouju [site vcc-site-27b404b316b5fece1ef1]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-27b404b316b5fece1ef1/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction