Campus AI Fouju

Under construction

France · 1 project · Last reported

Summary

Campus AI, a joint venture of the UAE fund MGX, French public bank Bpifrance, Mistral AI and NVIDIA, is developing a 1.4 GW AI data center campus at Fouju in Seine-et-Marne, about 40 km southeast of Paris. Plans call for roughly eleven data center buildings plus a training building on about 89 hectares, fed by a dedicated 400 kV substation. Environmental authorizations and the phase-one building permit were granted in summer 2026, phase-one works were scheduled from September 2026, and the first three data centers are targeted for early 2028. Local opponents have said they will appeal.

Source record as of 2026-09-01 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 48.58640, 2.77850 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Campus AI Fouju

Under construction last observed as of · Reported status

Location: Fouju, Seine-et-Marne, Île-de-France, FR. Nominatim centroid of the commune of Fouju; sources name the commune but not a parcel. Eiffage; Communauté de communes Brie des Rivières et Châteaux; Next

Use: Ai training, Ai inference, Cloud

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity1,400 MWPlanned · Campus · Unspecified2026-08-13MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage; Next
Power capacity1,400 MWPlanned · Campus · Grid connection2026-06-02Final output rating of the 400/33 kV substation Eiffage is building; same headline figure as the campus capacity, not additional.Eiffage
Investment50,000,000,000 EURReported · Campus2026-08-13News report attributing the sum to MGX, NVIDIA, Mistral AI and Bpifrance; no company source opened for this figure.Next
Land area89 hectaresPlanned · Campus2026-08-13Of which 73 hectares to be built on.Next
Buildings11 countPlanned · Campus2026-08-13Data center buildings; a training center is additional.Next
Buildings3 countPlanned · Phase · Phase 12026-09-01First three data centers, plus a reception and training building and the substation, due early 2028.Communauté de communes Brie des Rivières et Châteaux

Companies and organizations

NameRoleNotesSources
Campus AIDeveloperJoint venture that acquires land, builds high-voltage and shared infrastructure, and co-invests with data center developers; site companies Campus AI SPV1, SPV2 and SPV4 are authorized to operate DC1, DC2 and DC4.Eiffage; Communauté de communes Brie des Rivières et Châteaux
MGXInvestorMGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage
BpifranceInvestorMGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage
Mistral AIInvestorMGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage
NVIDIAInvestorMGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Eiffage
Mistral AITenantDescribed as the founding client, securing up to 200 MW of compute capacity with Campus AI (announced 2026-06-01; the source does not say all of it is at Fouju).Communauté de communes Brie des Rivières et Châteaux
EiffageBuilderGeneral contractor (consortium led by Eiffage Énergie Systèmes) for the 400/33 kV substation and shared infrastructure, contract above EUR 120 million.Eiffage
RTEUtilitySigned a fast-track grid connection agreement with Campus AI on 2026-01-26 and was authorized to build a substation at the site.MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Communauté de communes Brie des Rivières et Châteaux
Préfecture de Seine-et-MarneGovernmentIssued the environmental authorizations on 2026-07-29.Communauté de communes Brie des Rivières et Châteaux; Next

Timeline

DateEventActual or plannedNotesSources
2025-05-19AnnouncedActualJoint venture announced at the Choose France summit for an Île-de-France campus.MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Communauté de communes Brie des Rivières et Châteaux
2025-10-13OtherActualStart of the voluntary public pre-consultation under the CNDP framework (ran to 2025-11-23).Communauté de communes Brie des Rivières et Châteaux
2026-01-26OtherActualFast-track grid connection agreement signed with RTE.Communauté de communes Brie des Rivières et Châteaux
2026-04-30OtherActualSingle public inquiry opened (to 2026-05-30) covering environmental authorizations, local plan change and building permit.Communauté de communes Brie des Rivières et Châteaux
2026-06OtherActualAt Choose France 2026 the joint venture said it plans up to 3 GW in France through a second, not yet named site that will complement the Fouju campus.Mac4Ever
2026-06-02OtherActualEiffage named general contractor for the substation and shared infrastructure.Eiffage
2026-07-23Zoning approvedActualApproval of the Fouju local plan (PLU) amendment.Communauté de communes Brie des Rivières et Châteaux
2026-07-29Permit approvedActualPrefectoral environmental authorizations for data centers and an RTE substation.Communauté de communes Brie des Rivières et Châteaux; Next
2026-08-28Permit approvedActualBuilding permit for phase 1.Communauté de communes Brie des Rivières et Châteaux
2026-09Construction startedActualStart of phase-1 works as listed in the local authority's project timeline; archaeological excavations on 15 hectares were also under way from May 2026.Communauté de communes Brie des Rivières et Châteaux
2028First operationalPlannedEarly 2028 delivery of the first phase per the local timeline; the 2025 announcement targeted service by 2028.MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique); Communauté de communes Brie des Rivières et Châteaux

Power supply

TypeDescriptionSources
GridFast-track connection to the RTE transmission grid through a new 400/33 kV substation rated for 1.4 GW at full build-out.Eiffage; Communauté de communes Brie des Rivières et Châteaux

Investment figures for the campus vary widely in public reporting; only the EUR 50 billion figure from an opened news source is recorded. A June 2026 announcement raised the joint venture's national target to up to 3 GW with an unnamed second site, which is not part of this record. Opponents (collective Stop IA à Fouju) said they would file an appeal against the authorizations.

Sources for these details
Companies
  • Developer: Campus AI (unknown scope) evidence
  • Developer: Campus AI (unknown scope) evidence
  • Investor: MGX (unknown scope) evidence
  • Investor: MGX (unknown scope) evidence
  • Investor: Bpifrance (unknown scope) evidence
  • Investor: Bpifrance (unknown scope) evidence
  • Investor: Mistral AI (unknown scope) evidence
  • Investor: Mistral AI (unknown scope) evidence
  • Investor: NVIDIA (unknown scope) evidence
  • Investor: NVIDIA (unknown scope) evidence
  • Tenant: Mistral AI (unknown scope) evidence
  • Builder: Eiffage (unknown scope) evidence
  • Utility: RTE (unknown scope) evidence
  • Utility: RTE (unknown scope) evidence
  • Government: Préfecture de Seine-et-Marne (unknown scope) evidence
  • Government: Préfecture de Seine-et-Marne (unknown scope) evidence
Source and location review
Status source
Calendrier du projet Campus IA evidence row
Communauté de communes Brie des Rivières et Châteaux · published 2026-09-01 · Government record
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 56 days before the data update on 2026-10-27

Location details
Coordinates
48.58640, 2.77850
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Nominatim centroid of the commune of Fouju; sources name the commune but not a parcel.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
a82abc73

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Campus AI Fouju
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Calendrier du projet Campus IA
Archived copy
Communauté de communes Brie des Rivières et Châteaux
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Milestone: Announced, Milestone: Construction Started, Milestone: First Operational, Milestone: Other, Milestone: Permit Approved, Milestone: Zoning Approved, Power Source: Grid, Role: Developer, Role: Government, Tenant claim, Role: Utilitysource-terms-not-recordedCommunauté de communes Brie des Rivières et Châteaux8728810bbe736c6ec1711771f9d4a697a33b0400d11ccb7ac7800f0fb8763040
Factual source record; not the publisher page
Campus AI : Mistral, Bpifrance et MGX prévoient jusqu'à 3 GW de puissance IA en France
Archived copy
Mac4Ever
News
Imported: Record, Imported: Status, Milestone: Othersource-terms-not-recordedMac4Ever2733c039e5b074d28ab5762aa964c2cf4440cb0699f3746d52697bd5bee6a55e
Factual source record; not the publisher page
Campus AI enters the implementation phase: Eiffage selected for deployment of shared infrastructure on the Fouju Campus
Archived copy
Eiffage
Company disclosure
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Builder, Role: Developer, Role: Investorsource-terms-not-recordedEiffageb2748b12ab698c5b35ce778ff717e35b88920ce323ad3482fc54f52d8a6e8604
Factual source record; not the publisher page
La préfecture de Seine-et-Marne autorise l'installation de Campus IA à Fouju
Archived copy
Next
News
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Permit Approved, Role: Governmentsource-terms-not-recordedNextce1506ba0cfea309ba1229078f795a389f0b1053121b1598b1f51979155373b7
Factual source record; not the publisher page
MGX, Bpifrance, Mistral AI et NVIDIA annoncent la création d'une joint-venture pour développer en France le plus grand campus IA d'Europe
Archived copy
MGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique)
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Investor, Role: Utilitysource-terms-not-recordedMGX, Bpifrance, Mistral AI and NVIDIA (via École polytechnique)24793500d4358be16ee28da6d42320482bfe1f450a6f6bfb5c707dddd9d48e68
Factual source record; not the publisher page
Cite this site