Ascenty Vinhedo Campus
Under construction
Brazil · 1 project · Last reported
Summary
Ascenty reports construction of Vinhedo 3 and separately reports a 20 MW increase for its sixth Sao Paulo data center; both values remain untyped metadata. evidence
Ascenty · published 2026-05-28T12:05:17+00:00
Location
The interactive map needs JavaScript. Display anchor: -23.07022, -47.01299 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Ascenty Vinhedo 3
Under construction last observed as of · Authoritative status update
Source and location review
- Status source
- Ascenty Secures 150 Megawatts of New AI Contracts with Leading Global Hyperscalers evidence row
Ascenty · published 2026-05-28T12:05:17+00:00 · Company disclosure - Locator
- Campus locator · Official source · named_constituent_facility_point evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 152 days before the data update on 2026-10-27
Location details
- Coordinates
- -23.07022, -47.01299
- Geometry licence
- all-rights-reserved-fact-extraction-only
- Use scope
- Campus locator
- Scope class
- named_constituent_facility_point
- Authority
- Official source
- Source entity
- Campus
- Method
- first_party_published_coordinate
- Derivation
- coordinates_to_point
- Precision scope
- Exact publisher coordinate for VIN02, used only as a broad Vinhedo campus locator for Vinhedo 3; not Vinhedo 3 parcel, building, or work footprint.
- Horizontal uncertainty
Not reported
The factsheet does not state coordinate accuracy.
- Geometry evidence
- 2184bacc
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Ascenty Campus Vinhedo factsheet Archived copy | Ascenty Company disclosure | Geometry | not stated | all-rights-reserved-fact-extraction-only | Ascenty | c30210635d897e4545605e8f035a1678a7e0449d950f206fd4f27cb782c66e3aRetained source material; see source provenance | |
| Ascenty Secures 150 Megawatts of New AI Contracts with Leading Global Hyperscalers Archived copy | Ascenty Company disclosure | Source location context, Physical status | all-rights-reserved | Ascenty | 966870f4e9dc712246aaa91720f200ebb422da97c408f2ddedb8b9b1daa0e132Retained source material; see source provenance |