Ishikari Renewable Energy Data Center No.1

Operational

Japan · 1 project · Last reported

Summary

BroadBand Tower and Hokuden Information Technology's joint release of 15 October 2026 states that from that day Hokuden IT sells the data-centre services (colocation, internet lines, related options) that BroadBand Tower provides in its 石狩新港サイト data hall inside Ishikari Renewable Energy Data Center No.1, with a stated service start of 15 October 2026. This confirms the existing facility was in operation on 15 October 2026. It reports no new building, phase, capacity or occupancy, and GMO's planned GPU-cloud deployment in the same hall is not treated as operating. evidence

Hokuden Information Technology Co., Inc. · published 2026-10-15

Location

The interactive map needs JavaScript. Display anchor: 43.17856, 141.29812 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Ishikari Renewable Energy Data Center No.1

Operational last observed as of · Authoritative status update

PDF page 4 gives Ishikari Shinko Chuo 1-chome 722-1 parcel address, six halls and March 27 completion. This address supplies the identity bridge to the cadastral parcel. evidence

Tokyu Land Corporation · published 2026-04-22

Confirms host facility began service August 1. GMO plans to use part of BroadBand Tower Ishikari Shinko floor with operation targeted within 2026; future tenant deployment is not a second physical site or achieved GPU commissioning. evidence

BroadBand Tower / Tokyu Land / GMO Internet · published 2026-10-07

Undated facility page gives site area 14,215 square metres, six halls and indicative electrical specifications. It still displays a March 2026 completion forecast; later dated releases establish achieved milestones. evidence

Tokyu Land Corporation · publication date not stated

Companies
  • Operator: Ishikari Renewable Energy Data Center No.1 LLC (current) evidence
  • Tenant: BroadBand Tower (current) evidence
Source and location review
Status source
BroadBand Tower and Hokuden Information Technology joint release (15 October 2026): resale of BroadBand Tower data-centre services from its Ishikari Shinko Site hall inside Ishikari Renewable Energy Data Center No.1 evidence row
Hokuden Information Technology Co., Inc. · published 2026-10-15 · Company disclosure
Locator
Campus locator · Compiled location reference · exact_operator_parcel_cadastral_bridge evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 12 days before the data update on 2026-10-27

Location details
Coordinates
43.17856, 141.29812
Geometry licence
CC-BY
Use scope
Campus locator
Scope class
exact_operator_parcel_cadastral_bridge
Authority
Compiled location reference
Source entity
Campus
Method
moj_aigid_exact_address_parcel_interior_centroid
Derivation
direct_geometry
Precision scope
Interior centroid of uniquely matched published campus parcel. Six decimal coordinates do not imply equivalent horizontal accuracy; no building or tenant footprint.
Horizontal uncertainty
Not reported

No quantified positional accuracy established; source parcel classification is retained. Six decimal places describe calculation, not surveyed accuracy.

Geometry evidence
3a617222

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Ishikari Renewable Energy Data Center No.1
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
BroadBand Tower and Hokuden Information Technology joint release (15 October 2026): resale of BroadBand Tower data-centre services from its Ishikari Shinko Site hall inside Ishikari Renewable Energy Data Center No.1
Archived copy
Hokuden Information Technology Co., Inc.
Company disclosure
Physical statusall-rights-reservedHokuden Information Technology Co., Inc.; BroadBand Tower, Inc.d220e0bd6e1f7c37a721cb57aa15950f3e41e1907a908cab367bd20127af3a30
Retained source material; see source provenance
GMO, Tokyu and BroadBand Tower plan GPU deployment inside operating Ishikari DC
Archived copy
BroadBand Tower / Tokyu Land / GMO Internet
Company disclosure
Site and project identity, Tenant claimall-rights-reservedBroadBand Tower / Tokyu Land / GMO Internet2450ee26be0c226bfcb07b937fd463e2a910da5f2d2435c8ccc68bd61e8f8adb
Retained source material; see source provenance
Ishikari Renewable Energy Data Center No.1 begins service on August 1
Archived copy
Ishikari Renewable Energy Data Center No.1 LLC / Flower Communications via PR TIMES
Company disclosure
Physical status, Operator claimall-rights-reservedIshikari Renewable Energy Data Center No.1 LLC / Flower Communications via PR TIMESce6e1d177c8d356af81cb07e53ecd1d46fba5af753dbf24c2a8c11c463939f44
Retained source material; see source provenance
Ishikari Renewable Energy Data Center No.1 property specification
Archived copy
Tokyu Land Corporation
Company disclosure
Site and project identitynot statedall-rights-reservedTokyu Land Corporationf063e27d4a9efbe89732aee88493ba401822d4548131fc41dd57f9042aa204c1
Retained source material; see source provenance
MOJ / AIGID 2026 Ishikari cadastral geometry: Shinko Chuo 1-chome 722-1
Archived copy
AIGID; source registry map data by Japan Ministry of Justice
Map feature
Geometrynot statedCC-BYJapan Ministry of Justice registry map data; AIGID GeoJSON conversion. Catalog license CC BY: http://www.opendefinition.org/licenses/cc-by/d9b69bf72568ce9dbbf7d4ab8d379c05dca3073ce4b61ea80f4eac5ee33f2545
Retained source material; see source provenance
Tokyu announces completion of Ishikari Renewable Energy Data Center No.1; exact site parcel
Archived copy
Tokyu Land Corporation
Company disclosure
Site and project identityall-rights-reservedTokyu Land Corporation998fa5ec57f2af4c615bb14c0957930122232f8b94e52074abf3079a6d4a29a0
Retained source material; see source provenance
Tokyu Land joint release with GMO Internet and BroadBand Tower (October 7, 2026): GMO GPU Cloud site planned inside the operating Ishikari Renewable Energy Data Center No.1
Archived copy
Tokyu Land Corporation
Company disclosure
Physical statusall-rights-reservedTokyu Land Corporation; GMO Internet, Inc.; BroadBand Tower, Inc.48b59713b6aa05fabfed3db4b9e8dea5e2a62e7021e8fd9f2c1a7d499d420e1f
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Ishikari Renewable Energy Data Center No.1 [site vcc-site-2b082c2af5f1a4774370]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2b082c2af5f1a4774370/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction