Ishikari Renewable Energy Data Center No.1
Operational
Japan · 1 project · Last reported
Summary
BroadBand Tower and Hokuden Information Technology's joint release of 15 October 2026 states that from that day Hokuden IT sells the data-centre services (colocation, internet lines, related options) that BroadBand Tower provides in its 石狩新港サイト data hall inside Ishikari Renewable Energy Data Center No.1, with a stated service start of 15 October 2026. This confirms the existing facility was in operation on 15 October 2026. It reports no new building, phase, capacity or occupancy, and GMO's planned GPU-cloud deployment in the same hall is not treated as operating. evidence
Hokuden Information Technology Co., Inc. · published 2026-10-15
Location
The interactive map needs JavaScript. Display anchor: 43.17856, 141.29812 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Ishikari Renewable Energy Data Center No.1
Operational last observed as of · Authoritative status update
PDF page 4 gives Ishikari Shinko Chuo 1-chome 722-1 parcel address, six halls and March 27 completion. This address supplies the identity bridge to the cadastral parcel. evidence
Tokyu Land Corporation · published 2026-04-22
Confirms host facility began service August 1. GMO plans to use part of BroadBand Tower Ishikari Shinko floor with operation targeted within 2026; future tenant deployment is not a second physical site or achieved GPU commissioning. evidence
BroadBand Tower / Tokyu Land / GMO Internet · published 2026-10-07
Undated facility page gives site area 14,215 square metres, six halls and indicative electrical specifications. It still displays a March 2026 completion forecast; later dated releases establish achieved milestones. evidence
Tokyu Land Corporation · publication date not stated
- Companies
Source and location review
- Status source
- BroadBand Tower and Hokuden Information Technology joint release (15 October 2026): resale of BroadBand Tower data-centre services from its Ishikari Shinko Site hall inside Ishikari Renewable Energy Data Center No.1 evidence row
Hokuden Information Technology Co., Inc. · published 2026-10-15 · Company disclosure - Locator
- Campus locator · Compiled location reference · exact_operator_parcel_cadastral_bridge evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 12 days before the data update on 2026-10-27
Location details
- Coordinates
- 43.17856, 141.29812
- Geometry licence
- CC-BY
- Use scope
- Campus locator
- Scope class
- exact_operator_parcel_cadastral_bridge
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- moj_aigid_exact_address_parcel_interior_centroid
- Derivation
- direct_geometry
- Precision scope
- Interior centroid of uniquely matched published campus parcel. Six decimal coordinates do not imply equivalent horizontal accuracy; no building or tenant footprint.
- Horizontal uncertainty
Not reported
No quantified positional accuracy established; source parcel classification is retained. Six decimal places describe calculation, not surveyed accuracy.
- Geometry evidence
- 3a617222
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| BroadBand Tower and Hokuden Information Technology joint release (15 October 2026): resale of BroadBand Tower data-centre services from its Ishikari Shinko Site hall inside Ishikari Renewable Energy Data Center No.1 Archived copy | Hokuden Information Technology Co., Inc. Company disclosure | Physical status | all-rights-reserved | Hokuden Information Technology Co., Inc.; BroadBand Tower, Inc. | d220e0bd6e1f7c37a721cb57aa15950f3e41e1907a908cab367bd20127af3a30Retained source material; see source provenance | ||
| GMO, Tokyu and BroadBand Tower plan GPU deployment inside operating Ishikari DC Archived copy | BroadBand Tower / Tokyu Land / GMO Internet Company disclosure | Site and project identity, Tenant claim | all-rights-reserved | BroadBand Tower / Tokyu Land / GMO Internet | 2450ee26be0c226bfcb07b937fd463e2a910da5f2d2435c8ccc68bd61e8f8adbRetained source material; see source provenance | ||
| Ishikari Renewable Energy Data Center No.1 begins service on August 1 Archived copy | Ishikari Renewable Energy Data Center No.1 LLC / Flower Communications via PR TIMES Company disclosure | Physical status, Operator claim | all-rights-reserved | Ishikari Renewable Energy Data Center No.1 LLC / Flower Communications via PR TIMES | ce6e1d177c8d356af81cb07e53ecd1d46fba5af753dbf24c2a8c11c463939f44Retained source material; see source provenance | ||
| Ishikari Renewable Energy Data Center No.1 property specification Archived copy | Tokyu Land Corporation Company disclosure | Site and project identity | not stated | all-rights-reserved | Tokyu Land Corporation | f063e27d4a9efbe89732aee88493ba401822d4548131fc41dd57f9042aa204c1Retained source material; see source provenance | |
| MOJ / AIGID 2026 Ishikari cadastral geometry: Shinko Chuo 1-chome 722-1 Archived copy | AIGID; source registry map data by Japan Ministry of Justice Map feature | Geometry | not stated | CC-BY | Japan Ministry of Justice registry map data; AIGID GeoJSON conversion. Catalog license CC BY: http://www.opendefinition.org/licenses/cc-by/ | d9b69bf72568ce9dbbf7d4ab8d379c05dca3073ce4b61ea80f4eac5ee33f2545Retained source material; see source provenance | |
| Tokyu announces completion of Ishikari Renewable Energy Data Center No.1; exact site parcel Archived copy | Tokyu Land Corporation Company disclosure | Site and project identity | all-rights-reserved | Tokyu Land Corporation | 998fa5ec57f2af4c615bb14c0957930122232f8b94e52074abf3079a6d4a29a0Retained source material; see source provenance | ||
| Tokyu Land joint release with GMO Internet and BroadBand Tower (October 7, 2026): GMO GPU Cloud site planned inside the operating Ishikari Renewable Energy Data Center No.1 Archived copy | Tokyu Land Corporation Company disclosure | Physical status | all-rights-reserved | Tokyu Land Corporation; GMO Internet, Inc.; BroadBand Tower, Inc. | 48b59713b6aa05fabfed3db4b9e8dea5e2a62e7021e8fd9f2c1a7d499d420e1fRetained source material; see source provenance |