Nscale Kvandal Narvik AI Data Center Campus
Under construction
Norway · 2 projects · Last reported
Summary
Nscale Kvandal AI data center (Narvik)
AI data center campus at Kvandal outside Narvik in northern Norway, announced in July 2025 as Stargate Norway by Nscale, Aker and OpenAI with 230 MW planned and ambitions for 290 MW more. The Aker-Nscale joint venture signed a five-year Microsoft contract worth about USD 6.2bn in September 2025, and in April 2026 Microsoft took the capacity first linked to OpenAI, adding more than 30,000 NVIDIA Rubin GPUs for 2027. Aker transferred its half of the joint venture to Nscale in March 2026. Nscale raised USD 790m of debt in May 2026, and in September 2026 contractor HENT held contracts for three buildings totalling 100 MW, with construction under way and completion expected in 2027.
Source record as of 2026-09-02 · Details and sources
Nscale Kvandal Initial 25 MW EPC Current Build
Nscale says Nordkraft has delivered operational services during the construction phase at Nscale's Kvandal data center. evidence
Nscale · published 2026-07-06
Location
The interactive map needs JavaScript. Display anchor: 68.57525, 17.58006 (Polygon locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (2)
Nscale Kvandal AI data center (Narvik)
Under construction last observed as of · Reported status
Location: Kvandal, Narvik Municipality, Nordland, NO. Sources place the site at Kvandal, just outside Narvik, and Nscale says the operator's main office is on site in Bjerkvik. Kvandal itself was not resolved to a point, so a Narvik municipality centroid is used. Aker ASA; Nscale; Sentia (via Inderes)
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 230 MW | Planned · Campus · Unspecified | 2026-04-14 | Aker ASA; Nscale; AmCham Norway | |
| Power capacity | 290 MW | Planned · Phase · Unspecified · Possible expansion | 2025-07-31 | Stated as an ambition for additional capacity beyond the 230 MW. | Aker ASA |
| Power capacity | 20 MW | Planned · Phase · Unspecified · Initial phase | 2025-07-31 | Aker ASA | |
| Power capacity | 115 MW | Planned · Phase · Unspecified · Accordion-funded expansion | 2026-05-11 | An uncommitted USD 790m accordion could fund this further expansion. | Nscale |
| Power capacity | 100 MW | Under construction · Phase · Unspecified · HENT-contracted buildings | 2026-09-02 | Combined capacity of the three buildings HENT is contracted to build, including two added in September 2026 totalling 75 MW; the release says construction is under way but does not relate this to the 230 MW figure. | Sentia (via Inderes) |
| Investment | about 1,000,000,000 USD | Announced · Phase · Initial 20 MW phase | 2025-07-31 | Committed by Nscale and Aker, including upwards of USD 250m of equity shared equally. | Aker ASA |
| Accelerators | 100,000 count | Planned · Campus | 2025-07-31 | Original target of 100,000 GPUs by end of 2026 under the Stargate Norway plan. | Aker ASA |
| Accelerators | about 52,000 count | Planned · Campus | 2025-10-15 | GPUs to be delivered to Microsoft from the Narvik campus under a multi-year agreement. | Nscale |
| Accelerators | more than 30,000 count | Planned · Campus | 2026-04-14 | Expansion of the Microsoft deal for 2027 delivery. | Nscale |
| Buildings | 3 count | Under construction · Phase · HENT-contracted buildings | 2026-09-02 | Sentia (via Inderes) |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Nscale | Developer | Nscale leads design and build; the April 2026 release says the project is solely managed by Nscale. | Aker ASA; Nscale |
| Nscale | Owner | Owns the former Aker Nscale joint venture after Aker transferred its 50% stake in March 2026. | Aker ASA (via Placera); Nscale |
| Aker ASA | Owner | 50% owner of the Aker Nscale joint venture from its formation until it transferred the stake to Nscale on 27 March 2026. | Aker ASA; Aker ASA (via Placera) |
| Microsoft | Tenant | Five-year customer agreement of about USD 6.2bn signed in September 2025, expanded in April 2026 with more than 30,000 NVIDIA Rubin GPUs for 2027. | Aker ASA; Nscale |
| OpenAI | Tenant | Named as initial offtaker in July 2025; reported in April 2026 to have dropped out, with Microsoft taking the capacity. | Aker ASA; AmCham Norway |
| NVIDIA | Hardware supplier | Aker ASA; Nscale | |
| HENT | Builder | Sentia subsidiary holding civil, structural and architectural contracts for three buildings. | Sentia (via Inderes) |
| Nordscale Operations AS | Operator | Operating company owned 51% by Nscale Norway AS and 49% by Nordkraft AS. | Nscale |
| Vattenfall | Power supplier | Power purchase agreement covering a significant share of first-phase demand from 2027 to 2031; volume not disclosed. | Datacenter Forum |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-07-31 | Announced | Actual | Nscale and Aker said they were beginning preparatory work and mobilising for construction. | Aker ASA |
| 2025-09-17 | Other | Actual | Nscale, Aker and Microsoft signed a binding five-year customer agreement worth about USD 6.2bn, with staged deployments from 2026. | Aker ASA |
| 2026-03-27 | Other | Actual | Aker completed the transfer of its 50% stake in the Aker Nscale joint venture to Nscale as part of Nscale's Series C. | Aker ASA (via Placera) |
| 2026-04-14 | Other | Actual | Microsoft expanded its deal with more than 30,000 Rubin GPUs for 2027; OpenAI was reported to have dropped out. | Nscale; AmCham Norway |
| 2026-05-11 | Other | Actual | USD 790m debt financing from ABN AMRO, DNB, Eksfin, Nordea and SEB. | Nscale |
| 2026-09-02 | Expansion announced | Actual | HENT contracted for two additional buildings totalling 75 MW. | Sentia (via Inderes) |
| 2027 | First operational | Planned | Datacenter Forum; Sentia (via Inderes) |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Secured grid capacity with entirely renewable electricity; a Vattenfall PPA covers a significant share of first-phase demand from 2027 to 2031, generation assets not disclosed. | Aker ASA; Datacenter Forum |
Sources for these details
- Nscale, Aker and OpenAI to establish Stargate Norway: a 100,000 NVIDIA GPU AI gigafactory powered by renewable energy in Northern Norway — Aker ASA; 2025-07-31
- Aker-Nscale JV signs multi-billion dollar AI infrastructure agreement with Microsoft — Aker ASA; 2025-09-17
- Nscale Contracts Approximately 200,000 NVIDIA GB300 GPUs with Microsoft to Deliver NVIDIA AI Infrastructure Across Europe and the U.S. — Nscale; 2025-10-15
- Aker completes investment in Nscale's Series C funding round — Aker ASA (via Placera); 2026-03-27
- Nscale announces expanded deal with Microsoft in Norway — Nscale; 2026-04-14 · Archived source
- Nscale Secures $790 Million in Financing to Support AI Infrastructure Buildout in Norway — Nscale; 2026-05-11 · Archived source
- Nscale signs PPA with Vattenfall for Kvandal data center Norway — Datacenter Forum; 2026-06 · Archived source
- Nscale and Nordkraft Enter Strategic Partnership to Support Data Center Operations in Narvik — Nscale; 2026-07-06 · Archived source
- HENT, a subsidiary of Sentia, has signed a contract for the expansion of Nscale's data center in the Narvik region — Sentia (via Inderes); 2026-09-02
- Microsoft contracts 30,000 GPUs from Nscale at Norway data center as OpenAI drops out of latest Stargate — AmCham Norway; 2026-04-17
- Companies
- Developer: Nscale (unknown scope) evidence
- Developer: Nscale (unknown scope) evidence
- Owner: Nscale (unknown scope) evidence
- Owner: Nscale (unknown scope) evidence
- Owner: Aker ASA (unknown scope) evidence
- Owner: Aker ASA (unknown scope) evidence
- Tenant: Microsoft (unknown scope) evidence
- Tenant: Microsoft (unknown scope) evidence
- Tenant: OpenAI (unknown scope) evidence
- Tenant: OpenAI (unknown scope) evidence
- Hardware Supplier: NVIDIA (unknown scope) evidence
- Hardware Supplier: NVIDIA (unknown scope) evidence
- Builder: HENT (unknown scope) evidence
- Operator: Nordscale Operations AS (unknown scope) evidence
- Power Supplier: Vattenfall (unknown scope) evidence
Source and location review
- Status source
- HENT, a subsidiary of Sentia, has signed a contract for the expansion of Nscale's data center in the Narvik region evidence row
Sentia (via Inderes) · published 2026-09-02 · Company disclosure - Locator
- County or district reference only · Compiled location reference · admin2 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 55 days before the data update on 2026-10-27
Nscale Kvandal Initial 25 MW EPC Current Build
Under construction last observed as of · Authoritative status update
Source and location review
- Status source
- Nscale and Nordkraft establish Nordscale Operations evidence row
Nscale · published 2026-07-06 · Company disclosure - Locator
- Campus locator · Official source · official_cadastral_parcel_as_campus_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed_ for_ core_ preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 113 days before the data update on 2026-10-27
Location details
- Coordinates
- 68.57525, 17.58006
- Geometry licence
- CC-BY-4.0
- Use scope
- Campus locator
- Scope class
- official_cadastral_parcel_as_campus_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- kartverket_official_cadastral_parcel_polygon_as_campus_locator
- Derivation
- cross_source_overlay
- Precision scope
- Exact current Kartverket cadastral polygon for parcel 10/760, used only to locate the Nscale Kvandal campus and inherited by the 25 MW current-build project through the explicit v14 project_targets relationship. The parcel contains both officially mapped data-center buildings and is not the footprint or centroid of Data Center 1, the 25 MW EPC project, Data Center 2, or the complete campus.
- Horizontal uncertainty
Not reported
The captured WFS publishes accuracy class “Grønt” but no numeric horizontal uncertainty in metres; the bridge does not convert that class into survey accuracy.
- Geometry evidence
- 7960e467
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Aker completes investment in Nscale's Series C funding round Archived copy | Aker ASA (via Placera) Company disclosure | Imported: Record, Milestone: Other, Owner claim | source-terms-not-recorded | Aker ASA (via Placera) | bf7cf6c823d17117ee35149a3a4c838cbbe7c83ec47a0491d985f173a58e3d33Factual source record; not the publisher page | ||
| Aker-Nscale JV signs multi-billion dollar AI infrastructure agreement with Microsoft Archived copy | Aker ASA Company disclosure | Imported: Record, Milestone: Other, Power Source: Grid, Tenant claim | source-terms-not-recorded | Aker ASA | a1b8a090a9d087501e929bf293f3a13a14a5f317b0355b952379235659c01601Factual source record; not the publisher page | ||
| HENT, a subsidiary of Sentia, has signed a contract for the expansion of Nscale's data center in the Narvik region Archived copy | Sentia (via Inderes) Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Power Capacity, Milestone: Expansion Announced, Milestone: First Operational, Role: Builder | source-terms-not-recorded | Sentia (via Inderes) | 962b23d1839e520372b6a12573318d7ddc65124cf0404e951f49189b62539a5fFactual source record; not the publisher page | ||
| Kartverket Matrikkelen parcel 1806-10/760 Archived copy | Kartverket / Statens kartverk Government record | Geometry | CC-BY-4.0 | Kartverket | 8d835fa69725193def708489f681c84bb12c384d71e263fca1739c3c539f997bRetained source material; see source provenance | ||
| Microsoft contracts 30,000 GPUs from Nscale at Norway data center as OpenAI drops out of latest Stargate Archived copy | AmCham Norway News | Imported: Record, Metric: Power Capacity, Milestone: Other, Tenant claim | source-terms-not-recorded | AmCham Norway | 33078b241342527558b814816fabc2f9cb7f4221db20c1dbd0d5203be67337d5Factual source record; not the publisher page | ||
| Nscale and Nordkraft Enter Strategic Partnership to Support Data Center Operations in Narvik Archived copy | Nscale Company disclosure | Imported: Geometry, Imported: Record, Operator claim | source-terms-not-recorded | Nscale | 20e38f6153e2242766e0b1bea080815aeaac1c4cd40c2d053cf31797d80f9866Factual source record; not the publisher page | ||
| Nscale and Nordkraft establish Nordscale Operations Archived copy | Nscale Company disclosure | Physical status | all-rights-reserved | Nscale | 80083854496ae0b2952d0ccff49a3f6a85d33a9c6fa41c7caef55050a117e619Retained source material; see source provenance | ||
| Nscale announces expanded deal with Microsoft in Norway Archived copy | Nscale Company disclosure | Imported: Record, Metric: Accelerators, Metric: Power Capacity, Milestone: Other, Role: Developer, Role: Hardware Supplier, Owner claim, Tenant claim | source-terms-not-recorded | Nscale | a8440c4730bce8700ed3d981458ebf724941003ef8caa5fd745bcfb957bcbe68Factual source record; not the publisher page | ||
| Nscale Contracts Approximately 200,000 NVIDIA GB300 GPUs with Microsoft to Deliver NVIDIA AI Infrastructure Across Europe and the U.S. Archived copy | Nscale Company disclosure | Imported: Record, Metric: Accelerators | source-terms-not-recorded | Nscale | d8146bc0033ab5059f052289965894f0d1baf558b75a715285ce38c09a943b73Factual source record; not the publisher page | ||
| Nscale Secures $790 Million in Financing to Support AI Infrastructure Buildout in Norway Archived copy | Nscale Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Other | source-terms-not-recorded | Nscale | 3facb93418523e146ced4c86bf0b60b2192e3b1d15025c6e90bf5e7f1585fb83Factual source record; not the publisher page | ||
| Nscale signs PPA with Vattenfall for Kvandal data center Norway Archived copy | Datacenter Forum Trade publication | Imported: Record, Milestone: First Operational, Power Source: Grid, Role: Power Supplier | source-terms-not-recorded | Datacenter Forum | 74945f429841180038e8da11359ba7f370818fbe483852edea9a51967ad74727Factual source record; not the publisher page | ||
| Nscale, Aker and OpenAI to establish Stargate Norway: a 100,000 NVIDIA GPU AI gigafactory powered by renewable energy in Northern Norway Archived copy | Aker ASA Company disclosure | Imported: Geometry, Imported: Record, Metric: Accelerators, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Role: Developer, Role: Hardware Supplier, Owner claim, Tenant claim | source-terms-not-recorded | Aker ASA | 2313dfd01f3683d88d0aa41b6ecee9ad0bb009dc8aa53cccfc45ec25b5c90d65Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Nscale Kvandal Narvik AI Data Center Campus [site vcc-site-2fb799e38497b94b3ed1]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2fb799e38497b94b3ed1/