Aker Nscale Korgen AI data center

Announced

Norway · 1 project · Last reported

Summary

Aker Nscale, then a joint venture of Aker and Nscale, plans an AI data center at Korgen in Hemnes municipality, Nordland, possibly at Statkraft's Nedre Røssåga power station. In October 2025 an Aker investment director estimated the site would draw about 250 MW of grid capacity and said it could be as large as the Narvik project. Aker Nscale had bought out Nordkraft's position and landowner agreements for a plot zoned for commercial use in Hemnes's proposed land-use plan, and was waiting in line for a Statnett power allocation. Trade press put the project at about USD 5.4bn. Aker passed its joint-venture stake to Nscale in March 2026; no later Korgen-specific update was found.

Source record as of 2025-10-27 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 66.07660, 13.82190 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Aker Nscale Korgen AI data center

Announced last observed as of · Reported status

Location: Korgen, Hemnes Municipality, Nordland, NO. Korgen village centroid from Nominatim; sources say the plot is in a designated area at Korgen, possibly at Nedre Røssåga power station, but do not give a parcel. High North News; Datacenter Forum

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 250 MWPlanned · Campus · Grid connection2025-10-22Estimate by Aker's investment director of the grid capacity the data center would use.High North News; Datacenter Forum
Investment5,400,000,000 USDReported · Campus2025-10-27Figure appears in the trade press article's unattributed summary; the full text is paywalled and its basis is not explained.The Tech Capital

Companies and organizations

NameRoleNotesSources
Aker NscaleDeveloperJoint venture of Aker and Nscale when the plan was reported; Aker transferred its 50% stake in the joint venture to Nscale in March 2026.High North News; Datacenter Forum; The Tech Capital; Aker ASA (via Placera)
StatnettUtilityGrid operator from which the project awaits a power allocation.High North News; Datacenter Forum
Hemnes MunicipalityGovernmentIts proposed land-use plan zones the plot for commercial use.High North News

Timeline

DateEventActual or plannedNotesSources
2025-10-22AnnouncedActualHigh North News
2025-10OtherActualReported that Aker Nscale had bought out Nordkraft's position, including the option on a plot next to Statkraft's facility that Nordkraft had held since 2019, and taken over the landowner agreements.High North News
2025-10OtherActualGrid power application delayed by zoning; the project was waiting in line for a Statnett allocation.High North News; Datacenter Forum
2026-03-27OtherActualAker transferred its 50% stake in the Aker Nscale joint venture to Nscale; the release does not mention Korgen.Aker ASA (via Placera)

Power supply

TypeDescriptionSources
GridPlanned grid draw of about 250 MW subject to a Statnett allocation; the site may sit at the Nedre Røssåga power station.High North News; Datacenter Forum
Sources for these details
Companies
  • Developer: Aker Nscale (unknown scope) evidence
  • Developer: Aker Nscale (unknown scope) evidence
  • Developer: Aker Nscale (unknown scope) evidence
  • Developer: Aker Nscale (unknown scope) evidence
  • Utility: Statnett (unknown scope) evidence
  • Utility: Statnett (unknown scope) evidence
  • Government: Hemnes Municipality (unknown scope) evidence
Source and location review
Status source
Aker Nscale Planning Another AI Data Center in Northern Norway evidence row
High North News · published 2025-10-22 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 365 days before the data update on 2026-10-27

Location details
Coordinates
66.07660, 13.82190
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Korgen village centroid from Nominatim; sources say the plot is in a designated area at Korgen, possibly at Nedre Røssåga power station, but do not give a parcel.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
88844eaa

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Aker Nscale Korgen AI data center
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Aker completes investment in Nscale's Series C funding round
Archived copy
Aker ASA (via Placera)
Company disclosure
Imported: Record, Milestone: Other, Role: Developersource-terms-not-recordedAker ASA (via Placera)18d109a0210110077d26837cb97a16eed15d396408142afe423d49a43dde15fc
Factual source record; not the publisher page
Aker Nscale Planning Another AI Data Center in Northern Norway
Archived copy
High North News
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedHigh North News47d801ccf3b26bfd72b8d317ca15f18640a354d581a97e5b5744ab06c2bf73d4
Factual source record; not the publisher page
Aker Nscale plans to build large AI data center in northern Norway
Archived copy
Datacenter Forum
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedDatacenter Forum5fb7a24a83cf6388ccab21f363a09f62472cf93b984ac2f0035a2be535304ab7
Factual source record; not the publisher page
Nscale expands AI infrastructure with new 250 MW data centre project in Norway
Archived copy
The Tech Capital
Trade publication
Imported: Record, Imported: Status, Metric: Investment, Role: Developersource-terms-not-recordedThe Tech Capitalcd72b10d310367b80d09fbc1a77100619e31437409b84b7901584847cb048beb
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Aker Nscale Korgen AI data center [site vcc-site-35381f89404ef4c2a035]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-35381f89404ef4c2a035/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction