atNorth FIN05 Salo mega site

Announced

Finland · 1 project · Last reported

Summary

atNorth announced on 5 October 2026 a data center campus, FIN05, on a 28.6-hectare development-ready site in Salo, southwest Finland, with about EUR 2bn of its own investment; customer-owned servers could add a further investment estimated at up to EUR 10bn. The press release describes a 75 MW first phase with secured power and a path to up to 230 MW, while the site page lists 230 MW of gross power, up to 160 MW of IT capacity and a 60 MW IT first phase with power planned for Q3 2028. The site will connect to Fingrid's transmission grid through a substation, and atNorth plans long-term power purchase agreements with local suppliers.

Source record as of 2026-10-05 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 60.38790, 23.12490 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

atNorth FIN05 Salo mega site

Announced last observed as of · Reported status

Location: Salo, Southwest Finland, FI. Sources name Salo without a street address; the coordinates are the Nominatim point for Salo's central district (Salon suuralue). atNorth; atNorth

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity230 MWPlanned · Campus · Facility2026-10-05Site page gives 230 MW of gross power; the press release describes a path to up to 230 MW without stating scope.atNorth
Power capacityup to 160 MWPlanned · Campus · It load2026-10-05atNorth
Power capacity75 MWPlanned · Phase · Unspecified · First phase2026-10-05Press release figure; the site page lists the first phase as 60 MW of IT capacity, so the two may be different scopes.atNorth
Power capacity60 MWPlanned · Phase · It load · First phase2026-10-05atNorth
Investmentabout 2,000,000,000 EURAnnounced · Campus2026-10-05atNorth's own investment, excluding customer-owned servers and their installation, which the company says could represent a further investment estimated at up to EUR 10bn.atNorth
Land area28.6 hectaresReported · Campus2026-10-05atNorth; atNorth

Companies and organizations

NameRoleNotesSources
atNorthDeveloperatNorth; atNorth
FingridUtilityTransmission grid operator; the site will connect through a Fingrid substation.atNorth
City of SaloGovernmentMunicipality that worked with atNorth and site developer Regant Oy to prepare the site.atNorth

Timeline

DateEventActual or plannedNotesSources
2026-10-05AnnouncedActualatNorth
2028-Q3OtherPlannedPower availability planned for the 60 MW IT first phase.atNorth

Power supply

TypeDescriptionSources
GridConnection to Fingrid's transmission grid via a substation; first-phase power described as secured, with long-term PPAs with local suppliers planned and generation sources not named.atNorth
Sources for these details
Companies
  • Developer: atNorth (unknown scope) evidence
  • Developer: atNorth (unknown scope) evidence
  • Utility: Fingrid (unknown scope) evidence
  • Government: City of Salo (unknown scope) evidence
Source and location review
Status source
atNorth to develop new data center in Salo, Finland evidence row
atNorth · published 2026-10-05 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 22 days before the data update on 2026-10-27

Location details
Coordinates
60.38790, 23.12490
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources name Salo without a street address; the coordinates are the Nominatim point for Salo's central district (Salon suuralue).
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
e5f7decb

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for atNorth FIN05 Salo mega site
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
atNorth to develop new data center in Salo, Finland
Archived copy
atNorth
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedatNorthc4d98eec3f226d569e02e7c6b56b7393e0ffa436ea2613a0399814798536424d
Factual source record; not the publisher page
Salo mega site (FIN05)
Archived copy
atNorth
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Role: Developernot statedsource-terms-not-recordedatNorth39ddf178b99a005583f40b708bcca4369b209de743b4dc0d245572329df0dc94
Factual source record; not the publisher page