Data4 Escaudain campus

Announced

France · 1 project · Last reported

Summary

Data4, the Brookfield-owned European data center developer, plans a EUR 5 billion, 700 MW AI-oriented campus on the Parc des Soufflantes brownfield in Escaudain, northern France, the former Usinor steelworks. The local authority La Porte du Hainaut picked Data4 in December 2025; after feasibility studies Data4 confirmed the project in June 2026, with further studies and preliminary works over the following year and four data center buildings to follow. The site was among the French government and RTE fast-track grid sites.

Source record as of 2026-06-15 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 50.33330, 3.34380 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Data4 Escaudain campus

Announced last observed as of · Reported status

Location: Escaudain, Nord, Hauts-de-France, FR. Nominatim centroid of the commune of Escaudain; the site is the Parc des Soufflantes (former Usinor plant), which could not be geocoded more precisely. Data4; Data4

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity700 MWPlanned · Campus · Unspecified2026-06-12Data4; BeBeez International (DCD)
Investment5,000,000,000 EURAnnounced · Campus2026-06-12Data4; BeBeez International (DCD)
Land area33 hectaresPlanned · Campus2026-06-12The December 2025 selection release described a 38-hectare campus project.Data4
Land area38 hectaresPlanned · Campus2025-12-15Data4
Buildings4 countPlanned · Campus2026-06-12Data4 says four data centers will be built to expand the campus; trade press (DCD via BeBeez) described an initial building that could be followed by up to four more.Data4; BeBeez International (DCD)
Jobs permanent2,400 countPlanned · Campus2026-06-12Data4

Companies and organizations

NameRoleNotesSources
Data4DeveloperData4; Data4
BrookfieldInvestorOwner of Data4 since April 2023.BeBeez International (DCD)
Communauté d'Agglomération de La Porte du HainautGovernmentLocal authority that selected Data4 as exclusive partner to redevelop the former Usinor site.Data4; Data4

Timeline

DateEventActual or plannedNotesSources
2025-12-15AnnouncedActualLa Porte du Hainaut selected Data4 and opened a 60-day exclusive negotiation and feasibility phase.Data4
2026-06-12OtherActualData4 confirmed the EUR 5 billion project after feasibility studies; further studies and preliminary works planned over the next 12 months.Data4; BeBeez International (DCD)

Power supply

TypeDescriptionSources
GridSite benefited from the French government and RTE fast-track procedure for ready-to-connect data center sites.Data4; BeBeez International (DCD)

No construction start, permit or first-operation date had been published by the companies as of the latest source. Data4 said decontamination of the former Usinor plant would follow once project conditions were met.

Sources for these details
Companies
  • Developer: Data4 (unknown scope) evidence
  • Developer: Data4 (unknown scope) evidence
  • Investor: Brookfield (unknown scope) evidence
  • Government: Communauté d'Agglomération de La Porte du Hainaut (unknown scope) evidence
  • Government: Communauté d'Agglomération de La Porte du Hainaut (unknown scope) evidence
Source and location review
Status source
Data4 confirms its largest data center project in the North of France evidence row
Data4 · published 2026-06-12 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 134 days before the data update on 2026-10-27

Location details
Coordinates
50.33330, 3.34380
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Nominatim centroid of the commune of Escaudain; the site is the Parc des Soufflantes (former Usinor plant), which could not be geocoded more precisely.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
ac81d24f

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Data4 Escaudain campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Data4 confirms its largest data center project in the North of France
Archived copy
Data4
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Governmentsource-terms-not-recordedData4d56f3d707aedffad8e43670c4067c9b864a26f80391323cd232775ff514a4579
Factual source record; not the publisher page
Data4 confirms €5bn plan for 700MW AI data center in northern France
Archived copy
BeBeez International (DCD)
Trade publication
Imported: Record, Imported: Status, Metric: Buildings, Metric: Investment, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Investorsource-terms-not-recordedBeBeez International (DCD)835f1969e553fb1b7fd4e82fbab201e66158d13b157e78065932cee623701df4
Factual source record; not the publisher page
Escaudain : Data4 sélectionné pour le projet de campus numérique de La Porte du Hainaut
Archived copy
Data4
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Milestone: Announced, Role: Developer, Role: Governmentsource-terms-not-recordedData4f58231a21382931dfe20b5cbc4f90347de91436ea219fc2f70179418ad2955de
Factual source record; not the publisher page