Stargate UAE / UAE-US AI Campus

Under construction

United Arab Emirates · 1 project · Last reported

Summary

A planned 5 GW AI data centre campus in Abu Dhabi, unveiled in May 2025 under a US-UAE technology partnership and led by G42. Its first 1 GW block, branded Stargate UAE, is being developed by G42 unit Khazna Data Centers, with OpenAI and Oracle named as operators and NVIDIA supplying GB300 systems. Construction of an initial 200 MW (two 100 MW buildings) was under way in 2026, with handover targeted for 2026; no completion dates have been given for the rest of the 1 GW cluster or the wider campus. A UAE minister put the cost at more than USD 30 billion in January 2026.

Source record as of 2026-08-13 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 24.34380, 55.10000 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

State or region reference only; the facility position is not established.

Projects (1)

Stargate UAE / UAE-US AI Campus

Under construction last observed as of · Reported status

Location: Abu Dhabi, AE. Sources place the campus in Abu Dhabi without naming a district, and its exact site has not been published. Coordinates are the OpenStreetMap Nominatim centroid of the Abu Dhabi emirate, not the site. G42; The National

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity5,000 MWPlanned · Campus · Unspecified2025-05-15Planned capacity of the whole UAE-US AI Campus, of which Stargate UAE is one part.G42; G42
Power capacity1,000 MWPlanned · Phase · Unspecified · Stargate UAE cluster2025-10-16G42; G42 via PR Newswire
Power capacity200 MWUnder construction · Phase · Unspecified · Stargate UAE first phase2026-08-13Khazna said in August 2026 that two 100 MW buildings had been enclosed and fit-out was under way.G42 via PR Newswire; The National; Khaleej Times
Power capacity500 MWPlanned · Phase · Unspecified · Capacity slated to come online in 2026 (UAE Embassy)2026The UAE Embassy in Washington says the first 500 MW of the campus is due online in 2026. This differs from the 200 MW first phase given by G42, Khazna and Mubadala, and the sources do not reconcile the two figures.Embassy of the United Arab Emirates, Washington DC
Investmentmore than 30,000,000,000 USDReported · Campus2026-01-26Cost estimate given by the UAE Minister of State for AI. The report attributes it to the 5 GW project and says it is 50 percent above an early estimate in the USD 20 billion range; no phase breakdown was given.The National
Land area1,920 hectaresReported · Campus2026-01-26Reported as 19.2 square kilometres, converted exactly to hectares.The National; The National
Land areaabout 6,400 acresReported · Campus2025-05-22G42 described the campus as about 10 square miles, converted at 640 acres per square mile. This is larger than the 19.2 square kilometres reported later by The National; the conflict is unresolved.G42
Buildings2 countUnder construction · Phase · Stargate UAE first phase2026-08-13Two 100 MW buildings.Khaleej Times
Jobs constructionmore than 5,000 countReported · Phase · Stargate UAE first phase2025-12-05Workers on site as of December 2025.The National

Companies and organizations

NameRoleNotesSources
G42DeveloperG42 leads the consortium building the 5 GW campus and is named as the builder of the Stargate UAE cluster.G42; G42
Khazna Data CentersDeveloperG42 data centre company developing the Stargate UAE cluster and delivering the campus build.G42 via PR Newswire; The National; Khaleej Times
OpenAIOperatorNamed with Oracle as an operator of the 1 GW Stargate UAE cluster.G42
OracleOperatorNamed with OpenAI as an operator of the 1 GW Stargate UAE cluster.G42
NVIDIAHardware supplierTo supply Grace Blackwell GB300 systems.G42
CiscoHardware supplierDescribed as providing zero-trust security and AI-ready network connectivity.G42

Timeline

DateEventActual or plannedNotesSources
2025-05-15AnnouncedActual5 GW UAE-US AI Campus unveiled in Abu Dhabi.G42
2025-05-22AnnouncedActualStargate UAE 1 GW cluster launched as the first block within the campus.G42
2025-10-16OtherActualG42 reported that civil works were well advanced, all long-lead equipment had been procured and the first mechanical systems had arrived on site.G42 via PR Newswire
2026-Q3First operationalPlannedMubadala's chief executive said in December 2025 that the first 200 MW phase would be ready in the third quarter of 2026.The National
2026First operationalPlannedPartners and Khazna have repeatedly targeted 2026 for the first 200 MW; Khazna said in August 2026 it remained on track despite regional conflict. No go-live had been confirmed in the sources reviewed.G42; Khaleej Times

Power supply

TypeDescriptionSources
NuclearPartners said the campus would use nuclear power among its energy sources; the supply arrangement was not described.G42
SolarSolar power is named among the campus energy sources; no project or capacity was given.G42
OtherNatural gas is named among the campus energy sources; sources do not say whether generation is on site or via the grid.G42

Sources describe Stargate UAE as the first 1 GW cluster inside the 5 GW UAE-US AI Campus, so both are kept in one record with phase-level figures to avoid double counting. Some reports (for example The National in January 2026) use the Stargate UAE name for the whole 5 GW project. Khazna said in August 2026 that construction continued through that year's regional conflict. SoftBank Group is also named as a partner, but no source reviewed states its role, so it is not listed as a party.

Sources for these details
Companies
  • Developer: G42 (unknown scope) evidence
  • Developer: G42 (unknown scope) evidence
  • Developer: Khazna Data Centers (unknown scope) evidence
  • Developer: Khazna Data Centers (unknown scope) evidence
  • Developer: Khazna Data Centers (unknown scope) evidence
  • Operator: OpenAI (unknown scope) evidence
  • Operator: Oracle (unknown scope) evidence
  • Hardware Supplier: NVIDIA (unknown scope) evidence
  • Hardware Supplier: Cisco (unknown scope) evidence
Source and location review
Status source
G42 Provides Update on Construction of Stargate UAE AI Infrastructure Cluster evidence row
G42 via PR Newswire · published 2025-10-16 · Company disclosure
Locator
State or region reference only · Compiled location reference · admin1 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 75 days before the data update on 2026-10-27

Location details
Coordinates
24.34380, 55.10000
Geometry licence
source-terms-not-recorded
Use scope
State or region reference only
Scope class
admin1
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources place the campus in Abu Dhabi without naming a district, and its exact site has not been published. Coordinates are the OpenStreetMap Nominatim centroid of the Abu Dhabi emirate, not the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
dcc56831

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Stargate UAE / UAE-US AI Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Abu Dhabi's 5GW UAE-US AI Campus stays on track despite regional conflict
Archived copy
Khaleej Times
News
Imported: Record, Imported: Status, Metric: Buildings, Metric: Power Capacity, Milestone: First Operational, Role: Developersource-terms-not-recordedKhaleej Times45aeae4e529ef0c843c34b9b6cc6fbce71af275d52bc9183077e6d2562795f7b
Factual source record; not the publisher page
G42 Provides Update on Construction of Stargate UAE AI Infrastructure Cluster
Archived copy
G42 via PR Newswire
Company disclosure
Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Role: Developersource-terms-not-recordedG42 via PR Newswire3da1d44e52141a056d13769b8a8f1adb6704c1186210efcd0d1f48e1af6a54b4
Factual source record; not the publisher page
G42 to lead a consortium with US partners to build 5GW UAE-US AI Campus
Archived copy
G42
Company disclosure
Imported: Record, Metric: Power Capacity, Milestone: Announced, Role: Developersource-terms-not-recordedG42598541e2d8267e96f40e9518dde021c038d1955046d32022f8c5b0cfe095b76d
Factual source record; not the publisher page
Global Tech Alliance Launches Stargate UAE
Archived copy
G42
Company disclosure
Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Nuclear, Power Source: Other, Power Source: Solar, Role: Developer, Role: Hardware Supplier, Operator claimsource-terms-not-recordedG425df55b6d3a7087ae4975f2b1d4cbc8aac2b584593827bbc64ff6b2cce87f18b8
Factual source record; not the publisher page
Stargate UAE data centre to cost more than $30bn, AI minister says
Archived copy
The National
News
Imported: Record, Metric: Investment, Metric: Land Areasource-terms-not-recordedThe Nationalc49c456832de26222919f76ce7aca013a0ab67c13da45b496a4d0cc67e155a8e
Factual source record; not the publisher page
Stargate UAE's first phase to be completed in third quarter of 2026
Archived copy
The National
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Role: Developersource-terms-not-recordedThe Nationalf50c0a751fba6ca0f1f9b6c153d470a17fef1d9d3006b8604332768f493cb8b3
Factual source record; not the publisher page
The UAE-US AI & Advanced Tech Partnership
Archived copy
Embassy of the United Arab Emirates, Washington DC
Government record
Imported: Record, Metric: Power Capacitynot statedsource-terms-not-recordedEmbassy of the United Arab Emirates, Washington DC4145e46b29f5c1d430523a4df7a1108e2f665c08a26fe3f7e48949e5eb5c340e
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Stargate UAE / UAE-US AI Campus [site vcc-site-401adc8a0db451b1d581]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-401adc8a0db451b1d581/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction