Stargate UAE / UAE-US AI Campus
Under construction
United Arab Emirates · 1 project · Last reported
Summary
A planned 5 GW AI data centre campus in Abu Dhabi, unveiled in May 2025 under a US-UAE technology partnership and led by G42. Its first 1 GW block, branded Stargate UAE, is being developed by G42 unit Khazna Data Centers, with OpenAI and Oracle named as operators and NVIDIA supplying GB300 systems. Construction of an initial 200 MW (two 100 MW buildings) was under way in 2026, with handover targeted for 2026; no completion dates have been given for the rest of the 1 GW cluster or the wider campus. A UAE minister put the cost at more than USD 30 billion in January 2026.
Source record as of 2026-08-13 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 24.34380, 55.10000 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
State or region reference only; the facility position is not established.
Projects (1)
Stargate UAE / UAE-US AI Campus
Under construction last observed as of · Reported status
Location: Abu Dhabi, AE. Sources place the campus in Abu Dhabi without naming a district, and its exact site has not been published. Coordinates are the OpenStreetMap Nominatim centroid of the Abu Dhabi emirate, not the site. G42; The National
Use: Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 5,000 MW | Planned · Campus · Unspecified | 2025-05-15 | Planned capacity of the whole UAE-US AI Campus, of which Stargate UAE is one part. | G42; G42 |
| Power capacity | 1,000 MW | Planned · Phase · Unspecified · Stargate UAE cluster | 2025-10-16 | G42; G42 via PR Newswire | |
| Power capacity | 200 MW | Under construction · Phase · Unspecified · Stargate UAE first phase | 2026-08-13 | Khazna said in August 2026 that two 100 MW buildings had been enclosed and fit-out was under way. | G42 via PR Newswire; The National; Khaleej Times |
| Power capacity | 500 MW | Planned · Phase · Unspecified · Capacity slated to come online in 2026 (UAE Embassy) | 2026 | The UAE Embassy in Washington says the first 500 MW of the campus is due online in 2026. This differs from the 200 MW first phase given by G42, Khazna and Mubadala, and the sources do not reconcile the two figures. | Embassy of the United Arab Emirates, Washington DC |
| Investment | more than 30,000,000,000 USD | Reported · Campus | 2026-01-26 | Cost estimate given by the UAE Minister of State for AI. The report attributes it to the 5 GW project and says it is 50 percent above an early estimate in the USD 20 billion range; no phase breakdown was given. | The National |
| Land area | 1,920 hectares | Reported · Campus | 2026-01-26 | Reported as 19.2 square kilometres, converted exactly to hectares. | The National; The National |
| Land area | about 6,400 acres | Reported · Campus | 2025-05-22 | G42 described the campus as about 10 square miles, converted at 640 acres per square mile. This is larger than the 19.2 square kilometres reported later by The National; the conflict is unresolved. | G42 |
| Buildings | 2 count | Under construction · Phase · Stargate UAE first phase | 2026-08-13 | Two 100 MW buildings. | Khaleej Times |
| Jobs construction | more than 5,000 count | Reported · Phase · Stargate UAE first phase | 2025-12-05 | Workers on site as of December 2025. | The National |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| G42 | Developer | G42 leads the consortium building the 5 GW campus and is named as the builder of the Stargate UAE cluster. | G42; G42 |
| Khazna Data Centers | Developer | G42 data centre company developing the Stargate UAE cluster and delivering the campus build. | G42 via PR Newswire; The National; Khaleej Times |
| OpenAI | Operator | Named with Oracle as an operator of the 1 GW Stargate UAE cluster. | G42 |
| Oracle | Operator | Named with OpenAI as an operator of the 1 GW Stargate UAE cluster. | G42 |
| NVIDIA | Hardware supplier | To supply Grace Blackwell GB300 systems. | G42 |
| Cisco | Hardware supplier | Described as providing zero-trust security and AI-ready network connectivity. | G42 |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-05-15 | Announced | Actual | 5 GW UAE-US AI Campus unveiled in Abu Dhabi. | G42 |
| 2025-05-22 | Announced | Actual | Stargate UAE 1 GW cluster launched as the first block within the campus. | G42 |
| 2025-10-16 | Other | Actual | G42 reported that civil works were well advanced, all long-lead equipment had been procured and the first mechanical systems had arrived on site. | G42 via PR Newswire |
| 2026-Q3 | First operational | Planned | Mubadala's chief executive said in December 2025 that the first 200 MW phase would be ready in the third quarter of 2026. | The National |
| 2026 | First operational | Planned | Partners and Khazna have repeatedly targeted 2026 for the first 200 MW; Khazna said in August 2026 it remained on track despite regional conflict. No go-live had been confirmed in the sources reviewed. | G42; Khaleej Times |
Power supply
| Type | Description | Sources |
|---|---|---|
| Nuclear | Partners said the campus would use nuclear power among its energy sources; the supply arrangement was not described. | G42 |
| Solar | Solar power is named among the campus energy sources; no project or capacity was given. | G42 |
| Other | Natural gas is named among the campus energy sources; sources do not say whether generation is on site or via the grid. | G42 |
Sources describe Stargate UAE as the first 1 GW cluster inside the 5 GW UAE-US AI Campus, so both are kept in one record with phase-level figures to avoid double counting. Some reports (for example The National in January 2026) use the Stargate UAE name for the whole 5 GW project. Khazna said in August 2026 that construction continued through that year's regional conflict. SoftBank Group is also named as a partner, but no source reviewed states its role, so it is not listed as a party.
Sources for these details
- Global Tech Alliance Launches Stargate UAE — G42; 2025-05-22
- G42 to lead a consortium with US partners to build 5GW UAE-US AI Campus — G42; 2025-05-15 · Archived source
- G42 Provides Update on Construction of Stargate UAE AI Infrastructure Cluster — G42 via PR Newswire; 2025-10-16
- Stargate UAE's first phase to be completed in third quarter of 2026 — The National; 2025-12-05 · Archived source
- Stargate UAE data centre to cost more than $30bn, AI minister says — The National; 2026-01-26
- Abu Dhabi's 5GW UAE-US AI Campus stays on track despite regional conflict — Khaleej Times; 2026-08-13
- The UAE-US AI & Advanced Tech Partnership — Embassy of the United Arab Emirates, Washington DC; publication date not stated
- Companies
- Developer: G42 (unknown scope) evidence
- Developer: G42 (unknown scope) evidence
- Developer: Khazna Data Centers (unknown scope) evidence
- Developer: Khazna Data Centers (unknown scope) evidence
- Developer: Khazna Data Centers (unknown scope) evidence
- Operator: OpenAI (unknown scope) evidence
- Operator: Oracle (unknown scope) evidence
- Hardware Supplier: NVIDIA (unknown scope) evidence
- Hardware Supplier: Cisco (unknown scope) evidence
Source and location review
- Status source
- G42 Provides Update on Construction of Stargate UAE AI Infrastructure Cluster evidence row
G42 via PR Newswire · published 2025-10-16 · Company disclosure - Locator
- State or region reference only · Compiled location reference · admin1 evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 75 days before the data update on 2026-10-27
Location details
- Coordinates
- 24.34380, 55.10000
- Geometry licence
- source-terms-not-recorded
- Use scope
- State or region reference only
- Scope class
- admin1
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources place the campus in Abu Dhabi without naming a district, and its exact site has not been published. Coordinates are the OpenStreetMap Nominatim centroid of the Abu Dhabi emirate, not the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- dcc56831
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Abu Dhabi's 5GW UAE-US AI Campus stays on track despite regional conflict Archived copy | Khaleej Times News | Imported: Record, Imported: Status, Metric: Buildings, Metric: Power Capacity, Milestone: First Operational, Role: Developer | source-terms-not-recorded | Khaleej Times | 45aeae4e529ef0c843c34b9b6cc6fbce71af275d52bc9183077e6d2562795f7bFactual source record; not the publisher page | ||
| G42 Provides Update on Construction of Stargate UAE AI Infrastructure Cluster Archived copy | G42 via PR Newswire Company disclosure | Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Role: Developer | source-terms-not-recorded | G42 via PR Newswire | 3da1d44e52141a056d13769b8a8f1adb6704c1186210efcd0d1f48e1af6a54b4Factual source record; not the publisher page | ||
| G42 to lead a consortium with US partners to build 5GW UAE-US AI Campus Archived copy | G42 Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Announced, Role: Developer | source-terms-not-recorded | G42 | 598541e2d8267e96f40e9518dde021c038d1955046d32022f8c5b0cfe095b76dFactual source record; not the publisher page | ||
| Global Tech Alliance Launches Stargate UAE Archived copy | G42 Company disclosure | Imported: Geometry, Imported: Record, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Nuclear, Power Source: Other, Power Source: Solar, Role: Developer, Role: Hardware Supplier, Operator claim | source-terms-not-recorded | G42 | 5df55b6d3a7087ae4975f2b1d4cbc8aac2b584593827bbc64ff6b2cce87f18b8Factual source record; not the publisher page | ||
| Stargate UAE data centre to cost more than $30bn, AI minister says Archived copy | The National News | Imported: Record, Metric: Investment, Metric: Land Area | source-terms-not-recorded | The National | c49c456832de26222919f76ce7aca013a0ab67c13da45b496a4d0cc67e155a8eFactual source record; not the publisher page | ||
| Stargate UAE's first phase to be completed in third quarter of 2026 Archived copy | The National News | Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Role: Developer | source-terms-not-recorded | The National | f50c0a751fba6ca0f1f9b6c153d470a17fef1d9d3006b8604332768f493cb8b3Factual source record; not the publisher page | ||
| The UAE-US AI & Advanced Tech Partnership Archived copy | Embassy of the United Arab Emirates, Washington DC Government record | Imported: Record, Metric: Power Capacity | not stated | source-terms-not-recorded | Embassy of the United Arab Emirates, Washington DC | 4145e46b29f5c1d430523a4df7a1108e2f665c08a26fe3f7e48949e5eb5c340eFactual source record; not the publisher page |