atNorth SWE04 Sollefteå mega site
Announced
Sweden · 1 project · Last reported
Summary
atNorth announced in February 2026 a 300 MW campus, SWE04, at Hamre Industrial Park in Långsele, about 7 km west of Sollefteå in northern Sweden, on a zoned plot it describes as 50 hectares, with operation expected in the first half of 2028. In June 2026 it published a consultation document for an environmental permit application to the Land and Environment Court, describing three main buildings on a property of about 16 hectares, 145 backup generators running on HVO or similar fuel with about 1,200 MW of combustion input, and a planned grid connection agreement with E.ON. Investment has not been disclosed.
Source record as of 2026-06-16 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 63.17850, 17.06710 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
atNorth SWE04 Sollefteå mega site
Announced last observed as of · Reported status
Location: Långsele, Sollefteå Municipality, Västernorrland County, SE. Site is the Hamre property (Hamre 4:87 after subdivision) in Hamre Industrial Park, Långsele; the Långsele village centroid from Nominatim is used because the parcel was not geocoded. atNorth; atNorth AB (prepared by COWI)
Use: Colocation, Hpc
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 300 MW | Planned · Campus · Unspecified | 2026-02-23 | atNorth; atNorth | |
| Power capacity | 200 MW | Planned · Campus · Unspecified | 2026 | The FAQ on atNorth's site page cites a 200 MW path to power, conflicting with the 300 MW headline on the same page. | atNorth |
| Land area | 50 hectares | Reported · Campus | 2026-02-23 | The site page FAQ separately calls the campus 4 hectares, which conflicts with its own 50-hectare headline. | atNorth; atNorth |
| Land area | about 16 hectares | Reported · Campus | 2026-06 | The consultation document gives the property area as about 160,000 square metres, smaller than the 50 hectares in atNorth's announcement. | atNorth AB (prepared by COWI) |
| Buildings | 3 count | Planned · Campus | 2026-06 | Three main buildings of roughly 160 by 130 metres, up to 26 metres high. | atNorth AB (prepared by COWI) |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| atNorth | Developer | atNorth; atNorth; atNorth AB (prepared by COWI) | |
| atNorth AB | Owner | The consultation document lists atNorth AB as owner of the land within the site. | atNorth AB (prepared by COWI) |
| E.ON | Utility | atNorth states it will sign a grid connection agreement with E.ON. | atNorth AB (prepared by COWI) |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-02-23 | Announced | Actual | atNorth | |
| 2026-06 | Other | Actual | Consultation document published ahead of an environmental permit application to the Land and Environment Court, with Västernorrland County Administrative Board as supervisory authority. | atNorth AB (prepared by COWI) |
| 2028-H1 | First operational | Planned | atNorth |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Grid connection agreement to be signed with E.ON; atNorth cites renewable energy access at the park. | atNorth; atNorth AB (prepared by COWI) |
| Diesel backup | 145 backup generators running on HVO, biodiesel or similar fuel, with total installed combustion input of about 1,200 MW and fuel for up to 24 hours. | atNorth AB (prepared by COWI) |
Sources for these details
- New 300MW mega site in Sollefteå, Sweden — atNorth; 2026-02-23 · Archived source
- Sollefteå mega site (SWE04) — atNorth; publication date not stated · Archived source
- Samrådsunderlag för atNorths tillståndsansökan för datacenter i Långsele, Sollefteå kommun — atNorth AB (prepared by COWI); 2026-06-16
- Companies
Source and location review
- Status source
- New 300MW mega site in Sollefteå, Sweden evidence row
atNorth · published 2026-02-23 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 133 days before the data update on 2026-10-27
Location details
- Coordinates
- 63.17850, 17.06710
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Site is the Hamre property (Hamre 4:87 after subdivision) in Hamre Industrial Park, Långsele; the Långsele village centroid from Nominatim is used because the parcel was not geocoded.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 5633b2ba
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| New 300MW mega site in Sollefteå, Sweden Archived copy | atNorth Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Grid, Role: Developer | source-terms-not-recorded | atNorth | 9364b7445192d0e4e8373b9f428d248acf1cfa665bc41964f99afa8950c13bbbFactual source record; not the publisher page | ||
| Samrådsunderlag för atNorths tillståndsansökan för datacenter i Långsele, Sollefteå kommun Archived copy | atNorth AB (prepared by COWI) Regulatory filing | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Land Area, Milestone: Other, Power Source: Diesel Backup, Power Source: Grid, Role: Developer, Owner claim, Role: Utility | source-terms-not-recorded | atNorth AB (prepared by COWI) | 964379e95e9c3e69fc3f2c7f1d88dbd3bcd17cb7617255019403d6f88d486787Factual source record; not the publisher page | ||
| Sollefteå mega site (SWE04) Archived copy | atNorth Company disclosure | Imported: Record, Metric: Land Area, Metric: Power Capacity, Role: Developer | not stated | source-terms-not-recorded | atNorth | 59dcefc2309dca195b3bb11efecc40363e91a33ac451a802fdcd954a90641373Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). atNorth SWE04 Sollefteå mega site [site vcc-site-424c62f417d6e6ef2c93]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-424c62f417d6e6ef2c93/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction