atNorth SWE04 Sollefteå mega site

Announced

Sweden · 1 project · Last reported

Summary

atNorth announced in February 2026 a 300 MW campus, SWE04, at Hamre Industrial Park in Långsele, about 7 km west of Sollefteå in northern Sweden, on a zoned plot it describes as 50 hectares, with operation expected in the first half of 2028. In June 2026 it published a consultation document for an environmental permit application to the Land and Environment Court, describing three main buildings on a property of about 16 hectares, 145 backup generators running on HVO or similar fuel with about 1,200 MW of combustion input, and a planned grid connection agreement with E.ON. Investment has not been disclosed.

Source record as of 2026-06-16 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 63.17850, 17.06710 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

atNorth SWE04 Sollefteå mega site

Announced last observed as of · Reported status

Location: Långsele, Sollefteå Municipality, Västernorrland County, SE. Site is the Hamre property (Hamre 4:87 after subdivision) in Hamre Industrial Park, Långsele; the Långsele village centroid from Nominatim is used because the parcel was not geocoded. atNorth; atNorth AB (prepared by COWI)

Use: Colocation, Hpc

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity300 MWPlanned · Campus · Unspecified2026-02-23atNorth; atNorth
Power capacity200 MWPlanned · Campus · Unspecified2026The FAQ on atNorth's site page cites a 200 MW path to power, conflicting with the 300 MW headline on the same page.atNorth
Land area50 hectaresReported · Campus2026-02-23The site page FAQ separately calls the campus 4 hectares, which conflicts with its own 50-hectare headline.atNorth; atNorth
Land areaabout 16 hectaresReported · Campus2026-06The consultation document gives the property area as about 160,000 square metres, smaller than the 50 hectares in atNorth's announcement.atNorth AB (prepared by COWI)
Buildings3 countPlanned · Campus2026-06Three main buildings of roughly 160 by 130 metres, up to 26 metres high.atNorth AB (prepared by COWI)

Companies and organizations

NameRoleNotesSources
atNorthDeveloperatNorth; atNorth; atNorth AB (prepared by COWI)
atNorth ABOwnerThe consultation document lists atNorth AB as owner of the land within the site.atNorth AB (prepared by COWI)
E.ONUtilityatNorth states it will sign a grid connection agreement with E.ON.atNorth AB (prepared by COWI)

Timeline

DateEventActual or plannedNotesSources
2026-02-23AnnouncedActualatNorth
2026-06OtherActualConsultation document published ahead of an environmental permit application to the Land and Environment Court, with Västernorrland County Administrative Board as supervisory authority.atNorth AB (prepared by COWI)
2028-H1First operationalPlannedatNorth

Power supply

TypeDescriptionSources
GridGrid connection agreement to be signed with E.ON; atNorth cites renewable energy access at the park.atNorth; atNorth AB (prepared by COWI)
Diesel backup145 backup generators running on HVO, biodiesel or similar fuel, with total installed combustion input of about 1,200 MW and fuel for up to 24 hours.atNorth AB (prepared by COWI)
Sources for these details
Companies
  • Developer: atNorth (unknown scope) evidence
  • Developer: atNorth (unknown scope) evidence
  • Developer: atNorth (unknown scope) evidence
  • Owner: atNorth AB (unknown scope) evidence
  • Utility: E.ON (unknown scope) evidence
Source and location review
Status source
New 300MW mega site in Sollefteå, Sweden evidence row
atNorth · published 2026-02-23 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 133 days before the data update on 2026-10-27

Location details
Coordinates
63.17850, 17.06710
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Site is the Hamre property (Hamre 4:87 after subdivision) in Hamre Industrial Park, Långsele; the Långsele village centroid from Nominatim is used because the parcel was not geocoded.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
5633b2ba

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for atNorth SWE04 Sollefteå mega site
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
New 300MW mega site in Sollefteå, Sweden
Archived copy
atNorth
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Grid, Role: Developersource-terms-not-recordedatNorth9364b7445192d0e4e8373b9f428d248acf1cfa665bc41964f99afa8950c13bbb
Factual source record; not the publisher page
Samrådsunderlag för atNorths tillståndsansökan för datacenter i Långsele, Sollefteå kommun
Archived copy
atNorth AB (prepared by COWI)
Regulatory filing
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Land Area, Milestone: Other, Power Source: Diesel Backup, Power Source: Grid, Role: Developer, Owner claim, Role: Utilitysource-terms-not-recordedatNorth AB (prepared by COWI)964379e95e9c3e69fc3f2c7f1d88dbd3bcd17cb7617255019403d6f88d486787
Factual source record; not the publisher page
Sollefteå mega site (SWE04)
Archived copy
atNorth
Company disclosure
Imported: Record, Metric: Land Area, Metric: Power Capacity, Role: Developernot statedsource-terms-not-recordedatNorth59dcefc2309dca195b3bb11efecc40363e91a33ac451a802fdcd954a90641373
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). atNorth SWE04 Sollefteå mega site [site vcc-site-424c62f417d6e6ef2c93]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-424c62f417d6e6ef2c93/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction