AdaniConneX Hyderabad data centre campus
Partially operational
India · 1 project · Last reported
Summary
AdaniConneX, the Adani group's data centre business, lists a Hyderabad campus with a potential capacity of 600 MW of IT load, of which a first phase went live in October 2024. The company says the campus can draw up to 100% renewable power and offers colocation, connectivity and managed services there. A February 2026 Adani group release links its Microsoft partnership to the Hyderabad and Pune campuses without describing the terms. The site address and the size of the live first phase have not been published.
Source record as of 2026-10-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 17.38880, 78.46110 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
AdaniConneX Hyderabad data centre campus
Partially operational last observed as of · Reported status
Location: Hyderabad, Telangana, IN. Sources name Hyderabad only. Coordinates are the OpenStreetMap Nominatim centroid of Hyderabad, not the site. AdaniConneX; AdaniConneX; Adani Group
Use: Colocation
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | up to 600 MW | Planned · Campus · It load | 2026 | Listed by the company as potential capacity in IT load. | AdaniConneX |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| AdaniConneX | Developer | AdaniConneX; AdaniConneX | |
| AdaniConneX | Operator | Offers colocation and managed services at the campus. | AdaniConneX |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2024-10 | First operational | Actual | Company lists Phase 1 as live from October 2024; its capacity is not given. | AdaniConneX |
Power supply
| Type | Description | Sources |
|---|---|---|
| Other | Company states up to 100% renewable energy; the supply arrangement is not described. | AdaniConneX |
The status comes from the company's undated campus page, accessed on 2026-10-09, so status_as_of is that access date. Microsoft is not listed as a party because the Adani release does not state its role at the Hyderabad campus. The March 2024 safety-grading release confirms the Hyderabad site existed but gives no capacity or status.
Sources for these details
- Data Centers — AdaniConneX; publication date not stated
- AdaniConneX's Hyderabad Site Gets Five-Star Grading from British Safety Council — AdaniConneX; 2024-03-13
- Adani Commits USD 100 Bn to Sovereign AI Infrastructure — Adani Group; 2026-02-17
- Companies
Source and location review
- Status source
- Data Centers evidence row
AdaniConneX · publication date not stated · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- 17.38880, 78.46110
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources name Hyderabad only. Coordinates are the OpenStreetMap Nominatim centroid of Hyderabad, not the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 9d576bb9
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Adani Commits USD 100 Bn to Sovereign AI Infrastructure Archived copy | Adani Group Company disclosure | Imported: Geometry, Imported: Record | source-terms-not-recorded | Adani Group | 52bbf47e55bddaf81da563826cb3dda9403faac2bccebfca5d8ed7a199483930Factual source record; not the publisher page | ||
| AdaniConneX's Hyderabad Site Gets Five-Star Grading from British Safety Council Archived copy | AdaniConneX Company disclosure | Imported: Geometry, Imported: Record, Role: Developer | source-terms-not-recorded | AdaniConneX | bfe31b3a94ed059ffd4f2d5530584d2d54055234c558bf5cb65f5ed73e3055a9Factual source record; not the publisher page | ||
| Data Centers Archived copy | AdaniConneX Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: First Operational, Power Source: Other, Role: Developer, Operator claim | not stated | source-terms-not-recorded | AdaniConneX | 7008d8b0a8b97a56ad973489d645fd2624a899a1356929d8b3d9be2201a06163Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). AdaniConneX Hyderabad data centre campus [site vcc-site-42f06f3124352e4af817]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-42f06f3124352e4af817/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction