Mihta Askiy Data Centre

Proposed

Canada · 1 project · Last reported

Summary

Proposed gas-powered data centre about 40 km northeast of Peace River in Northern Sunrise County, Alberta. Alberta's project inventory says the plan involves acquiring a partially completed power plant and converting it into a natural-gas-powered data centre. The proponent, Cree Ative Datacenter Corp GP, filed a federal project description for a 650 MW gas plant to serve the data centre, starting with simple-cycle turbines and later converting to combined cycle. The federal agency decided in March 2026 that no further federal assessment was required; Alberta's inventory lists the project as proposed, with work commencing in 2027.

Source record as of 2026-10-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 56.38140, -116.74790 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Mihta Askiy Data Centre

Proposed last observed as of · Reported status

Location: Peace River (about 40 km northeast), Northern Sunrise County, Alberta, CA. Point from the Government of Alberta major projects inventory, which notes its map location is not exact; rounded to four decimals. The federal notice places the project about 40 km northeast of Peace River. Government of Alberta, Major Projects; Impact Assessment Agency of Canada

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity650 MWPlanned · Campus · Onsite generation2026-01-02Production capacity of the gas-fired facility that would support the data centre; no separate data centre IT load was published in the sources opened.Impact Assessment Agency of Canada; Impact Assessment Agency of Canada; Government of Alberta, Major Projects

Companies and organizations

NameRoleNotesSources
Cree Ative Datacenter Corp GPDeveloperFederal proponent; the Alberta inventory describes it as a wholly owned subsidiary of Sovereign Digital Infrastructure.Impact Assessment Agency of Canada; Impact Assessment Agency of Canada; Government of Alberta, Major Projects
Mihta Askiy Datacenter LPDeveloperListed as developer in the Alberta major projects inventory.Government of Alberta, Major Projects

Timeline

DateEventActual or plannedNotesSources
2025-12-11OtherActualInitial project description and its summary posted on the Impact Assessment Agency of Canada registry (reference 90036).Impact Assessment Agency of Canada
2026-03-03OtherActualFederal agency decided no further assessment under the Impact Assessment Act was required; notice posted March 4, 2026.Impact Assessment Agency of Canada
2027Construction startedPlannedAlberta inventory lists the schedule as commencing in 2027.Government of Alberta, Major Projects

Power supply

TypeDescriptionSources
Natural gas onsiteDedicated 650 MW gas plant built in two stages: simple-cycle turbines first, later converted to combined cycle; planned 30-year operating life.Impact Assessment Agency of Canada; Impact Assessment Agency of Canada

Status rests partly on the undated Government of Alberta major projects entry, which lists the stage as proposed, so status_as_of is the date it was read (2026-10-09). No data centre IT load or cost estimate was published in the sources opened.

Sources for these details
Companies
  • Developer: Cree Ative Datacenter Corp GP (unknown scope) evidence
  • Developer: Cree Ative Datacenter Corp GP (unknown scope) evidence
  • Developer: Cree Ative Datacenter Corp GP (unknown scope) evidence
  • Developer: Mihta Askiy Datacenter LP (unknown scope) evidence
Source and location review
Status source
Notice of early decision with reasons: Mihta Askiy Data Center Project evidence row
Impact Assessment Agency of Canada · published 2026-03-04 · Government record
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 18 days before the data update on 2026-10-27

Location details
Coordinates
56.38140, -116.74790
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Point from the Government of Alberta major projects inventory, which notes its map location is not exact; rounded to four decimals. The federal notice places the project about 40 km northeast of Peace River.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
1b01daad

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Mihta Askiy Data Centre
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Mihta Askiy Data Center Project (reference 90036)
Archived copy
Impact Assessment Agency of Canada
Government record
Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Natural Gas Onsite, Role: Developernot statedsource-terms-not-recordedImpact Assessment Agency of Canadadb866428e7fdbaa425e2df7e43ad5a78d8ed06051fdff152d2e0fbb9beb4a990
Factual source record; not the publisher page
Mihta Askiy Data Centre
Archived copy
Government of Alberta, Major Projects
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Construction Started, Role: Developernot statedsource-terms-not-recordedGovernment of Alberta, Major Projects7036f5aadf7f3224127a4584f6867b27d3e115b1cd30b4d39eb96705aef517f2
Factual source record; not the publisher page
Notice of early decision with reasons: Mihta Askiy Data Center Project
Archived copy
Impact Assessment Agency of Canada
Government record
Imported: Record, Imported: Status, Milestone: Othersource-terms-not-recordedImpact Assessment Agency of Canada41ae4e4c1284652a1ec0d6673e601e1342172a1ae31510b56e5f0c7666aeca91
Factual source record; not the publisher page
Public notice: Mihta Askiy Data Center Project, comments invited on the summary of the initial project description
Archived copy
Impact Assessment Agency of Canada
Government record
Imported: Geometry, Imported: Record, Metric: Power Capacity, Power Source: Natural Gas Onsite, Role: Developersource-terms-not-recordedImpact Assessment Agency of Canada79e3818942954ed56657fbb6343958d58a7f611bf56bbe8cc1e1e6d4e7550628
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Mihta Askiy Data Centre [site vcc-site-499a1602728034c6a587]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-499a1602728034c6a587/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction