Iozera Tetouan AI data center and hub

Announced

Morocco · 1 project · Last reported

Summary

Proposed 386 MW data center and artificial-intelligence hub in Tetouan, northern Morocco, announced in May 2024 by the US start-up Iozera during a Moroccan government roadshow in North America, with a planned investment of about USD 500 million and renewable power. Plans included AI computing, AI training and data-labelling units, conventional data storage and a start-up incubation centre. Reports from January and July 2026 still describe it as announced; a BMI note summarised by Le360 in July 2026 put commissioning in the second half of 2026, but no source found confirms construction.

Source record as of 2026-07-09 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 35.56700, -5.36700 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Iozera Tetouan AI data center and hub

Announced last observed as of · Reported status

Location: Tetouan, Tanger-Tetouan-Al Hoceima, MA. City coordinates from the Tétouan Wikipedia article; the opened sources name only the city, not a site within it. The North Africa Post; Daba Finance; Le360; Wikipedia

Use: Ai training, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity386 MWPlanned · Campus · Unspecified2026-07-09The North Africa Post; Daba Finance; Le360
Investment500,000,000 USDAnnounced · Campus2024-05-06The North Africa Post; Daba Finance; Le360

Companies and organizations

NameRoleNotesSources
IozeraDeveloperThe North Africa Post describes it as a US-based technology start-up.The North Africa Post; Daba Finance; Le360
Kingdom of MoroccoGovernmentLe360 describes the project as a partnership with the Moroccan state without naming an agency.Le360

Timeline

DateEventActual or plannedNotesSources
2024-05AnnouncedActualAnnounced during a North American roadshow organised by the Moroccan government.The North Africa Post; Daba Finance
2026-H2First operationalPlannedCommissioning window cited from a BMI (Fitch Solutions) note; no construction progress was reported.Le360

Power supply

TypeDescriptionSources
OtherThe project is to run on renewable energy; the opened sources do not name the plants or technologies.The North Africa Post

Daba Finance (January 2026) says Naver's separate 500 MW AI data center plan, unveiled in 2025 with Nvidia, is at the same Tetouan site, whereas Le360 (July 2026) places the Naver Cloud-led 500 MW hub near Casablanca; that project is not covered by this record. Iozera's own website did not mention the Morocco project when checked. Earlier reports of a specific Tetouan site, floor area and an original Q2 2026 opening target come from pages that could not be opened, so they are not recorded.

Sources for these details
Companies
  • Developer: Iozera (unknown scope) evidence
  • Developer: Iozera (unknown scope) evidence
  • Developer: Iozera (unknown scope) evidence
  • Government: Kingdom of Morocco (unknown scope) evidence
Source and location review
Status source
Morocco Attracts Data Center Investments Despite Power, Demand Gaps evidence row
Daba Finance · published 2026-01-10 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 110 days before the data update on 2026-10-27

Location details
Coordinates
35.56700, -5.36700
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
City coordinates from the Tétouan Wikipedia article; the opened sources name only the city, not a site within it.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
00756bbb

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Iozera Tetouan AI data center and hub
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Artificial Intelligence: U.S. firm Iozera to Invest $500 Mln in Data-center and AI Hub in Morocco
Archived copy
The North Africa Post
News
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Power Source: Other, Role: Developersource-terms-not-recordedThe North Africa Post6da303cc56cdc764ca6cf6a9a6c51cff134d800b773b1eb10994b28f5cfd4075
Factual source record; not the publisher page
Data centers au Maroc: une nouvelle vague d'investissements portée par l'IA et la souveraineté numérique
Archived copy
Le360
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: First Operational, Role: Developer, Role: Governmentsource-terms-not-recordedLe36037d8dcfaf33511e621634bb92bae3eebd3d41b346b9ad71e893731d61d087d8a
Factual source record; not the publisher page
Morocco Attracts Data Center Investments Despite Power, Demand Gaps
Archived copy
Daba Finance
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Role: Developersource-terms-not-recordedDaba Finance2ba0564a770e7f4f39c57c6194a04db9178702aec8b301510c8593aaa8e64531
Factual source record; not the publisher page
Tétouan
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia20252d621479c42a6f5a68f56a935ff7fe7cc2088b302a6af6602836fa3b33f5
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Iozera Tetouan AI data center and hub [site vcc-site-4b620bcac790d6755738]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4b620bcac790d6755738/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction