Rechenzentrum Alteno, Industriegebiet Alteno (Luckau)

Announced

Germany · 1 project · Last reported

Summary

The Stadt Luckau published on 23 September 2026 its official notice of the Aufstellungsbeschluss for Bebauungsplan Nr. 04.1.02 „Ergänzung zum Bebauungsplan Nr. 01 Industriegebiet Alteno“, the Einleitungsbeschluss of the 14th amendment of its land-use plan and the early public participation. The council (Stadtverordnetenversammlung) took both items on 27 August 2026 (Vorlagen V Stvv/26/029 and 030). The Vorlage states that a hyperscale data centre is to be built within the in-force B-Plans Nr. 01 and 01a „Industriegebiet Alteno“, for which the Landkreis Dahme-Spreewald issued a positive preliminary decision on 7 March 2025, and that the new plan adds about 1.5 ha on Flurstück 44/1 to create one building field; the state DiPlanung portal lists the public participation period for the 14th land-use plan amendment as 12 October to 12 November 2026. Announced status only: a B-Plan Aufstellungsbeschluss and a preliminary building decision are not a building permit, and no building permit, Federal Immission Control Act permit or physical work is established. evidence

Stadt Luckau, Der Bürgermeister · published 2026-09-23

Location

The interactive map needs JavaScript. Display anchor: 51.86959, 13.79745 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Project locator; building footprints are not mapped.

Projects (1)

Rechenzentrum Alteno — planned hyperscale data centre (B-Plan Nr. 04.1.02, Industriegebiet Alteno)

Announced last observed as of · Project announcement

The council information system lists the Stadtverordnetenversammlung session of 27 August 2026 (18:00-19:40, Rathaus Luckau) with the public agenda items "Bebauungsplan Nr. 04.1.02 „Ergänzung zum Bebauungsplan Nr. 01 Industriegebiet Alteno“ - Aufstellungsbeschluss" (V Stvv/26/029) and "14. Änderung des Flächennutzungsplans ... - Einleitungsbeschluss" (V Stvv/26/030), each with the Vorlage and its annexes. evidence

Stadt Luckau, Der Bürgermeister · publication date not stated

The draft resolution (deliberation sequence: Planungs- und Bauausschuss 14.07.2026, Hauptausschuss 04.08.2026, Ortsbeirat Duben 05.08.2026, Stadtverordnetenversammlung 27.08.2026 for decision) proposes the Aufstellung of B-Plan Nr. 04.1.02 in the regular procedure with environmental report, covering part of Flurstück 192 and Flurstück 44/1, Flur 1, Gemarkung Alteno. It states that a hyperscale data centre is to be built within the in-force Bebauungspläne Nr. 01 and 01a „Industriegebiet Alteno“, for which the Landkreis Dahme-Spreewald issued a positive preliminary decision (Vorbescheid) on 07.03.2025; that the developer's current plans additionally require about 1.5 ha of so far unplanned land on Flurstück 44/1; that the plan area of about 2 ha also includes a planting strip on Flurstück 192 to create one contiguous building field; that the provisions will follow B-Plans 01 and 01a (industrial area, GRZ 0.8, BMZ 8.0); and that the developer bears all planning costs under a cost-assumption and urban-development contract. The developer is not named. evidence

Stadt Luckau, Der Bürgermeister · publication date not stated

A3 plan sheet (AutoCAD Map, 1 July 2026) showing the boundary of the Geltungsbereich of B-Plan Nr. 04.1.02 according to the Aufstellungsbeschluss over the cadastral map, with parcel labels 191, 201, 44/1, 192, 136, 160, 209, 43/1 and 253 of Gemarkung Alteno. evidence

Stadt Luckau, Der Bürgermeister · publication date not stated

Parallel draft resolution to start the 14th amendment of the Luckau land-use plan for Flurstück 44/1, Flur 1, Gemarkung Alteno, changing its designation from agricultural land to commercial building land, in parallel with B-Plan Nr. 04.1.02, with early public and agency participation. evidence

Stadt Luckau, Der Bürgermeister · publication date not stated

The state participation portal lists the Stadt Luckau procedure for the 14th FNP amendment with a public participation period from 12.10.2026 to 12.11.2026; at capture the page labels the step „Auswertung Öffentlichkeit“ (evaluation of the public participation). Its stated planning purpose: the city wants to make so far undeveloped land in the Industriegebiet Alteno available for the development of a data centre; a project developer intends to use undeveloped parts of B-Plans Nr. 01 and 01a „Industriegebiet Alteno“ plus about 1.5 ha of unplanned land, for which B-Plan Nr. 04.1.02 is being drawn up. The page carries a drawn change-area polygon and links the Informationsblatt (August 2026), the spatial-planning statement and draft environmental report (July 2026) and the plan drawing (15 July 2026). evidence

Stadt Luckau via DiPlanung Beteiligung Brandenburg (state Bauleitplanung participation portal) · publication date not stated

Information sheet for the early participation: the city wants to make undeveloped land of the Industriegebiet Alteno available for a data centre; a developer intends to use undeveloped parts of B-Plans Nr. 01 and 01a, for which a permit for a logistics centre had first been issued, and about 1.5 ha of unplanned land; the plan area covers about 2 ha on Flurstücke 44/1 and 192, Flur 1, Gemarkung Alteno, accessed via Frederik-Ipsen-Straße; woodland adjoins to the north and east and a solar park to the south. evidence

Stadt Luckau via DiPlanung Beteiligung Brandenburg (state Bauleitplanung participation portal) · publication date not stated

Mitteldeutsche Netzgesellschaft Strom intends, for the project „Netzanschluss Rechenzentrum Alteno“, to erect two cable-transition masts and modify two masts of the existing 110-kV line Uckro-Ragow, because a new data centre with an associated 110-kV switching station in the industrial area of Alteno near Luckau requires an extension of the 110-kV network. The LBGR screening decision (16.03.2026) found no EIA obligation. evidence

Landesamt für Bergbau, Geologie und Rohstoffe Brandenburg (LBGR), via UVP-Verbund · publication date not stated

Source and location review
Status source
Stadt Luckau: Öffentliche Bekanntmachungen (official notices listing) — Amtliche Bekanntmachung published 23.09.2026: Aufstellungsbeschluss Bebauungsplan Nr. 04.1.02 „Ergänzung zum Bebauungsplan Nr. 01 Industriegebiet Alteno“, Einleitungsbeschluss der 14. Änderung des Flächennutzungsplans und frühzeitige Unterrichtung der Öffentlichkeit evidence row
Stadt Luckau, Der Bürgermeister · published 2026-09-23 · Government record
Locator
Project locator · Compiled location reference · official_plan_named_cadastral_parcels_union_centroid evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 34 days before the data update on 2026-10-27

Location details
Coordinates
51.86959, 13.79745
Geometry licence
Datenlizenz Deutschland - Namensnennung 2.0 (dl-de/by-2-0)
Use scope
Project locator
Scope class
official_plan_named_cadastral_parcels_union_centroid
Authority
Compiled location reference
Source entity
Campus
Method
brandenburg_alkis_vereinfacht_wfs_flurstuecke_alteno_flur1_44-1_and_192_union_polygon_centroid_epsg25833_shapely_pyproj_to_wgs84
Derivation
coordinate_transform
Precision scope
Centroid of the union of cadastral parcels Alteno Flur 1 Flurstück 44/1 (15,530 m2) and Flurstück 192 (45,810 m2), the two parcels on which the city places the plan area of B-Plan Nr. 04.1.02 to form one contiguous building field for the data centre (about 6.1 ha together, about 370 by 250 m). It locates the named development parcels, not a building footprint, the 110-kV switching station, the 2 ha plan area alone or the full extent of the other undeveloped plots of B-Plans 01 and 01a that the developer may also use.
Horizontal uncertainty
Not reported

ALKIS publishes no positional accuracy for the parcel boundaries; the point is a derived interior point of a 6.1 ha two-parcel union whose vertices lie up to 217 m away, and the data-centre buildings' positions are not published. The Vorlage says the data centre also uses undeveloped parts of B-Plans 01 and 01a without identifying them, so the building field may extend onto adjoining industrial parcels.

Geometry evidence
763f4d4d

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Rechenzentrum Alteno, Industriegebiet Alteno (Luckau)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
ALKIS vereinfacht WFS (LGB Brandenburg): Gemarkung Alteno parcels numbered 44 and 192, including Flur 1 Flurstück 44/1 and Flurstück 192
Archived copy
Landesvermessung und Geobasisinformation Brandenburg (LGB)
Government record
Geometrynot statedDatenlizenz Deutschland - Namensnennung 2.0 (dl-de/by-2-0)© GeoBasis-DE/LGB, dl-de/by-2-0 (Daten geändert)20d38be4744305a305af0b89e790adc849b2eb5ae87615c19568093987cd3a82
Retained source material; see source provenance
DiPlanung Beteiligung Brandenburg: 14. Änderung des Flächennutzungsplans der Stadt Luckau (procedure page; public participation 12.10.2026-12.11.2026)
Archived copy
Stadt Luckau via DiPlanung Beteiligung Brandenburg (state Bauleitplanung participation portal)
Government record
Site and project identitynot statedpublic-record-source-termsStadt Luckau; DiPlanung Beteiligung8099eef7e133499cfcbde523edb1c95ea0d2779ad41f551a89707589c3f0359b
Retained source material; see source provenance
Stadt Luckau (Plan und Recht GmbH): Bebauungsplan Nr. 04.1.02 „Ergänzung zum Bebauungsplan Nr. 01 Industriegebiet Alteno“ sowie 14. Änderung des Flächennutzungsplans - Informationsblatt zur frühzeitigen Beteiligung, Stand August 2026
Archived copy
Stadt Luckau via DiPlanung Beteiligung Brandenburg (state Bauleitplanung participation portal)
Government record
Site and project identitynot statedpublic-record-source-termsStadt Luckau; DiPlanung Beteiligung9d54c0e732cd2ac1705ac92e588c8d07f32d74e79025209c6254374af899bfd6
Retained source material; see source provenance
Stadt Luckau Beschlussvorlage V Stvv/26/029 (21.07.2026): Bebauungsplan Nr. 04.1.02 „Ergänzung zum Bebauungsplan Nr. 01 Industriegebiet Alteno“ - Aufstellungsbeschluss
Archived copy
Stadt Luckau, Der Bürgermeister
Government record
Site and project identitynot statedpublic-record-source-termsStadt Luckauaa11fa2023a99d3124520b5213c5fd2284ea2f23420a7c7f513cba178b13dd1b
Retained source material; see source provenance
Stadt Luckau Beschlussvorlage V Stvv/26/030 (21.07.2026): 14. Änderung des Flächennutzungsplans für den Bebauungsplan Nr. 04.1.02 - Einleitungsbeschluss
Archived copy
Stadt Luckau, Der Bürgermeister
Government record
Site and project identitynot statedpublic-record-source-termsStadt Luckau520501e1368e8e52299b71686c889c49d423fb65b6da40b363a870ae30f2ea29
Retained source material; see source provenance
Stadt Luckau SessionNet: ordentliche Sitzung der Stadtverordnetenversammlung, 27.08.2026 (agenda with items V Stvv/26/029 and V Stvv/26/030)
Archived copy
Stadt Luckau, Der Bürgermeister
Government record
Site and project identitynot statedpublic-record-source-termsStadt Luckauc3cc1c97881df043f9762491338b1812bde809adcbbcb729cf955759147bbc70
Retained source material; see source provenance
Stadt Luckau, Anlage 2 to V Stvv/26/029: Bebauungsplan Nr. 04.1.02 - Abgrenzung des räumlichen Geltungsbereichs, Stand 01.07.2026
Archived copy
Stadt Luckau, Der Bürgermeister
Government record
Site and project identitynot statedpublic-record-source-termsStadt Luckauef8ce97ed46a308d52d31346af25e487478175872fb4efc43b6cf9602485f046
Retained source material; see source provenance
Stadt Luckau: Öffentliche Bekanntmachungen (official notices listing) — Amtliche Bekanntmachung published 23.09.2026: Aufstellungsbeschluss Bebauungsplan Nr. 04.1.02 „Ergänzung zum Bebauungsplan Nr. 01 Industriegebiet Alteno“, Einleitungsbeschluss der 14. Änderung des Flächennutzungsplans und frühzeitige Unterrichtung der Öffentlichkeit
Archived copy
Stadt Luckau, Der Bürgermeister
Government record
Project announcementpublic-record-source-termsStadt Luckaucdbfe56333a76030b1fe62a319febc47ccb070543e75a98162063b1f86387af1
Retained source material; see source provenance
UVP-Portal der Länder: Landesamt für Bergbau, Geologie und Rohstoffe Brandenburg - negative UVP screening, „Netzanschluss Rechenzentrum Alteno“ (cable-transition masts on the 110-kV line Uckro-Ragow), decision 16.03.2026
Archived copy
Landesamt für Bergbau, Geologie und Rohstoffe Brandenburg (LBGR), via UVP-Verbund
Government record
Site and project identitynot statedpublic-record-source-termsLBGR Brandenburg; UVP-Verbund der Länder963d094255f73ed6b6ac5ce7ddf798b92152c1a0086814b800d32934b88b6bb4
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Rechenzentrum Alteno, Industriegebiet Alteno (Luckau) [site vcc-site-508c3ba12d404b778be3]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-508c3ba12d404b778be3/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction