Teton Digital Black Bear power and data centre campus (Swan Hills)

Proposed

Canada · 1 project · Last reported

Summary

Proposed gas-powered data centre campus on Crown land about 19 km south of Swan Hills, Alberta, in Big Lakes County. Kiwetinohk Energy first proposed the roughly 460 MW Black Bear combined-cycle plant in 2024 and received a federal decision that no impact assessment was needed; Teton Digital has since taken it up as the power source for about 1,500 acres of adjacent data centre land. Teton describes a 466 MW first phase with a path to about 3 GW, compute online as early as 2027 using grid power, and the full plant running in Q3 2028. Alberta's project inventory lists it as proposed.

Source record as of 2026-09-23 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 54.53254, -115.57319 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Approximate site reference; the exact facility position is unverified.

Projects (1)

Teton Digital Black Bear power and data centre campus (Swan Hills)

Proposed last observed as of · Reported status

Location: About 19 km south of Swan Hills, Big Lakes County, Alberta, CA. Coordinates of the south end of the power plant project area as stated in the 2024 federal project description (SW and SE quarters of Section 15-64-11-W5M). The data centre land is described only as adjacent Crown land, so its centre may differ. Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada); Impact Assessment Agency of Canada; Daily Hive

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityabout 460 MWPlanned · Campus · Onsite generation2024-07Net output of the plant's single combustion turbine generator in Kiwetinohk's 2024 federal filing, before a data centre was attached.Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada); Impact Assessment Agency of Canada
Power capacity466 MWPlanned · Phase · Onsite generation · Phase I2026-09-23Teton's figure for the natural gas combined-cycle plant.Teton Digital; Daily Hive; DeSmog
Power capacityabout 3,000 MWPlanned · Campus · Unspecified2026-09-23Teton's stated long-term pathway, split as about 2 GW behind the meter and 1 GW grid-connected, across one or more data centre campuses.Teton Digital; Daily Hive
Land areaabout 1,500 acresPlanned · Campus2026-09-23Adjacent Crown land being developed for data centre use.Teton Digital; Daily Hive

Companies and organizations

NameRoleNotesSources
Teton DigitalDeveloperTeton Digital; Daily Hive; DeSmog
Kiwetinohk Energy Corp.DeveloperOriginal 2024 proponent of the power plant; DeSmog reports it exited the power business in 2025 and cancelled its planned AESO grid connection in December 2025.Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada); Impact Assessment Agency of Canada; Daily Hive; DeSmog
Big Lakes CountyGovernmentReported in July 2026 to be amending bylaws to fast-track the project; the Sucker Creek First Nation asked council to wait until environmental and water questions were answered.DeSmog

Timeline

DateEventActual or plannedNotesSources
2024-07-18OtherActualKiwetinohk filed the initial project description for the Black Bear power plant with the Impact Assessment Agency of Canada.Impact Assessment Agency of Canada
2024-12-23OtherActualFederal agency decided that an impact assessment of the power plant is not required.Impact Assessment Agency of Canada
2026-04OtherActualTeton says it filed an AESO Cluster 3 grid interconnection application.Teton Digital; DeSmog
2027First operationalPlannedCompute could begin as early as 2027 using temporary grid power before the plant is complete.Teton Digital; Daily Hive
2028-Q3OtherPlannedTarget for full 466 MW commercial operation of the power plant.Teton Digital

Power supply

TypeDescriptionSources
Natural gas onsiteA natural gas combined-cycle plant of 466 MW in its first phase; Kiwetinohk's 2024 design included CO2 capture with pipeline transport to a storage hub, which Teton's materials do not mention.Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada); Impact Assessment Agency of Canada; Teton Digital; DeSmog
GridTeton plans bridge power from the grid from 2027 and has applied to AESO for an interconnection; it puts roughly 1 GW of the long-term pathway on the grid.Teton Digital; Daily Hive

Status rests on Daily Hive's September 2026 report that Alberta Major Projects lists the project as proposed, plus Teton's undated project page (read 2026-10-09), which says provincial and federal permits are in hand and an AESO interconnection application was filed in April 2026. DeSmog reported Teton's federal permitting claim without verifying it, raised questions about the developer's background, and reported that the 2024 carbon capture design no longer appears in Teton's materials. Both news outlets describe it as a $1.3 billion project without stating the currency, so no investment figure is recorded.

Sources for these details
Companies
  • Developer: Teton Digital (unknown scope) evidence
  • Developer: Teton Digital (unknown scope) evidence
  • Developer: Teton Digital (unknown scope) evidence
  • Developer: Kiwetinohk Energy Corp. (unknown scope) evidence
  • Developer: Kiwetinohk Energy Corp. (unknown scope) evidence
  • Developer: Kiwetinohk Energy Corp. (unknown scope) evidence
  • Developer: Kiwetinohk Energy Corp. (unknown scope) evidence
  • Government: Big Lakes County (unknown scope) evidence
Source and location review
Status source
Black Bear evidence row
Teton Digital · publication date not stated · Company disclosure
Locator
Approximate site reference · Compiled location reference · approximate_site evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 34 days before the data update on 2026-10-27

Location details
Coordinates
54.53254, -115.57319
Geometry licence
source-terms-not-recorded
Use scope
Approximate site reference
Scope class
approximate_site
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Coordinates of the south end of the power plant project area as stated in the 2024 federal project description (SW and SE quarters of Section 15-64-11-W5M). The data centre land is described only as adjacent Crown land, so its centre may differ.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
d5c22c5a

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Teton Digital Black Bear power and data centre campus (Swan Hills)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
A $1.3B power plant and data centre is in the works northwest of Edmonton
Archived copy
Daily Hive
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Developersource-terms-not-recordedDaily Hive09e578f5e3258b8b2bf49827a90929064167d6f50fa100bf6cec7e872d02dc1b
Factual source record; not the publisher page
Black Bear
Archived copy
Teton Digital
Company disclosure
Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Power Source: Grid, Power Source: Natural Gas Onsite, Role: Developernot statedsource-terms-not-recordedTeton Digital1896c7190b65072773ecf9112cf55aef99747f5e1b94816a85c529cf1694059f
Factual source record; not the publisher page
Black Bear Power Plant Project (Canadian Impact Assessment Registry, reference 88747)
Archived copy
Impact Assessment Agency of Canada
Government record
Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Natural Gas Onsite, Role: Developernot statedsource-terms-not-recordedImpact Assessment Agency of Canada7b5d11a8a55ead98ede7ff7a7c4081b4d2093102835cbf447534070d04952dd6
Factual source record; not the publisher page
Black Bear Power Plant: Summary of the Initial Project Description
Archived copy
Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada)
Regulatory filing
Imported: Geometry, Imported: Record, Metric: Power Capacity, Power Source: Natural Gas Onsite, Role: Developersource-terms-not-recordedKiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada)b37d19861f54474daf6c0b03b229275ab1f15a4506a09d3535ace146055b8e3c
Factual source record; not the publisher page
U.S. Developer Tied to Failed Bitcoin Venture Is Proposing Major Alberta Data Centre
Archived copy
DeSmog
News
Imported: Record, Metric: Power Capacity, Milestone: Other, Power Source: Natural Gas Onsite, Role: Developer, Role: Governmentsource-terms-not-recordedDeSmogd43a055aa786e4b3d587e2687ae16cbc8d6b7e0fa7f2e1786e3982bf034356af
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Teton Digital Black Bear power and data centre campus (Swan Hills) [site vcc-site-50ba6e2d0f69faaff629]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-50ba6e2d0f69faaff629/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction