Amazon Data Services Italy Data Center Campus, Rho/Pero (via Buonarroti, Rho Fiera)
Announced
Italy · 1 project · Last reported
Summary
On 6 October 2026 the Environment Ministry (MASE) informed Amazon Data Services Italy s.r.l. that the change to its 'Data Center edificio A ed edificio B Rho/Pero (MI)' project, adding a water-treatment building and four industrial-water wells inside the ADS data-centre campus in Pero, needs no further environmental assessment (preliminary evaluation ID_VIP 14760, letter MASE_2026-0207141). This dated government record names the project and supports announced only. The project already holds a positive VIA decree (DM_2025-0000532, 10 September 2025) and, per the proponent's March 2026 report, a Rho building permit of 11 December 2025 and a works-commencement communication of 30 January 2026, while the Pero building permit was still pending; those dates are outside the window and no in-window source reports physical works, completion or operation. evidence
Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali · published 2026-10-06
Location
The interactive map needs JavaScript. Display anchor: 45.52232, 9.06706 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
Data Center Edificio A and Edificio B — proposed two-building data-centre campus (MASE ID_VIP 13213 / 14760)
Announced last observed as of · Project announcement
The VIA/VAS technical commission's opinion assesses the proponent's request to add four wells for industrial water and a water-treatment building to the Edificio A/B data-centre project in Rho and Pero, lists the checklist annexes (including demolition, existing-state and project plans) and concludes that the change needs no further environmental assessment. It contains no statement of construction progress. evidence
Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali · published 2026-10-06
The proponent's descriptive report summarises the permits for the Edificio A and B data-centre project on a former industrial site of about 100,000 m2 straddling Rho and Pero next to Rho Fiera (former 'Vivaldi', 'Ex CAM Petroli' and 'Ex Deposito IP DEIN' areas), with the main entrance on via Buonarroti: VIA decree DM_2025-0000532 of 10 September 2025 (positive with conditions); a Rho building permit (permesso di costruire) issued on 11 December 2025 as an essential variant of permit 233/2022; a works-commencement communication (CILA) filed in Rho on 30 January 2026; and a Pero building-permit application still pending remediation procedures. Two parallel data-centre buildings are planned, Edificio A to the north and Edificio B to the south of an east-west spine. It lists the Pero cadastral sheet 1 and Rho sheets 34-35 parcels and gives the Gauss-Boaga coordinates of four planned wells (Tabella 1). evidence
Amazon Data Services Italy S.r.l. (filing published on the MASE VA portal) · published 2026-04-01
The VIA decree for the Edificio A and Edificio B data-centre project in Rho and Pero, proponent Amazon Data Services Italy s.r.l., expresses a positive environmental compatibility judgement subject to environmental conditions. An environmental assessment decree is not a planning or building permit. evidence
Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali · published 2025-09-10
The portal record lists proponent Amazon Data Services Italy S.r.l., municipalities Rho and Pero, the VIA decree DM_2025-0000532 of 10 September 2025 (positive with conditions) and two compliance-verification procedures: conditions 1-4, 8, 9 and 11-13 judged partially complied with on 4 August 2026 (MASE_2026-0166732) and conditions 5-7 judged complied with on 1 September 2026 (MASE_2026-0180966). No construction or operating milestone is recorded. evidence
Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali · publication date not stated
The portal record shows the preliminary evaluation filed on 23 March 2026 and concluded with the outcome letter MASE_2026-0207141 of 6 October 2026 ('Non necessita di ulteriori valutazioni ambientali'), municipality Pero, proponent Amazon Data Services Italy S.r.l. No later procedure is listed. evidence
Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali · publication date not stated
The proponent's newest compliance filing recalls the 29 November 2024 Council of Ministers declaration of pre-eminent strategic interest for Amazon Data Services Italy's 'Regione AWS Europe (Milan) - Espansione' investment programme and the positive VIA decree 532/2025, and supplies the sources and quality certificates of fill material for the planned acoustic mitigation mounds, to be provided at least 30 days before the presumed start of those works. The supplier list is described as the general contractor's current availability. It states no construction start, completion or operation. evidence
Amazon Data Services Italy S.r.l. (filing published on the MASE VA portal) · published 2026-10-19
The original air-dispersion annex of the Edifici A/B Rho-Pero SIA states that 42 emergency generators will be installed at the data centre: 40 MTU 20V4000G94F units of 2.8 MWe and 2 MTU 16V2000G76F 'house' units of 0.8 MWe, with 25 m stacks. These are standby plant ratings, not IT load or grid connection. evidence
Amazon Data Services Italy S.r.l. (filing published on the MASE VA portal) · published 2024-11-13
Georeferenced imagery extract used only to check the WGS84 reading of the filed building outlines. Qualitative registration check only: the Edificio A and B outlines fall on the cleared brownfield lot bounded by the motorway to the west, the railway to the north and the Rho Fiera car parks to the east, and the four Gauss-Boaga well points fall at the south-east edge of Edificio B. This is not a measured accuracy and not a status observation. evidence
Esri · publication date not stated
- Companies
- Owner: Amazon Data Services Italy S.r.l. (intended) evidence
Source and location review
- Status source
- MASE letter MASE_2026-0207141 of 6 October 2026: outcome of the preliminary evaluation [ID_VIP 14760] for 'Data Center edificio A ed edificio B Rho/Pero (MI) - inserimento pozzi e edificio trattamento acque' (proponent Amazon Data Services Italy s.r.l.) evidence row
Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali · published 2026-10-06 · Government record - Locator
- Campus locator · Compiled location reference · official_filing_building_outline_union_centroid evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 21 days before the data update on 2026-10-27
Location details
- Coordinates
- 45.52232, 9.06706
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_filing_building_outline_union_centroid
- Authority
- Compiled location reference
- Source entity
- Campus
- Method
- regulatory_filing_utm32n_wgs84_building_vertices_edificio_a_b_union_area_centroid_epsg32632_inverse_projected_to_wgs84
- Derivation
- coordinate_transform
- Precision scope
- Area centroid of the union of the two planned data-centre building outlines (Edificio A, about 11,900 m2, and Edificio B, about 6,700 m2) printed in UTM 32N WGS84 in the proponent's April 2025 air-dispersion integration. The point lies on the campus's central east-west spine, 16 m from Edificio A and 27 m from Edificio B, inside the roughly 10 ha Rho/Pero campus entered from via Buonarroti. It locates the campus through its two planned buildings; it is not a building footprint, parcel centroid, entrance or construction boundary, and the filed outlines are modelling inputs rather than surveyed as-built geometry.
- Horizontal uncertainty
Not reported
The filing states no positional accuracy for its modelling outlines; the point is a computed centroid of two outlines whose vertices lie up to 148 m away, and the as-built layout may differ. Decimal places are computation precision, not accuracy.
- Geometry evidence
- e709938d
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| ADS Edificio A & Edificio B: 'Ottemperanza Condizioni Ambientali Decreto MASE 532/2025' - supplementary documentation for condition 5 (rev. A, 14 September 2026; signed 5 October 2026), ID_VIP 14356 Archived copy | Amazon Data Services Italy S.r.l. (filing published on the MASE VA portal) Regulatory filing | Site and project identity | all-rights-reserved | Amazon Data Services Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali | 8d0e0a56b3d3f1d51dfeb720ab8da082e3c5ed5b9378145c7910d748635dc69cRetained source material; see source provenance | ||
| Amazon Data Services Italy: 'Progetto di Data Center Edificio A e Edificio B (Rho/Pero) - inserimento pozzi e edificio trattamento acque - Valutazione preliminare - Relazione descrittiva' (rev. A, 16 March 2026), MASE ID_VIP 14760 Archived copy | Amazon Data Services Italy S.r.l. (filing published on the MASE VA portal) Regulatory filing | Site and project identity, Owner claim | all-rights-reserved | Amazon Data Services Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali | 26bb25d35748b2f76890e5edd69d4e5ea01980946b69d85bdd588c2e72ba9012Retained source material; see source provenance | ||
| Esri World Imagery export: Rho/Pero site next to Rho Fiera (EPSG:32632, 504837-505637 E, 5040578-5041378 N) Archived copy | Esri Other | Site and project identity | not stated | Esri World Imagery terms of use; not redistributed | Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery) | 937f34f429ec47ebd6279bc422527b65eb26fcc2b6b93bd42f6ee709f4753dadRetained source material; see source provenance | |
| MASE decree DM_2025-0000532 of 10 September 2025 (with the Ministry of Culture): environmental compatibility of 'Progetto Datacenter edificio A e edificio B Rho/Pero (MI)', ID_VIP 13213 Archived copy | Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali Government record | Site and project identity | all-rights-reserved | Ministero dell'Ambiente e della Sicurezza Energetica, Portale Valutazioni e Autorizzazioni Ambientali | a61e7e458c67b6ae8355552f7749e93919edae784db75f25db2269959fe5c214Retained source material; see source provenance | ||
| MASE letter MASE_2026-0207141 of 6 October 2026: outcome of the preliminary evaluation [ID_VIP 14760] for 'Data Center edificio A ed edificio B Rho/Pero (MI) - inserimento pozzi e edificio trattamento acque' (proponent Amazon Data Services Italy s.r.l.) Archived copy | Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali Government record | Project announcement | all-rights-reserved | Ministero dell'Ambiente e della Sicurezza Energetica, Portale Valutazioni e Autorizzazioni Ambientali | 7a7b94190039379e6694d8b4889aad4c71fbaf841aeab2009d79f55da08c4c19Retained source material; see source provenance | ||
| MASE technical commission (CTVA) opinion no. 1068 of 14 September 2026 on preliminary evaluation ID_VIP 14760 (ADS Data Center Edificio A and B, Rho/Pero: wells and water-treatment building), annexed to MASE_2026-0207141 Archived copy | Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali Government record | Site and project identity | all-rights-reserved | Ministero dell'Ambiente e della Sicurezza Energetica, Portale Valutazioni e Autorizzazioni Ambientali | ad0d2e41d1ce7b0ff85ef27497ee98e24ca51964e985ba955666c900001f6a5fRetained source material; see source provenance | ||
| MASE VA portal object 11344: 'Progetto Datacenter edificio A e edificio B Rho/Pero (MI)' - procedure history (VIA 13213; compliance checks 14356 and 14377) Archived copy | Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali Government record | Site and project identity | not stated | all-rights-reserved | Ministero dell'Ambiente e della Sicurezza Energetica, Portale Valutazioni e Autorizzazioni Ambientali | 1c2109f957e2eda0e09c1a797b2583b1765817f4015c729da8e21f9a46073670Retained source material; see source provenance | |
| MASE VA portal object 12028: 'DATACENTER EDIFICIO A e EDIFICIO B RHO/PERO (MILANO) - inserimento pozzi e edificio trattamento acque' - preliminary evaluation 14760 Archived copy | Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali Government record | Site and project identity | not stated | all-rights-reserved | Ministero dell'Ambiente e della Sicurezza Energetica, Portale Valutazioni e Autorizzazioni Ambientali | 1498898815bf557ad5ac43e309ac9830377b2e4480ba89883a77b36424d800dfRetained source material; see source provenance | |
| Studio di Impatto Ambientale Edifici A/B Rho-Pero (MI): 'Studio previsionale delle ricadute in atmosfera delle emissioni - INTEGRAZIONI' (April 2025), filed by Amazon Data Services Italy in VIA procedure ID_VIP 13213 Archived copy | Amazon Data Services Italy S.r.l. (filing published on the MASE VA portal) Regulatory filing | Geometry | all-rights-reserved | Amazon Data Services Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali | c69049162857b525db184f62ad3bd7c0b77ca4dca668ffd0762bbdea4fa695caRetained source material; see source provenance | ||
| Studio di Impatto Ambientale Edifici A/B Rho-Pero (MI): 'Studio previsionale delle ricadute in atmosfera delle emissioni' (October 2024), SIA annex 4 filed by Amazon Data Services Italy in VIA procedure ID_VIP 13213 Archived copy | Amazon Data Services Italy S.r.l. (filing published on the MASE VA portal) Regulatory filing | Site and project identity | all-rights-reserved | Amazon Data Services Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali | b545c9ab48678f08ca20c5dcb3d2380f659982db209a9d5aca4463e878a1fce4Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). Amazon Data Services Italy Data Center Campus, Rho/Pero (via Buonarroti, Rho Fiera) [site vcc-site-50d8ca798842d8a98b32]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-50d8ca798842d8a98b32/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction