Vantage Data Centers Cyberjaya II campus (KUL2)

Under construction

Malaysia · 1 project · Last reported

Summary

Vantage Data Centers' second hyperscale campus in Cyberjaya, Selangor, next to its existing KUL1 campus. Announced in May 2023 as a 256 MW IT campus of 10 facilities on nearly 35 acres, with the first facility planned for Q4 2025, it broke ground in August 2024 alongside a supply agreement with Tenaga Nasional Berhad for 500 MVA through a dedicated 275 kV substation. Vantage's campus page, viewed in October 2026, now describes a larger plan of 436 MW of critical IT load in six data centers on 52 acres. No source found confirms whether the first facility has opened.

Source record as of 2024-08-06 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 2.92250, 101.65500 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Vantage Data Centers Cyberjaya II campus (KUL2)

Under construction last observed as of · Reported status

Location: Cyberjaya, Sepang District, Selangor, MY. Vantage places KUL2 next to its KUL1 campus in Cyberjaya without an address. The point is the Cyberjaya coordinate from its Wikipedia article (which also gives the district), so it marks the township rather than the parcel. Vantage Data Centers (press release via Media OutReach, Viet Nam News); Vantage Data Centers; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity256 MWPlanned · Campus · It load2024-08-06IT capacity at full build-out as announced in 2023 and restated at groundbreaking.Vantage Data Centers (press release via Media OutReach, Viet Nam News); Vantage Data Centers
Power capacity436 MWPlanned · Campus · It load2026-10-09Critical IT load once fully developed, from Vantage's undated campus page viewed on the access date; it supersedes the 256 MW plan without an announced explanation.Vantage Data Centers
Land areaabout 35 acresReported · Campus2024-08-06Vantage Data Centers (press release via Media OutReach, Viet Nam News); Vantage Data Centers
Land area52 acresReported · Campus2026-10-09Campus page figure (21 hectares), larger than the 35 acres given in 2023 and 2024.Vantage Data Centers
Floor area256,000 sq_mPlanned · Campus2023-05-16Given as 2.75 million square feet.Vantage Data Centers (press release via Media OutReach, Viet Nam News)
Floor areaabout 445,000 sq_mPlanned · Campus2026-10-09Given as 4.8 million square feet (445,000 square metres) once fully developed.Vantage Data Centers
Buildings10 countPlanned · Campus2023-05-16Vantage Data Centers (press release via Media OutReach, Viet Nam News)
Buildings6 countPlanned · Campus2026-10-09Campus page count of data centers once fully developed.Vantage Data Centers

Companies and organizations

NameRoleNotesSources
Vantage Data CentersDeveloperVantage Data Centers (press release via Media OutReach, Viet Nam News); Vantage Data Centers; Vantage Data Centers
Tenaga Nasional Berhad (TNB)UtilityElectricity supply agreement for 500 MVA via a dedicated 275 kV substation.Vantage Data Centers; Vantage Data Centers

Timeline

DateEventActual or plannedNotesSources
2023-05-16AnnouncedActualVantage Data Centers (press release via Media OutReach, Viet Nam News)
2024-08-06Construction startedActualGroundbreaking ceremony, at which the TNB supply agreement was disclosed.Vantage Data Centers
2025-Q4First operationalPlannedTarget set in the May 2023 announcement; no source found confirms whether it was met.Vantage Data Centers (press release via Media OutReach, Viet Nam News)

Power supply

TypeDescriptionSources
GridElectricity supply agreement with TNB for 500 MVA through a dedicated 275 kV high-voltage substation on campus; the campus page lists a 500 MVA on-campus substation.Vantage Data Centers; Vantage Data Centers
SolarVantage's campus page says solar panels will power non-critical areas such as offices and amenity spaces.Vantage Data Centers

Vantage's May 2023 release presented an additional US$3 billion for building the campus, but its 2024 release calls the same sum investment into Malaysia, so it is kept out of the metrics as a country-level figure. Vantage signed an agreement with Cyberview Sdn Bhd, Cyberjaya's tech-hub developer, to secure the land; its formal role is not stated. The undated campus page (s3), read on 2026-10-09, gives the 436 MW plan in future tense without saying which buildings are live, so the status rests on the 2024 groundbreaking. KUL1 next door is a separate campus; in 2023 Vantage said both together would deliver 287 MW of IT capacity. Coordinates and district come from Wikipedia (s4).

Sources for these details
Companies
  • Developer: Vantage Data Centers (unknown scope) evidence
  • Developer: Vantage Data Centers (unknown scope) evidence
  • Developer: Vantage Data Centers (unknown scope) evidence
  • Utility: Tenaga Nasional Berhad (TNB) (unknown scope) evidence
  • Utility: Tenaga Nasional Berhad (TNB) (unknown scope) evidence
Source and location review
Status source
Vantage Data Centers Breaks Ground on 256MW Cyberjaya Campus evidence row
Vantage Data Centers · published 2024-08-06 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 812 days before the data update on 2026-10-27

Location details
Coordinates
2.92250, 101.65500
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Vantage places KUL2 next to its KUL1 campus in Cyberjaya without an address. The point is the Cyberjaya coordinate from its Wikipedia article (which also gives the district), so it marks the township rather than the parcel.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
89571c26

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Vantage Data Centers Cyberjaya II campus (KUL2)
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Cyberjaya
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediade6ff702d4f06ff817cc0c44660dc59445a219c9ee04e5783b7c32ef14e5a4b3
Factual source record; not the publisher page
Cyberjaya II, Malaysia Campus
Archived copy
Vantage Data Centers
Company disclosure
Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Land Area, Metric: Power Capacity, Power Source: Grid, Power Source: Solar, Role: Developer, Role: Utilitynot statedsource-terms-not-recordedVantage Data Centerscfd67396aae9d1c8142a6ce25a33acf9e2e7b28d01c9f0a1e5531fa0e25707a4
Factual source record; not the publisher page
Vantage Data Centers Announces Second Campus in Cyberjaya
Archived copy
Vantage Data Centers (press release via Media OutReach, Viet Nam News)
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developersource-terms-not-recordedVantage Data Centers (press release via Media OutReach, Viet Nam News)a05f43273146286de62d84f6aa933840073eea9f9ee50494f9c47948af5875a5
Factual source record; not the publisher page
Vantage Data Centers Breaks Ground on 256MW Cyberjaya Campus
Archived copy
Vantage Data Centers
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Metric: Power Capacity, Milestone: Construction Started, Power Source: Grid, Role: Developer, Role: Utilitysource-terms-not-recordedVantage Data Centers82c61df0e638149769bd9bc16b3285fdd67eef7fd35496099b4d62fea1c1747b
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Vantage Data Centers Cyberjaya II campus (KUL2) [site vcc-site-54113ebec20f61dd4a6e]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54113ebec20f61dd4a6e/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction