Digital Edge Seoul Bupyeong Campus

Under construction

Korea, Republic of · 1 project · Last reported

Summary

SK ecoplant, co-developer and builder of the Bupyeong campus with Digital Edge, reported on August 27, 2026 that its Bupyeong data centre is currently being built, presenting the active construction site and its power and cooling systems. Phase 1 (SEL2) is complete; the build in progress is the 60 MW IT second phase (SEL3). August 27 is the report date, not a filming date or a specific work-stage milestone. evidence

SK ecoplant Co., Ltd. · published 2026-08-27

Location

The interactive map needs JavaScript. Display anchor: 37.51800, 126.71090 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Campus reference; individual project footprints are not mapped.

Projects (1)

Digital Edge SEL3 Phase 2

Under construction last observed as of · Authoritative status update

Power

MetricStageValueAs ofMethodNotesEvidence
Critical IT loadPlanned60 MWReportedReported 60 MW IT capacity for the current SEL3/Bupyeong phase-2 project, normalized once as planned critical IT capacity. The nested 96 MW SEL2-plus-SEL3 campus total is not added. This is not grid capacity, gross facility demand, generation, energized or current load, annual energy, consumption, or PUE, and no conversion is made.evidence
Source and location review
Status source
SK ecoplant newsroom: Bupyeong data centre construction-site feature (August 27, 2026) evidence row
SK ecoplant Co., Ltd. · published 2026-08-27 · Company disclosure
Locator
Campus locator · Official source · official_source_reported_adjacent_facility_point_used_as_shared_campus_locator evidence
Source checks

Not reviewed against imagery not_reviewed_for_core_preview
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 61 days before the data update on 2026-10-27

Location details
Coordinates
37.51800, 126.71090
Geometry licence
all-rights-reserved
Use scope
Campus locator
Scope class
official_source_reported_adjacent_facility_point_used_as_shared_campus_locator
Authority
Official source
Source entity
Campus
Method
first_party_sel2_specification_point_to_cross_source_shared_sel2_sel3_campus_locator
Derivation
cross_source_geometry
Precision scope
The point is the first-party SEL2 facility coordinate and may be spatially offset from SEL3. It is a shared-campus locator only, not a SEL3 project point, campus centroid, footprint, parcel, building outline, construction extent, or boundary.
Horizontal uncertainty
Not reported

The specification does not state datum, reference feature, collection method, or horizontal accuracy.

Geometry evidence
adac0b2c

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Digital Edge Seoul Bupyeong Campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
SEL2 Data Center Specification
Archived copy
Digital Edge
Company facility specification
Geometrynot statedall-rights-reservedDigital Edge509a845cdc5677392bf05941c54487f0a1f74482491bb890e69987b11e16522f
Retained source material; see source provenance
SK ecoplant AI data-center competitiveness interview
Archived copy
SK ecoplant
Company disclosure
Physical status, Critical IT load observationall-rights-reservedSK ecoplanta86acc48fadb7fe6143016fd05e4af6aaf18e624cc4ca6f4ecae4b03a7f69b9a
Retained source material; see source provenance
SK ecoplant newsroom: Bupyeong data centre construction-site feature (August 27, 2026)
Archived copy
SK ecoplant Co., Ltd.
Company disclosure
Physical statusall-rights-reservedSK ecoplant Co., Ltd.fc8ab3c543dca8d56a0641b2ab29c41cacf65ab8926e253e25bc6acebc193776
Retained source material; see source provenance
Cite this site

Kyars, K. (2026). Digital Edge Seoul Bupyeong Campus [site vcc-site-5750ea0ecd6d7c900211]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5750ea0ecd6d7c900211/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction