ACS DC La Puebla data center campus
Announced
Spain · 1 project · Last reported
Summary
Data center campus planned by ACS with Benbros Energy on about 25.5 hectares of industrial land in La Puebla de Alfindén, Zaragoza province. Announced in June 2025 with EUR 1,254 million for the first phase and 150 MW of grid access at Red Eléctrica's Peñaflor substation; a second phase depends on a further 150 MW the developers have requested. The regional plan describes two data halls of 40 MW and 60 MW of IT load, a new 400/220 kV substation next to Peñaflor and an underground line to the site. The plan won initial approval in December 2025 and was amended in July 2026 to add the power line projects. Urbanisation works were expected from late 2026 or in 2027.
Source record as of 2026-10-05 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 41.63400, -0.74800 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
ACS DC La Puebla data center campus
Announced last observed as of · Reported status
Location: La Puebla de Alfindén, Zaragoza, Aragon, ES. Town centroid from the La Puebla de Alfindén Wikipedia article. The regional plan describes the plot but no cited source gives coordinates for it. Gobierno de Aragón; Hoy Aragón; Wikipedia
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 150 MW | Planned · Phase · Grid connection · Phase 1 | 2025-06-27 | Electrical power secured at the Peñaflor access point; the regional plan describes the project as 150 MW of electrical power. | Hoy Aragón; Gobierno de Aragón |
| Power capacity | 40 MW | Planned · Phase · It load · Building 1 (four 10 MW modules) | 2026-07-06 | Gobierno de Aragón | |
| Power capacity | 60 MW | Planned · Phase · It load · Building 2 (six 10 MW modules) | 2026-07-06 | Gobierno de Aragón | |
| Power capacity | 150 MW | Planned · Phase · Grid connection · Phase 2 (pending Red Eléctrica approval) | 2025-06-27 | Additional capacity the developers had requested; the plot reserves space for a possible second phase. | Hoy Aragón |
| Investment | 1,254,000,000 EUR | Announced · Phase · Phase 1 | 2025-06-27 | Announced by Aragon's regional president; El Español describes it as committed for the first phase. | Hoy Aragón; El Español |
| Land area | about 25.55 hectares | Planned · Campus | 2026-07-06 | The regional plan covers 255,504.65 square metres of industrial development land. | Gobierno de Aragón; El Español |
| Buildings | 2 count | Planned · Phase · Phase 1 | 2026-07-06 | Gobierno de Aragón; El Español | |
| Jobs construction | 1,510 count | Planned · Campus | 2025-06-27 | Hoy Aragón | |
| Jobs permanent | 540 count | Planned · Campus | 2025-06-27 | Operating jobs; a further 724 induced jobs were also projected. | Hoy Aragón |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| ACS | Developer | The regional plan is promoted by the project company ACS DC Infra La Puebla, S.L. | Hoy Aragón; El Español; Gobierno de Aragón |
| Benbros Energy | Developer | Announced as ACS's partner in the project; its specific role is not described. | Hoy Aragón |
| Red Eléctrica | Utility | Guaranteed the 150 MW first-phase connection at the Peñaflor substation; a second 150 MW request is pending. | Hoy Aragón |
| Government of Aragon | Government | Declared the project of general interest and gave the regional plan initial approval. | Gobierno de Aragón; Gobierno de Aragón |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-06-27 | Announced | Actual | Hoy Aragón | |
| 2025-06-27 | Other | Actual | Declared an investment of general interest for Aragon; published in the regional gazette on 23 July 2025. | Gobierno de Aragón; Gobierno de Aragón |
| 2025-09-17 | Other | Actual | Regional plan filed for initial approval. | Gobierno de Aragón |
| 2025-12-01 | Other | Actual | Initial approval of the Plan de Interés General de Aragón (Order FOM/1698/2025), followed by a 30-working-day public information period opened on 9 December 2025. | Gobierno de Aragón; Gobierno de Aragón; El Español |
| 2026-07-31 | Other | Actual | Order VFL/1184/2026 amended the initial approval to add updated 400 kV and 220 kV line and remote substation projects with their environmental studies. | Gobierno de Aragón |
| 2027 | Construction started | Planned | In March 2026 urbanisation was expected in 2026 and the buildings from early 2027; in October 2026 urbanisation was expected by late 2026 or during 2027. | El Español; El Español |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | About 13.5 km of underground line from Red Eléctrica's Peñaflor substation, a new remote 400/220 kV substation next to it, and a substation on the campus plot. | Gobierno de Aragón; Gobierno de Aragón |
The regional plan pages carry last-updated dates (6 July 2026 and 2 September 2026), used here as their published dates. The two data hall IT figures are recorded per building and not summed. No final approval of the regional plan had been reported by early October 2026.
Sources for these details
- Plan de Interés General de Aragón: Instalación de un centro de datos en el término municipal de La Puebla de Alfindén — Gobierno de Aragón; 2026-07-06
- Modificación de la aprobación inicial del PIGA del centro de datos de La Puebla de Alfindén — Gobierno de Aragón; 2026-09-02
- ACS aterriza con Benbros Energy en Aragón para la construcción de otro centro de datos — Hoy Aragón; 2025-06-27
- Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras — El Español; 2026-10-05
- Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos — El Español; 2026-03-22 · Archived source
- La Puebla de Alfindén — Wikipedia; publication date not stated · Archived source
- Companies
- Developer: ACS (unknown scope) evidence
- Developer: ACS (unknown scope) evidence
- Developer: ACS (unknown scope) evidence
- Developer: Benbros Energy (unknown scope) evidence
- Utility: Red Eléctrica (unknown scope) evidence
- Government: Government of Aragon (unknown scope) evidence
- Government: Government of Aragon (unknown scope) evidence
Source and location review
- Status source
- Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras evidence row
El Español · published 2026-10-05 · News - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 22 days before the data update on 2026-10-27
Location details
- Coordinates
- 41.63400, -0.74800
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Town centroid from the La Puebla de Alfindén Wikipedia article. The regional plan describes the plot but no cited source gives coordinates for it.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 183ff3fc
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| ACS aterriza con Benbros Energy en Aragón para la construcción de otro centro de datos Archived copy | Hoy Aragón News | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Announced, Role: Developer, Role: Utility | source-terms-not-recorded | Hoy Aragón | 29b4536b1f970f6571d3d4d2cbe07aed56b1eaf3b4efbb3946f8342429e2259bFactual source record; not the publisher page | ||
| Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos Archived copy | El Español News | Imported: Record, Metric: Buildings, Metric: Land Area, Milestone: Construction Started | source-terms-not-recorded | El Español | 207dd0fcaae6c0765d41910f5aca8db2687ef5cae368b5f4874833c3b0c4fb64Factual source record; not the publisher page | ||
| Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras Archived copy | El Español News | Imported: Record, Imported: Status, Metric: Investment, Milestone: Construction Started, Milestone: Other, Role: Developer | source-terms-not-recorded | El Español | e672206da4800b4575a1aa288cc19bcebdb7096682c6ee907eead61d9fa77770Factual source record; not the publisher page | ||
| La Puebla de Alfindén Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 89f6f7acbaf0c4881bdf0f1538af9d1196de6fbc9cd801fd2a5480bda9170775Factual source record; not the publisher page | |
| Modificación de la aprobación inicial del PIGA del centro de datos de La Puebla de Alfindén Archived copy | Gobierno de Aragón Government record | Imported: Record, Imported: Status, Milestone: Other, Power Source: Grid, Role: Government | source-terms-not-recorded | Gobierno de Aragón | f3cf313a7acb3632670c46a8b98b161793665c0dcc001017f48eae2b073a6eecFactual source record; not the publisher page | ||
| Plan de Interés General de Aragón: Instalación de un centro de datos en el término municipal de La Puebla de Alfindén Archived copy | Gobierno de Aragón Government record | Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Land Area, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government | source-terms-not-recorded | Gobierno de Aragón | 1ca2288d3e357208b7f88fd345bef4139005fe43886f929689c5ff607e0ed31eFactual source record; not the publisher page |