NTT Global Data Centers Tokyo TKY12 campus, Shiroi
Announced
Japan · 1 project · Last reported
Summary
NTT DATA Group and its data center arm NTT Global Data Centers announced in April 2026 that they had begun developing Tokyo TKY12, a six-building hyperscale campus in Shiroi City, Chiba Prefecture, in the Inzai-Shiroi data center cluster east of Tokyo. It is planned for about 200 MW of total IT capacity on a flat site about 20 m above sea level, near NTT's 50 MW TKY11 facility, which is due to open in April 2027. The first building is to enter service in 2030 or later, once the utility supplies power. No investment figure or construction start date has been disclosed.
Source record as of 2026-04-22 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 35.79147, 140.05631 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
NTT Global Data Centers Tokyo TKY12 campus, Shiroi
Announced last observed as of · Reported status
Location: Shiroi, Chiba Prefecture, JP. NTT names Shiroi City, Chiba Prefecture, without an address. The point is the Shiroi city coordinate from its Wikipedia article, so it marks the city rather than the site. NTT DATA Group / NTT Global Data Centers; W.Media; Wikipedia
Use: Cloud, Ai unspecified
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | about 200 MW | Planned · Campus · It load | 2026-04-17 | Total IT capacity of TKY12. NTT's headline figure of about 250 MW for the Inzai-Shiroi development matches TKY12 plus the nearby 50 MW TKY11, a separate facility, though the release does not break it down. | NTT DATA Group / NTT Global Data Centers; W.Media |
| Buildings | 6 count | Planned · Campus | 2026-04-17 | NTT DATA Group / NTT Global Data Centers; W.Media |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| NTT Global Data Centers Corporation | Developer | Data center subsidiary of NTT DATA Group, which co-issued the announcement. | NTT DATA Group / NTT Global Data Centers; W.Media |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2026-04-17 | Announced | Actual | NTT DATA and NTT GDC announced the start of development. | NTT DATA Group / NTT Global Data Centers; W.Media |
| 2030 | First operational | Planned | First building to start service in 2030 or later, after power is received from the utility. | NTT DATA Group / NTT Global Data Centers; W.Media |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Service at the first building depends on power being supplied by the local utility, which is not named. | NTT DATA Group / NTT Global Data Centers |
The status is 'announced' because NTT described the start of development but gave no construction start date. TKY11, the nearby 50 MW facility due in April 2027, is not part of this record. Shiroi coordinates come from Wikipedia (s3), used only for the map point.
Sources for these details
- 国内最大級、千葉県印西・白井エリアで約250メガワット(MW)のデータセンターキャンパス開発を始動 — NTT DATA Group / NTT Global Data Centers; 2026-04-17 · Archived source
- NTT Data plans a 200 MW data center campus in Japan — W.Media; 2026-04-22
- Shiroi — Wikipedia; publication date not stated · Archived source
- Companies
Source and location review
- Status source
- 国内最大級、千葉県印西・白井エリアで約250メガワット(MW)のデータセンターキャンパス開発を始動 evidence row
NTT DATA Group / NTT Global Data Centers · published 2026-04-17 · Company disclosure - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 188 days before the data update on 2026-10-27
Location details
- Coordinates
- 35.79147, 140.05631
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- NTT names Shiroi City, Chiba Prefecture, without an address. The point is the Shiroi city coordinate from its Wikipedia article, so it marks the city rather than the site.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 23498602
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| NTT Data plans a 200 MW data center campus in Japan Archived copy | W.Media Trade publication | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Role: Developer | source-terms-not-recorded | W.Media | 0648ffc8941fedb51bd67c95ecb43e0371b215f79d6b7cda5a9f7d8d550d68c0Factual source record; not the publisher page | ||
| Shiroi Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 9a7643725a732caa8e211dc37113e802d707a9588a103448aefbb81c9bbe75e3Factual source record; not the publisher page | |
| 国内最大級、千葉県印西・白井エリアで約250メガワット(MW)のデータセンターキャンパス開発を始動 Archived copy | NTT DATA Group / NTT Global Data Centers Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Metric: Power Capacity, Milestone: Announced, Milestone: First Operational, Power Source: Grid, Role: Developer | source-terms-not-recorded | NTT DATA Group / NTT Global Data Centers | f8c174680a9236dfed387b898946d8dbb2320a57604c08ccef4707c51b1c3f7fFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). NTT Global Data Centers Tokyo TKY12 campus, Shiroi [site vcc-site-627bed0b413c9b712d70]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-627bed0b413c9b712d70/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction