AirTrunk Kurri Kurri Data Centre

Announced

Australia · 1 project · Last reported

Summary

AirTrunk proposes a 540 MW data center on the former Hydro Aluminium smelter site on Hart Road, Loxford, near Kurri Kurri in the Hunter region of New South Wales. It is being assessed as state significant development; the NSW planning department issued assessment requirements by July 2026 and AirTrunk said it lodged an environmental impact statement in September 2026. Plans show a two-storey building of about 44,220 square metres with air-based cooling and a 132 kV grid connection with a new substation. Coverage puts the investment at about A$3.7 billion, and AirTrunk told local press it targets opening in 2028.

Source record as of 2026-09-21 · Details and sources

NSW placed the Kurri Kurri Data Centre application (SSD-128819490) on public exhibition from 14 October to 11 November 2026. It covers the former Hydro Aluminium site on Hart Road, Loxford. The proposal is to fit out and operate an approved industrial building as a data centre with a total power consumption of 550.5 MW, with generators, battery storage, a switchyard and two substations. The application has not been determined. evidence

NSW Department of Planning, Housing and Infrastructure · published 2026-10-14

Location

The interactive map needs JavaScript. Display anchor: -32.81670, 151.48330 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

AirTrunk Kurri Kurri Data Centre

Announced last observed as of · Project announcement

This record reports proposed as of 2026-09-21. NSW Planning Portal; W.Media

Location: Loxford (Kurri Kurri), City of Cessnock, New South Wales, AU. Sources name the former Kurri Kurri smelter site on Hart Road, Loxford, without coordinates; the point is the Kurri Kurri town coordinate from its Wikipedia article, so it marks the neighbouring town rather than the site. AirTrunk; NSW Planning Portal; W.Media; Newcastle Weekly; Wikipedia

Use: Cloud, Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity540 MWPlanned · Campus · Facility2026-07-15The NSW planning portal describes 540 MW as total power consumption of the data center.NSW Planning Portal; W.Media; Newcastle Weekly
Investmentabout 3,700,000,000 AUDReported · Campus2026-09-21Figure reported by W.Media; AirTrunk's project page gives only community infrastructure commitments.W.Media
Floor areaabout 44,220 sq_mPlanned · Campus2026-09-21Two-storey building about 16.8 m high; Newcastle Weekly describes this as gross floor area.AirTrunk; W.Media; Newcastle Weekly
Jobs permanentmore than 350 countPlanned · Campus2026-09-21AirTrunk's figure of ongoing local jobs, about 250 on site and more than 100 off site. The July 2026 scoping report coverage gave 250 ongoing jobs.AirTrunk; W.Media
Jobs constructionabout 500 countPlanned · Campus2026-07-15Figure from coverage of the scoping report; AirTrunk later spoke of several thousand construction jobs.Newcastle Weekly

Companies and organizations

NameRoleNotesSources
AirTrunkDeveloperProponent. Newcastle Weekly's July 2026 coverage of the scoping report named planning consultancy ADW Johnson as lodging it, without naming the developer.AirTrunk; W.Media; Newcastle Herald
McCloy GroupOwnerThe Newcastle Herald reports the site is on land owned by the McCloy Group.Newcastle Herald
NSW Department of Planning, Housing and InfrastructureGovernmentAssessing the project as state significant development; issued the assessment requirements.NSW Planning Portal; Newcastle Weekly

Timeline

DateEventActual or plannedNotesSources
2026-07OtherActualScoping report lodged and the planning department issued the Secretary's Environmental Assessment Requirements, as reported by mid-July 2026.Newcastle Weekly
2026-09OtherActualAirTrunk said it lodged the environmental impact statement; the portal still showed the Prepare EIS stage and public exhibition had not started.W.Media
2028First operationalPlannedOpening year given in Newcastle Herald reporting on AirTrunk's energy plans; Newcastle Weekly reported that construction would take about 14 months.Newcastle Weekly; Newcastle Herald

Power supply

TypeDescriptionSources
GridConnection to a 132 kV line, with AirTrunk funding the connection and a new on-site substation.AirTrunk; W.Media
OtherRenewable supply under negotiation with three suppliers in the Hunter Renewable Energy Zone, with about 70 to 75 percent clean energy expected at opening and 90 to 100 percent targeted by 2030; AirTrunk was also in talks with Snowy Hydro about firmed capacity from the nearby gas-fired Kurri peaking plant.Newcastle Herald

Not approved: the project awaits public exhibition and determination. A Newcastle Herald opinion column speculated about a possible tenant; no end user has been confirmed, so none is recorded. Wikipedia is cited only for the town coordinate.

Sources for these details
Companies
  • Developer: AirTrunk (unknown scope) evidence
  • Developer: AirTrunk (unknown scope) evidence
  • Developer: AirTrunk (unknown scope) evidence
  • Owner: McCloy Group (unknown scope) evidence
  • Government: NSW Department of Planning, Housing and Infrastructure (unknown scope) evidence
  • Government: NSW Department of Planning, Housing and Infrastructure (unknown scope) evidence
Source and location review
Status source
NSW exhibition notice: Kurri Kurri Data Centre (SSD-128819490) evidence row
NSW Department of Planning, Housing and Infrastructure · published 2026-10-14 · Government record
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 13 days before the data update on 2026-10-27

Location details
Coordinates
-32.81670, 151.48330
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Sources name the former Kurri Kurri smelter site on Hart Road, Loxford, without coordinates; the point is the Kurri Kurri town coordinate from its Wikipedia article, so it marks the neighbouring town rather than the site.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
7745e0a7

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for AirTrunk Kurri Kurri Data Centre
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
540MW AI data centre planned for Kurri Kurri
Archived copy
Newcastle Weekly
News
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Jobs Construction, Metric: Power Capacity, Milestone: First Operational, Milestone: Other, Role: Governmentsource-terms-not-recordedNewcastle Weekly0f66f997db462c6723194e6a7461d2669b79d12d564190f9e6c382bd7001b7f6
Factual source record; not the publisher page
AirTrunk proposes AUD 3.7bn NSW data centre with AUD 37m community offer
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Imported: Status, Metric: Floor Area, Metric: Investment, Metric: Jobs Permanent, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developersource-terms-not-recordedW.Media5d01f214ba0eee1048156eed72e231a8e828a038bc75e1ea52536a848853cf02
Factual source record; not the publisher page
Kurri data centre energy whale needs its own power supply
Archived copy
Newcastle Herald
News
Imported: Record, Milestone: First Operational, Power Source: Other, Role: Developer, Owner claimsource-terms-not-recordedNewcastle Heraldef8b974ea973094cebca38bab7b0940535a103ddc1f2c318f2756dce0ff39346
Factual source record; not the publisher page
Kurri Kurri
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipediad9cccc0436ce8bc3e0be1c9f22417655a165e16169a4bfc31ceac3652d704a91
Factual source record; not the publisher page
Kurri Kurri Data Centre
Archived copy
AirTrunk
Company disclosure
Imported: Geometry, Imported: Record, Metric: Floor Area, Metric: Jobs Permanent, Power Source: Grid, Role: Developernot statedsource-terms-not-recordedAirTrunka38497c9a4b53c838ee5bd76b328a28610abe12950cd649ab487eba6dd296125
Factual source record; not the publisher page
Kurri Kurri Data Centre (SSD-128819490)
Archived copy
NSW Planning Portal
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Role: Governmentnot statedsource-terms-not-recordedNSW Planning Portal3b717ac3ef8957eb1e3e3ac53f85cece11ff31988264b11c66984ee8ba0ce877
Factual source record; not the publisher page
NSW exhibition notice: Kurri Kurri Data Centre (SSD-128819490)
Archived copy
NSW Department of Planning, Housing and Infrastructure
Government record
Project announcementCC-BY-4.0© State of New South Wales and Department of Planning, Housing and Infrastructure 20260a91b994d34807432b19ccc6f2905c5f0b4dfca04e2c4eee501902c4c5e0b3df
Retained source material; see source provenance