Brookfield AI center, Strängnäs

Announced

Sweden · 1 project · Last reported

Summary

Brookfield Asset Management plans a large AI data center in Strängnäs, Sweden, announced in June 2025. Brookfield said a land allocation agreement for about 350,000 square metres of extra land would let the site grow from 300 MW to 750 MW. Local press placed the site at Gorsingeberget on the edge of town, with the municipality intending to sell the land for SEK 525 million and grant two years of exclusive planning rights. Brookfield expects more than 1,000 permanent jobs and a 10 to 15 year build-out. No 2026 progress report was found.

Source record as of 2025-06-04 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 59.36700, 17.03300 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Brookfield AI center, Strängnäs

Announced last observed as of · Reported status

Location: Strängnäs, Strängnäs Municipality, Södermanland County, SE. Town centroid from the Strängnäs Wikipedia article. Dagens PS places the site at Gorsingeberget on the outskirts of Strängnäs, but no cited source gives a parcel or coordinates, so the site itself is not pinpointed. Brookfield Asset Management (via MFN); Dagens PS; Wikipedia

Use: Ai unspecified

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity750 MWPlanned · Campus · Unspecified2025-06-04Brookfield described the site as currently 300 MW, rising to 750 MW if the additional land is allocated. IT versus facility scope is not stated.Brookfield Asset Management (via MFN)
Land areaabout 35 hectaresPlanned · Phase · Additional land under the planned land allocation agreement2025-06-04Reported as about 350,000 square metres of land in addition to the property already in the project.Brookfield Asset Management (via MFN); Dagens PS
Jobs permanentmore than 1,000 countPlanned · Campus2025-06-04Dagens PS gives 3,000 jobs in total, of which 1,000 permanent.Brookfield Asset Management (via MFN)
Jobs construction2,000 countPlanned · Campus2025-06-04Additional jobs Brookfield links to the 10 to 15 year construction process.Brookfield Asset Management (via MFN)

Companies and organizations

NameRoleNotesSources
Brookfield Asset ManagementDeveloperBrookfield Asset Management (via MFN); Dagens PS
Strängnäs MunicipalityGovernmentReported in June 2025 as intending to sign a land allocation agreement selling about 350,000 square metres to Brookfield for SEK 525 million, with two years of exclusive planning rights.Dagens PS

Timeline

DateEventActual or plannedNotesSources
2025-06-04AnnouncedActualBrookfield Asset Management (via MFN); Dagens PS
2025-06OtherActualThe municipality was reported as intending to sign a land allocation agreement giving Brookfield two years of exclusive planning rights; whether it was signed was not confirmed by the sources opened.Dagens PS

Brookfield announced up to SEK 95 billion (about USD 10 billion) of AI infrastructure investment in Sweden, centred on the Strängnäs AI center but also covering data transfer, chip storage and energy generation, with no breakdown for the site; it is therefore not recorded as a campus investment. The record qualifies on the 750 MW site figure. No 2026 update on the land allocation agreement, detailed planning, grid connection or construction start was found; status reflects the June 2025 announcement.

Sources for these details
Companies
  • Developer: Brookfield Asset Management (unknown scope) evidence
  • Developer: Brookfield Asset Management (unknown scope) evidence
  • Government: Strängnäs Municipality (unknown scope) evidence
Source and location review
Status source
Brookfield To Advance AI Infrastructure in Sweden Through SEK 95 Billion Investment evidence row
Brookfield Asset Management (via MFN) · published 2025-06-04 · Company disclosure
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 510 days before the data update on 2026-10-27

Location details
Coordinates
59.36700, 17.03300
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Town centroid from the Strängnäs Wikipedia article. Dagens PS places the site at Gorsingeberget on the outskirts of Strängnäs, but no cited source gives a parcel or coordinates, so the site itself is not pinpointed.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
6e8e9bad

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Brookfield AI center, Strängnäs
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
AI-jätte etablerar sig i Strängnäs – tusentals nya jobb
Archived copy
Dagens PS
News
Imported: Geometry, Imported: Record, Imported: Status, Metric: Land Area, Milestone: Announced, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedDagens PS42a9e8d9f71e99e0eaa6c8fb6f5f06dc0d67fcc77db0d5acb05874f0ceeb6f31
Factual source record; not the publisher page
Brookfield To Advance AI Infrastructure in Sweden Through SEK 95 Billion Investment
Archived copy
Brookfield Asset Management (via MFN)
Company disclosure
Imported: Geometry, Imported: Record, Imported: Status, Metric: Jobs Construction, Metric: Jobs Permanent, Metric: Land Area, Metric: Power Capacity, Milestone: Announced, Role: Developersource-terms-not-recordedBrookfield Asset Management (via MFN)49eaaf08309c33403daaf1d001695ed0737399b463ec5450f5102c7c50e28441
Factual source record; not the publisher page
Strängnäs
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia5bc71f29deeda10e0086ddb9daa613e7d424db81b09e3912a94f1452bd464a56
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Brookfield AI center, Strängnäs [site vcc-site-6548266e7ea8549844f6]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6548266e7ea8549844f6/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction