Tillion Aragón data center campus (Azora), Villamayor de Gállego

Announced

Spain · 1 project · Last reported

Summary

Data center campus planned by Azora, through its Tillion Data Centres business and the project company Tillion Aragón, near Villamayor de Gállego outside Zaragoza. Announced in March 2025 at 150 MW expandable to 300 MW, with EUR 1.1 billion for the first phase and up to about EUR 2 billion in total. Red Eléctrica approved the first 150 MW grid connection in 2024. The regional plan covers four data center buildings and a 400 kV link to the Peñaflor substation. In October 2026 El Español reported the investment had risen to about EUR 2.36 billion, with site works expected from late 2026 or in 2027.

Source record as of 2026-10-05 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 41.68556, -0.77389 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

Town or locality reference only; the facility position is not established.

Projects (1)

Tillion Aragón data center campus (Azora), Villamayor de Gállego

Announced last observed as of · Reported status

Location: Villamayor de Gállego, Zaragoza, Aragon, ES. Town centroid from the Villamayor de Gállego Wikipedia article. Azora places the site near Villamayor de Gállego, less than 3 km from the transmission substation, but no cited source gives coordinates. Azora; Gobierno de Aragón; Wikipedia

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacityup to 300 MWPlanned · Campus · Unspecified2025-03-13Expansion ceiling after the first phase; scope not stated.Azora
Power capacity150 MWPlanned · Phase · Unspecified · Phase 12025-03-13Azora
Power capacity150 MWPermitted · Phase · Grid connection · Phase 12025-03-13Red Eléctrica approved the initial 150 MW grid connection in 2024.Azora
Investment1,100,000,000 EURAnnounced · Phase · Phase 12025-03-13Also the figure recorded in the initial declaration of general interest.Azora; El Español
Investmentup to 1,950,000,000 EURAnnounced · Campus2025-03-13Azora's investment at 300 MW, headlined as up to EUR 2 billion. Azora said end users would add about EUR 5 billion of computing equipment.Azora
Investment2,359,900,000 EURReported · Campus2026-10-05El Español reports that the investment rose from EUR 1,100 million in the initial declaration of general interest to EUR 2,359.9 million; it does not say whether this covers a phase or the whole campus.El Español
Buildings4 countPlanned · Campus2026-07-07The plan documents include basic building projects for four data center buildings.Gobierno de Aragón

Companies and organizations

NameRoleNotesSources
AzoraDeveloperDevelops the campus through its subsidiary Tillion Data Centres.Azora; El Español
Tillion Aragón, S.L.DeveloperPromoter of the regional plan; formerly named Maquina Solar, S.L.Gobierno de Aragón
Red EléctricaUtilityTransmission operator that approved the initial 150 MW grid connection; the plan includes a 400 kV connection to its Peñaflor substation.Azora; Gobierno de Aragón
Government of AragonGovernmentDeclared the project of general interest and is processing its Plan de Interés General de Aragón.Gobierno de Aragón; El Español

Timeline

DateEventActual or plannedNotesSources
2025-03-13AnnouncedActualAzora
2025-03-13OtherActualThe Government of Aragon declared the project of general interest (DIGA); published in the regional gazette on 3 April 2025.Gobierno de Aragón; Azora
2026-02-21OtherActualTillion Aragón filed the Plan de Interés General de Aragón for initial approval.Gobierno de Aragón
2026-07OtherActualEl Español reported the regional plan approved in July; the regional page lists an initial-approval order dated 24 June and no final approval. Public information on the plan and its environmental documents followed.El Español; Gobierno de Aragón
2027Construction startedPlannedAzora targeted a 2026 start; in 2026 El Español expected urbanisation works between late 2026 and 2027.El Español; El Español; Azora

Power supply

TypeDescriptionSources
GridPlanned 400 kV connection to Red Eléctrica's Peñaflor substation with 66 kV lines and on-site substations.Gobierno de Aragón; Azora
OtherAzora says the campus will run fully on renewable energy through self-consumption or long-term power purchase agreements; El Español reported a plot added to the plan for power supply.Azora; El Español

The regional plan page shows a last-updated date of 7 July 2026, used as its published date. The date of the initial-approval order is ambiguous on that page (shown as 24 June with a 2025 order code, before the February 2026 filing), so the approval milestone follows El Español's July report. Microsoft separately plans a campus in the same municipality (microsoft-aragon-villamayor-de-gallego); this is a different project.

Sources for these details
Companies
  • Developer: Azora (unknown scope) evidence
  • Developer: Azora (unknown scope) evidence
  • Developer: Tillion Aragón, S.L. (unknown scope) evidence
  • Utility: Red Eléctrica (unknown scope) evidence
  • Utility: Red Eléctrica (unknown scope) evidence
  • Government: Government of Aragon (unknown scope) evidence
  • Government: Government of Aragon (unknown scope) evidence
Source and location review
Status source
Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras evidence row
El Español · published 2026-10-05 · News
Locator
Locality reference only · Compiled location reference · locality evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 22 days before the data update on 2026-10-27

Location details
Coordinates
41.68556, -0.77389
Geometry licence
source-terms-not-recorded
Use scope
Locality reference only
Scope class
locality
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
Town centroid from the Villamayor de Gállego Wikipedia article. Azora places the site near Villamayor de Gállego, less than 3 km from the transmission substation, but no cited source gives coordinates.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
7db7facd

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for Tillion Aragón data center campus (Azora), Villamayor de Gállego
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos
Archived copy
El Español
News
Imported: Record, Milestone: Construction Started, Power Source: Othersource-terms-not-recordedEl Español697d39245a10441534aaeed03c2e0029bb24b0ca1495fa1725e1295a260e1b21
Factual source record; not the publisher page
Azora to invest €2 billion in Zaragoza data centre
Archived copy
Azora
Company disclosure
Imported: Geometry, Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Milestone: Other, Power Source: Grid, Power Source: Other, Role: Developer, Role: Utilitysource-terms-not-recordedAzoracc8a90ff1c1c564afdce5c744281f42caff367b07a57f5e2bf69e3ea81bc9fc1
Factual source record; not the publisher page
Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras
Archived copy
El Español
News
Imported: Record, Imported: Status, Metric: Investment, Milestone: Construction Started, Milestone: Other, Role: Developer, Role: Governmentsource-terms-not-recordedEl Español2de00c1ea5531e9199d811695e6ab8022330e70d91351006d00418ded20b65e9
Factual source record; not the publisher page
Plan de Interés General de Aragón Tillion Aragón
Archived copy
Gobierno de Aragón
Government record
Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Utilitysource-terms-not-recordedGobierno de Aragón21e8c71062a037c99b918f82edfe7e7d9a8b2485fa7e937fee30c18c1e126b0a
Factual source record; not the publisher page
Villamayor de Gállego
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia04249de9081de044003cddc04b518393a0d4a0cd574ee49817f64a7e7e214144
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). Tillion Aragón data center campus (Azora), Villamayor de Gállego [site vcc-site-6bd6515ae5d1dc80cf5a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bd6515ae5d1dc80cf5a/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction