Tillion Aragón data center campus (Azora), Villamayor de Gállego
Announced
Spain · 1 project · Last reported
Summary
Data center campus planned by Azora, through its Tillion Data Centres business and the project company Tillion Aragón, near Villamayor de Gállego outside Zaragoza. Announced in March 2025 at 150 MW expandable to 300 MW, with EUR 1.1 billion for the first phase and up to about EUR 2 billion in total. Red Eléctrica approved the first 150 MW grid connection in 2024. The regional plan covers four data center buildings and a 400 kV link to the Peñaflor substation. In October 2026 El Español reported the investment had risen to about EUR 2.36 billion, with site works expected from late 2026 or in 2027.
Source record as of 2026-10-05 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: 41.68556, -0.77389 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Town or locality reference only; the facility position is not established.
Projects (1)
Tillion Aragón data center campus (Azora), Villamayor de Gállego
Announced last observed as of · Reported status
Location: Villamayor de Gállego, Zaragoza, Aragon, ES. Town centroid from the Villamayor de Gállego Wikipedia article. Azora places the site near Villamayor de Gállego, less than 3 km from the transmission substation, but no cited source gives coordinates. Azora; Gobierno de Aragón; Wikipedia
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | up to 300 MW | Planned · Campus · Unspecified | 2025-03-13 | Expansion ceiling after the first phase; scope not stated. | Azora |
| Power capacity | 150 MW | Planned · Phase · Unspecified · Phase 1 | 2025-03-13 | Azora | |
| Power capacity | 150 MW | Permitted · Phase · Grid connection · Phase 1 | 2025-03-13 | Red Eléctrica approved the initial 150 MW grid connection in 2024. | Azora |
| Investment | 1,100,000,000 EUR | Announced · Phase · Phase 1 | 2025-03-13 | Also the figure recorded in the initial declaration of general interest. | Azora; El Español |
| Investment | up to 1,950,000,000 EUR | Announced · Campus | 2025-03-13 | Azora's investment at 300 MW, headlined as up to EUR 2 billion. Azora said end users would add about EUR 5 billion of computing equipment. | Azora |
| Investment | 2,359,900,000 EUR | Reported · Campus | 2026-10-05 | El Español reports that the investment rose from EUR 1,100 million in the initial declaration of general interest to EUR 2,359.9 million; it does not say whether this covers a phase or the whole campus. | El Español |
| Buildings | 4 count | Planned · Campus | 2026-07-07 | The plan documents include basic building projects for four data center buildings. | Gobierno de Aragón |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Azora | Developer | Develops the campus through its subsidiary Tillion Data Centres. | Azora; El Español |
| Tillion Aragón, S.L. | Developer | Promoter of the regional plan; formerly named Maquina Solar, S.L. | Gobierno de Aragón |
| Red Eléctrica | Utility | Transmission operator that approved the initial 150 MW grid connection; the plan includes a 400 kV connection to its Peñaflor substation. | Azora; Gobierno de Aragón |
| Government of Aragon | Government | Declared the project of general interest and is processing its Plan de Interés General de Aragón. | Gobierno de Aragón; El Español |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-03-13 | Announced | Actual | Azora | |
| 2025-03-13 | Other | Actual | The Government of Aragon declared the project of general interest (DIGA); published in the regional gazette on 3 April 2025. | Gobierno de Aragón; Azora |
| 2026-02-21 | Other | Actual | Tillion Aragón filed the Plan de Interés General de Aragón for initial approval. | Gobierno de Aragón |
| 2026-07 | Other | Actual | El Español reported the regional plan approved in July; the regional page lists an initial-approval order dated 24 June and no final approval. Public information on the plan and its environmental documents followed. | El Español; Gobierno de Aragón |
| 2027 | Construction started | Planned | Azora targeted a 2026 start; in 2026 El Español expected urbanisation works between late 2026 and 2027. | El Español; El Español; Azora |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Planned 400 kV connection to Red Eléctrica's Peñaflor substation with 66 kV lines and on-site substations. | Gobierno de Aragón; Azora |
| Other | Azora says the campus will run fully on renewable energy through self-consumption or long-term power purchase agreements; El Español reported a plot added to the plan for power supply. | Azora; El Español |
The regional plan page shows a last-updated date of 7 July 2026, used as its published date. The date of the initial-approval order is ambiguous on that page (shown as 24 June with a 2025 order code, before the February 2026 filing), so the approval milestone follows El Español's July report. Microsoft separately plans a campus in the same municipality (microsoft-aragon-villamayor-de-gallego); this is a different project.
Sources for these details
- Azora to invest €2 billion in Zaragoza data centre — Azora; 2025-03-13 · Archived source
- Plan de Interés General de Aragón Tillion Aragón — Gobierno de Aragón; 2026-07-07
- Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras — El Español; 2026-10-05
- Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos — El Español; 2026-03-22 · Archived source
- Villamayor de Gállego — Wikipedia; publication date not stated · Archived source
- Companies
- Developer: Azora (unknown scope) evidence
- Developer: Azora (unknown scope) evidence
- Developer: Tillion Aragón, S.L. (unknown scope) evidence
- Utility: Red Eléctrica (unknown scope) evidence
- Utility: Red Eléctrica (unknown scope) evidence
- Government: Government of Aragon (unknown scope) evidence
- Government: Government of Aragon (unknown scope) evidence
Source and location review
- Status source
- Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras evidence row
El Español · published 2026-10-05 · News - Locator
- Locality reference only · Compiled location reference · locality evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 22 days before the data update on 2026-10-27
Location details
- Coordinates
- 41.68556, -0.77389
- Geometry licence
- source-terms-not-recorded
- Use scope
- Locality reference only
- Scope class
- locality
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Town centroid from the Villamayor de Gállego Wikipedia article. Azora places the site near Villamayor de Gállego, less than 3 km from the transmission substation, but no cited source gives coordinates.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 7db7facd
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Aragón se convierte en la capital de los datos y la nube: el calendario de Amazon, Microsoft y todos los proyectos Archived copy | El Español News | Imported: Record, Milestone: Construction Started, Power Source: Other | source-terms-not-recorded | El Español | 697d39245a10441534aaeed03c2e0029bb24b0ca1495fa1725e1295a260e1b21Factual source record; not the publisher page | ||
| Azora to invest €2 billion in Zaragoza data centre Archived copy | Azora Company disclosure | Imported: Geometry, Imported: Record, Metric: Investment, Metric: Power Capacity, Milestone: Announced, Milestone: Construction Started, Milestone: Other, Power Source: Grid, Power Source: Other, Role: Developer, Role: Utility | source-terms-not-recorded | Azora | cc8a90ff1c1c564afdce5c744281f42caff367b07a57f5e2bf69e3ea81bc9fc1Factual source record; not the publisher page | ||
| Cerca de 6.000 millones invertidos en centros de datos en Aragón esperan en la rampa de salida para las obras Archived copy | El Español News | Imported: Record, Imported: Status, Metric: Investment, Milestone: Construction Started, Milestone: Other, Role: Developer, Role: Government | source-terms-not-recorded | El Español | 2de00c1ea5531e9199d811695e6ab8022330e70d91351006d00418ded20b65e9Factual source record; not the publisher page | ||
| Plan de Interés General de Aragón Tillion Aragón Archived copy | Gobierno de Aragón Government record | Imported: Geometry, Imported: Record, Imported: Status, Metric: Buildings, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government, Role: Utility | source-terms-not-recorded | Gobierno de Aragón | 21e8c71062a037c99b918f82edfe7e7d9a8b2485fa7e937fee30c18c1e126b0aFactual source record; not the publisher page | ||
| Villamayor de Gállego Archived copy | Wikipedia Other | Imported: Geometry, Imported: Record | not stated | source-terms-not-recorded | Wikipedia | 04249de9081de044003cddc04b518393a0d4a0cd574ee49817f64a7e7e214144Factual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Tillion Aragón data center campus (Azora), Villamayor de Gállego [site vcc-site-6bd6515ae5d1dc80cf5a]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bd6515ae5d1dc80cf5a/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction