Rio AI City (Elea Data Centers)
Partially operational
Brazil · 1 project · Last reported
Summary
Elea Data Centers is developing Rio AI City, a data centre hub in the Olympic Park area of Rio de Janeiro with institutional support from the city government. Announced in May 2025 with an initial 1.5 GW of energy capacity and potential growth to 3.2 GW, it was later targeted to reach 1.5 GW by 2027 and 3.2 GW by 2032. Elea counts its operating RJO1 facility in the first phase; RJO2 (about 80 MW) was under construction for initial delivery in 2026, and RJO3 and RJO4 would add 120 MW. Elea signed memoranda with the city and Oracle in August 2025 and with the city, energy companies and Tapestry in November 2025. I Squared Capital had completed its acquisition of Elea by June 2026.
Source record as of 2026-10-09 · Details and sources
Location
The interactive map needs JavaScript. Display anchor: -22.97700, -43.39400 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Approximate site reference; the exact facility position is unverified.
Projects (1)
Rio AI City (Elea Data Centers)
Partially operational last observed as of · Reported status
Location: Rio de Janeiro (Olympic Park area), Rio de Janeiro, BR. Sources place the project in Rio de Janeiro's Olympic Park area without a parcel; coordinates are the Barra Olympic Park reference point (Wikipedia). Whether the existing RJO1 building sits inside the park was not stated. Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire; Elea Data Centers
Use: Ai unspecified, Cloud
Capacity, investment and other figures
| Measure | Value | Scope | As of | Notes | Sources |
|---|---|---|---|---|---|
| Power capacity | 1,500 MW | Planned · Phase · Unspecified · Phase 1 | 2025-11-06 | Described as energy capacity; the August 2025 release targets it for 2027. | Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire; Elea Data Centers |
| Power capacity | up to 3,200 MW | Planned · Campus · Unspecified | 2025-11-06 | Potential capacity by 2032 per the August and November 2025 releases; a June 2026 release refers to the project as 3 GW. | Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire; Elea Data Centers |
| Power capacity | about 80 MW | Under construction · Phase · Unspecified · RJO2 | 2025-05-08 | Elea Data Centers via PR Newswire | |
| Power capacity | 120 MW | Planned · Phase · Unspecified · RJO3 and RJO4 | 2025-05-08 | Elea Data Centers via PR Newswire |
Companies and organizations
| Name | Role | Notes | Sources |
|---|---|---|---|
| Elea Data Centers | Developer | Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire; Elea Data Centers | |
| Elea Data Centers | Owner | Elea Data Centers via PR Newswire | |
| I Squared Capital | Owner | Completed its acquisition of Elea, per Elea's June 2026 release; terms not disclosed. | Elea Data Centers via PR Newswire |
| City of Rio de Janeiro | Government | Provides institutional support through its economic development secretariat, CCPar and Invest.Rio; party to the 2025 memoranda. | Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire; Elea Data Centers via PR Newswire |
Timeline
| Date | Event | Actual or planned | Notes | Sources |
|---|---|---|---|---|
| 2025-05-08 | Announced | Actual | Elea Data Centers via PR Newswire | |
| 2025-08-14 | Other | Actual | Memorandum of understanding signed by Elea, the City of Rio de Janeiro and Oracle to advance the project; Oracle's role was not specified. | Elea Data Centers via PR Newswire |
| 2025-11-06 | Other | Actual | Memorandum with the city, CCPar, Axia Energia, Light and Tapestry; the release presents Axia and Light as assurance of the city's ability to supply renewable energy to the project. Date is the release date. | Elea Data Centers via PR Newswire |
| 2026 | Other | Planned | Initial delivery of the RJO2 building. | Elea Data Centers via PR Newswire; Elea Data Centers |
| 2027 | Other | Planned | Target for the initial 1.5 GW. | Elea Data Centers via PR Newswire |
Power supply
| Type | Description | Sources |
|---|---|---|
| Grid | Grid-connected; Elea says supply will be 100% renewable, certified energy. | Elea Data Centers via PR Newswire; Elea Data Centers |
Elea's investment figures are inconsistent: the May 2025 release refers both to several billion dollars and to hundreds of billions of dollars of direct and indirect investment over a decade, so no investment metric is recorded. The status also rests on Elea's undated Rio AI City page, which lists RJO1 as operating and RJO2 as under construction, so status_as_of is the date it was read (2026-10-09). Axia Energia and Light signed the November 2025 memorandum, but no source states a supply or utility role for them, so they are not listed as parties.
Sources for these details
- Elea announces Rio AI City, a landmark Brazilian data center project with capacity up to 3.2 GW of renewable energy supporting AI growth — Elea Data Centers via PR Newswire; 2025-05-08 · Archived source
- Elea signs MoU with Oracle and Rio de Janeiro City Hall to advance data center project — Elea Data Centers via PR Newswire; 2025-08-18 · Archived source
- Elea signs MoU with Tapestry to enhance assurance of Rio AI City's 1.5 GW energy capacity — Elea Data Centers via PR Newswire; 2025-11-06
- Rio AI City — Elea Data Centers; publication date not stated · Archived source
- Elea Data Centers appoints new board of directors to accelerate AI-ready infrastructure expansion in Brazil — Elea Data Centers via PR Newswire; 2026-06-03
- Companies
- Developer: Elea Data Centers (unknown scope) evidence
- Developer: Elea Data Centers (unknown scope) evidence
- Developer: Elea Data Centers (unknown scope) evidence
- Owner: Elea Data Centers (unknown scope) evidence
- Owner: I Squared Capital (unknown scope) evidence
- Government: City of Rio de Janeiro (unknown scope) evidence
- Government: City of Rio de Janeiro (unknown scope) evidence
- Government: City of Rio de Janeiro (unknown scope) evidence
Source and location review
- Status source
- Elea announces Rio AI City, a landmark Brazilian data center project with capacity up to 3.2 GW of renewable energy supporting AI growth evidence row
Elea Data Centers via PR Newswire · published 2025-05-08 · Company disclosure - Locator
- Approximate site reference · Compiled location reference · approximate_site evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 18 days before the data update on 2026-10-27
Location details
- Coordinates
- -22.97700, -43.39400
- Geometry licence
- source-terms-not-recorded
- Use scope
- Approximate site reference
- Scope class
- approximate_site
- Authority
- Compiled location reference
- Source entity
- Project
- Method
- imported_reference_point
- Derivation
- imported_reference_point
- Precision scope
- Sources place the project in Rio de Janeiro's Olympic Park area without a parcel; coordinates are the Barra Olympic Park reference point (Wikipedia). Whether the existing RJO1 building sits inside the park was not stated.
- Horizontal uncertainty
Not reported
The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.
- Geometry evidence
- 83146c8f
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Elea announces Rio AI City, a landmark Brazilian data center project with capacity up to 3.2 GW of renewable energy supporting AI growth Archived copy | Elea Data Centers via PR Newswire Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Announced, Milestone: Other, Power Source: Grid, Role: Developer, Role: Government | source-terms-not-recorded | Elea Data Centers via PR Newswire | 8552a48f2fcdf2fedcd46793439369d71b396dbd07809ebc09db1f77e931f457Factual source record; not the publisher page | ||
| Elea Data Centers appoints new board of directors to accelerate AI-ready infrastructure expansion in Brazil Archived copy | Elea Data Centers via PR Newswire Company disclosure | Imported: Record, Owner claim | source-terms-not-recorded | Elea Data Centers via PR Newswire | a78a6b72925f4f17c9d9451b8fd5f3ef8b1033476f214d4149ed4063c758d2b0Factual source record; not the publisher page | ||
| Elea signs MoU with Oracle and Rio de Janeiro City Hall to advance data center project Archived copy | Elea Data Centers via PR Newswire Company disclosure | Imported: Geometry, Imported: Record, Metric: Power Capacity, Milestone: Other, Role: Developer, Role: Government, Owner claim | source-terms-not-recorded | Elea Data Centers via PR Newswire | 454b556cb76abe9fd4eafad8ff850ba99e7dd8c98934add6fd04d0254f4a6f48Factual source record; not the publisher page | ||
| Elea signs MoU with Tapestry to enhance assurance of Rio AI City's 1.5 GW energy capacity Archived copy | Elea Data Centers via PR Newswire Company disclosure | Imported: Record, Metric: Power Capacity, Milestone: Other, Role: Government | source-terms-not-recorded | Elea Data Centers via PR Newswire | 245ec3f7f552e3f15fd1e9b7cc6b1829b3be0851b6ec8e8b5aadd3401b5173dbFactual source record; not the publisher page | ||
| Rio AI City Archived copy | Elea Data Centers Company disclosure | Imported: Geometry, Imported: Record, Imported: Status, Metric: Power Capacity, Milestone: Other, Power Source: Grid, Role: Developer | not stated | source-terms-not-recorded | Elea Data Centers | 7fa3fc478f36ef43bb25708571214ea32665ed10540fd07b06946c6b2e56e8afFactual source record; not the publisher page |
Cite this site
Kyars, K. (2026). Rio AI City (Elea Data Centers) [site vcc-site-72339650a9d5c93e8286]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-72339650a9d5c93e8286/