China Mobile (Ningxia Zhongwei) Data Center Xuanhe Campus
Permitted
China · 1 project · Last reported
Summary
On 20 September 2026 the Zhongwei Natural Resources Bureau issued the construction-project planning permit (electronic supervision no. 6405022026GG0070678) to China Mobile's Ningxia branch for the Xuanhe campus D07-D10 machine-room buildings with the F05 fire-water pool and P07-P10 diesel platforms (175,737.58 m2 GFA), published on 21 September. No construction start, completion or operation of these buildings is established; earlier permits for D01-D06 remain separate scope. evidence
Zhongwei Natural Resources Bureau · published 2026-09-21
Location
The interactive map needs JavaScript. Display anchor: 37.37033, 105.50433 (Point locator, WGS 84).
View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser
Campus reference; individual project footprints are not mapped.
Projects (1)
China Mobile (Ningxia Zhongwei) Data Center Xuanhe Campus — D07–D10 Machine-Room Buildings
Permitted last observed as of · Development consent
Pre-approval publicity (10-18 September 2026) of the Ningxia branch application to replace the planned six three-storey machine-room buildings D07-D12 with five four-storey buildings D07-D11 (43,772 m2 each, 33 m), adjust diesel platforms and support buildings and relocate the G03 110 kV substation; total campus GFA after adjustment 411,950.69 m2. evidence
Zhongwei Natural Resources Bureau · published 2026-09-10
Board text as summarised for the notice; applicant China Mobile Communications Group Co., Ltd. Ningxia Branch; publicity 10-18 September 2026. Low-resolution plans carry no legible coordinates. evidence
Zhongwei Natural Resources Bureau · published 2026-09-10
Permit 6405022026GG0043618 issued 14 July 2026 for D05/D06 machine-room buildings, P05/P06 process pump rooms and diesel platforms and M02 gatehouse (55,618.42 m2) on the same real-estate unit 640502105212GB00031W00000000. Earlier context; its issue date precedes the admission window and is not the selected observation. evidence
Zhongwei Natural Resources Bureau · published 2026-07-21
Imagery extract used only to compare the EIA's own satellite figure with the WGS84 reading of the printed coordinate: the ploughed field to the west, the scrub to the east, the NW-SE track just south of the point and the NE-SW road and fields to the south-east all match. Qualitative check; not an accuracy measure. evidence
Esri · publication date not stated
- Companies
- Owner: China Mobile Communications Group Co., Ltd. Ningxia Branch (current) evidence
Source and location review
- Status source
- Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, China Mobile (Ningxia Zhongwei) Data Center Xuanhe campus (D07-D10 machine-room buildings; F05 fire-water pool and pump room; P07-P10 diesel platforms) evidence row
Zhongwei Natural Resources Bureau · published 2026-09-21 · Government record - Locator
- Campus locator · Official source · official_eia_on_campus_substation_locator evidence
- Source checks
Not reviewed against imagery not_
reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verificationStatus age at review: 37 days before the data update on 2026-10-27
Location details
- Coordinates
- 37.37033, 105.50433
- Geometry licence
- all-rights-reserved
- Use scope
- Campus locator
- Scope class
- official_eia_on_campus_substation_locator
- Authority
- Official source
- Source entity
- Campus
- Method
- official_eia_geographic_dms_point_transcription
- Derivation
- direct_geometry
- Precision scope
- EIA centre point of the D-zone 110 kV substation, which the report places inside the China Mobile (Ningxia Zhongwei) Data Center Xuanhe campus. Locates the campus through on-campus support infrastructure; not the D07-D10 footprints, a parcel centroid, entrance or construction extent.
- Horizontal uncertainty
Not reported
No datum or positional accuracy is stated; the WGS84 reading is supported only by the qualitative match between the report figure and imagery. Offset from the substation to D07-D10 is unknown, and the 10 September plan adjustment relocates the campus G03 110 kV substation within the campus, so the April EIA point may not mark its final position; it is used only as a point inside the campus project. Decimal places are transcription precision, not accuracy.
- Geometry evidence
- 6feb43ae
A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.
Evidence
Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.
| Title | Publisher | Roles | Published | Retrieved | Licence | Attribution | Content hash (SHA-256) |
|---|---|---|---|---|---|---|---|
| Environmental impact report form: China Mobile (Ningxia Zhongwei) Data Center D-zone 110 kV substation (Zhongwei EEB acceptance notice, 23 April 2026) Archived copy | Zhongwei Ecology and Environment Bureau Government record | Geometry | all-rights-reserved | Zhongwei Ecology and Environment Bureau | efef0f26613da541eca58211837aa2ece8e7d70a38345e8545aa1b5cb9d678e0Retained source material; see source provenance | ||
| Esri World Imagery export around the China Mobile Xuanhe D-zone substation EIA point (EPSG:4326, 105.5003-105.5083E, 37.3680-37.3727N) Archived copy | Esri Other | Site and project identity | not stated | Esri World Imagery terms of use; not redistributed | Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery) | aac5d6ac08d753789b18acb4ffb717bb7b47c29f85b0f72f3c4507cf1a35b3e1Retained source material; see source provenance | |
| Plan board: China Mobile (Ningxia Zhongwei) Data Center Xuanhe campus local optimisation (original and adjusted general plans) Archived copy | Zhongwei Natural Resources Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Natural Resources Bureau | fecf79d5e252d411d0a9cc051f65c7cd66a5d62dd5d8fce97247a32966c5c25dRetained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, China Mobile (Ningxia Zhongwei) Data Center Xuanhe campus (D07-D10 machine-room buildings; F05 fire-water pool and pump room; P07-P10 diesel platforms) Archived copy | Zhongwei Natural Resources Bureau Government record | Development consent, Owner claim | all-rights-reserved | Zhongwei Natural Resources Bureau | 40ac15815a9f9365b284a57e0b46b163e00f5a1a45c4bebede43845986300ae5Retained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau post-issuance notice: construction-project planning permit, China Mobile Xuanhe campus D05 and D06 machine-room buildings Archived copy | Zhongwei Natural Resources Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Natural Resources Bureau | 8add98472696620380e29dd015dad84f893e73cb7cb2c2a5917d75fb38037a7aRetained source material; see source provenance | ||
| Zhongwei Natural Resources Bureau pre-approval notice: local optimisation of China Mobile (Ningxia Zhongwei) Data Center Xuanhe campus site plan Archived copy | Zhongwei Natural Resources Bureau Government record | Site and project identity | all-rights-reserved | Zhongwei Natural Resources Bureau | 6e0e5976c9e70aaa1f22570772e754268a3cf38352bd827c82f6810eca2ef955Retained source material; see source provenance |
Cite this site
Kyars, K. (2026). China Mobile (Ningxia Zhongwei) Data Center Xuanhe Campus [site vcc-site-767b690a800dad05ddac]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-767b690a800dad05ddac/
Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction