STT Fairview data center campus

Under construction

Philippines · 1 project · Last reported

Summary

STT GDC Philippines, a joint venture of Globe Telecom, Ayala Corporation and ST Telemedia Global Data Centres, is building a four-building carrier-neutral campus on Regalado Avenue in Fairview, Quezon City. Announced in May 2023, it is planned at 124 MW of IT load and over 83,000 square metres of floor space. The first building, STT Fairview 1, was designed for 28 MW of IT load and targeted for service in 2025, but in April 2026 the Philippine Star reported the campus would partly open during 2026 with an initial 12 MW and put the project's cost at USD 1 billion. A 10-year MPower renewable supply deal signed in April 2026 covers Fairview and the Cavite data center.

Source record as of 2026-04-20 · Details and sources

Location

The interactive map needs JavaScript. Display anchor: 14.65000, 121.04750 (Point locator, WGS 84).

View location: OpenStreetMap · Google Maps · Bing aerial · Copernicus Browser

County or district reference only; the facility position is not established.

Projects (1)

STT Fairview data center campus

Under construction last observed as of · Reported status

Location: Fairview (Regalado Avenue), Quezon City, Metro Manila, PH. STT's factsheet gives the address as Regalado Avenue, Fairview, Quezon City. The point is the Quezon City coordinate from its Wikipedia article, so it marks the city centre, several kilometres south of the Fairview area; precision is therefore given at city level. W.Media; ST Telemedia Global Data Centres; Wikipedia

Use: Colocation

Capacity, investment and other figures

MeasureValueScopeAs ofNotesSources
Power capacity124 MWPlanned · Campus · It load2024-10IT load at full build-out across four buildings. The power section of STT's 2024 factsheet gives a campus total of 128 MW instead, without explanation. STT's October 2025 release and the April 2026 Philippine Star report also give 124 MW, without saying whether it is IT load.W.Media; W.Media; ST Telemedia Global Data Centres
Power capacity28 MWPlanned · Phase · It load · STT Fairview 1 (first building)2024-10ST Telemedia Global Data Centres
Power capacity12 MWPlanned · Phase · Unspecified · Initial opening capacity (2026)2026-04-20Initial capacity the Philippine Star said would open during 2026.The Philippine Star
Investment1,000,000,000 USDReported · Campus2026-04-20Single news source: the Philippine Star states the project costs USD 1 billion without attributing the figure, and does not say whether it covers only Fairview. No company source opened for this record gives it.The Philippine Star
Floor areamore than 83,000 sq_mPlanned · Campus2024-10Gross floor area across four buildings.W.Media; ST Telemedia Global Data Centres
Floor area24,918 sq_mPlanned · Phase · STT Fairview 1 (first building)2024-10Gross floor area; the factsheet gives 8,619 square metres of net lettable area.ST Telemedia Global Data Centres
Buildings4 countPlanned · Campus2024-10W.Media; ST Telemedia Global Data Centres

Companies and organizations

NameRoleNotesSources
STT GDC Philippines (Globe STT GDC Inc.)DeveloperJoint venture of Globe Telecom, Ayala Corporation and ST Telemedia Global Data Centres.W.Media; ST Telemedia Global Data Centres; The Philippine Star
STT GDC Philippines (Globe STT GDC Inc.)OperatorSTT GDC Philippines presents STT Fairview 1 as its flagship data centre.ST Telemedia Global Data Centres (Philippines)
Globe TelecomInvestorJoint venture partner in STT GDC Philippines.W.Media; The Philippine Star
Ayala CorporationInvestorJoint venture partner in STT GDC Philippines.W.Media; The Philippine Star
ST Telemedia Global Data CentresInvestorSingapore-based joint venture partner in STT GDC Philippines.W.Media; The Philippine Star
Leighton AsiaBuilderAwarded the contract for the first phase of STT Fairview 1 in November 2023, together with First Balfour.W.Media
First BalfourBuilderW.Media
MPower (Meralco)Power supplierMeralco's retail electricity arm; 10-year deal for up to 40.5 MW of clean energy covering the Fairview and Cavite data centers.The Philippine Star

Timeline

DateEventActual or plannedNotesSources
2023-05-19AnnouncedActualW.Media
2023-11OtherActualLeighton Asia and First Balfour awarded the contract for the first phase of STT Fairview 1.W.Media
2026First operationalPlannedEarlier targets slipped: the 2024 factsheet gave ready-for-service in Q2 2025 and STT said in October 2025 that Fairview 1 was on track for full operations in Q4 2025; in April 2026 the Philippine Star said the campus would partly open during 2026 with 12 MW.ST Telemedia Global Data Centres; ST Telemedia Global Data Centres (Philippines); The Philippine Star

Power supply

TypeDescriptionSources
GridSTT Fairview 1 is designed with two diverse 115 kV utility feeds and up to 48 hours of on-site fuel storage for backup.ST Telemedia Global Data Centres
OtherRenewable electricity bought under a 10-year retail supply deal with MPower for up to 40.5 MW across the Fairview and Cavite data centers; STT described Fairview 1 as powered by 100% renewable energy. The generation types were not disclosed.ST Telemedia Global Data Centres (Philippines); The Philippine Star

Whether STT Fairview 1 was operating by October 2026 is unconfirmed: STT said in October 2025 that it was on track for full operations in Q4 2025, but the April 2026 Philippine Star report described the campus as only partly opening during 2026. The USD 1 billion cost comes from that single news report. A third-party report that Fairview 1 opened in 2025 could not be opened and is not used. The factsheet file sits in a 2024-11 folder and is labelled October 2024. Quezon City coordinates come from Wikipedia (s6), used only for the map point.

Sources for these details
Companies
  • Developer: STT GDC Philippines (Globe STT GDC Inc.) (unknown scope) evidence
  • Developer: STT GDC Philippines (Globe STT GDC Inc.) (unknown scope) evidence
  • Developer: STT GDC Philippines (Globe STT GDC Inc.) (unknown scope) evidence
  • Operator: STT GDC Philippines (Globe STT GDC Inc.) (unknown scope) evidence
  • Investor: Globe Telecom (unknown scope) evidence
  • Investor: Globe Telecom (unknown scope) evidence
  • Investor: Ayala Corporation (unknown scope) evidence
  • Investor: Ayala Corporation (unknown scope) evidence
  • Investor: ST Telemedia Global Data Centres (unknown scope) evidence
  • Investor: ST Telemedia Global Data Centres (unknown scope) evidence
  • Builder: Leighton Asia (unknown scope) evidence
  • Builder: First Balfour (unknown scope) evidence
  • Power Supplier: MPower (Meralco) (unknown scope) evidence
Source and location review
Status source
Ayala-led data center builder inks supply deal with Meralco evidence row
The Philippine Star · published 2026-04-20 · News
Locator
County or district reference only · Compiled location reference · admin2 evidence
Source checks

Not reviewed against imagery not_reviewed
No imagery review is recorded for this project. Its status rests only on the dated authoritative source. · no independent imagery verification

Status age at review: 190 days before the data update on 2026-10-27

Location details
Coordinates
14.65000, 121.04750
Geometry licence
source-terms-not-recorded
Use scope
County or district reference only
Scope class
admin2
Authority
Compiled location reference
Source entity
Project
Method
imported_reference_point
Derivation
imported_reference_point
Precision scope
STT's factsheet gives the address as Regalado Avenue, Fairview, Quezon City. The point is the Quezon City coordinate from its Wikipedia article, so it marks the city centre, several kilometres south of the Fairview area; precision is therefore given at city level.
Horizontal uncertainty
Not reported

The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.

Geometry evidence
9adc2e4b

A locator places the site on the map. It is not a building footprint, a construction extent or a surveyed boundary unless the use scope is an official boundary, and even then it is a parcel or permit boundary.

Evidence

Sources are linked, not redistributed; each keeps its own terms. An archived copy is a lookup for the Wayback Machine capture nearest the retrieval date and may be unavailable or differ from what was reviewed. Each hash states what it covers; imported factual records are not publisher-page captures.

Evidence for STT Fairview data center campus
TitlePublisherRolesPublishedRetrievedLicenceAttributionContent hash (SHA-256)
Ayala-led data center builder inks supply deal with Meralco
Archived copy
The Philippine Star
News
Imported: Record, Imported: Status, Metric: Investment, Metric: Power Capacity, Milestone: First Operational, Power Source: Other, Role: Developer, Role: Investor, Role: Power Suppliersource-terms-not-recordedThe Philippine Stard291c66b7a78a390b3b178b2ee4a96f925fa6458a1890cd60a81ea022353527f
Factual source record; not the publisher page
Quezon City
Archived copy
Wikipedia
Other
Imported: Geometry, Imported: Recordnot statedsource-terms-not-recordedWikipedia88a30072af0b334591d410c3d2a029f2d044933d07d129502058b1b9d306e84c
Factual source record; not the publisher page
STT Fairview 1 factsheet (version October 2024)
Archived copy
ST Telemedia Global Data Centres
Company disclosure
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Power Capacity, Milestone: First Operational, Power Source: Grid, Role: Developersource-terms-not-recordedST Telemedia Global Data Centresdabc2edd711b2ef5a6858bc0692255eafe6a9ef9b1fc7407a708fb906616dd7d
Factual source record; not the publisher page
STT GDC Announces Plans to Build Sustainable Carrier-Neutral Data Center in the Philippines
Archived copy
W.Media
Trade publication
Imported: Geometry, Imported: Record, Metric: Buildings, Metric: Floor Area, Metric: Power Capacity, Milestone: Announced, Role: Developer, Role: Investorsource-terms-not-recordedW.Mediaa3ba18811cde1e7f23b22747bea1c5baee34b0ce026f87edafbd8d916b3a5201
Factual source record; not the publisher page
STT GDC Philippines Advances the Country's Digital Readiness, Welcomes Globe, Radius and Source Telecoms as Connectivity Partners
Archived copy
ST Telemedia Global Data Centres (Philippines)
Company disclosure
Imported: Record, Milestone: First Operational, Power Source: Other, Operator claimsource-terms-not-recordedST Telemedia Global Data Centres (Philippines)c627fc9b821464310cd8a2ea749a892d8a6032469072d05d6dceccad64aeedb4
Factual source record; not the publisher page
STT GDC Selects Leighton Asia and First Balfour for Hyperscale DC Development in the Philippines
Archived copy
W.Media
Trade publication
Imported: Record, Metric: Power Capacity, Milestone: Other, Role: Buildersource-terms-not-recordedW.Media5c59792c15fc5334cdad5b77f69dab6c818affaae87107c5c4a7a0defef63069
Factual source record; not the publisher page
Cite this site

Kyars, K. (2026). STT Fairview data center campus [site vcc-site-78bd59a55f0376662286]. In Data Center Atlas (2026-10-27) [Data set]. https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78bd59a55f0376662286/

Show on the map explorer JSON for this site GeoJSON for this site Download dataset Report a correction